addendum - berkeley, california · 2019-08-21 · addendum 2 august 20, 2019 page 2 of 2 mechanical...
TRANSCRIPT
ADDENDUM Addendum No. 2
August 20, 2019
PROJECT: Live Oak Community Center Seismic Upgrade + Renovation OWNER: City of Berkeley
SPECIFICATION: #19-11320-C
ARCHITECT: ELS Architecture and Urban Design
Description:The following items are additions, revisions or clarifications to the bid set drawings Plan check 1 set latest revision date July 15, 2019 with Addendum 1 revisions dated 8/12/2019. This is an “instructional” addendum and these changes are not shown on any other drawings referenced, unless specifically noted. ARCHITECTURAL DRAWINGS SheetA601–Schedules‐Doors
1. Door Schedule – Revise door 002 to HM door and frame. Pair of doors to have full height weatherproof louvers, lever hardware/lock, anodized aluminum rain drip over door, weatherstripping and aluminum offset threshold.
2. Door Schedule – Add door schedule note 9 to clarify that “9. Swinging Gates type GG at 001 and 003 are framed out of ignition resistant wood similar to fencing. Construction to be 3x6 framing with 1x6 flat boards attached, with diagonal bracing. Provide gate heavy duty hinges appropriately sized for weight and size of gate, with keyed lock/ and drop bolt. Provide swivel gate wheels under gate.”
3. Door Schedule – At door schedule note 10 to clarify that “10. Rolling gate type S is framed out of ignition resistant wood similar to fencing. Construction to be 3x6 framing with 1x6 flat boards attached, with diagonal bracing. Provide (2) aluminum fence mounted gate tracks (2) with keyed lock/ and drop bolt. Provide v groove wheels and track.”
SheetA801ExteriorDetails1. 6/A801 Equipment Screen at Roof – Modify clearance at bottom of screen to provide 8”
clearance between shingle roof and siding. (in lieu of 1’-6”) SheetA805ExteriorDetails
2. 2/A805 – Enlarge size of mechanical equipment pad and enclosure 6’ to provide clearances shown around the larger equipment shown on 2/M202 Mechanical Enlarged Plan, Addendum 1.
STRUCTURAL DRAWINGS FRPShopDrawingsprovidedbySimpsonStrongTie,dated 8-14-2019 attached, provided for reference only.
Addendum 2 August 20, 2019 Page 2 of 2
MECHANICAL DRAWINGS M003MechanicalEquipmentSchedules
1. Modify equipment serving Lobby 101 - see attached revised sheet M201MechanicalFloorPlans
1. Sheet Notes – Add sheet note 4 to read “4.AllexposedductworkatFiresideRoom104,TotRoom105andCraftsRoom106tobeSpiralStraightDuct,EmpowerAirTechnologiesorequal,galvanizedsteelconstruction,exposedmetalfinish.”
2. Sheet Notes – Add sheet note 5 to read “5.Provideanchoredsleepersatrooftoppiping”. See attached ASK – 001 Conduit/Piping Mounting at Roof for detail of anchorage.
3. Key Note 20 – Modify note to clarify structural framing requirements shown in italics to read “Provide (N) ceiling mounted ductless split indoor fan coil cassette unit with all associated appurtenances.Modifyexistingframingatexistingmezzanineandprovidenewframingtoaccommodatethesizeoftheunitwithintheexistingmezzanineornewmezzanineframing.SSDformoreinformation.”
4. Key Note 21 – changed to not used. 5. 1/M201 - Modify equipment serving Lobby 101 - see attached revised sheet
M203Mechanicalroofplan1. Modify equipment serving Lobby 101 - see attached revised sheet 2. Sheet Notes – Add sheet note 4 to read “4.Provideanchoredsleepersatrooftoppiping
M205MechanicalSections1. Modify equipment serving Lobby 101 - see attached revised sheet
M301MechanicalPipingDiagram1. Modify equipment serving Lobby 101 - see attached revised sheet
M403ControlDiagram1. Modify equipment serving Lobby 101 - see attached revised sheet
M501MechanicalDetails1. Modify equipment serving Lobby 101 - see attached revised sheet
ELECTRICAL DRAWINGS E112PowerPlanNewRoof
1. Sheet Notes – Add sheet note 7 to read “7. Provide anchored sleepers at roof top conduit”. See attached ASK – 001 Conduit/Piping Mounting at Roof dated 8/20/2019 for detail of anchorage.
E114PowerPlanNewRoof1. Sheet Notes – Add sheet note 3 to read “3.Provideanchoredsleepersatrooftopconduit”.
See attached ASK – 001 Conduit/Piping Mounting at Roof for detail of anchorage. See E112 for additional rooftop conduit scope of work.”
E502Details1. Detail added for conduit mounting.
E602Details1. Panel schedule updated to omit FCU 8.
PLUMBING DRAWINGS P201–PlumbingNewWorkPlan
1. Sheet Notes – Add sheet note 4 to read “4.AtFCU5,FCU6andFCU7providedrainsinmezzanine.”
2. PipingforFCU8eliminated.P202–PlumbingNewWorkEnlargedPlans
1. Sheet Notes – Add sheet note 10 to read “10.Provideanchoredsleepersatrooftoppiping”.See attached ASK – 001 Conduit/Piping Mounting at Roof for detail of anchorage.
P404Details1. Detail added for pipe mounting.
END OF NARRATIVE
FRP SYSTEM NOTESPART 1 GENERAL
1.01 DESCRIPTION
A. This specification section shall define the minimum requirements of the externally bonded composite strengthening
system.
1.02 REFERENCES
A. General
1. The latest reference edition available on the day of bid invite shall be used for all standards.
B. American Concrete Institute (ACI)
1. ACI 440.7R, Guide for the Design and Construction of Externally Bonded FRP Systems for Strengthening
Unreinforced Masonry Structures
2. ACI Repair Application Procedures (RAP) No. 1 through No. 7
C. American Society for Testing and Materials (ASTM)
1. ASTM D3039, Standard Test Method for Tensile Properties of Polymer Matrix Composite Materials
2. ASTM D4263, Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method
3. ASTM D4541, Standard Test Method for Pull-Off Strength for Coatings Using Portable Adhesion Testers
4. ASTM D7522, Standard Test Method for Pull-Off Strength for FRP Bonded to Concrete Substrate
5. ASTM D7565, Standard Test Method for Determining Tensile Properties of Fiber Reinforced Polymer Matrix
Composites Used for Strengthening of Civil Structures
6. ASTM E84, Standard Test Method for Surface Burning Characteristics of Building Materials
D. ICC Evaluation Service (ICC-ES)
1. AC125, Acceptance Criteria for Concrete and Reinforced and Unreinforced Masonry Strengthening using Externally
Bonded Fiber-Reinforced Polymer (FRP) Composite Systems
2. AC178, Acceptance Criteria for Inspection and Verification of Concrete and Reinforced and Unreinforced Masonry
Strengthening using Fiber-Reinforced Polymer (FRP) Composite Systems
1.03 SUBMITTALS
A. Manufacturers' Product Data
1. Current ICC Evaluation Service Report for the proposed materials.
2. Technical data sheets for materials to be used.
3. Safety data sheets (SDS) for each material component.
4. Installation instructions, including temperature restrictions, moisture limitations, surface preparation methods, curing
times, and finish requirements.
B. Calculations and Drawings
1. Design calculations and shop drawings for the composite system shall be compliant with ACI 440.7R and must be
stamped and signed by Civil or Structural Engineer registered in the state that the project site resides in.
2. Shop drawings, at a minimum, must detail the necessary surface preparation, composite system to be used, number
of layers, locations, end details, primary fiber direction, and finish requirements.
C. Applicator Qualification
1. Written documentation from the composite system manufacturer that the contractor has completed the
manufacturer's training program and has been trained to install the proposed system.
1.04 PRODUCT DELIVERY, STORAGE, AND HANDLING
A. All products shall be delivered, stored, and handled according to the manufacturer's recommendations.
B. Materials shall be clearly labeled and delivered in factory-sealed containers with manufacturing dates and shelf lives
easily identifiable.
C. Materials shall be stored in a protected area free of moisture and UV exposure, with temperatures between 45°F and
95°F.
PART 2 PRODUCTS
2.01 FRP COMPOSITE STRENGTHENING SYSTEM
A. The FRP composite strengthening system has been preapproved and shall be a Composite Strengthening
System™ supplied by Simpson Strong-Tie®, Inc., 5956 W. Las Positas
Boulevard, Pleasanton, CA 94588, Phone: 925.560.9000, Fax: 925.847.1605.
1. Fabric
a. CSS-CUGF27: Code listed, unidirectional glass fabric.
2. Epoxy Adhesive
a. CSS-ES: Epoxy saturant and primer.
3. Epoxy Paste
a. CSS-EP: Epoxy paste and filler.
b. CSS-ES thickened with fumed silica: Epoxy paste and filler.
c. FX-702: Oven-Dried Rounded Silica Filler.
4. Coating
a. FX-207: Slurry Seal.
PART 3 EXECUTION OF WORK
3.01 SURFACE PREPARATION
A. Surfaces to be wrapped shall be clean, sound, and free of standing water at time of application. All dust, laitance, grease,
curing compounds, and other foreign materials that may hinder the bond must be removed before installation.
B. Cracked substrates with cracks wider than 0.01 inch must be pressure injected with epoxy prior to FRP installation.
C. Existing concave and convex surfaces (including mortar joints) must be filled/transitioned with epoxy paste or a suitable
repair mortar. To repair voids, CSS-EP or CSS-ES thickened with fumed silica may be extended with FX-702 at no more
than a 1:1 ratio by volume.
3.02 SURFACE MOUNTED APPLICATION
A. Verify ambient and masonry surface temperatures are between 45°F and 95°F.
B. Apply two coats of epoxy primer using a nap roller, allowing the first coat to soak in for several minutes when using
fabrics.
C. Apply epoxy paste where minor surface defects are present, to fill in masonry joints and apply a thin layer where all FRP
will be installed.
D. Allow the primer and/or paste to become tacky to the touch before applying the saturated fabric.
E. When manually saturating fabric, precut sheets to required length using heavy duty shears before saturating with hand
rollers. If mechanically saturating fabric with rollers, cut sheets using heavy duty shears either before or after they go
through the epoxy bath. In both cases, ensure full fabric saturation is achieved.
F. Apply the saturated fabric to the installation surface and remove entrapped air using hand pressure, rollers, or trowels.
G. Apply additional layers as necessary to meet the project requirements, ensuring each layer is firmly adhered to the
previous layer.
H. Feather all fabric seams/edges with epoxy paste.
I. Confirm that intimate contact between composite system and substrate will be maintained throughout the curing process.
J. Apply finish coating after full epoxy cure, lightly sanding epoxy surfaces before installation.
3.03 QUALITY CONTROL
A. Field Monitoring
1. The work performed in the preceding sections of Part 3 of this specification will be field monitored by the Owner's
Special Inspection Agency and will be paid for by the owner. The surface preparation shall be checked immediately
before application of the composite system materials. Periodic inspection shall be provided during the application
process.
2. The special inspector shall create daily reports that document the following:
a. Date and time of installation.
b. Ambient temperature, relative humidity, and weather conditions.
c. Substrate surface temperature and dryness.
d. Surface preparation method.
e. Surface cleanliness description.
f. Fabric batch numbers.
g. Epoxy batch numbers, mix ratios, and mixing times.
h. Application locations.
i. Conformance with installation procedures.
j. Location and size of any delaminations/voids identified or repaired.
3. For fabric systems, the contractor shall create a minimum of two material sample sets daily. Each set will consist of
two 12 in. by 12 in. panels made of two layers of saturated fabric and the sets shall be taken at different times during
the working shift so that it is representative of maximum variances in material/site conditions. Prepare samples on a
flat, level surface covered with heavy-duty vinyl (or similar). Prime vinyl with epoxy saturant, place saturated layers,
and apply a top coat of epoxy saturant. Samples shall be cured at the site under the same environmental conditions
as the production work they represent and must be marked with sample date, time, epoxy/fabric batch numbers, and
installation locations.
B. Field Testing
1. Adhesion Tests
a. Pull-off tests shall be conducted in accordance with ASTM D7522 and/or ASTM D4541 and performed on flat
surfaces. 3 tests shall be executed on each type of substrate or surface preparation method used, with a
minimum of 3 tests per 1000 square feet of surface area covered. Testing shall be done on an area adjacent to
strengthening locations with substrate, surface preparation, and orientation (i.e. overhead, vertical, etc.) that
are representative of that being strengthened. Before pull-off tests are performed, the composite system shall
be allowed to reach full cure.
b. Adhesion tests shall exhibit failure in the masonry substrate.
C. Lab Testing
1. Tension Tests
a. General
i. Lab tension tests are only required when structural performance criteria is specified.
ii. Tension tests shall be performed to verify the tensile strength, strain, and modulus of the composite
strengthening system based on the nominal layer thickness reported on the manufacturer's data sheet and
used in the design calculations.
iii. The composite tensile properties used in the design calculations must be lower than the average of the test
results unless calculations are performed with the reported average tensile properties show that the
strengthening requirements are satisfied.
b. Fabric Systems
i. One panel from a minimum of 15% of all sample sets shall be selected for tension testing performed in
accordance with ASTM D7565 and/or ASTM D3039.
D. Defects
1. Small delaminations less than 2 square inches are acceptable so long as the delaminated area is less than 5% of
the total laminate area and there are no more than 10 such delaminations per 10 square feet.
2. Large delaminations greater than 25 square inches shall be locally cut away and a new material shall be applied
with an equivalent number of layers and sufficient development length overlaps.
3. Delaminations between 2 square inches and 25 square inches shall be injected with epoxy or replaced, depending
on the size, number of delaminations, and locations.
E. Remedial Measures
1. If the composite tensile properties used in the design calculations are higher than the average of the laboratory test
results, design calculations shall be resubmitted, showing that the target design performance has been achieved. If
this is not the case, additional layers shall be applied until the target design performance is reached.
JOB NO.
SHEET:
SCALE:
DATE:
NAME:
Ple
asa
nto
n, C
A 9
45
88
59
56
W
. L
as P
osita
s B
lvd
.
SIM
PS
ON
S
TR
ON
G-T
IE
, C
O. IN
C.
TH
ER
E IS
N
O E
QU
AL
Te
l: (8
00
) 9
99
-5
09
9
RE
VIS
IO
NS
NO
.D
AT
E
Fa
x: (9
25
) 8
47
-1
59
77
We
b site
: w
ww
.stro
ng
tie
.co
m
OF SHEETS
DE
SIG
N D
OC
UM
EN
TS
B
Y:
DA
TE
O
F D
OC
UM
EN
TS
(D
.O
.D
.):
BE
RK
EL
EY
, C
A 9
47
04
13
01
S
HA
TT
UC
K A
VE
ES-190405C
FRP
N.T.S.
B.E.
08-14-2019
LIV
E O
AK
C
OM
MU
NIT
Y C
EN
TE
R
61
ID
A S
TR
UC
TU
RA
L E
NG
IN
EE
RS
07
/2
3/2
01
9
EXP: 6/30/2020
08/15/2019
6 7 8 9 9 6 10 119 15 9
D.6
E
F
G
G.1
I
H
G.4
1
3
D.9
.
FOUNDATION - PARTIAL PLAN
N
(N) FRP AT LINE D.9, TYP.
WHEN WALL THICKNESS VARIES,
PROVIDE REPAIR MORTAR RAMP PER
DETAIL A ON THIS SHEET, FOR
HORIZONTAL FRP APPLICATION, TYP.
A
4,5,6
(E) 12" WALL AT PILASTER
FRP STRENGTHENING
(E) 8" WALL BETWEEN PILASTER
DETAIL A
(FOR HORIZONTAL STRIPS APPLICATIONS)
PROVIDE REPAIR MORTAR
RAMP WHERE THICKNESS OF
THE WALL VARIES (1:3 RATIO)
JOB NO.
SHEET:
SCALE:
DATE:
NAME:
Ple
asa
nto
n, C
A 9
45
88
59
56
W
. L
as P
osita
s B
lvd
.
SIM
PS
ON
S
TR
ON
G-T
IE
, C
O. IN
C.
TH
ER
E IS
N
O E
QU
AL
Te
l: (8
00
) 9
99
-5
09
9
RE
VIS
IO
NS
NO
.D
AT
E
Fa
x: (9
25
) 8
47
-1
59
77
We
b site
: w
ww
.stro
ng
tie
.co
m
OF SHEETS
DE
SIG
N D
OC
UM
EN
TS
B
Y:
DA
TE
O
F D
OC
UM
EN
TS
(D
.O
.D
.):
BE
RK
EL
EY
, C
A 9
47
04
13
01
S
HA
TT
UC
K A
VE
ES-190405C
FRP
N.T.S.
B.E.
08-14-2019
LIV
E O
AK
C
OM
MU
NIT
Y C
EN
TE
R
62
ID
A S
TR
UC
TU
RA
L E
NG
IN
EE
RS
07
/2
3/2
01
9
EXP: 6/30/2020
08/15/2019
6 7 8 9 9.6 10 119.15.9
D.6
D.9
E
F
G
G.1
I
H
G.4
LEVEL 2 - PARTIAL PLAN
N
(N) FRP AT LINE D.9, TYP.
WHEN WALL THICKNESS VARIES,
PROVIDE REPAIR MORTAR RAMP PER
DETAIL A ON THIS SHEET, FOR
HORIZONTAL FRP APPLICATION, TYP.
A
1
3
(E) 12" WALL AT PILASTER
FRP STRENGTHENING
PROVIDE REPAIR MORTAR
RAMP WHERE THICKNESS OF
THE WALL VARIES (1:3 RATIO)
(E) 8" WALL BETWEEN PILASTER
DETAIL A
(FOR HORIZONTAL STRIPS APPLICATIONS)
4,5,6
JOB NO.
SHEET:
SCALE:
DATE:
NAME:
Ple
asa
nto
n, C
A 9
45
88
59
56
W
. L
as P
osita
s B
lvd
.
SIM
PS
ON
S
TR
ON
G-T
IE
, C
O. IN
C.
TH
ER
E IS
N
O E
QU
AL
Te
l: (8
00
) 9
99
-5
09
9
RE
VIS
IO
NS
NO
.D
AT
E
Fa
x: (9
25
) 8
47
-1
59
77
We
b site
: w
ww
.stro
ng
tie
.co
m
OF SHEETS
DE
SIG
N D
OC
UM
EN
TS
B
Y:
DA
TE
O
F D
OC
UM
EN
TS
(D
.O
.D
.):
BE
RK
EL
EY
, C
A 9
47
04
13
01
S
HA
TT
UC
K A
VE
ES-190405C
FRP
N.T.S.
B.E.
08-14-2019
LIV
E O
AK
C
OM
MU
NIT
Y C
EN
TE
R
63
ID
A S
TR
UC
TU
RA
L E
NG
IN
EE
RS
07
/2
3/2
01
9
EXP: 6/30/2020
08/15/2019
F
7899.1
OPEN
OPENOPEN
OPEN OPEN
OPEN
D.9 E
STEP 1: IN-PLANE SHEAR STRENGTHENING
HORIZONTAL FRP - ELEVATION AT GRID D.9
SECTION A
HORIZONTAL FRP STRENGTHENING, TYP.
0'-8
"
F
(E) CONC. SOG
0 - 1/2" GAP, TYP.
A
4
LEVEL 1
ROOF
+25' - 0"
APPLY 2 LAYERS OF CSS-CUGF27
(2-SIDES), 25" WIDE STRIPS @ 41" MAX.
O.C., ORIENTED HORIZONTALLY, TYP.
FIBER DIRECTION, TYP.
5'-6"
10
'-7
"
12
'-2
"1
0'-3
"
12
'-2
"1
0'-3
"
(E) WALL
10
'-7
"
5'-6"
NOTE:
IF STEEL IS TO COME IN CONTACT WITH CARBON FIBER, GLASS
FABRIC SHOULD BE USED AS A DIELECTRIC BARRIER.
JOB NO.
SHEET:
SCALE:
DATE:
NAME:
Ple
asa
nto
n, C
A 9
45
88
59
56
W
. L
as P
osita
s B
lvd
.
SIM
PS
ON
S
TR
ON
G-T
IE
, C
O. IN
C.
TH
ER
E IS
N
O E
QU
AL
Te
l: (8
00
) 9
99
-5
09
9
RE
VIS
IO
NS
NO
.D
AT
E
Fa
x: (9
25
) 8
47
-1
59
77
We
b site
: w
ww
.stro
ng
tie
.co
m
OF SHEETS
DE
SIG
N D
OC
UM
EN
TS
B
Y:
DA
TE
O
F D
OC
UM
EN
TS
(D
.O
.D
.):
BE
RK
EL
EY
, C
A 9
47
04
13
01
S
HA
TT
UC
K A
VE
ES-190405C
FRP
N.T.S.
B.E.
08-14-2019
LIV
E O
AK
C
OM
MU
NIT
Y C
EN
TE
R
64
ID
A S
TR
UC
TU
RA
L E
NG
IN
EE
RS
07
/2
3/2
01
9
EXP: 6/30/2020
08/15/2019
F
7899.1
OPEN
OPENOPEN
OPEN OPEN
OPEN
STEP 2: OUT-PLANE FLEXURAL STRENGTHENING
VERTICAL FRP - ELEVATION AT GRID D.9
SECTION A
VERTICAL FRP STRENGTHENING, TYP.
0'-8"
F
(E) CONC. SOG
0 - 1/2" GAP, TYP.
A
5
LEVEL 1
ROOF
+25' - 0"
5'-6"
10'-7"
12'-2"
10'-3"
12'-2"
10'-3"
(E) WALL
D.9 E
FIBER DIRECTION, TYP.
APPLY 1 LAYER OF CSS-CUGF27
(2-SIDES), 5" WIDE STRIPS @ 27" MAX.
O.C., ORIENTED VERTICALLY, TYP.
10'-7"
5'-6"
NOTES:
1. STRIPS ON STEP 1 ARE NOT SHOWN FOR CLARITY
2. IF STEEL IS TO COME IN CONTACT WITH CARBON FIBER,
GLASS FABRIC SHOULD BE USED AS A DIELECTRIC BARRIER.
JOB NO.
SHEET:
SCALE:
DATE:
NAME:
Ple
asa
nto
n, C
A 9
45
88
59
56
W
. L
as P
osita
s B
lvd
.
SIM
PS
ON
S
TR
ON
G-T
IE
, C
O. IN
C.
TH
ER
E IS
N
O E
QU
AL
Te
l: (8
00
) 9
99
-5
09
9
RE
VIS
IO
NS
NO
.D
AT
E
Fa
x: (9
25
) 8
47
-1
59
77
We
b site
: w
ww
.stro
ng
tie
.co
m
OF SHEETS
DE
SIG
N D
OC
UM
EN
TS
B
Y:
DA
TE
O
F D
OC
UM
EN
TS
(D
.O
.D
.):
BE
RK
EL
EY
, C
A 9
47
04
13
01
S
HA
TT
UC
K A
VE
ES-190405C
FRP
N.T.S.
B.E.
08-14-2019
LIV
E O
AK
C
OM
MU
NIT
Y C
EN
TE
R
65
ID
A S
TR
UC
TU
RA
L E
NG
IN
EE
RS
07
/2
3/2
01
9
EXP: 6/30/2020
08/15/2019
F
7899.1
OPEN
OPENOPEN
OPEN OPEN
OPEN
D.9 E
STEP 3: IN-PLANE FLEXURAL STRENGTHENING
VERTICAL FRP - ELEVATION AT GRID D.9
SECTION A
F
(E) CONC. SOG
FILL CORNERS WITH PASTE,
2" MIN. RADIUS, TYP.
LEVEL 1
ROOF
+25' - 0"
(E) WALL
NOTES:
1. STRIPS ON STEP 1 & 2 ARE NOT SHOWN FOR CLARITY
2. IF STEEL IS TO COME IN CONTACT WITH CARBON FIBER,
GLASS FABRIC SHOULD BE USED AS A DIELECTRIC BARRIER.
9'-8" 2'-8 1/2"3'-9 1/2" 5'-9" 6'-0" 6'-3" 9'-8"5'-6"
2 LAYERS OF CSS-CUGF27, 25" WIDE
STRIP, APPLIED ON BOTH FACES OF
THE WALL, ORIENTED VERTICALLY
2 LAYERS OF CSS-CUGF27, 60" WIDE
STRIP, APPLIED ON BOTH FACES OF
THE WALL, ORIENTED VERTICALLY
1 LAYER OF CSS-CUGF27, 12.5" WIDE
STRIP, APPLIED ON BOTH FACES OF
THE WALL, ORIENTED VERTICALLY
2 LAYERS OF CSS-CUGF27, 25" WIDE
STRIP, APPLIED ON BOTH FACES OF
THE WALL, ORIENTED VERTICALLY
2 LAYERS OF CSS-CUGF27, 25" WIDE
STRIP, APPLIED ON BOTH FACES OF
THE WALL, ORIENTED VERTICALLY
2 LAYERS OF CSS-CUGF27, 60" WIDE
STRIP, APPLIED ON BOTH FACES OF
THE WALL, ORIENTED VERTICALLY
2 LAYERS OF CSS-CUGF27, 25" WIDE
STRIP, APPLIED ON BOTH FACES OF
THE WALL, ORIENTED VERTICALLY
0 - 1/2" GAP, TYP.
FIBER DIRECTION, TYP.
24" M
IN
.
EX
TE
NS
IO
N, T
YP
.
11'-8"
0" M
IN
. E
XT
EN
SIO
N, T
YP
.
0" MIN. EXTENSION, TYP.
FRP STRENGTHENING, TYP.
FX-207 COATING (40MILS), FULLY COVER ALL
FRP FABRIC, TYP.
COVERAGE WITH FX-207
A
6
FRP STRENGTHENING, TYP.
24" M
IN
. E
XT
EN
SIO
N, T
YP
.
0 - 1/2" GAP, TYP.
JOB NO.
SHEET:
SCALE:
DATE:
NAME:
Ple
asa
nto
n, C
A 9
45
88
59
56
W
. L
as P
osita
s B
lvd
.
SIM
PS
ON
S
TR
ON
G-T
IE
, C
O. IN
C.
TH
ER
E IS
N
O E
QU
AL
Te
l: (8
00
) 9
99
-5
09
9
RE
VIS
IO
NS
NO
.D
AT
E
Fa
x: (9
25
) 8
47
-1
59
77
We
b site
: w
ww
.stro
ng
tie
.co
m
OF SHEETS
DE
SIG
N D
OC
UM
EN
TS
B
Y:
DA
TE
O
F D
OC
UM
EN
TS
(D
.O
.D
.):
BE
RK
EL
EY
, C
A 9
47
04
13
01
S
HA
TT
UC
K A
VE
ES-190405C
FRP
N.T.S.
B.E.
08-14-2019
LIV
E O
AK
C
OM
MU
NIT
Y C
EN
TE
R
66
ID
A S
TR
UC
TU
RA
L E
NG
IN
EE
RS
07
/2
3/2
01
9
EXP: 6/30/2020
08/15/2019
CU
1
CU
3
50
LOCATION
90.0
OUTDOOR CONDENSING UNIT OF SOCIAL HALL SCHEDULE
90.0 96 35
EQUIP.I.D.
MOCP
AMPS
REFRIGERANT COOLING COILSERVICE NO.
TYPE
TYPE
HEAT PUMP
MIN. COOLINGCAPACITY, MBH
R410A
GAS LINECONN.
IN.
LIQUIDLINE
CONN.
IN.
COMPRESSOR DATA
TYPE QUANTITY
1 3/83/4 1INVERTERHERMETIC
NOTES:
REFERTO
DRAWING
MIN. HEATINGCAPACITY, MBH
AMBIENTAIR TEMP
°F
CAPACITYCONTROL
%
80
AMPS
MANUFACTURER ORAPPROVED EQUAL
CARRIER
1. PROVIDE ELECTRICAL DISCONNECT SWITCH.
2. PROVIDE REFRIGERANT PIPING COMPLETE WITH INSULATION PER MANUFACTURER'S RECOMMENDATION ON SIZES AND ACCESSORIES.
3. PROVIDE CONCRETE HOUSEKEEPING PAD, SUPPORTS AND SEISMIC RESTRAIN AS PER CODE REQUIREMENTS.
SCROLL
HEATING AND
COOLING COILS
50HEAT PUMP 90.0 R410A 1 3/83/4 1INVERTERHERMETIC
REFERTO
DRAWING
90.0 96 80 35HEATING AND
COOLING COILS
CARRIER
SCROLL
MCA OPERATINGWEIGHT
LBS
485
485
REMARKS
SEENOTESBELOW
SEENOTESBELOW
REFRIGERANT
R-410A
R-410A
REFRIGERANT
LBS
26.8
23
TYPE AMOUNT
FCU
6
FCU
7
FCU
5
FCU
4
FCU
3
FCU
2
FCU
1
VRF SYSTEM (FAN COIL INDOOR UNIT) SCHEDULE
EQUIP.I.D.
REFRIGERANT COIL DATATYPE
MIN. COOLINGCAPACITY, MBH
NOTES:
MIN. HEATINGCAPACITY, MBH
TOTAL SENSIBLE
48 46
DB WB DB WB
76 65 55 53 48
DB DB
70 85
CFM CFM
1440 NA
MAXIMUM CIRCUITAMPS @
208V/3PH/60HZ
AMPS
15
MOCP @208V/3PH/60HZ
AMPS
4
AIR FILTER
CLEANABLE
FILTER
LBS
420
REMARKS
SEENOTESBELOW
MANUFACTURER ORAPPROVED EQUAL
CARRIER
36 34 76 65 55 53 38 70 85 1050 NA 15 4 CLEANABLE
FILTER
420 SEENOTESBELOW
CARRIER
36 34 76 65 55 53 38 70 85 1050 NA 15 4 CLEANABLE
FILTER
420 SEENOTESBELOW
CARRIER
60 58 76 65 55 53 66 70 85 1750 NA 15 5 CLEANABLE
FILTER
450 SEENOTESBELOW
CARRIER
12 9 76 65 55 53 13.5 70 85 700 NA 15 2.0 CLEANABLE
FILTER
13.2 SEENOTESBELOW
CARRIER
12 10 76 63 55 53 13.5 70 85 460 NA 15 0.9 CLEANABLE
FILTER
13.2 SEENOTESBELOW
CARRIER
19 14 76 63 55 53 21.5 70 85 700 NA 15 2 CLEANABLE
FILTER
13.2 SEENOTESBELOW
CARRIER
AREA
SERVE
CLASSROOM(104)
ROOFTOPHEAT PUMP
UNIT
ENT. AIR
TEMP. °FLVG. AIR
TEMP. °F
ENT. AIR
TEMP. °FLVG. AIR
TEMP. °F
SUPPLY AIR
FLOW RATE
OUTDOOR AIR
FLOW RATE
MAX.OPERATING
WEIGHT
CLASSROOM(104a)
ROOFTOPHEAT PUMP
UNIT
CLASSROOM(105)
ROOFTOPHEAT PUMP
UNIT
CLASSROOM
(106)
ROOFTOPHEAT PUMP
UNIT
CASSETTE
CASSETTE
ADMINROOM(119)
1. VRF SYSTEM SHALL BE HEAT PUMP.
2. PROVIDE WIRED PROGRAMMABLE THERMOSTAT AND ELECTRICAL DISCONNECT SWITCH.
3. PROVIDE REFRIGERANT PIPING COMPLETE WITH INSULATION PER MANUFACTURER'S RECOMMENDATION ON SIZES AND ACCESSORIES.
4. PROVIDE CONDENSATE DRAIN PIPING COMPLETE WITH INSULATION.
5. PROVIDE SUPPORTS AND SEISMIC RESTRAIN AS PER LATEST EDITION OF SMACNA AND CALIFORNIA MECHANICAL CODE REQUIREMENTS.
ADMINROOM(120)
RECEPTIONROOM(115)
CASSETTE
CU
2
LBS
2 X 78026
LOCATION
288.0
CLASSROOM VRF SYSTEM (CONDENSING UNIT) SCHEDULE
320.0 96 2 X 70
OPERATINGWEIGHT
REMARKSEQUIP.I.D.
SEENOTESBELOW
MINIMUM POWERSUPPLY @
208V/3PH/60HZ
KW
REFRIGERANT COOLING COILSERVICE FCUNO.
FCU-1 TO FCU-8
TYPE
TYPE
HEAT PUMP
MIN. COOLINGCAPACITY, MBH
R410A
GAS LINECONN.
IN.
LIQUIDLINE
CONN.
IN.
COMPRESSOR DATA
TYPE QUANTITY
1 3/83/4 2INVERTERDRIVEN
NOTES:1. PROVIDE ELECTRICAL DISCONNECT SWITCH.2. PROVIDE REFRIGERANT PIPING COMPLETE WITH INSULATION PER MANUFACTURER'S RECOMMENDATION ON SIZES AND ACCESSORIES.3. PROVIDE CONCRETE HOUSEKEEPING PAD, SUPPORTS AND SEISMIC RESTRAIN AS PER CODE REQUIREMENTS.
REFERTO
DRAWING
MIN. HEATINGCAPACITY, MBH
AMBIENTAIR TEMP
°F
CAPACITYCONTROL
%
80
MINIMUM CIRCUITAMPS @
208V/3PH/60HZ
AMPS
MANUFACTURER ORAPPROVED EQUAL
CARRIER
A
22
2
2
e saurchitec uretrban design
SHEET NUMBER:
PROJECT NUMBER:
DATE:
ISSUE:
SHEET TITLE:
PROJECT:
CLIENT:
201320.21
ARCHITECT:ELS Architecture & Urban Design2040 Addison StreetBerkeley, CA 94704TEL: 510.549.2929
STRUCTURAL ENGINEER:IDA STRUCTURAL ENGINEERS, INC1629 TELEGRAPH AVENUE, SUITE 300OAKLAND, CA 94612TEL: (510) 834-1629
MECHANICAL,ELECTRICAL AND
PLUMBING ENGINEERS:YEI ENGINEERS, INC.7677 OAKPORT ST. SUITE 200OAKLAND, CA 94621TEL: (510) 383-1050
CIVIL ENGINEERS:BKF ENGINEERS300 FRANK OGAWA PLAZA, #380OAKLAND, CA 94612TEL: (510) 899-7300
PROJECT TEAM:
STAMP:
PERMIT SET
MECHANICALEQUIPMENT SCHEDULES
M003
04/22/19
CITY OF BERKELEY
PUBLIC WORKS DEPARTMENT
LIVE OAKCOMMUNITY
CENTERUPGRADE
1947 CENTER STREET, 4TH FL
BERKELEY, CA 94704
1301 Shattuck Ave
Berkeley, CA 94704
M30258
S
TA T E OF CA L IFORNIA
RE
GIS
TE
RE
DPROFESSIONA
LEN
GIN
EE
R
ME C H A N I C A
L
PA
TR
I CK R . M A L
LI L
LI N
REVISION
NUMBER DATE DESCRIPTION
A 07/15/19 PLAN CHECK 1SET
2 08/20/19 ADDENDUM 2
FA
CP
FA
AF
AA
B
D
E
F
G
H
I
D.6
G.4
G.1
6 7 8 9 10 11
9.1 9.66.2
CF
1
104
FIRESIDE
ROOM
102
THEATER
103
THEATER
LOBBY
105
TOT ROOM
106
CRAFTS
ROOM
111
KITCHEN
112
WOMEN'S RM
113
MEN'S RM
114
SOCIAL HALL
110
JANITOR
109
STORAGE101
LOBBY
108
STORAGE
107
HALLWAY
115
RECEPTION
118
HALLWAY116
WOMEN'S RM
117
MEN'S RM
119
ADMIN
120
ADMIN
121
STORAGE
20
20
1
CF
11
20
EF
14 5
T
(N) MULTISTAGE EF CONTROL SWITCH
T
T
T
T
CU
1
CU
2
FCU
7
FCU
6
FCU
5
AT 2ND FLR, SEE 4/M202
AT 2ND FLR, SEE 3/M202
A
M204
11
12
EF
2
B
M204
25 26
A1
460A1
460
7
8 8
7
8
9
10
RG & RL
RG & RL 13
1617RG & RL
RG & RL 15 (TYP)
23
23
RG & RL 17
23
T23
23
T
24
RG & RL 19
RG & RL 18
23
T
23
T T
RC
1
RC
2
1 2 3 4
5
12"ø SA
RG&RL PIPING UP AND CONNECT TO EACH ROOFTOP FCU. SEE SHEET M203
22
22
22
M202
2
B1
1240A1
460
A1
460
B1
1240 A1
460
B1
1240 A1
460
A3
580
B2
2300 A3
580
14"ø SA 12"ø SA 12"ø SA 12"ø SA 12"ø SA 16"ø SA 16"ø SA
A
C
27
2
M205
1
M205
A3
580A3
5807 A2
230
A2
230
A2
230A2
230
A2
230
A2
230
111
RESTROOM
B4
50
B4
50
B4
50
6"ø
EA
6"ø
EA
25 26
C1
M202
1
D9
2 2 2 2
C
M204
CU
3
RG & RL 14
A
33
1
A1
390
10"ø SA
TRANSFER GRILLE18"x12"
2
e saurchitec uretrban design
SHEET NUMBER:
PROJECT NUMBER:
DATE:
ISSUE:
SHEET TITLE:
PROJECT:
CLIENT:
201320.21
ARCHITECT:ELS Architecture & Urban Design2040 Addison StreetBerkeley, CA 94704TEL: 510.549.2929
STRUCTURAL ENGINEER:IDA STRUCTURAL ENGINEERS, INC1629 TELEGRAPH AVENUE, SUITE 300OAKLAND, CA 94612TEL: (510) 834-1629
MECHANICAL,ELECTRICAL AND
PLUMBING ENGINEERS:YEI ENGINEERS, INC.7677 OAKPORT ST. SUITE 200OAKLAND, CA 94621TEL: (510) 383-1050
CIVIL ENGINEERS:BKF ENGINEERS300 FRANK OGAWA PLAZA, #380OAKLAND, CA 94612TEL: (510) 899-7300
KEY PLAN:
PROJECT TEAM:
STAMP:
PERMIT SET
MECHANICAL FLOORPLANS
M201
04/22/19
CITY OF BERKELEY
PUBLIC WORKS DEPARTMENT
LIVE OAKCOMMUNITY
CENTERUPGRADE
1947 CENTER STREET, 4TH FL
BERKELEY, CA 94704
1301 Shattuck Ave
Berkeley, CA 94704
1/8" = 1'-0"1MECH - LEVEL 1 NEW WORK
SHEET NOTES:
1. REFER TO DRAWING M001 FOR MECHANICAL GENERAL NOTES, ABBREVIATION AND LEGEND.
2. CONTRACTOR SHALL REPAIR ALL SURFACES DAMAGED OR AFFECTED BY THE DEMOLITION OPERATIONS WITH FINISH TO MATCH EXISTING CONDITION.
3. CONTRACTORS SHALL DISPOSE ALL DEMOLISHED EQUIPMENT, PIPING, ASSOCIATED ACCESSORIES AND MATERIALS OFF PROJECT SITE. NO DEMOLISHED EQUIPMENT AND/OR MATERIALS SHALL BE TURNED OVER TO THE DISTRICT, COUNTY OR OTHER GOVERNMENT AGENCY.
4. ALL EXPOSED DUCTWORK AT FIRESIDE ROOM 104, TOT ROOM 105 AND CRAFTS ROOM 106 TO BE SPIRAL STRAIGHT DUCT, EMPOWER AIR TECHNOLOGIES OR EQUAL, GALVANIZED STEEL CONSTRUCTION, EXPOSED METAL FINISH.
5. PROVIDE ANCHORED SLEEPERS AT ROOF TOP PIPING
N
1
2
3
4
6
7
9
5
10
11
12
13
14
8
KEY NOTES:
PROVIDE (N) FIVE BLADE CEILING FAN WITH COMPLETE CONTROL, SUPPORT AND SEISMIC BRACING.
PROVIDE (N) ROOFTOP REFRIGERANT FAN COIL UNIT ON THE ROOF, COMPLETE WITH CONTROLS, REFRIGERANT PIPING (RG/RL), DRAIN PIPING, SUPPORTS, FRESH AIR DUCTWORK AND SEISMIC BRACING, ROOF CURB AND ALL OTHER ASSOCIATED APPURTENANCES. SEAL AND FLASH WATERTIGHT.
REMOVE AND REPLACE (E) FURNACE GAS TYPE WITH (N) HEATING AND COOLING COILS HEAT PUMP WITH COMPLETE CONTROL, SUPPORTS AND SEISMIC BRACING.
PROVIDE (N) ROOF EXHAUST FAN (REF-1) WITH COMPLETE CONTROL, SUPPORTS AND ROOF CURB ON THE ROOF.
PROVIDE (N) 14”X14” EA DUCT RISER UP TO REF-1 @ ROOF COMPLETE WITH EXHAUST AIR GRILLE FITTINGS AND SUPPORTS.
PROVIDE (N) ROOFTOP FCU HEAT PUMP WITH COMPLETE CONTROL, REFRIGERANT PIPING (RG/RL), DRAIN PIPING, SUPPORTS, FRESH AIR DUCTWORK AND SEISMIC BRACING.
PROVIDE (N) 16”X16” SA DUCT RISER UP TO ROOFTOP FCU @ ROOF WITH FITTINGS AND SUPPORTS.
PROVIDE (N) 16”X16” RA DUCT RISER UP TO ROOFTOP FCU @ ROOF WITH RETURN AIR GRILLE FITTINGS AND SUPPORTS.
PROVIDE (N) 20”X20” SA DUCT RISER UP TO ROOFTOP FCU @ ROOF WITH FITTINGS AND SUPPORTS.
PROVIDE (N) 20”X20” RA DUCT RISER UP TO ROOFTOP FCU @ ROOF WITH RETURN AIR GRILLE FITTINGS AND SUPPORTS.
PROVIDE (N) VRF OUTDOOR CONDENSING UNIT SHALL BE SUPPORTED BY A CONCRETE BASE EXTENDING NOT LESS THAN 3” ABOVE ADJOINING GRADE. FOR DETAIL REFER TO STRUCTURAL DRAWING 12/S005.
PROVIDE (N) VRF OUTDOOR CONDENSING UNIT (HEAT PUMP) SHALL BE SUPPORTED BY A CONCRETE BASE EXTENDING NOT LESS THAN 3” ABOVE ADJOINING GRADE. FOR DETAIL REFER TO STRUCTURAL DRAWING 12/S005.
REFRIGERANT PIPING TO VRF OUTDOOR HEAT PUMP, COMPLETE W/ FLOOR MOUNTED RG & RL PIPE SUPPORTS AND WITH ALL ASSOCIATED APPURTENANCES.
REFRIGERANT PIPING TO OUTDOOR HEAT PUMP, COMPLETE W/ FLOOR MOUNTED RG & RL PIPE SUPPORTS AND WITH ALL ASSOCIATED APPURTENANCES.
15
17
18
19
20
21
22
23
24
25
26
REFRIGERANT PIPING TO ROOFTOP FCU HEAT PUMP ON THE ATTIC SPACE FLOOR, COMPLETE W/ FLOOR MOUNTED RG & RL PIPE SUPPORTS AND WITH ALL ASSOCIATED APPURTENANCES. FOR PIPE SIZE REFER TO SHEET M301.
RG & RL PIPE RISERS W/MIN 2 WALL-MOUNT GALV STL PIPE SUPPORTS TOP AND BOTTOM.
REFRIGERANT PIPING TO HEATING AND COOLING COILS (HEAT PUMP), COMPLETE W/ FLOOR MOUNTED RG & RL PIPE SUPPORTS AND WITH ALL ASSOCIATED APPURTENANCES.
REFRIGERANT PIPING TO HEATING AND COOLING COILS (HEAT PUMP), COMPLETE W/ HANGERS AND CHANNEL STRUT SUPPORTS. THE EXPOSED LINES IN THE SOCIAL HALL SHALL BE ROUTED ON THE SOUTH SIDE OF THE BEAM WITH ALL ASSOCIATED APPURTENANCES. FOR PIPE SIZE REFER TO SHEET M301.
REFRIGERANT PIPING TO FAN COIL CASSETTE UNITS, COMPLETE W/ HANGERS AND CHANNEL STRUT SUPPORTS. THE EXPOSED LINES IN THE SOCIAL HALL SHALL BE ROUTED ON THE SOUTH SIDE OF THE BEAM WITH ALL ASSOCIATED APPURTENANCES. FOR PIPE SIZE REFER TO SHEET M301.
PROVIDE (N) CEILING MOUNTED DUCTLESS SPLIT INDOOR FAN COIL CASSETTE UNIT WITH ALL ASSOCIATED APPURTENANCES. MODIFY EXISTING FRAMING AT EXISTING MEZZANINE AND PROVIDE NEW FRAMING TO ACCOMMODATE THE SIZE OF THE UNIT WITHIN THE EXISTING MEZZANINE OR NEW MEZZANINE FRAMING. SSD FOR MORE INFORMATION.
NOT USED.
FOR DRAIN PIPING SEE PLUMBING DRAWING.
LOW VOLTAGE WIRED CONTROLLER THERMOSTAT FOR FAN COIL UNIT. MOUNT ON WALL AT 48” A.F.F. SET AT 70 DEG.F.
LOW VOLTAGE WIRED CONTROLLER THERMOSTAT FOR HP-1 AND HP-2 COILS. MOUNT ON WALL AT 48" A.F.F.
PROVIDE (N) CEILING FAN INCLUDING WITH EXHAUST AIR GRILLE, CEILING SUPPORT, EXHAUST DUCT UP TO ROOF, AND CONTROL SYSTEM, OCCUPIED SENSOR WITH ALL ASSOCIATED APPURTENANCES.
PROVIDE 6ø EXHAUST DUCTWORK FROM CEILING MOUNTED EXHAUST FAN UP TO ROOF AND 3 FEET ABOVE THE ROOF WITH CAP.
REUSE (E) KITCHEN HOOD AT NEW LOCATION AND PROVIDE ALL (N) DUCTWORK CONNECTION FROM (E) ROOF KITCHEN HOOD IN THE MENTIONED LOCATION.
27
M30258
S
TA T E OF CA L IFORNIA
RE
GIS
TE
RE
DPROFESSIONA
LEN
GIN
EE
R
ME C H A N I C A
L
PA
TR
I CK R . M A L
LI L
LI N
REVISION
NUMBER DATE DESCRIPTION
A 07/15/19 PLAN CHECK 1SET
A1 07/17/19 UPDATE A1
1 08/12/19 ADDENDUM 1
2 08/20/19 ADDENDUM 2
16
A
A1A1
BID ALTERNATE KITCHEN OPTION(SEE 5/M202 FOR BASE BID KITCHEN OPTION)
A1
BID ALTERNATE KITCHEN OPTION
A1
1
2
2
B
D
E
F
G
H
I
D.6
G.4
G.1
6 7 8 9 10 11
9.1 9.66.2
FCU
31 2 1 2 1 2
7
6
1 2
9
8
A
M204
3 4 5
EF
1
B
M204
1 2 3 4 5
7
6
7
6
12
FCU
1
FCU
2
FCU
4
18"
36"
36"
18"11 TYP
A
C10 10 10
RG&RL PIPING UP FROM BELOW ROOF. CONNECT TO EACH ROOFTOP FCU. SEE SHEET M201 FOR CONTINUATION
2
M205
13
D9
(E) EXHAUST FANA
14 14 14 14
15A
AAAA
e saurchitec uretrban design
SHEET NUMBER:
PROJECT NUMBER:
DATE:
ISSUE:
SHEET TITLE:
PROJECT:
CLIENT:
201320.21
ARCHITECT:ELS Architecture & Urban Design2040 Addison StreetBerkeley, CA 94704TEL: 510.549.2929
STRUCTURAL ENGINEER:IDA STRUCTURAL ENGINEERS, INC1629 TELEGRAPH AVENUE, SUITE 300OAKLAND, CA 94612TEL: (510) 834-1629
MECHANICAL,ELECTRICAL AND
PLUMBING ENGINEERS:YEI ENGINEERS, INC.7677 OAKPORT ST. SUITE 200OAKLAND, CA 94621TEL: (510) 383-1050
CIVIL ENGINEERS:BKF ENGINEERS300 FRANK OGAWA PLAZA, #380OAKLAND, CA 94612TEL: (510) 899-7300
PROJECT TEAM:
STAMP:
PERMIT SET
MECHANICAL ROOFPLAN
M203
04/22/19
CITY OF BERKELEY
PUBLIC WORKS DEPARTMENT
LIVE OAKCOMMUNITY
CENTERUPGRADE
1947 CENTER STREET, 4TH FL
BERKELEY, CA 94704
1301 Shattuck Ave
Berkeley, CA 94704
1/8" = 1'-0"1MECHANICAL ROOF PLAN NEW WORK
SHEET NOTES:
1. REFER TO DRAWING M001 FOR MECHANICAL GENERAL NOTES, ABBREVIATION\ AND LEGEND.
2. CONTRACTOR SHALL REPAIR ALL SURFACES DAMAGED OR AFFECTED BY THE DEMOLITION OPERATIONS WITH FINISH TO MATCH EXISTING CONDITION.
3. CONTRACTORS SHALL DISPOSE ALL DEMOLISHED EQUIPMENT, PIPING, ASSOCIATED ACCESSORIES AND MATERIALS OFF PROJECT SITE. NO DEMOLISHED EQUIPMENT AND/OR MATERIALS SHALL BE TURNED OVER TO THE DISTRICT, COUNTY OR OTHER GOVERNMENT AGENCY.
4. PROVIDE ANCHORED SLEEPERS AT ROOF TOP PIPING.
KEY NOTES:
PROVIDES (N) ROOFTOP OF REFRIGERANT FAN COIL UNIT, WITH COMPLETE CONTROL, REFRIGERANT PIPING (RG/RL), DRAIN PIPING, SUPPORTS, FRESH AIR DUCTWORK AND SEISMIC BRACING WITH ALL OTHER ASSOCIATED APPURTENANCES
PROVIDE (N) ROOFTOP CURB ON (N) ROOF OPENING .SEAL AND FLASH WATERTIGHT WITH ALL ASSOCIATED APPURTENANCES.
PROVIDE (N) ROOFTOP CURB ON (N) ROOF OPENING FOR EF-1 .SEAL AND FLASH WATERTIGHT WITH ALL ASSOCIATED APPURTENANCES.
PROVIDE (N) ROOF EXHAUST FAN (EF-1) WITH COMPLETE CONTROL, SUPPORTS AND ROOF CURB ON THE ROOF WITH ALL ASSOCIATED APPURTENANCES.
PROVIDE (N) 14”X14” EA DUCT RISER UP TO EF-1 @ ROOF COMPLETE WITH FITTINGS AND SUPPORTS AND ALL ASSOCIATED APPURTENANCES.
PROVIDE (N) 16”X16” SA DUCT RISER UP TO ROOFTOP FCU @ ROOF WITH FITTINGS AND SUPPORTS.
PROVIDE (N) 16”X16” RA DUCT RISER UP TO ROOFTOP FCU @ ROOF WITH EXHAUST AIR GRILLE FITTINGS, SUPPORTS AND ALL ASSOCIATED APPURTENANCES.
PROVIDE (N) 20”X20” SA DUCT RISER UP TO ROOFTOP FCU @ ROOF WITH FITTINGS, SUPPORTS AND ALL ASSOCIATED APPURTENANCES.
PROVIDE (N) 20”X20” EA DUCT RISER UP TO ROOFTOP FCU @ ROOF WITH EXHAUST AIR GRILLE FITTINGS AND SUPPORT WITH ALL ASSOCIATED APPURTENANCES.
REFRIGERANT PIPING ON THE ROOF TO ROOFTOP FAN COILS UNITS (HEAT PUMP). COMPLETE W/ ROOF MOUNTED RG&RL PIPE SUPPORTS AND WITH ALL ASSOCIATED APPURTENANCES. SEE M301 FOR PIPE SIZE.
FAN COIL UNIT CLEARANCE AREA.
PROVIDE 6ø EXHAUST DUCTWORK FROM CEILING MOUNTED EXHAUST FAN UP TO ROOF AND 3 FEET ABOVE THE ROOF WITH CAP.
PROVIDE 6ø EXHAUST DUCTWORK FROM CEILING MOUNTED EXHAUST FAN UP TO ROOF AND 3 FEET ABOVE THE ROOF WITH CAP. PROVIDE (N) ROOF CURB WITH MANUFACTURED FLASHING.
REFER TO M003 FAN COIL UNITS SCHEDULE FOR AREA SERVED.
REFER TO M002 EXHAUST FANS SCHEDULE FOR AREA SERVED.
1
2
3
4
5
6
N
7
8
9
10
11
12
13
M30258
S
TA T E OF CA L IFORNIA
RE
GIS
TE
RE
DPROFESSIONA
LEN
GIN
EE
R
ME C H A N I C A
L
PA
TR
I CK R . M A L
LI L
LI N
REVISION
NUMBER DATE DESCRIPTION
A 07/15/19 PLAN CHECK 1SET
2 08/20/19 ADDENDUM 2
14
15
A
2
2
LEVEL 1+0' - 0"
THEATER MEZZ+9' - 8"
ROOF+25' - 0"
EFGHI G.4 G.1 D9
FCU
6
FCU
5
FCU
7
RG/RLRG/RL, AC
M501
1 TYPICAL CASSETTE TYPE FCU DETAIL
RG/RL INSIDE MEZZANINE
A
A
A
1
LEVEL 1+0' - 0"
THEATER MEZZ+9' - 8"
7 8 9 10 119.1 9.6
A
M204
FCU
1
FCU
2
FCU
3
FCU
4
A1
460
A1
460
A1
460
A1
460A1
460
A1
460
A3
580
A3
580
A3
580
A3
580
A2
230
A2
230
A2
230
A2
230A2
230
A2
230
14"ø SA 12"ø SA
16"ø SA
12"ø SA 12"ø SA
16"ø SA
12"ø SA 12"ø SA
16"ø SA
16"ø SA 16"ø SA20"ø SA
C
M204
B2
2300
B1
1240B1
1240
B1
1240 VD (TYP)
AAAA
2
e saurchitec uretrban design
SHEET NUMBER:
PROJECT NUMBER:
DATE:
ISSUE:
SHEET TITLE:
PROJECT:
CLIENT:
201320.21
ARCHITECT:ELS Architecture & Urban Design2040 Addison StreetBerkeley, CA 94704TEL: 510.549.2929
STRUCTURAL ENGINEER:IDA STRUCTURAL ENGINEERS, INC1629 TELEGRAPH AVENUE, SUITE 300OAKLAND, CA 94612TEL: (510) 834-1629
MECHANICAL,ELECTRICAL AND
PLUMBING ENGINEERS:YEI ENGINEERS, INC.7677 OAKPORT ST. SUITE 200OAKLAND, CA 94621TEL: (510) 383-1050
CIVIL ENGINEERS:BKF ENGINEERS300 FRANK OGAWA PLAZA, #380OAKLAND, CA 94612TEL: (510) 899-7300
PROJECT TEAM:
STAMP:
PERMIT SET
MECHANICAL SECTIONS
M205
04/22/19
CITY OF BERKELEY
PUBLIC WORKS DEPARTMENT
LIVE OAKCOMMUNITY
CENTERUPGRADE
1947 CENTER STREET, 4TH FL
BERKELEY, CA 94704
1301 Shattuck Ave
Berkeley, CA 94704
1/4" = 1'-0"1MECHANICAL SECTION
1/4" = 1'-0"2MECHANICAL SECTION
A
M30258
S
TA T E OF CA L IFORNIA
RE
GIS
TE
RE
DPROFESSIONA
LEN
GIN
EE
R
ME C H A N I C A
L
PA
TR
I CK R . M A L
LI L
LI N
REVISION
NUMBER DATE DESCRIPTION
A 07/15/19 PLAN CHECK 1SET
1 08/12/19 ADDENDUM 1
2 08/20/19 ADDENDUM 2
MMY-MAP1206HT9P-UL MMY-MAP1206HT9P-UL MMY-AP240S6HT9P-UL
FCU-1
Rooftop Unit Indoor Unit
40QQ-036AAA3-0A0
FCU-2
Rooftop Unit Indoor Unit
40QQ-036AAA3-0A0
FCU-3
Rooftop Unit Indoor Unit
40QQ-036AAA3-0A0
FCU-4
Rooftop Unit Indoor Unit
40QQ-060AAA3-0A0
RBM-BY105UL
RBM-BY105UL
RBM-BY205UL
FCU-5
4-Way Cassette Type
MMU-AP0122H2UL
FCU-6
4-Way Cassette Type
MMU-AP0122H2UL
RBM-BY55UL
FCU-7
4-Way Cassette Type
MMU-AP0212H2UL
RBM-BY55UL
RBM-BY305UL
FCU
6
FCU
7
FCU
5
FCU
4
FCU
3
FCU
2
FCU
1
CU
2
CU
1
3/8" RL
3/8" RL
B2
3/8" RL
1/2" RL
B2
3/8" RL
5/8" RL
B1
1/4" RL
1/4" RL
B33/8" RL
3/8" RL
B3
5/8" RL
3/8" RL
B03/4" RL
5/8" RG
5/8" RG
5/8" RG
7/8" RG
5/8" RG
1-1/8" RG
3/8" RG
3/8" RG
5/8" RG
5/8" RG
1-1/8" RG
5/8" RG
1-3/8" RG
2
e saurchitec uretrban design
SHEET NUMBER:
PROJECT NUMBER:
DATE:
ISSUE:
SHEET TITLE:
PROJECT:
CLIENT:
201320.21
ARCHITECT:ELS Architecture & Urban Design2040 Addison StreetBerkeley, CA 94704TEL: 510.549.2929
STRUCTURAL ENGINEER:IDA STRUCTURAL ENGINEERS, INC1629 TELEGRAPH AVENUE, SUITE 300OAKLAND, CA 94612TEL: (510) 834-1629
MECHANICAL,ELECTRICAL AND
PLUMBING ENGINEERS:YEI ENGINEERS, INC.7677 OAKPORT ST. SUITE 200OAKLAND, CA 94621TEL: (510) 383-1050
CIVIL ENGINEERS:BKF ENGINEERS300 FRANK OGAWA PLAZA, #380OAKLAND, CA 94612TEL: (510) 899-7300
PROJECT TEAM:
STAMP:
PERMIT SET
MECHANICAL PIPINGDIAGRAM
M301
04/22/19
CITY OF BERKELEY
PUBLIC WORKS DEPARTMENT
LIVE OAKCOMMUNITY
CENTERUPGRADE
1947 CENTER STREET, 4TH FL
BERKELEY, CA 94704
1301 Shattuck Ave
Berkeley, CA 94704
NTS1MECHANICAL PIPING DIAGRAM
M30258
S
TA T E OF CA L IFORNIA
RE
GIS
TE
RE
DPROFESSIONA
LEN
GIN
EE
R
ME C H A N I C A
L
PA
TR
I CK R . M A L
LI L
LI N
REVISION
NUMBER DATE DESCRIPTION
A 07/15/19 PLAN CHECK 1SET
2 08/20/19 ADDENDUM 2
INTERNET
9
CU
1
FCU
1
4
1
42
FCU
2
FCU
3
FCU
4
FCU
5
FCU
7
CONTROL WIRING (TYP)
CONTROLWIRING (TYP)
4
1
4
1
4
1
FCU
6
4
2
4
2
2
8
ETHERNET CABLE (CAT 6)
INTERNET CABLE
7
E
POWER SUPPLY 120 VAC
6
1 1 1 1 1 1 1 1 1
6
CU
1EF
1
SF
1
CU
1
SF
1
FCU
1
FCU
2
FCU
3
FCU
4
FCU
5
FCU
6
FCU
7
NOTE:
1. PROVIDE PELICAN WIRELESS EXTENDED RANGE REPEATERS (MIN. 2) TO MAINTAIN STRONG COMMUNICATION SIGNAL TO ALL THERMOSTATS, CONTORLLERS AND ETHERNET GATEWAY.
e saurchitec uretrban design
SHEET NUMBER:
PROJECT NUMBER:
DATE:
ISSUE:
SHEET TITLE:
PROJECT:
CLIENT:
201320.21
ARCHITECT:ELS Architecture & Urban Design2040 Addison StreetBerkeley, CA 94704TEL: 510.549.2929
STRUCTURAL ENGINEER:IDA STRUCTURAL ENGINEERS, INC1629 TELEGRAPH AVENUE, SUITE 300OAKLAND, CA 94612TEL: (510) 834-1629
MECHANICAL,ELECTRICAL AND
PLUMBING ENGINEERS:YEI ENGINEERS, INC.7677 OAKPORT ST. SUITE 200OAKLAND, CA 94621TEL: (510) 383-1050
CIVIL ENGINEERS:BKF ENGINEERS300 FRANK OGAWA PLAZA, #380OAKLAND, CA 94612TEL: (510) 899-7300
PROJECT TEAM:
STAMP:
PERMIT SET
CONTROL DIAGRAM
M403
04/22/19
CITY OF BERKELEY
PUBLIC WORKS DEPARTMENT
LIVE OAKCOMMUNITY
CENTERUPGRADE
1947 CENTER STREET, 4TH FL
BERKELEY, CA 94704
1301 Shattuck Ave
Berkeley, CA 94704
NTS1VRV HEAT PUMP FCU/CU SYSTEM CONTROL DIAGRAM
NTS2HVAC CONTROL SYSTEM ARCHITECTURE
KEY NOTES:
24V THERMOSTAT INTERFACE MODULE SUPPLIED BY CARRIER VRV PUMP MANUFACTURER. INSTALL INSIDE THE ROOFTOP FAN COIL UNIT. COMPLY WITH MANUFACTURER INSTALLATION INSTRUCTION.
24V THERMOSTAT INTERFACE MODULE SUPPLIED CARRIER VRV PUMP MANUFACTURER. INSTALL ABOVE CEILING AS NEAR AS POSSIBLE TO CEILING CASSETTE FAN COIL UNIT. COMPLY WITH MANUFACTURER INSTALLATION INSTRUCTION.
24V THERMOSTAT INTERFACE MODULE SUPPLIED CARRIER VRV PUMP MANUFACTURER. INSTALL ABOVE CEILING AS NEAR AS POSSIBLE TO WALL MOUNTED FAN COIL UNIT. COMPLY WITH MANUFACTURER INSTALLATION INSTRUCTION.
CONNECT 24V THERMOSTAT INTERFACE MODULE TO ROOM WALL MOUNTED PELICAN THERMOSTAT COMPLETE WITH CONTROL WIRING AND CONDUIT.
NOT USED.
PELICAN – PEARL ECONOMIZER CONTROLLER COMPLETE WITH ELECTRICAL PANEL, IDENTIFICATION, CONTROL WIRING, SUPPORTS AND ASSOCIATED APPURTENANCES.
PELICAN – ETHERNET GATEWAY
HIGH-SPEED INTERNET ROUTER.
PELICAN-Z8 CONTROLLER COMPLETE WITH ELECTRICAL PANEL, IDENTIFICATION, CONTROL WIRING, SUPPORTS AND ASSOCIATED APPURTENANCES.
1
2
3
4
5
6
7
8
M30258
S
TA T E OF CA L IFORNIA
RE
GIS
TE
RE
DPROFESSIONA
LEN
GIN
EE
R
ME C H A N I C A
L
PA
TR
I CK R . M A L
LI L
LI N
REVISION
NUMBER DATE DESCRIPTION
A 07/15/19 PLAN CHECK 1SET
2 08/20/19 ADDENDUM 2
9
A
A
A
2
ROD STIFFENER (TYP.)
HEXAGON JAM NUT WITH
WASHER FACE, TOP AND
BOTTOM (TYP.)
GASKET (TYP.)
14 GAUGE G.I. SHEET METAL
STRAP @ 1 1/2" WIDE
INSULATION (WHERE REQUIRED)
RIGID DUCT
CHANNEL TRANSVERSE BRACE
CHANNEL LONGITUDINAL BRACE
1/2" x 1 1/4" HEX HEAD CAP SCREWS
& CHANNEL NUTS (TYP.)
ADJUSTABLE HINGE (TYP.)
DETAILS SHOWN ARE SIMILAR FOR NON-BRACED ROUND DUCT SUPPORT WITH BRACING
OMITTED.
NOTE:
ALL THREADED ROD
1.
(2) 3/8"ø THRU BOLT, LOCK WASHER AND NUT
SUPERSTRUT A-1200 CHANNEL
PROVIDE SUPPORTS 5'-6" MAX. ON CENTERAND AT EVERY CHANGE OF DIRECTION
PIPING WITH INSULATION AS SPECIFIED
BOLT AND NUT
6"x6" REDWOOD SLEEPER SHAPEDAS REQUIRED FOR PITCH/SLOPE.SET IN FULL COVERAGE MASTIC
MASTIC
PIPE CLAMP SUPERSTRUT 702
PROVIDE CARBON STEEL SHEETMETAL PIPE SHIELD OVERALUMINUM JACKET AT SUPPORTSSIMILAR TO SUPERSTRUT C-790.
6-1/2"øx3" LONG LAG BOLTS
(E) GROUND FLOOR
ADJUSTABLELIFT 22 IN.
NTS4TYPICAL BRANCH DUCT
NTS2TYPICAL FLEXIBLE DUCT CONNECTION
NTS3ROUND DUCT HANGER AND BRACING DETAIL
NTS5TYPICAL DUCT FITTINGS
NTS1TYPICAL CASSETTE TYPE FCU DETAIL
NTS7TYPICAL ROUND DUCT SUPPORT
NTS8TYPICAL REFRIGERANT PIPE OUTDOOR SUPPORT DETAIL
1
2
3
2
1
2
2
45°
4"
45°
2" MINIMUM
W
R=2W
45°
D
R=1.25D(SUPPLY OR RETURN)
BRANCH DUCT
(SUPPLY OR RETURN)
MAIN DUCT
BRANCH DUCT
(SUPPLY OR RETURN)
VD
(SUPPLY OR RETURN)
MAIN DUCT
BRANCH DUCT
VD
MAIN DUCT
BRANCH DUCT
MAIN DUCT
2" 2"
REFER TO SMACNA, HVAC DUCT CONSTRUCTION STANDARDS.
NOTE:
30° MAX ONCONTRACTIVE FLOW
30° MAX ONCONTRACTIVEFLOW
U-STRIP (TYP.)
SHEET METAL
COLLAR (TYP.)STEEL ANGLE
DUCT (TYP.)
SCREW @ 6" O.C.
INSULATIONOUTLINE OF DUCT
CANVAS CONNECTOR
@6" O.C.
FLEXIBLE DUCT
BOLT & NUT
CENTERLINE R=3W/2STD RADIUS ELBOWDETAIL 90°
R=1.25D
2" X 16 GAUGE20
3/16" X 2"
1/8" X 2"
1/8" X 1-1/2"
OVER 60
60
40
2" X 18 GAUGE10
STRAPLOAD RATEDFASTENER
STRAP
3/8" ALLTHREADED ROD
SHEET METAL SCREWOR POP RIVETS
ROUND DUCTS
20
OVER 60
60
40
SEE NOTE 4 BELOW10
SEE NOTE 5 BELOW
SEE NOTE 5 BELOW
SEE NOTE 6 BELOW
SEE NOTE 7 BELOW
48
84
60
1-1/2" X 1-1/2" X 1/8"36
2" X 2" X 1/8"
2" X 2" X 1/8"
2" X 2" X 1/8" 3/8"
1/4"
5/16"
1/4"
1" X 1" X 1/8"
1" X 1" X 1/8"
1" X 1" X 1/8"
1" X 1" X 1/8"
1"x16 GA (2) SEISMICSWAY BRACINGSTRAP
1"x16 GA (2)SEISMIC SWAYBRACING STRAP
NUT WITH WASHER(TYP. OF 2)
(TYP)
(TYP.)
INSTALL ROD STIFFENERWHEN LENGTH EXCEEDSTHE SCHEDULE LENGTH:
1/2
5/8
7/8
3/4
3/8
31
43
37
19
25
KEY NOTES:
1. SPACED VERTICALLY NOT MORE THAN 12' ON CENTERS.
2. SPACED HORIZONTALLY NOT MORE THAN 10' ON CENTERS.
3. SPACED NOT MORE THAN 8' ON CENTERS.
4. SAME GAUGE AS GALV. STEEL DUCT, 1" WIDE; OR NO. 18 GAUGE GALV. STEEL WIRE ON 10' CENTERS.
5. SAME GAUGE AS GALV. STEEL DUCT, 1" WIDE; OR NO. 8 GAUGE GALV. STEEL WIRE TIED TO 1" GALV. STEEL BAND AROUND DUCT ON 10' CENTERS.
6. SAME GAUGE AS GALV. STEEL DUCT, 1-1/2" WIDE ON 6' CENTERS.
7. SAME GAUGE AS GALV. STEEL DUCT, 1-1/2" WIDE ON 4' CENTERS.
REFER TO BEAM AND DECK
ATTACHMENTS DETAILS FOR
APPLICABLE CONTINUATION.
REFER TO B-LINE COOPER OR EQUAL
CHANNEL TYPE AND LOAD RATING
BASED ON BEAM SPAN FOR UNIFORM
AND CONCENTRATED LOADING.
VERTICAL
MAX.DUCT ø
IN.
METAL STRAP OR ANGLEBRACKET
(SEE NOTE 1 BELOW)
HORIZONTAL
METAL STRAP OR ANGLEBRACKET
(SEE NOTE 2 BELOW)
TRAPEZE-TYPE SUPPORTS
HORIZONTALSUPPORT ANGLE
(SEE NOTE 3 BELOW)RNDROD
ANGLE
HANGER
ROD SIZE,IN.
MAX. ROD LENGTH,IN.
CEILINGMOUNTEDCASSETTE FANCOIL UNIT
CL
CL
SA SA
RA
CONDENSATE DRAIN PIPE(REFER TO PLUMBINGDRAWINGS)
REFRIGERANTLIQUID PIPE
REFRIGERANTSUCTION PIPE
3/8"ø ALLTHREADED ROD(TYP. OF 4)
HANGER BRACKET(TYP. OF 4)
SPRINGISOLATOR(TYP. OF 4)
CEILING
TYPICAL CASSETTE TYPE FCU WITH SPRING ISOLATORS.DWG
SPRING TYPEVIBRATIONISOLATION
RUBBERIN SHEAR
HANGER ROD OR ASPER MANUFACTURE'SRECOMMENDATION
MAX.DUCT ø
IN.
MAX.DUCT ø
IN.
6PIPING MOUNTING AT ROOFNTS
2
e saurchitec uretrban design
SHEET NUMBER:
PROJECT NUMBER:
DATE:
ISSUE:
SHEET TITLE:
PROJECT:
CLIENT:
201320.21
ARCHITECT:ELS Architecture & Urban Design2040 Addison StreetBerkeley, CA 94704TEL: 510.549.2929
STRUCTURAL ENGINEER:IDA STRUCTURAL ENGINEERS, INC1629 TELEGRAPH AVENUE, SUITE 300OAKLAND, CA 94612TEL: (510) 834-1629
MECHANICAL,ELECTRICAL AND
PLUMBING ENGINEERS:YEI ENGINEERS, INC.7677 OAKPORT ST. SUITE 200OAKLAND, CA 94621TEL: (510) 383-1050
CIVIL ENGINEERS:BKF ENGINEERS300 FRANK OGAWA PLAZA, #380OAKLAND, CA 94612TEL: (510) 899-7300
PROJECT TEAM:
STAMP:
PERMIT SET
MECHANICAL DETAILS
M501
04/22/19
CITY OF BERKELEY
PUBLIC WORKS DEPARTMENT
LIVE OAKCOMMUNITY
CENTERUPGRADE
1947 CENTER STREET, 4TH FL
BERKELEY, CA 94704
1301 Shattuck Ave
Berkeley, CA 94704
M30258
S
TA T E OF CA L IFORNIA
RE
GIS
TE
RE
DPROFESSIONA
LEN
GIN
EE
R
ME C H A N I C A
L
PA
TR
I CK R . M A L
LI L
LI N
A
A
REVISION
NUMBER DATE DESCRIPTION
A 07/15/19 PLAN CHECK 1SET
2 08/20/19 ADDENDUM 2
A
FA
CP
SBSB TSW
GF
CI
GF
CI
GF
CI
GF
CI
GF
CI
GF
CI
GFCI
GFCI
J
J
GF
CI
JGFCI
J
J
J
J J
GF
CI
GFCI
B
D
E
F
G
H
I
D.6
G.4
G.1
6 7 8 9 10 119.1 9.66.2
PANEL B
LIGHTING CONTROL PANEL
(N) FIRE ALARM ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL
MAIN SWITCHBOARD
(E) PANEL S
E113
1
E113
2
E113
3
CRAFTS ROOM
106
TOT ROOM
105(E) FIRESIDE ROOM
104THEATER LOBBY
103
(E) THEATER
102
(E) STAGE
137
MAIN LOBBY
101
STORAGE
108
HALLWAY
107
STORAGE
109
KITCHEN
110
(E) WOMEN'S RM
112
(E) MEN'S RM
113
OFFICE
120
STORAGE
121
ADMIN
119
(E) HALLWAY
118
MEN'S RM
117
WOMEN'S RM
116
RECEPTION
115
(E) DRESSING ROOM
136
(E) DRESSING ROOM
135
(E) SOCIAL HALL
114
MANUAL TRANSFER SWITCH
GENERATOR TAP BOX
(N) RESTROOM
111
WH
4
IWH
1
M
M
CU
2
CU
1
M
M
M
FCU
6
FCU
5
FCU
7
STORAGE
109B
1 2 3 4 5
PANEL C
PANEL D
CF
1
CF
2
+42"
1
2
2
2
1
3
3
2
2
4
4
4
12
4
8
8
86
10
6
5
75
75
5 7
9
9
9
13,15 RESTROOM
122
A
C
C - 1,2,3,48#10, 1#10G, 3/4"C
C - 6,8,106#10, 1#10G, 3/4"C
14,16,18
14,16,18 ~
~
~
~
~
~
14,16,18
D - 14,16,183#10, 1#10G, 3/4"C
16
1616
16
16
20
20
D - 202#12, 1#12G, 3/4"C
C - 5,7,16,188#10, 1#10G, 3/4"C
18
M
1,3,5
2,4,6
8,10,12
D - 2,4,63#4, 1#10G, 1"C
D - 8,10,123#4, 1#10G, 1"C
D - 1,3,53#6, 1#10G, 3/4"C
PANEL A 1
2
18
18
20
24
22
22
C - 18,20,22,248#10, 1#10G, 3/4"C
4
4
4
4
4PANEL E
C - 13,152#10, 1#10G, 3/4"C
C - 122#12, 1#12G, 3/4"C
14C - 142#12, 1#12G, 3/4"C
C - 92#12, 1#12G, 3/4"C
7
5 5 5
7
9
9
9
9
9
8
8
38,40,42
8
E - 5,7,8,98#10, 1#10G, 3/4"C
E - 38,40,423#10, 1#10G, 3/4"C
21
14
2
29
29
S
22
8
23
+42"
E - 31,33,353#1, 1#8G, 1-1/4"CE - 37,39,413#4, 1#10G, 1"C
12
12
5
E - 21,234#10, 1#10G, 3/4"C
E - 2,12,296#10, 1#10G, 3/4"C
E - 142#10, 1#10G, 3/4"C D9
GFCIGFCI
GFCI
6
D - 7,9,113#6, 1#10G, 3/4"C
M
GFCI /WP
6
6
6
S 8
S
S
8
8
S
9
7
S
S
10
10
E - 192#12, 1#12G, 3/4"C
ELECTRIC RANGE
KITCHEN HOOD 11
GARBAGE DISPOSAL
A
A
A
A
A
A
A
A
A
A
A
A
12TYP
E112
2 BID ALTERNATE
KITCHEN OPTION(SEE 2/E112 FOR
BASE BID KITCHEN OPTION)
CU
3
7,9,11
M
SD - 262#12, 1#12G, 3/4"C
M
S
A - 92#12, 1#12G, 3/4"C
EF
2
EF
3
1 10
10
E
F
D.6
9 9.1 9.6
D9
GFCI
GFCI
2
2 2 +42"
E - 21,234#10, 1#10G, 3/4"C
GFCI
GFCI+42"
PANEL E
E - 2,12,296#10, 1#10G, 3/4"C
29
21 23
4
e saurchitec uretrban design
SHEET NUMBER:
PROJECT NUMBER:
DATE:
ISSUE:
SHEET TITLE:
PROJECT:
CLIENT:
201320.21
ARCHITECT:ELS Architecture & Urban Design2040 Addison StreetBerkeley, CA 94704TEL: 510.549.2929
STRUCTURAL ENGINEER:IDA STRUCTURAL ENGINEERS, INC1629 TELEGRAPH AVENUE, SUITE 300OAKLAND, CA 94612TEL: (510) 834-1629
MECHANICAL,ELECTRICAL AND
PLUMBING ENGINEERS:YEI ENGINEERS, INC.7677 OAKPORT ST. SUITE 200OAKLAND, CA 94621TEL: (510) 383-1050
CIVIL ENGINEERS:BKF ENGINEERS300 FRANK OGAWA PLAZA, #380OAKLAND, CA 94612TEL: (510) 899-7300
PROJECT TEAM:
STAMP:
PERMIT SET
POWER PLAN NEW -LEVEL 1
E112
04/22/19
CITY OF BERKELEY
PUBLIC WORKS DEPARTMENT
LIVE OAKCOMMUNITY
CENTERUPGRADE
1947 CENTER STREET, 4TH FL
BERKELEY, CA 94704
1301 Shattuck Ave
Berkeley, CA 94704
1/8" = 1'-0"1POWER PLAN NEW - LEVEL 1
N
SHEET NOTES:
1. SEE SHEET E001 FOR GENERAL NOTES, ABBREVIATIONS, AND LEGEND
2. ALL EQUIPMENT SHOWN ARE NEW, UNO.
3. CONTRACTOR TO MAINTAIN CONTINUITY AND POWER TO UNAFFECTED EQUIPMENT, LOADS, DEVICES, ETC OUTSIDE OF PROJECT BOUNDARIES.
4. SEE DRAWING E611 FOR SINGLE LINE.
5. SEE DRAWING E602 AND E603 FOR PANEL SCHEDULES.
6. ALL EXPOSED CONDUITS SHALL BE GROUPED AND CONDENSED IN ORDERLY MANNER. PROVIDE MOCKUP OF CONDUIT ROUTING FOR ARCHITECTURAL REVIEW PRIOR TO INSTALLATION.
7. PROVIDE ANCHORED SLEEPERS FOR ROOFTOP CONDUITS. SEE DETAIL 5, DWG E502.
KEY NOTES:
RECONNECT (E) LOADS TO (N) PANEL.
PROVIDE (N) RECEPTACLE AT (E) RECEPTACLE LOCATION.
HOME RUN (N) 2#12, 1#12G IN (E) CONDUIT.
SEE SINGLE LINE FOR FEEDER AND RACEWAY REQUIREMENTS. FEEDER CONDUITS TO SWITCHBOARD SHALL BE ROUTED ON ROOF.
PROVIDE CORD REEL DROP DOWN RECEPTACLE. MOUNT ON CEILING.
PROVIDE 60A, NEMA 3R DISCONNECT.
PROVIDE 30A DISCONNECT.
PROVIDE 20A, 3 PHASE MOTOR RATED TOGGLE SWITCH SICONNECT WITHIN SIGHT OF EQUIPMENT. COORDINATE WITH MECHANICAL CONTRACTOR FOR FINAL LOCATIONS
PROVIDE 30A, 2 POLE TOGGLE SWITCH DISCONNECT OF EQUIPMENT.
PROVIDE 20A TOGGLE SWITCH DISCONNECT WITHIN SIGHT OF LOAD EQUIPMENT.
PROVIDE CONNECTION TO RELOCATED KITCHEN HOOD. COORDINATE WITH MECHANICAL CONTRACTOR FOR FINAL LOCATION.
PROVIDE PRINTED IDENTIFICATION DIFFERENTIATING CONTROLLED AND UNCONTROLLED RECEPTACLES. RECEPTACLES SHALL BE CONTROLLED BY SAME OCCUPANCY SENSOR CONTROLLING LIGHTS WITHIN THE SAME ENCLOSED ROOM.
1
2
3
4
5
E14107
S
TA T E OF CA L IFORNIA
RE
GIS
TE
RE
DPROFESSIONA
LEN
GIN
EE
R
EL E C T R I C A
L
GE
OR
G E W K C H
EU
NG
REVISION
NUMBER DATE DESCRIPTION
A 07/15/19 PLAN CHECK 1SET
1 08/12/19 ADDENDUM 1
2 08/20/19 ADDENDUM 2
6
7
8
9
10
11
A12
1/8" = 1'-0"2POWER PLAN NEW - BASE BID KITCHEN
1
1
1
1
12
2
B
D
E
F
G
H
I
D.6
G.4
G.1
6 7 8 9 10 119.1 9.66.2
M M M M
FCU
1
FCU
2
FCU
3
FCU
4
1 2 3 4 5
A
C
D9
D-13,15,173#12, 1#12, 3/4"C
D-19,21,233#12, 1#12, 3/4"C
D-31,33,353#12, 1#12, 3/4"C
C-172#12, 1#12, 3/4"C
GFCI/WP
1
1
1
D-25,27,293#12, 1#12, 3/4"C
12
1
12
12 12
GFCI/WPGFCI/WPGFCI/WP
M
EF
1S
D - 222#120, 1#12G, 3/4"C
2
e saurchitec uretrban design
SHEET NUMBER:
PROJECT NUMBER:
DATE:
ISSUE:
SHEET TITLE:
PROJECT:
CLIENT:
201320.21
ARCHITECT:ELS Architecture & Urban Design2040 Addison StreetBerkeley, CA 94704TEL: 510.549.2929
STRUCTURAL ENGINEER:IDA STRUCTURAL ENGINEERS, INC1629 TELEGRAPH AVENUE, SUITE 300OAKLAND, CA 94612TEL: (510) 834-1629
MECHANICAL,ELECTRICAL AND
PLUMBING ENGINEERS:YEI ENGINEERS, INC.7677 OAKPORT ST. SUITE 200OAKLAND, CA 94621TEL: (510) 383-1050
CIVIL ENGINEERS:BKF ENGINEERS300 FRANK OGAWA PLAZA, #380OAKLAND, CA 94612TEL: (510) 899-7300
PROJECT TEAM:
STAMP:
PERMIT SET
POWER PLAN NEW -ROOF
E114
04/22/19
CITY OF BERKELEY
PUBLIC WORKS DEPARTMENT
LIVE OAKCOMMUNITY
CENTERUPGRADE
1947 CENTER STREET, 4TH FL
BERKELEY, CA 94704
1301 Shattuck Ave
Berkeley, CA 94704
1/8" = 1'-0"1POWER PLAN NEW - ROOF
N
E14107
S
TA T E OF CA L IFORNIA
RE
GIS
TE
RE
DPROFESSIONA
LEN
GIN
EE
R
EL E C T R I C A
L
GE
OR
G E W K C H
EU
NG
REVISION
NUMBER DATE DESCRIPTION
A 07/15/19 PLAN CHECK 1SET
1 08/12/19 ADDENDUM 1
2 08/20/19 ADDENDUM 2
SHEET NOTES:
1. SEE SHEET E001 FOR GENERAL NOTES, ABBREVIATIONS, AND LEGEND
2. ALL EQUIPMENT SHOWN ARE NEW, UNO.
3. PROVIDE ANCHORED SLEEPERS FOR ROOFTOP CONDUITS. SEE DETAIL 5, DWG E501. SEE E112 FOR ADDITIONAL ROOFTOP CONDUIT SCOPE OF WORK.
KEY NOTES:
PROVIDE 30A, NEMA 3R DISCONNECT.
PROVIDE 20A TOGGLE SWITCH DISCONNECT.
1
A
A
1
2 1
2
GROUNDING CONDUCTORAS SHOWN ON PLAN
GROUND CONNECTORNEMA TWO-HOLE LUG DRILL & TAP2 HOLES FOR 3/8"-16 UNC BOLTS
EXOTHERMIC WELD
FINISHED GRADE
NOTE:GROUND GRID CONNECTORAS SHOWN ON PLAN
COPPER CLAD GROUNDROD 3/4" DIA. x 10' LONG
FINISHED GRADE
2'-0"
GROUND ROD
MARKING ON COVER
PROVIDE "GROUND ROD"
CONNECTOR
ROD-TO-WIRE
PEA GRAVEL FILLED
#4/0 B.S. CUGROUND WIRE
COPPER CLAD STEEL3/4" DIA. X 10' LONG
REINFORCED BOX
GROUND ROD BOX
8 1/2"x 11 3/4" INSIDE
DIM. HIGH DENSITY
18"
2"
3"
6"
24"
MIN
. FR
OM
FIN
AL
GR
AD
E
BEDDING MATERIAL
(AS REQUIRED)
FINAL GRADE
PVC CONDUIT QUANTITY AS NEEDED CONDUITSPACING SHALL BE 3" MIN EDGE TO EDGE
1-6# AWG CU BARESTRANDED GROUND
MAGNETICALLY DETECTABLE WARNING TAPEPLACE A MINIUMUM OF 12" BELOW FINISHEDGRADE
SELECT BACKFILL 95%COMPACTION
e saurchitec uretrban design
SHEET NUMBER:
PROJECT NUMBER:
DATE:
ISSUE:
SHEET TITLE:
PROJECT:
CLIENT:
201320.21
ARCHITECT:ELS Architecture & Urban Design2040 Addison StreetBerkeley, CA 94704TEL: 510.549.2929
STRUCTURAL ENGINEER:IDA STRUCTURAL ENGINEERS, INC1629 TELEGRAPH AVENUE, SUITE 300OAKLAND, CA 94612TEL: (510) 834-1629
MECHANICAL,ELECTRICAL AND
PLUMBING ENGINEERS:YEI ENGINEERS, INC.7677 OAKPORT ST. SUITE 200OAKLAND, CA 94621TEL: (510) 383-1050
CIVIL ENGINEERS:BKF ENGINEERS300 FRANK OGAWA PLAZA, #380OAKLAND, CA 94612TEL: (510) 899-7300
PROJECT TEAM:
STAMP:
PERMIT SET
DETAILS
E502
04/22/19
CITY OF BERKELEY
PUBLIC WORKS DEPARTMENT
LIVE OAKCOMMUNITY
CENTERUPGRADE
1947 CENTER STREET, 4TH FL
BERKELEY, CA 94704
1301 Shattuck Ave
Berkeley, CA 94704
12" = 1'-0"1DETAIL EQUIPMENT GFROUND CONNECTOR
12" = 1'-0"2DETAIL GROUND ROD
12" = 1'-0"3DETAIL GROUND WELL
12" = 1'-0"4DETAIL - TRENCHING
E14107
S
TA T E OF CA L IFORNIA
RE
GIS
TE
RE
DPROFESSIONA
LEN
GIN
EE
R
EL E C T R I C A
L
GE
OR
G E W K C H
EU
NG
REVISION
NUMBER DATE DESCRIPTION
A 07/15/19 PLAN CHECK 1SET
2 08/20/19 ADDENDUM 2
NTS5DETAIL CONDUIT MOUNTING AT ROOF
2
Ckt.
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
Panel
Bus
Main
Lugs
NEMA
Description
(E) EXIT LIGHTS
(E) HOUSE LITE DIMMER
SPARE
(E) UNIDENTIFIED
RESTROOM 111 - EXHAUST FAN EF-3
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
Type:
C
H
K
L
M
R
A
100A
100A
---
1
CB
20/1
20/1
20/1
20/1
15/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
Type
L
L
H
Computer
HVAC
Kitchen
Lighting
Misc.
Recept.
Total
Load
200
1000
172
Connected
-
3,688
-
1,351
-
3,060
8,099
Ph.
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
Voltage
KAIC
Location
Mounting
Remark
Load
1080
540
360
151
360
180
360
180
1758
1758
0
Demand
-
4,567
-
1,689
-
3,060
9,316
208/120V, 3PH, 4W
22
STAGE ROOM 137
SURFACE
Type
R
R
R
L
R
R
R
R
H
H
H
=
CB
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/3
Ph.
A
B
C
26
Description
(E) STAGE
SPARE
(E) RECEPT ORCHESTRA PIT
SPARE
(E) RECEPT STAGE SOUTH WALL
SPARE
SPARE
LTG - RM 111, MEZZ NORTH, EXTERIOR ELEC RM
RECP - RM 135
RECP - RM 135 GFCI
RECP - RM 136
RECP - RM 136 GFCI
PANEL HR-1
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
3218
3801
1080
Amps
Ckt.
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
Ckt.
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
Panel
Bus
Main
Lugs
NEMA
Description
LIGHTING - RM 104
LIGHTING - RM 105,106
LIGHTING - RM 114
LIGHTING - RM 114
LIGHTING - PERIMETER THEATER
LIGHTING - PERIMETER
(E) BASKETBALL LIGHTS
EMERGENCY LIGHTING UPS
SPARE
SPARE
SPARE
SPARE
SPARE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
Type:
C
H
K
L
M
R
B
225A
225A
---
1
CB
20/1
20/1
20/1
20/1
20/1
20/1
50/3
20/1
20/1
20/1
20/1
20/1
20/1
Type
L
L
L
L
L
L
L
L
L
L
Computer
HVAC
Kitchen
Lighting
Misc.
Recept.
Total
Load
704
880
928
928
156
312
4000
4000
4000
1446
Connected
-
-
-
36,884
-
-
36,884
Ph.
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
Voltage
KAIC
Location
Mounting
Remark
Load
257
72
499
555
1500
1500
5000
5000
5000
84
63
Demand
-
-
-
36,884
-
-
36,884
208/120V, 3PH, 4W
22
ELECTRICAL CLOSET (RECEPTION)
SURFACE
Type
L
L
L
L
L
L
L
L
L
L
L
=
CB
20/1
20/1
20/1
20/1
20/1
20/1
60/3
20/1
20/1
20/1
20/1
20/1
20/1
Ph.
A
B
C
102
Description
LIGHTING - RM 101,103,107, 118
SIGNAGE LIGHTING
LTG - RM 108,109,110,111,112,,113, MECH YD
LIGHTING - RM 115,116,117,119,120,121
NORTH TENNIS LIGHTS
(E) SOUTH TENNIS LIGHTS
(E) TENNIS COURTS
LIGHTING - MEZZANINE WEST
LIGHTING - MEZZANINE EAST
SPARE
SPARE
SPARE
SPARE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
12974
11671
12239
Amps
Ckt.
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
Ckt.
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
Panel
Bus
Main
Lugs
NEMA
Description
RECP - RM 119,120
RECP - RM 119
RECP - RM 114
RECP - RM 114
RECP - RM 101,103, H20 FOUNTAIN
FIRE DUCT DETECTOR
WATER HEATER - RM 122
RECP - ROOF
WATER HEATER WH-1- ATTIC
WATER HEATER WH-2 - ATTIC
SPARE
SPARE
SPARE
SPARE
(E) STAGE A.V. CAB
(E) UNIDENTIFIED
(E) UNIDENTIFIED
(E) UNIDENTIFIED
Type:
C
H
K
L
M
R
C
100A
100A
---
1
CB
20/1
20/1
20/1
20/1
20/1
20/1
30/2
20/1
20/2
30/2
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
Type
R
R
R
R
R
R
R
R
R
R
R
R
R
Computer
HVAC
Kitchen
Lighting
Misc.
Recept.
Total
Load
1000
1000
720
540
860
50
2050
2050
720
1000
1000
2000
2000
Connected
-
-
-
-
-
26,750
26,750
Ph.
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
Voltage
KAIC
Location
Mounting
Remark
Load
900
1260
360
1500
1500
500
200
900
180
1140
2080
1140
100
Demand
-
-
-
-
-
18,375
18,375
208/120V, 3PH, 4W
22
ELECTRICAL CLOSET (RECEPTION)
SURFACE
Type
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
=
CB
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
60/3
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
Ph.
A
B
C
51
Description
RECP - RM 119,120,121
RECP - RM 116,117 ELEC CLOSET, H20 FOUNTAIN
RECP - RM 115
RECP - RM 115
TELE COMM RECP - RM 115
FIRE ALARM CONTROL PANEL
FIRE ALARM ANNUNCIATOR PANEL
RECP RM 108, 109, 109B
RECP - EXTERIOR EAST
PANEL HR-2
SUPPLY FAN SF-2 CONTROLLER
SPARE
SPARE
SPARE
SPARE
(E) UNIDENTIFIED
(E) UNIDENTIFIED
(E) UNIDENTIFIED
(E) UNIDENTIFIED
10430
10650
5670
Amps
Ckt.
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
Ckt.
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
Panel
Bus
Main
Lugs
NEMA
Description
CU-1
CU-3
FCU-1
FCU-2
FCU-3
FCU-4
SPACE
SPACE
SPACE
Type:
C
H
K
L
M
R
D
225A
225A
---
1
CB
50/3
50/3
15/3
15/3
15/3
15/3
Type
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
Computer
HVAC
Kitchen
Lighting
Misc.
Recept.
Total
Load
4203
4203
4203
4203
4203
4203
481
481
481
481
481
481
481
481
481
481
481
481
Connected
-
66,071
-
-
-
-
66,071
Ph.
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
Voltage
KAIC
Location
Mounting
Remark
Load
5452
5452
5452
5452
5452
5452
591
591
591
240
348
8
Demand
-
68,797
-
-
-
-
68,797
208/120V, 3PH, 4W
22
ELECTRICAL CLOSET (HALLWAY)
SURFACE
Type
H
H
H
H
H
H
H
H
H
H
H
H
H
=
CB
60/3
60/3
20/3
20/1
15/1
15/1
15/1
20/1
20/1
Ph.
A
B
C
191
Description
CU-2
CU-2
FCU-5, FCU--6, FCU-7
SOCIAL HALL - CEILING FAN CF-1, CF-2
HALLWAY 107 - EXHAUST FAN EF-1
(E) RESTROOM 116,117 - EXHAUST FAN
RESTROOM 122 - EXHAUST FAN EF-2
SPARE
SPARE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
22073
22173
21825
Amps
Ckt.
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
e saurchitec uretrban design
SHEET NUMBER:
PROJECT NUMBER:
DATE:
ISSUE:
SHEET TITLE:
PROJECT:
CLIENT:
201320.21
ARCHITECT:ELS Architecture & Urban Design2040 Addison StreetBerkeley, CA 94704TEL: 510.549.2929
STRUCTURAL ENGINEER:IDA STRUCTURAL ENGINEERS, INC1629 TELEGRAPH AVENUE, SUITE 300OAKLAND, CA 94612TEL: (510) 834-1629
MECHANICAL,ELECTRICAL AND
PLUMBING ENGINEERS:YEI ENGINEERS, INC.7677 OAKPORT ST. SUITE 200OAKLAND, CA 94621TEL: (510) 383-1050
CIVIL ENGINEERS:BKF ENGINEERS300 FRANK OGAWA PLAZA, #380OAKLAND, CA 94612TEL: (510) 899-7300
PROJECT TEAM:
STAMP:
PERMIT SET
PANEL SCHEDULES
E602
04/22/19
CITY OF BERKELEY
PUBLIC WORKS DEPARTMENT
LIVE OAKCOMMUNITY
CENTERUPGRADE
1947 CENTER STREET, 4TH FL
BERKELEY, CA 94704
1301 Shattuck Ave
Berkeley, CA 94704
E14107
S
TA T E OF CA L IFORNIA
RE
GIS
TE
RE
DPROFESSIONA
LEN
GIN
EE
R
EL E C T R I C A
L
GE
OR
G E W K C H
EU
NG
REVISION
NUMBER DATE DESCRIPTION
A 07/15/19 PLAN CHECK 1SET
2 08/20/19 ADDENDUM 2
SHEET NOTES:
1. EXISTING LOADS ARE BASED ON AS-BUILT DRAWINGS AND LIMITED FIELD VISITS. LOADS ARE ESTIMATED AND SHALL BE VERIFIED.
2. PROVIDE COMPUTER PRINTED FIELD PANEL SCHEDULE INSERTS
A
A
A
A
2
FA
CP
FA
AF
AA
B
D
E
F
G
H
I
D.6
G.4
G.1
6 7 8 9 10 11
9.1 9.66.2
N
(E) 6" SS
(E) 6" SS
(E) 6" SS
(E) 4" SS
104
FIRESIDE
ROOM
102
THEATER
103
THEATER
LOBBY
105
TOT ROOM
106
CRAFTS
ROOM
133
STORAGE
111
KITCHEN
112
WOMEN'S RM
113
MEN'S RM
114
SOCIAL HALL
110
JANITOR
109
STORAGE
101
LOBBY
108
STORAGE
107
HALLWAY
115
RECEPTION
118
HALLWAY
116
WOMEN'S RM
117
MEN'S RM
119
ADMIN
120
ADMIN
121
STORAGE
(E) MH
(E) MH
P202
1
P203
1
P202
5
P204
1
P204
3
P202
7
P202
2
P202
3
P202
4
P202
6
P203
2
P203
3
P203
4 P204
2
P204
4
P202
8
1 2 3 4 5
(N) 1 1/2" CW, BF@ 287.13' IE
1
4" SS, BF @ 285.0' IE1 COTG
(N) 4" SS, BF
(N) 1 1/2" CW, BF
(N) FCO
1" CD
1" CD
1" CD
CO
CO
A
C
D9
FCU
6
FCU
5
FCU
7
RC
2
RC
1
3
3
3
3 3
3
1%
S
LO
PE
1%
S
LO
PE
A
4
1
1
1
12
E
F
D.6
9
9.1 9.6
D9
e saurchitec uretrban design
SHEET NUMBER:
PROJECT NUMBER:
DATE:
ISSUE:
SHEET TITLE:
PROJECT:
CLIENT:
201320.21
ARCHITECT:ELS Architecture & Urban Design2040 Addison StreetBerkeley, CA 94704TEL: 510.549.2929
STRUCTURAL ENGINEER:IDA STRUCTURAL ENGINEERS, INC1629 TELEGRAPH AVENUE, SUITE 300OAKLAND, CA 94612TEL: (510) 834-1629
MECHANICAL,ELECTRICAL AND
PLUMBING ENGINEERS:YEI ENGINEERS, INC.7677 OAKPORT ST. SUITE 200OAKLAND, CA 94621TEL: (510) 383-1050
CIVIL ENGINEERS:BKF ENGINEERS300 FRANK OGAWA PLAZA, #380OAKLAND, CA 94612TEL: (510) 899-7300
PROJECT TEAM:
STAMP:
PERMIT SET
PLUMBING NEW WORKPLAN
P201
04/22/19
CITY OF BERKELEY
PUBLIC WORKS DEPARTMENT
LIVE OAKCOMMUNITY
CENTERUPGRADE
1947 CENTER STREET, 4TH FL
BERKELEY, CA 94704
1301 Shattuck Ave
Berkeley, CA 94704
1/8" = 1'-0"1PLUMBING NEW WORK PLAN
SHEET NOTES:
1. SEE SHEET P001 FOR PLUMBING GENERAL NOTES, LEGEND AND ABBREVIATIONS.
2. SEE SHEET P002 FOR PLUMBING SCHEDULES.
3. ALL PLUMBING WORK IS NEW WORK, UNO.
4. AT FCU-5, FCU-6 AND FCU-7, PUMP CONDENSATE TO CD PIPING IN MEZZANINE AND RUN CD PIPING DOWN IN-WALL TO LAVATORY DRAIN TAILPIECE.
KEY NOTES:
REFER TO CIVIL DRAWINGS FOR PIPING CONTINUATION.
3/4" CD PIPING RISER FROM MECHANICAL EQUIPMENT ON ROOF. REFER TO SHEET P205 FOR PIPING RISER CONTINUATION.
REFER TO MECHANICAL DRAWINGS FOR MECHANICAL EQUIPMENT INFORMATION.
REFER TO DRAWING P204 FOR PLUMBING NEW WORK SCOPE BID ALTERNATE.
REFER TO DRAWINGS 2/P201 AND 2/P205 FOR PLUMBING NEW WORK SCOPE BASE BID.
BASE BID - ALL EXISTING SEWER AND VENT PIPING TO REMAIN IN PLACE.
1
2
M30258
S
TA T E OF CA L IFORNIA
RE
GIS
TE
RE
DPROFESSIONA
LEN
GIN
EE
R
ME C H A N I C A
L
PA
TR
I CK R . M A L
LI L
LI N
3 A
A
A
A
REVISION
NUMBER DATE DESCRIPTION
A 07/15/19 PLAN CHECK 1SET
A1 07/17/19 UPDATE A1
1 08/12/19 ADDENDUM 1
2 08/20/19 ADDENDUM 2
5
4
5
1/8" = 1'-0"2PLUMBING ENLARGED PLAN - SS & V - (E) KITCHEN - BASE BID
6
6
A1
A1
A1
2
B
1
(N) 2" SS,BF
(E)4"SS,BF
1
(N)2"V RISER UP
(N)2"V,BF
(N)4"SS,BF
(N)WC-1
(N)L-1
(N)2"SS,BF
(N)2"SS,BF
(N)FCO
(N)4" SS,BF(N)2"SS,BF
(N)L-1
(N) WCO
1
1(N) WCO
1
1
B
1
(N)L-1
432
(E)1 1/2" CW, BF
(N)1" CWWHA
(N)WC-1
(N)L-1
4
1
1
B
1
WH
1
7 8
(N) 3/4" T&P DRAIN
(N) 3/4" DRAIN PAN DRAIN
(N) 1 1/2"V RISER IN-WALL FROM GROUND FLR
(N) 1 1/2"V RISER IN-WALL FROM GROUND FLR
1 1/2"V ABOVE ATTIC FLR
10 11
2"V ABOVE ATTIC FLR
9
(N)2"SS RISER DN IN-WALL TO GROUND FLR
(N)1 1/2"V ABOVE ATTIC FLR
(N)2"V RISER FROM GROUND FLR
B
1
7 8
WH
1
12
(N)1/2"CW & (N)1/2"HW RISER DNIN-WALL TO GROUND FLR
(N)3/4"HW ABOVE ATTIC SPACE FLR
(N)3/4"CW ABOVE ATTIC SPACE FLR
(N)1/2"CW & (N)1/2"HW RISER DN IN-WALL TO GROUND FLR
B
7
(N) FCO
DF-1(N) 2" VTR
(N) 2" V, AC
(N) 2" SS, BF
(N) FCO
(N) 2" SS, BF
(N) 1 1/2" V
(N) 4" SS, BF
(N) 4" SS, BF
(N) 2" V RISERTO BF
18
(N) FD
19
1" CD, AC
A
2
B
7
IWH
1
WHY-1
1/2" CW,AC
1/2" CW RISERDN TO DF-1
WHA
1" CW
1 1/2" CWRISER UP TOABOVE FLR
1/2" CWRISER DN
A
WC-1
FD-1L-1
1
11
SK-213
WH
4
(E) GCO
16
(E) 1 1/2" VTR
(N) 2" SS, BF
(N) 1 1/2" V, BF
(E) 3" SS, BF
14
SK-1 13
(N) FS-1
15
(N) 1 1/2" V RISERFROM BELOW FLR
20
C
1
1
11
WH
4
(E) 3/4" CW, BF
(E) 3/4" CW, BF
(E) 3/4" CW, BF
(N) 3/4" CW
17
(N) 3/4" HWBELOW COUNTER
(N) 3/4" CWBELOW COUNTER
(N) 1/2" CWBELOW COUNTER
(N) 1/2" HWBELOW COUNTER
16
C
e saurchitec uretrban design
SHEET NUMBER:
PROJECT NUMBER:
DATE:
ISSUE:
SHEET TITLE:
PROJECT:
CLIENT:
201320.21
ARCHITECT:ELS Architecture & Urban Design2040 Addison StreetBerkeley, CA 94704TEL: 510.549.2929
STRUCTURAL ENGINEER:IDA STRUCTURAL ENGINEERS, INC1629 TELEGRAPH AVENUE, SUITE 300OAKLAND, CA 94612TEL: (510) 834-1629
MECHANICAL,ELECTRICAL AND
PLUMBING ENGINEERS:YEI ENGINEERS, INC.7677 OAKPORT ST. SUITE 200OAKLAND, CA 94621TEL: (510) 383-1050
CIVIL ENGINEERS:BKF ENGINEERS300 FRANK OGAWA PLAZA, #380OAKLAND, CA 94612TEL: (510) 899-7300
KEY PLAN:
PROJECT TEAM:
STAMP:
PERMIT SET
PLUMBING NEW WORKENLARGED PLANS
P202
04/22/19
CITY OF BERKELEY
PUBLIC WORKS DEPARTMENT
LIVE OAKCOMMUNITY
CENTERUPGRADE
1947 CENTER STREET, 4TH FL
BERKELEY, CA 94704
1301 Shattuck Ave
Berkeley, CA 94704
SHEET NOTES:
1. REFER TO DRAWING P001 FOR PLUMBING GENERAL NOTES, ABBREVIATIONS AND LEGEND.
2. REFER TO DRAWING P002 FOR PLUMBING EQUIPMENT SCHEDULES.
3. PLUMBING SYSTEM HAS LIMITED RECORD DRAWINGS. CONTRACTOR SHALL FIELD VERIFY INSTALLATION AND ROUTING PRIOR TO PLUMBING WORK AND SHALL NOTIFY THE CITY’S REPRESENTATIVE OF EXISTING CONDITION. CONTRACTOR SHALL PROVIDE AS-BUILT CONDITION.
4. COORDINATE ALL WORK AND SHUTDOWNS WITH THE CITY’S REPRESENTATIVE. CONTRACTOR SHALL PROVIDE ALL MATERIALS AND EQUIPMENT NECESSARY SO THAT NO UTILITY SERVICE TO BUILDING WILL BE INTERRUPTED.
5. CONTRACTOR SHALL REPAIR ALL SURFACES DAMAGED OR AFFECTED BY THE DEMOLITION OPERATIONS WITH FINISH TO MATCH EXISTING CONDITION.
6. CONTRACTOR SHALL DISPOSE ALL DEMOLISHED EQUIPMENT, PIPEWORK, ASSOCIATED ACCESSORIES AND MATERIALS OFF PROJECT SITE. NO DEMOLISHED EQUIPMENT AND/OR MATERIALS SHALL BE TURNED OVER TO THE CITY, COUNTY OR OTHER GOVERNMENT AGENCY.
7. CONTRACTOR SHALL INCLUDE COST FOR SAW CUTTING AND PATCHING OF EXISTING FLOORS TO MATCH EXISTING CONDITION OR AS DIRECTED BY ARCHITECT FOR RECONNECTION TO THE EXISTING DRAIN AND VENT SYSTEMS, AND INSTALLATION OF NEW PLUMBING PIPING UNDER THE EXISTING FLOOR SLAB.
8. DEMOLISH ALL ABANDON PIPING IN-WALL AND CAP PIPING BELOW FLOOR IF NOT IN USE.
9. ALL PLUMBING WORK INDICATED IS NEW WORK, UNO.
10. PROVIDE ANCHORED SLEEPERS AT ROOTOP PIPING. SEE SHEET P404 DETAIL 3 FOR DETAIL OF ANCHORAGE.
1/4" = 1'-0"1
PLUMBING ENLARGED PLAN - SS & V -THEATER RESTROOM
1/4" = 1'-0"2
PLUMBING ENLARGED PLAN - CW & HW -THEATER RESTROOM
1/4" = 1'-0"3
PLUMBING ATTIC PLAN - SS & VTHEATER RESTROOM
1/4" = 1'-0"4
PLUMBING ATTIC PLAN - CW & HWTHEATER RESTROOM
1/4" = 1'-0"5
PLUMBING ENLARGED PLAN - SS & V -THEATER LOBBY RESTROOM
1/4" = 1'-0"6
PLUMBING ENLARGED PLAN - CW & HW -THEATER LOBBY RESTROOM
1/4" = 1'-0"7
PLUMBING ENLARGED PLAN -SS & V - CRAFTS ROOM
1/4" = 1'-0"8
PLUMBING ENLARGED PLAN -CW & HW - CRAFTS ROOM
6
(N) 1/2"CW ABOVE ATTIC SPACE FLR
(N) 1/2"HW ABOVE ATTIC SPACE FLR
(N) 3/4" T&P DRAIN TO (N) FS-1 W/ 1" AIR GAP
M30258
S
TA T E OF CA L IFORNIA
RE
GIS
TE
RE
DPROFESSIONA
LEN
GIN
EE
R
ME C H A N I C A
L
PA
TR
I CK R . M A L
LI L
LI N
N
KEY NOTES:
CONNECT (N) 4” SS PIPING TO (E) 4” SS PIPING BELOW FLOOR COMPLETE WITH FITTINGS.
CONNECT (N) 1” CW PIPING TO (E) 1 1/2” CW PIPING RISER IN-WALL AND CONNECT TO (N) WATER CLOSET FLUSH VALVE COMPLETE WITH FITTINGS AND SUPPORTS.
CONNECT (N) 1” CW PIPING RISER TO (E) 1 1/2” CW PIPING RISER IN-WALL AND RISER UP TO ATTIC SPACE COMPLETE WITH FITTINGS AND SUPPORTS.
(N) 1/2” CW AND (N) 1/2” HW PIPING RISER FROM ATTIC SPACE AND DOWN TO LAVATORY FAUCET COMPLETE WITH (N) CHROME PLATED SOLID BRASS ANGLE STOP WITH LOOSE KEY, BRAIDED STAINLESS STEEL RISER AND CHROME PLATED STEEL FLANGE.
NOT USED.
CONNECT (N) 1” CW PIPING RISER TO (E) 1 1/2” CW PIPING RISER IN-WALL AT GROUND FLOOR COMPLETE WITH FITTINGS AND SUPPORTS.
PROVIDE WATER HEATER STAND (HOLDRITE MODEL QUICKSTAND) AND ANCHOR TO ATTIC FLOOR COMPLETE WITH DRAIN PAN (HOLDRITE) AND DRAIN PIPING CONNECTION.
1
2
3
4
PROVIDE SEISMIC WATER HEATER STRAP AND ANCHOR TO ATTIC WALL.
(N) 2” P-TRAP WITH TRAP PRIMER CONNECTION AND 7”DIAMETER INDIRECT WASTE FUNNEL (ZURN MODEL Z326).
CONNECT 2 NUMBERS OF 2” V PIPING TO (E) 2” VTR PIPING COMPLETE WITH FITTINGS AND SUPPORTS.
CONNECT 1 1/2” V PIPING TO (E) 2” VTR PIPING COMPLETE WITH FITTINGS AND SUPPORTS.
CONNECT (N) 1/2” CW PIPING TO (N) 2” P-TRAP WITH TRAP PRIMER CONNECTION FITTING COMPLETE WITH IN-WALL TRAP PRIMER, ISOLATION BALL VALVE, FITTINGS AND SUPPORTS.
INSTALL (N) COUNTER MOUNTED SINK WITH (N) 1 1/2” P-TRAP WITH CLEANOUT DRAIN, (N) TUBULAR WALL BEND, AND CONNECT TO (E) 2” SS PIPING RISER BELOW COUNTER COMPLETE WITH FITTINGS.
CONNECT (N) 2” SS TO (E) 3” SS PIPING BELOW FLOOR COMPLETE WITH FITTINGS.
CONNECT (N) 1 1/2” V PIPING RISER TO (E) 1 1/2” VTR PIPING BELOW COUNTER COMPLETE WITH FITTINGS AND SUPPORTS.
11
12
15
8
9
10
PROVIDE DRAIN PAN (HOLDRITE) BELOW WATER HEATER AND SEISMICALLY STRAP WATER HEATER TO WALL BELOW COUNTER.
CONNECT (N) 3/4" CW PIPING RISER TO (E) 3/4" CW PIPING RISER BELOW COUNTER COMPLETE WITH ISOLATION BALL VALVE, FITTINGS, AND SUPPORTS.
(N) 1 1/2" V PIPING RISER DOWN TO (N) FLOOR DRAIN AND CONNECT TO (N) SS PIPING BELOW FLOOR COMPLETE WITH FITTINGS AND SUPPORTS.
(N) 1" CD RISER FROM ROOF. CONNECT CD PIPING TO LAVATORY DRAIN TAILPIECE.
(N) 1" CD RISER FROM ROOF. CONNECT CD PIPING TO SINK DRAIN TAILPIECE.
16
17
18
19
20
5
6
7
13
14
A
A
A
A
A
A
A
A
A
A
A
A
REVISION
NUMBER DATE DESCRIPTION
A 07/15/19 PLAN CHECK 1SET
1 08/12/19 ADDENDUM 1
2 08/20/19 ADDENDUM 2
1
1
1
1
1
1
2
2
SECTION A
ELEVATION
A A
HW
HIGH DENSITY CALCIUM SILICATEASBESTOS-FREE TREATED WITH WATERREPELLANT STRUCTURAL INSERT 100 PSIMIN. COMPRESSION STRENGTH
12 GAUGE x 1 5/8" WIDE x 1 5/8" HEIGHT
HOT-DIPPED GALVANIZED PIPE STRAP (TYP.)
STUD WALL
GALVANIZED BOLT AND CHANNEL NUT WITH SPRING
NOTES:
CW/VENTSS
HWCW/VENTSS
1. PROVIDE STRUCTURAL CALCULATIONS AND SHOP
DRAWINGS FOR ANCHORING.
2. WRAP BARE PIPE WITH VIBRA CUSHION (B-LINE
MODEL B1999).
3. REFER TO ARCHITECTURAL DWGS. FOR WALL TYPE
AND DETAIL.
UNION
WALL
WALLWRAP PERFORATED GALVANIZED STEEL STRAPAROUND WH AT LEAST ONCE COMPLETE ANDSECURE TO ADJACENT WALL STRUCTURE (ATTWO POINTS MIN.) (TYP.)
COLD WATER SUPPLY
BALL VALVE
HOT WATER SUPPLY
INSULATION
TEMPERATUREAND PRESSURERELIEF VALVE
RELIEF OUTLETWASTE
NOTE: WATER HEATER INSTALLATION SHALL COMPLY WITH THE LATESTAPPLICABLE CODES AND STANDARDS.REFER TO ARCHITECTURAL DWGS. FOR WALL TYPE AND DETAIL.
GYPSUM BOARD
WOOD FRAMING (TYP.)
1/2" DIA. HEX BOLT WITHLOCK WASHER (TYP.)
1.
2.
STAINLESS STEEL DRAINPAN (HOLDRITE MODELQP)
WATER HEATER STAND(HOLDRITE MODEL 40-S)
4X BLOCKING WITH A24TOP AND BOTTOM EACHSIDE (TYP.)
HEAT WELDED LAP
CONTINUOUS PENETRATION
CAULK GRADE SEALANT
WATER-BLOCK OR UNDER METALBAND (EVERGUARD)
PIPE
SEALANT
MIN
.
MAX.
FLASHING 2-PLY
COPPERFLASHING
(E) ROOFING. REFER TOARCHITECTURAL DRAWINGSFOR DETAIL.
PIPE
4"
4"
9"
PREMOLDED SPLIT PIPE BOOT (EVERGUARD)
STAINLESS STEELDRAW BAND
OUTDOOR NEOPRENE TAPE
(E) ROOF. REFERTOARCHITECTURALDRAWINGS FORDETAIL.
2
e saurchitec uretrban design
SHEET NUMBER:
PROJECT NUMBER:
DATE:
ISSUE:
SHEET TITLE:
PROJECT:
CLIENT:
201320.21
ARCHITECT:ELS Architecture & Urban Design2040 Addison StreetBerkeley, CA 94704TEL: 510.549.2929
STRUCTURAL ENGINEER:IDA STRUCTURAL ENGINEERS, INC1629 TELEGRAPH AVENUE, SUITE 300OAKLAND, CA 94612TEL: (510) 834-1629
MECHANICAL,ELECTRICAL AND
PLUMBING ENGINEERS:YEI ENGINEERS, INC.7677 OAKPORT ST. SUITE 200OAKLAND, CA 94621TEL: (510) 383-1050
CIVIL ENGINEERS:BKF ENGINEERS300 FRANK OGAWA PLAZA, #380OAKLAND, CA 94612TEL: (510) 899-7300
PROJECT TEAM:
STAMP:
PERMIT SET
PLUMBING DETAILS
P404
04/22/19
CITY OF BERKELEY
PUBLIC WORKS DEPARTMENT
LIVE OAKCOMMUNITY
CENTERUPGRADE
1947 CENTER STREET, 4TH FL
BERKELEY, CA 94704
1301 Shattuck Ave
Berkeley, CA 94704
NTS1TYPICAL PIPE RISER SUPPORT DETAIL
NTS2TYPICAL ELECTRICAL HOT WATER HEATER INSTALLATION DETAIL
A
M30258
S
TA T E OF CA L IFORNIA
RE
GIS
TE
RE
DPROFESSIONA
LEN
GIN
EE
R
ME C H A N I C A
L
PA
TR
I CK R . M A L
LI L
LI N
REVISION
NUMBER DATE DESCRIPTION
A 07/15/19 PLAN CHECK 1SET
1 08/12/19 ADDENDUM 1
2 08/20/19 ADDENDUM 2
NTS3PIPE ON ROOF SUPPORT DETAIL
NTS4PIPING ROOF PENETRATION DETAIL
1