addendum-1 pts-13en1179.pdf
TRANSCRIPT
SCOPE OF WORK & TECHNICAL SPECIFICATIONS
FOR
6 e P B
4 C,
z s t a V
2
g m m -
NATIONAL GRID-SA P ~ & N JU ~ A I
R E V l S I O N S
DEPT.: EBDD
H\ &' PREP. BY: MSiKNFMBR ,
DATE: 2.9 101 12015
APPROVEQ
Fv BY: , ASIMA
DATE: 28 101 12015
CERTIFIED
BY: AHM hq DATE: 28 101 12015
THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
DRAWING CONTROLSHEET
ET-91370s
JOB ORDER NO.
4B 115113.8KV SUBSTATION IN SECOND DAMMAM INDUSTRIAL ESTATE lSUBSTATlON PORTION)
ADDENDUM-I TO S O W ~ ~ S FOR 4 8 1 1 5 / 1 3 . 8 ~ ~ SUBSTATION IN SECOND DAMMAM INDUSTRIAL ESTATE
DAMMAM SAUDI ARABIA
PLANT NO. ,
T664
INDEX
A
DOCUMENT NO.
ADDENDUM-I to PTS-13EN1179
PAGE NO.
1 OF 3
REV.
0
; U
P k
E U
z 0 t B
2
NATIONAL GRID-SA ck&\ &I *$I is91
TABLE OF CONTENTS
SECTION-1 PAGE
1.01 GENERAL 3 1.02 SCOPE OF WORK 3
APPENDIX
APPENDIX-1 DRAWING CONTROL SHEET & DRAWINGS
THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
DRAWING CONTROL SHEET
ET-913705
JOB ORDER NO.
REV.
0
ADDENDUM-I TO SOWITS FOR 4B 1 1 5 / 1 3 . 8 ~ ~ SUBSTATION IN SECOND DAMMAM INDUSTRIAL ESTATE
DAMMAM SAUDI ARABIA
PLANTNO. .
T664
INDEX
A
DOCUMENTNO.
ADDENDUM-1 to PTS-13EN1179
PAGENO.
2 OF 3
NATIONAL GRID-SA +MI &I &ib~ll h91
SECTION-1
1.01 GENERAL
A. This Addendum-I to PTS-13EN1179 shall be read in conjunction with the Original PTS-13EN1179 and shall be considered as an integral part of it. This addendum is issued due to the followings:
1. Change from cable entry to basement 2. Jib Crane is not applicable.
B. The General requirements, Design criteria, Detailed Technical Specifications and Testing and Commissioning requirements for the equipmentlWORK covered under this Addendum shall be considered as identical to those applicable to original scope
I- B
1 &
<
2 u
z 8 t a ,a
a
g o - - REVISIONS
DEPT.: E&DD
f PREP. BY:%' NFM
DATE: 28/01 I Z O I S
APPROVED
Bc--& BY. AASI MA
DATE: M I 01 I Z O I S
CERTIFIED
P? BY: AHM
DATE: 28 101 1 2015
THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
DRAWING CONTROLSHEET
ET-913705
JOB ORDER NO.
of work (PTS-13EN1179). Unless otherwise specifically indicated, all the requirements applicable to the original scope of work shall also be applicable to this Addendum.
1.02 SCOPE OF WORK
1. The word "cable entry room" shall be replaced by "cable basement" wherever it is mentioned.
2. The item no. 37 in clause no. 4.09.A is not valid.
3. In item in clause 4.09.D.3, replace section "3.15" with "3.16".
4. The item B.9 of clause 4.10 is not valid.
5. The item in table-4.01, under index Q "Jib Crane Structural Support Plan, Section and Details" is not valid.
6. The item in table-4.01, under index M "Plan, Sections and Details of Jib Crane Steel Structure" is not valid.
7. The item 6.13 is not valid.
8. Appendix-I, Drawing Control Sheet no. ET-913705 (sheet 1 of 1, Rev. 0) of Original PTS-13EN1179 shall be replaced by ET-913705 (sheet 1 of 1, Rev. 1). Accordingly, replace Rev.0 of drawings ET-913706, ET-913708, ET-913709 (Sheet 2 of 3) and ET- 913712 Sh.1 to 414 by their new Rev.01 given in Appendix-I.
*** End of SECTION-1 & ADDENDUM-1 ***
AQQENQUM-~ TO SOWITS FOR 4~ 1 1 5 / 1 3 . 8 ~ ~ SUBSTATION IN SECOND DAMMAM INDUSTRIAL ESTATE
DAMMAM SAUDI ARABIA
PLANT NO.
T664
INDEX
A
PAGE NO.
3 OF 3
DOCUMENT NO.
ADDENDUM-1 to PTS-13EN1179
REV.
0
APPENDIX-1
DRAWING CONTROL SHEET
APPENDIX-1
DRAWING CONTROL SHEETS parre 1 of 1
1. CONCEPTUAL DESIGN DRAWINGS
The following conceptual design drawings are included as attachment to the ADDENDUM-1 to Scope of Work and Technical Specifications:
Drawing no. 1 Sheet no. 1 Drawing Title A. 4 6 11 511 3.8kV SUBSTATION
ET-913705 I I I Drawing Control Sheet
NOTE:
All the relevant drawings of the existing facilities affected due to this PROJECT shall also be revisedlupdated by the CONTRACTOR as a part of "As-Built" drawings submissions. The successful CONTRACTOR shall identify the relevant drawings required by him and request for copies during BaselDetail Engineering stage of the PROJECT. The COMPANY will provide assistance to the successful CONTRACTOR in obtaining the available drawingslinformation such as detailed drawings, equipment nameplate details etc. required by him from the COMPANY.
1 133x3 10 'U3NMO SlI jOlN3SN03 N3lllWn3H.l KlOHlIM lN3Wn3W SIHI WOW (13NW180 39 TlWSlMVd NI YO Tm3 NI NOU3lOOYd3Y ON'S aR(O lW4OUIN 40 MY36QUd TNXS 3M3W N13Y3H (13NMN03 NOUWOdNI 3HI (INV E)NM+.LIQ SlM
W3lSAS AY8'01 B Stl3WtlOJSNWl AYB'ELISLL - WWOVIO 3Nll3NO 3Nlt1313W B 3NlAVl3tl
(3tl~dS) S3Nll AYSLL - WVtl3Vla 3Nl13NO 3Nltl313W B 3NIAVl3tl
(uo!lelsqnS VP AYB'ELISLL 310) S3Nll AYSLL - WW3VlO3Nll3NO 3Nlt1313W B 3NlAVl3tl
(uo!lelsqnS 89 M8'ELISLl 310) S3Nll AYSLl - WW3VIa 3Nll3NO 3NIt1313W B 3NIAVl3tl
A8 li1n8 sv
LO 'ON 'AIU
WW3VlO 311VW3H3S 3Nldld lN3A 8 33VNlWO tl3M3S
WW3VIa 311VW3H3S lOtllN03 dWnd ONV 3Nldld tl31VM
1 - X30NI
I I I I
0
0
0
0
SHNWW3Y
nav31a3a~a1aa3
1 do L 'ON 133HS
0
L 40 P
L 30 E
L 40 Z L JO 1
31Wa
SOLE 16-13 'ON ONIMWa
LlLCL6-13
LlLCLG-U
LlLCl6-13
LLLEL6-U
E 40 2
E 30 L
60LEL6-13
60LEL6-13
'ON
X X3aNI
'A3U U3HlUnj
hllAllSIS3tl lVWtl3H~V3ltl13313 1IOS B ltlOd3tl N011V311S3ANI lV31NH331039
NVld N011V301310H3808
a3H3VllV S331ON3ddV HllM SNOllV314133dS lV31NH331 ONV YtlOM 30 3d03S
V - X3aNI
P991 'ON 1NWd
311U DNIMWtl
31Wa NOU3ldW03133rOUd
LOLE 16-U
90LEl6-U
6Ll lN3CLSld
1
0
'ON 9NIMWa
1 40 1
01 1 01 1
'?AT IHYHSVPIV -IIVW~Y
.ON 133HS
v~amv lanvs wwwwwa (NOUNO~ NOUVlSBllS)
UVLS~ ivltllsnaNI wvwwva NI Nouvlsans IUIO'CLIELL a*