DGS C-0251-0045PHASE 001 PAGE 1 ADDENDUM NO. 1 DATE: June 12, 2019 DEPARTMENT OF GENERAL SERVICES BUREAU OF PRE-CONSTRUCTION 1800 HERR STREETS HARRISBURG, PENNSYLVANIA ADDENDUM NO. 1 on PROJECT NO. DGS C-0251-0045 PHASE 001 PROJECT TITLE - Safety Rest Area Site 47 I-81 NB - Demolition & New Construction PROFESSIONAL: LSC Design 320 George Street York, PA, 17401 If you submitted a bid through e-Builder prior to this Addendum being issued, your bid has been discarded and you must re-submit your bid(s) through e-Builder prior to the bid opening date and time. Please see Section 4.C. of the Instruction to Bidder GENERAL CHANGES – ALL CONTRACTS Item 1 - Refer to attached documents SPECIFICATION CHANGES – ALL CONTRACTS Item 1 - Refer to attached documents DRAWING CHANGES – ALL CONTRACTS Item 1 - Refer to attached documents The written portion of the addendum covers Northbound and Southbound projects. There are separate drawing files for Northbound and Southbound drawing changes.

Upload: others

Post on 23-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

  • DGS C-0251-0045PHASE 001 PAGE 1 ADDENDUM NO. 1

    DATE: June 12, 2019

    DEPARTMENT OF GENERAL SERVICESBUREAU OF PRE-CONSTRUCTION

    1800 HERR STREETSHARRISBURG, PENNSYLVANIA

    ADDENDUM NO. 1

    on

    PROJECT NO. DGS C-0251-0045 PHASE 001PROJECT TITLE - Safety Rest Area Site 47 I-81 NB - Demolition & New ConstructionPROFESSIONAL:LSC Design320 George StreetYork, PA, 17401

    If you submitted a bid through e-Builder prior to this Addendum being issued, your bid has been discarded and you must re-submit your bid(s) through e-Builder prior to the bid opening date and

    time. Please see Section 4.C. of the Instruction to Bidder

    GENERAL CHANGES – ALL CONTRACTS Item 1 - Refer to attached documents

    SPECIFICATION CHANGES – ALL CONTRACTS Item 1 - Refer to attached documents

    DRAWING CHANGES – ALL CONTRACTS Item 1 - Refer to attached documents

    The written portion of the addendum covers Northbound and Southbound projects. There are separate drawing files for Northbound and Southbound drawing changes.

  • 1 Addendum No. 1

    DEPARTMENT OF GENERAL SERVICES BUREAU PRE-

    CONSTRUCTION 1800 HERR STREET

    HARRISBURG, PENNSYLVANIA

    ADDENDUM NO. 1

    on PROJECT NO. and TITLE: DGS 251-45-01 PHASE 1 - Safety Rest Area Site 47 I-81 NB PROJECT NO. and TITLE: DGS 251-46-01 PHASE 1 - Safety Rest Area Site 48 I-81 SB LSC Design, Inc 320 N. George Street, Suite 100 York, PA 17401

    DATE: June 12, 2019

    GENERAL CLARIFICATIONS – ALL CONTRACTS

    Item 1 - Question: Can earthwork occur during night time hours?

    Response: Work hours shall remain 6:00 AM to 6:00 PM as stated in Section 010400.

    Item 2 - Question: The announcement says click here for a list of bidders and bid information. But I do not see where the list of bidders is located. Please provide direction?

    Response: A list of Invited Bidders for each Contract can be found on the Bid Package Details page under the Invited Bidders tab.

    Item 3 - Question: Is the geotechnical engineer of record (GTA, Inc.) allowed to serve as the Quality Assurance Agency?

    Response: GTA may not be used as the Quality Control Testing Agency that is hired by the Contractor.

    Item 4 - Question: The Department/Agency in the solicitation lists the Department of Transportation. Must Contractors be pre-qualified and/or a Business Partner with PennDOT to submit a proposal?

    Response: If you are an “Invited Bidder” you are pre-qualified to submit a proposal for this Project.

    Item 5 - Question: Can we do additional test probes of the sites prior to the bid date?

    Response: Yes, but the test visit must be scheduled through DGS and there must be an appropriate PA1 call before starting.

    Item 6 - Question: Can we get the CAD file for the site drawings prior to the bid date?

    Response: No

    Item 7 - Question: We do not see a server PC or thin client called out in the specification. Will the new BAS system be installed on an existing server (physical or virtual) or should a server PC be provided by the BAS contractor?

    Response: Server used for the BAS will be the server provided under Section 260923 – Network Lighting Controls.

  • PROJECT NO. and TITLE: DGS 251-45-01 PHASE 1 - Safety Rest Area Site 47 I-81 NB PROJECT NO. and TITLE: DGS 251-46-01 PHASE 1 - Safety Rest Area Site 48 I-81 SB

    Addendum No. 1, June 12, 2019

    2 Addendum No. 1

    Item 8 - Question: On the Detail of the cement concrete Truck pavement on Sheet C-11 are we to assume the Treated permeable Base course (TPBC) is Asphalt?

    Response: Refer to revision to Section 321313 listed below.

    Item 9 - Question: Spec section 334111 Site Storm Drainage Piping, 1.06 Reference Standards, A – Rubber Gaskets. Are water tight gaskets required for storm structures or can standard brick/mortar parge pipe connections at the structures be acceptable? These gaskets require larger inlet boxes and result in significant increased costs for the precast structures (about 70 – 80% increase).

    Response: Refer to revision to Section 334111 listed below.

    Item 10 - Question: Looking at the north and south bound drawings C5; it appears on the north bound side the PC is responsible for water tank and treatment, pump, casing, lockable cap, etc BUT on the south bound drawing it says all those items are covered by GC. Is this correct? NO Also, can you provide a spec for the 6" CPVC piping as the plumbing specs only have under building slab piping. The PC is responsible for all underground piping from the well head to the water treatment building and then into the bathrooms? YES

    Response: All the piping is by the .3 Plumbing Contractor (on both jobs); C-5 has been revised. Revise all the 6” CPVC piping to 6” PVC refer to Section 331116 -Site Water Utility Distribution Piping.

    Item 11 - Question: Asphalt Paving Detail on Sheet C-11 for the Standard Duty should the 25 mm listed be 19 mm?

    Response: No, 25 mm indicated on the Drawing C-11 is correct.

    Item 12 - Question: Asphalt Paving Detail on Sheet C-11 for the Heavy Duty should the 37.5 mm and the 25 mm be reversed. Note the thickness portion?

    Response: No, drawings note should not be changed.

    Item 13 - Question: Concrete Curb: Can a better start and stop indication be noted for the Curb in looking at the line thickness on Sheet C-3D are not very clear.

    Response: Curb Ends shown on Drawings. Additional end of designation added to revised Drawing C-3D.

    Item 14 - Question: Please clarify/define how much we will have to extend the well casing per drawing C-5 on the Northbound rest stop.

    Response: Northbound rest stop well casing needs to be extended approximately 2 feet. Southbound well casing does not need to be extended.

    Item 15 - Question: On Page C-65 of the Northbound plans the seeding rate is 20# / 1000 sy which seems excessive. Can you please clarify that this rate is correct?

    Response: This rate is correct SPECIFICATION CHANGES – CONTRACT NO. DGS 251-45-01 Phase 1.1 and DGS 251-46-01

    Phase 1.1

    Item 16 - Page 074113-4, Article 2.06, Revise Paragraph D. to read as follows:

    D. Beam Insulation: Provide polyisocyanurate insulation laminated to 7/16 inch OSB. 1. Thickness: Nominal 2 inches. 2. Minimum R-Value: 9.1 3. Manufacturers/Products: a. Atlas Roofing Corporation; AC Foam Nailbase b. Hunter Panels; H-Shield NB c. Rmax, Inc; ThermaBase-CI d. Or equal as approved by the Design Professional

  • PROJECT NO. and TITLE: DGS 251-45-01 PHASE 1 - Safety Rest Area Site 47 I-81 NB PROJECT NO. and TITLE: DGS 251-46-01 PHASE 1 - Safety Rest Area Site 48 I-81 SB

    Addendum No. 1, June 12, 2019

    3 Addendum No. 1

    Item 17 - Page 074113-7, Article 3.03, Paragraph G. Item 1. Add the following as a second sentence.

    “Each insulation panel shall be secured with a minimum of 2 fasteners per panel and construction adhesive compatible with the insulation.

    Item 18 - Page 088000-2, Article 2.01, Paragraph C. Item 2., a. revise 1) to read as follows:

    1) Vitro Architectural Glass: Graylite II.

    Item 19 - Page 088000-2, Article 2.01, Paragraph C. Item 2., Delete Item b.

    Item 20 - Page 088000-2, Article 2.01, Paragraph D. Item 2., Delete Item b.

    Item 21 - Page 321313-2, Add Article 2.07, as follows:

    2.07 TREATED PERMEABLE BASE COURSE - (TPBC)

    A. Provide Cement Treated Permeable Base Course complying with PennDot Publication 408, Section 303.

    Item 22 - Page 334111-1, Article 1.06, add the following paragraphs:

    A. ASTM C32 - Standard Specification for Sewer and Manhole Brick (Made From Clay or Shale)

    B. ASTM C270 – Standard Specification for Mortar for Unit Masonry

    Item 23 - Page 334111-1, Article 2.01, add Paragraph D as follows:

    D. Pipe Joints to Structures: Brick meeting ASTM C32 and Mortar meeting ASTM C270 Type M shall be used to seal joints.

    SPECIFICATION CHANGES – CONTRACT NO. DGS 251-45-01 Phase 1.2 and DGS 251-46-01

    Phase 1.2

    Item 24 - Page 230900-2, Article 1.5, Paragraph A., Under 1. Electrical Contractor (.4 Contractor) shall provide add: .4 Server to house Building Automation System.

    SPECIFICATION CHANGES – CONTRACT NO. DGS 251-45-01 Phase 1.4 and DGS 251-46-01

    Phase 1.4

    Item 25 - Page 260923-1, Article 1.2, Add Paragraph D. as follows:

    D. Server provided by this Section shall house the Building Automation System specified in Section 230900.

    DRAWING CHANGES – CONTRACT NO. DGS 251-45-01 Phase 1.1 and DGS 251-46-01 Phase 1.1

    Item 26 - Drawing No. C-3D, This Drawing has been revised to indicate the ends of the concrete curbing. Refer to the reissued Drawing dated 06/12/2019.

    Item 27 - Drawing No. C-5; This Drawing has been revised and is being reissued. Revisions include changing water piping from 6” CPVC to 6” PVC, and clarifying how much the well pipe needs to be extended on Northbound Site. Refer to the reissued Drawing dated 06/12/2019.

    Item 28 - Drawing No. A-4: Detail 4 on this Drawing has been revised to match revision to Beam Insulation revision to Section 074113 above. Refer to the reissued Drawing dated 06/12/2019.

    Item 29 - Drawing No. A-11: Detail 5, and Detail 7 on this Drawing has been revised to match revision to Beam Insulation revision to Section 074113 above. Refer to the reissued Drawing dated 06/12/2019.

  • PROJECT NO. and TITLE: DGS 251-45-01 PHASE 1 - Safety Rest Area Site 47 I-81 NB PROJECT NO. and TITLE: DGS 251-46-01 PHASE 1 - Safety Rest Area Site 48 I-81 SB

    Addendum No. 1, June 12, 2019

    4 Addendum No. 1

    ATTACHMENTS - CONTRACT NO. DGS 251-45-01 Phase 1.1:

    Drawing No. C-3D, Drawing No. C-5, Drawing No. A-4 and Drawing No. A-11

    ATTACHMENTS - CONTRACT NO. DGS 251-46-01 Phase 1.1:

    Drawing No. C-3D, Drawing No. C-5, Drawing No. A-4 and Drawing No. A-11

    END OF ADDENDUM NO. 1

  • STONE

    X

    N 8

    35' 02"

    E 102.9

    6'

    S

    1

    6

    °

    0

    7

    ' 4

    6

    "

    W

    6

    1

    .7

    2

    '

    S

    1

    1

    ° 3

    1

    ' 4

    6

    " W

    2

    3

    0

    .5

    2

    '

    S

    7

    2

    °

    5

    9

    ' 0

    6

    "

    W

    2

    9

    3

    .0

    0

    '

    N

    7° 43' 13" W

    188.74'

    N/F

    SAUL & JUDITH A.SCHMOLITZ

    DEED BOOK 5706, PAGE 166

    TAX PARCEL 25-010.071

    LOT NO. 6

    PLAN BOOK O, VOLUME 7, PAGE 9

    N/F

    ROY & CAROLINE ENSOR

    DEED BOOK 5063, PAGE 555

    TAX PARCEL 25-010-073

    LOT NO. 7

    PLAN BOOK O, VOLUME 7, PAGE 9

    N/F

    LAWRENCE A. & CHRISTEN M. COOKE

    DEED BOOK 5347, PAGE 611

    TAX PARCEL 25-010-074

    LOT NO. 8

    PLAN BOOK O, VOLUME 7, PAGE 9

    N/F

    DAVID J. WELLS

    TAX PARCEL 25-010.016

    P

    R

    O

    P

    E

    R

    T

    Y

    L

    I

    N

    E

    P

    R

    O

    P

    E

    R

    T

    Y

    /

    H

    I

    G

    H

    W

    A

    Y

    R

    I

    G

    H

    T

    -

    O

    F

    -

    W

    A

    Y

    L

    I

    N

    E

    X

    X

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    M

    A

    T

    C

    H

    L

    I

    N

    E

    A

    -

    A

    X

    X

    X

    X

    X

    X

    X

    X

    25' LANDSCAPE

    STRIP

    25' LANDSCAPE

    STRIP

    SWM BASIN 3

    N

    E

    W

    R

    E

    S

    T

    A

    R

    E

    A

    F

    A

    C

    I

    L

    I

    T

    Y

    F

    .

    F

    .

    E

    L

    E

    V

    .

    =

    5

    2

    8

    .

    5

    0

    5

    0

    '

    R

    E

    A

    R

    S

    E

    T

    B

    A

    C

    K

    5

    0

    '

    F

    R

    O

    N

    T

    S

    E

    T

    B

    A

    C

    K

    35' S

    IDE

    SE

    TB

    AC

    K

    3

    5

    '

    S

    I

    D

    E

    S

    E

    T

    B

    A

    C

    K

    5

    0

    '

    F

    R

    O

    N

    T

    S

    E

    T

    B

    A

    C

    K

    5

    0

    '

    F

    R

    O

    N

    T

    S

    E

    T

    B

    A

    C

    K

    DOG AREA

    8" VERTICAL CURB END

    TREATMENT

    8" VERTICAL CURB END

    TREATMENT

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    LIMIT OF CONTRACT LINE

    CONTRACT 251-45

    (OFFSET 3' FOR CLARITY)

    X

    M

    A

    T

    C

    H

    L

    I

    N

    E

    B

    -

    B

    LAWN

    M

    E

    C

    H

    P

    A

    D

    &

    E

    N

    C

    L

    .

    M

    E

    C

    H

    P

    A

    D

    &

    E

    N

    C

    L

    .

    LIMIT OF CONTRACT LINE

    CONTRACT 215-45

    (OFFSET 3' FOR CLARITY)

    6' H. PVC

    PRIVACY FENCE

    u

    u

    u

    u

    TEST

    LAWN

    LAWN

    LAWN

    8" VERTICAL

    CONC. CURB

    (SEE DETAIL

    RC64/C-38)

    8" VERTICAL

    CONC. CURB

    (SEE DETAIL

    RC64/C-38)

    CONCRETE

    SIDEWALK

    (SEE DETAIL 3/C-11)

    CONTRACTOR TRAILER &

    LAYDOWN AREA

    FINAL LOCATION TO BE

    APPROVED BY THE DEPARTMENT

    BORE PIT L.O.D.

    N/F

    SAUL & JUDITH A.SCHMOLITZ

    DEED BOOK 5706, PAGE 166

    TAX PARCEL 25-010.071

    LOT NO. 6

    PLAN BOOK O, VOLUME 7, PAGE 9

    P

    R

    O

    P

    E

    R

    T

    Y

    /

    H

    I

    G

    H

    W

    A

    Y

    R

    I

    G

    H

    T

    -

    O

    F

    -

    W

    A

    Y

    L

    I

    N

    E

    P

    R

    O

    P

    E

    R

    T

    Y

    L

    I

    N

    E

    BkB2

    BkB2

    BkC2

    BkC2

    (OFFSET 3' FOR CLARITY)

    M

    A

    T

    C

    H

    L

    I

    N

    E

    B

    -

    B

    N

    AD

    8

    3 P

    A S

    OU

    TH

    Z

    ON

    E

    N/F

    EUGENE KRISTEL

    INST. NO. 25-010.038

    I

    -

    8

    1

    N

    O

    R

    T

    H

    B

    O

    U

    N

    D

    N

    O

    R

    T

    H

    B

    O

    U

    N

    D

    L

    A

    N

    E

    S

    N/F

    DAVID J. WELLS

    TAX PARCEL 25-010.016

    N/F

    JANICE FUREMAN

    TAX PARCEL 25-010.046

    P

    R

    O

    P

    E

    R

    T

    Y

    L

    I

    N

    E

    P

    R

    O

    P

    E

    R

    T

    Y

    /

    H

    I

    G

    H

    W

    A

    Y

    R

    I

    G

    H

    T

    -

    O

    F

    -

    W

    A

    Y

    L

    I

    N

    E

    o

    o

    o

    o

    o

    o

    o

    o

    o

    M

    A

    T

    C

    H

    L

    I

    N

    E

    A

    -

    A

    15

    44' CHAN. FLOW

    15"RCP @ 0.73%

    LIMIT OF CONTRACT LINE

    6' H. PVC

    PRIVACY FENCE

    ELECUP

    I

    -

    8

    1

    N

    O

    R

    T

    H

    B

    O

    U

    N

    D

    I

    -

    8

    1

    N

    O

    R

    T

    H

    B

    O

    U

    N

    D

    S

    h

    e

    lls

    C

    h

    u

    rc

    h

    R

    o

    a

    d

    (T

    -5

    2

    3

    )

    N

    O

    R

    T

    H

    B

    O

    U

    N

    D

    LIMIT OF CONTRACT LINE

    CONTRACT 251-45

    (OFFSET 3' FOR CLARITY)

    END 6' H. PVC

    PRIVACY FENCE

    SCALE

    SCALECHECKED BY

    DRAWING NO.

    DRAWN BY

    DATE

    DESCRIPTION DESCRIPTION

    Date

    Consultant's Signature

    Professional's Signature

    Date

    SEALSEAL

    SITE 47, I-81 NORTH BOUND

    EAST HANOVER TOWNSHIP, DAUPHIN COUNTY

    PENNSYLVANIA

    HARRISBURG, PENNSYLVANIA

    AS-BUILT REVISIONS

    DEPARTMENT OF GENERAL SERVICES

    COMMONWEALTH OF PENNSYLVANIA

    PROJECT NO. D.G.S. 251-45 Phase 1

    RENOVATION OF SAFETY REST AREA

    I:\Jobs 2008\2008.0231.04\04 C

    ivil\D

    esign D

    ocum

    ents\D

    esign-P

    erm

    it D

    ocum

    ents\A

    ctive\Interim

    -F

    inal C

    Ds - 2018 revisions\2008023104_N

    B-C

    D 3D

    .dw

    g 09/18/18 9:07.25 A

    M E

    ST

    320 N. GEORGE ST.

    YORK, PA 17401

    (717) 845.8383

    C-3D

    SITE LAYOUT PLAN BASE BID 1

    09/19/2018

    DAK

    DDW

    AS SHOWN

    NOTE:

    REFER TO SITE PLAN SHEET C-7 FOR IDENTIFICATION OF ALL PROPOSED SITE SIGNAGE.

    STANDARD ASPHALT PAVEMENT

    HEAVY-DUTY ASPHALT PAVEMENT

    CEMENT CONCRETE PAVEMENT

    00 50' 100'

    SCALE: 1" = 50'

    SCALE

    00 50' 100'

    SCALE: 1" = 50'

    SCALE

    00 50' 100'

    SCALE: 1" = 50'

    N

    BAR IS ONE (1) INCH LONG

    ON ORIGINAL DRAWING:

    IF BAR IS NOT ONE (1)

    INCH LONG, ADJUST

    SCALE ACCORDINGLY

    10

    VERIFY SCALE

    ISSUED FOR BIDDING 09/19/2018

    N

    N

    LIMIT OF CONTRACT LINE

    BASE BID 1

    AS SHOWN

    GRADING, STORMWATER AND UTILITIES TO BE INSTALLED PER

    PERMITTED DOCUMENTS

    SEAL

    11/13/2018

    03/05/201904/26/201906/12/2019

    8" VERTICAL CURB EN

    TREATMENT

    8" VERTICAL CURB EN

    TREATMENT

    1

    1 ADDENDUM 1

  • D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    STONE

    I

    -

    8

    1

    N

    O

    R

    T

    H

    B

    O

    U

    N

    D

    P

    E

    D

    WELL CAP

    X

    1

    4

    2

    '

    L

    E

    G

    A

    L

    R

    I

    G

    H

    T

    -

    O

    F

    -

    W

    A

    Y

    N

    O

    R

    T

    H

    B

    O

    U

    N

    D

    L

    A

    N

    E

    S

    U/T

    U/T

    U/T

    U/T

    U/T

    U/T

    U/T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    1

    0

    '

    S

    H

    O

    U

    L

    D

    E

    R

    ,

    T

    Y

    P

    .

    2

    4

    '

    C

    A

    R

    T

    W

    A

    Y

    I

    -

    8

    1

    N

    O

    R

    T

    H

    B

    O

    U

    N

    D

    N

    O

    R

    T

    H

    B

    O

    U

    N

    D

    L

    A

    N

    E

    S

    SMH 4S RIM

    504.0 INV 491.4

    1

    0

    '

    S

    H

    O

    U

    L

    D

    E

    R

    ,

    T

    Y

    P

    .

    P

    R

    O

    P

    E

    R

    T

    Y

    /

    H

    I

    G

    H

    W

    A

    Y

    R

    I

    G

    H

    T

    -

    O

    F

    -

    W

    A

    Y

    L

    I

    N

    E

    P

    R

    O

    P

    E

    R

    T

    Y

    L

    I

    N

    E

    P

    R

    O

    P

    E

    R

    T

    Y

    L

    I

    N

    E

    P

    R

    O

    P

    E

    R

    T

    Y

    /

    H

    I

    G

    H

    W

    A

    Y

    R

    I

    G

    H

    T

    -

    O

    F

    -

    W

    A

    Y

    L

    I

    N

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U/T

    U/T

    U/T

    X

    X

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    o

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    S

    U

    /E

    U

    /E

    U/E

    U

    /E

    U

    /E

    U

    /E

    M

    A

    T

    C

    H

    L

    I

    N

    E

    A

    -

    A

    N

    E

    W

    R

    E

    S

    T

    A

    R

    E

    A

    F

    A

    C

    I

    L

    I

    T

    Y

    ±

    5

    3

    3

    5

    S

    Q

    .

    F

    T

    .

    F

    .

    F

    .

    E

    L

    E

    V

    .

    =

    5

    2

    8

    .

    5

    0

    6

    "

    C

    P

    V

    C

    SMH 1A

    (WATERTIGHT)

    LIMIT OF CONTRACT LINE

    CONTRACT 251-45

    (OFFSET 3' FOR CLARITY)

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    DD

    D

    D

    D

    D

    D

    D

    2

    4

    .

    5

    '

    G

    A

    P

    I

    N

    M

    O

    U

    N

    T

    A

    B

    L

    E

    C

    U

    R

    B

    M

    A

    T

    C

    H

    L

    I

    N

    E

    B

    -

    B

    DSDS

    M

    E

    C

    H

    P

    A

    D

    &

    E

    N

    C

    L

    .

    M

    E

    C

    H

    P

    A

    D

    &

    E

    N

    C

    L

    .

    LIMIT OF CONTRACT LINE

    CONTRACT 215-45

    (OFFSET 3' FOR CLARITY)

    S

    S

    A

    N

    S

    A

    N

    S

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    S

    A

    N

    S

    A

    N

    S

    A

    N

    W

    W

    W

    W

    W

    W

    W

    W

    W

    W

    W

    D

    D

    D

    D

    D

    D

    D

    u

    u

    u

    u

    TELEPHONE SERVICE CONNECTION

    AT EXISTING TELEPHONE SERVICE

    PEDESTAL

    BY EC

    SINGLE PHASE ELECTRIC SERVICE

    EXTENDED FROM EXISTING

    LOCATION TO TRANSFORMER

    TRENCHING, BACKFILL,

    STABILIZATION BY GC

    SERVICE INSTALLATION BY POWER

    COMPANY

    YD-1 (26" X 26")

    YD-2 (26" X 26")

    I-A3.5

    I-A8

    I-A7 (WQ)

    I-B4

    I-A6

    I-B5 (WQ)

    I-B3

    I-A4.5

    I-A4

    SMH 2A

    SMH 4A

    S

    I-A3

    I-A2

    I-A2.5

    I-A1.4

    I-A1.3

    I-A1.2

    I-A1.1

    SMH 3A

    TEST

    NEW WATER TANK & TREATMENT

    SYSTEM BY PC

    I-81 WEIGH STATION SIGN

    CONTROL PANNEL

    BY EC

    E-F1

    I-A5

    U

    D

    U

    D

    WELL TREATMENT BUILDING

    FIN. PAD EL. = 520.0

    BY GC

    E-B1

    OS-1

    E-A1

    STORMWATER

    MANAGEMENT BASIN #3

    (SEE DETAILS 9-12/C-12 & 7-10/C-67)

    D

    I-B3.1

    PROVIDE NEW PUMP AND NEW

    LOCKABLE SECURE WELL CAP,

    EXTEND WELL CASING AS NEEDED

    BY PC (USING AGENCY TO SUPPLY

    LOCK)

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    2

    4

    "

    R

    C

    P

    2

    4

    "

    R

    C

    P

    2

    4

    "

    R

    C

    P

    2

    4

    " R

    C

    P

    2

    4

    "

    R

    C

    P

    24" RCP

    24"

    RC

    P

    24" R

    CP

    30" R

    CP

    2

    4

    "

    R

    C

    P

    1

    5

    " R

    C

    P

    15" RCP

    1

    5

    "

    R

    C

    P

    15" R

    CP

    1

    5

    "

    R

    C

    P

    15" R

    CP

    1

    8

    "

    R

    C

    P

    1

    8

    "

    R

    C

    P

    1

    5

    "

    R

    C

    P

    1

    5

    " R

    C

    P

    1

    5

    "

    R

    C

    P

    SINGLE PHASE ELECTRIC

    SERVICE EXTENDED FROM

    TRANSFORMER TO BUILDING

    BY POWER COMPANY

    3" CPVC

    4'

    4

    '

    8

    "

    P

    V

    C

    8

    "

    P

    V

    C

    8

    "

    P

    V

    C

    8

    "

    P

    V

    C

    1

    8

    "

    R

    C

    P

    BASIN UNDERDRAIN

    (SEE DETAIL 15/C-12)

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    4

    '

    PROPOSED SINGLE PHASE

    ELECTRICAL TRANSFORMER BY EC

    TRUCK INSPECTION

    LANE SIGNAL LIGHT

    6" CPVC PIPING TO BE INSTALLED

    BY PLUMBING CONTRACTOR

    E

    X

    .

    C

    O

    N

    C

    .

    P

    A

    V

    E

    1

    4

    2

    '

    L

    E

    G

    A

    L

    R

    I

    G

    H

    T

    -

    O

    F

    -

    W

    A

    Y

    N/F

    SAUL & JUDITH A.SCHMOLITZ

    DEED BOOK 5706, PAGE 166

    TAX PARCEL 25-010.071

    LOT NO. 6

    PLAN BOOK O, VOLUME 7, PAGE 9

    P

    R

    O

    P

    E

    R

    T

    Y

    /

    H

    I

    G

    H

    W

    A

    Y

    R

    I

    G

    H

    T

    -

    O

    F

    -

    W

    A

    Y

    L

    I

    N

    E

    P

    R

    O

    P

    E

    R

    T

    Y

    L

    I

    N

    E

    U/T

    U/T

    5

    0

    '

    F

    R

    O

    N

    T

    S

    E

    T

    B

    A

    C

    K

    LIMIT OF CONTRACT LINE

    CONTRACT 251-45

    (OFFSET 3' FOR CLARITY)

    M

    A

    T

    C

    H

    L

    I

    N

    E

    B

    -

    B

    21' - 4" x 60" 3000 GAL. WATER TANK

    & CRADLE, TREATMENT SYSTEM &

    VAULT

    (TO BE REMOVED)

    (

    L

    O

    C

    A

    T

    E

    D

    F

    R

    O

    M

    A

    S

    -

    B

    U

    I

    L

    T

    D

    R

    A

    W

    I

    N

    G

    S

    )

    S

    A

    N

    I

    T

    A

    R

    Y

    S

    E

    W

    E

    R

    T

    -

    L

    I

    N

    E

    S

    A

    N

    G

    G

    N

    AD

    8

    3 P

    A S

    OU

    TH

    Z

    ON

    E

    S

    S

    S

    S

    S

    E

    E

    Met Ed

    30057

    38192

    Met Ed

    30075

    38200

    Met Ed

    30090

    38206

    Met Ed

    30117 38217

    14

    TELE UP

    ELEC UP

    ELEC UP

    ELEC UP

    ELEC UP

    ELEC UP

    ELEC UP

    SEWER MH

    RIM 463.38

    INV 454.29

    SEWER MH

    RIM 461.94

    INV 452.51

    SEWER MH

    RIM 461.16

    INV 451.47

    SEWER MH

    RIM 463.37

    INV 450.22

    SEWER MH

    RIM 471.90

    INV IN 465.57

    INV OUT 455.70

    SEWER MH

    RIM 485.69

    INV 478.51

    I

    -

    8

    1

    N

    O

    R

    T

    H

    B

    O

    U

    N

    D

    N

    O

    R

    T

    H

    B

    O

    U

    N

    D

    L

    A

    N

    E

    S

    SMH 4S RIM

    504.0 INV 491.4

    P

    R

    O

    P

    E

    R

    T

    Y

    L

    I

    N

    E

    P

    R

    O

    P

    E

    R

    T

    Y

    /

    H

    I

    G

    H

    W

    A

    Y

    R

    I

    G

    H

    T

    -

    O

    F

    -

    W

    A

    Y

    L

    I

    N

    E

    E

    E

    E

    E

    E

    E

    E

    E

    E

    E

    E

    E

    E

    E

    E

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    o

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    o

    o

    o

    o

    o

    o

    o

    o

    o

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    M

    A

    T

    C

    H

    L

    I

    N

    E

    A

    -

    A

    15

    44' CHAN. FLOW

    15"RCP @ 0.73%

    LIMIT OF CONTRACT LINE

    CONTRACT 215-45

    (OFFSET 3' FOR CLARITY)

    ELECUP

    I

    -

    8

    1

    N

    O

    R

    T

    H

    B

    O

    U

    N

    D

    I

    -

    8

    1

    N

    O

    R

    T

    H

    B

    O

    U

    N

    D

    S

    h

    e

    lls

    C

    h

    u

    rc

    h

    R

    o

    a

    d

    (T

    -5

    2

    3

    )

    N

    O

    R

    T

    H

    B

    O

    U

    N

    D

    LIMIT OF CONTRACT LINE

    CONTRACT 251-45

    (OFFSET 3' FOR CLARITY)

    SCALE

    SCALECHECKED BY

    DRAWING NO.

    DRAWN BY

    DATE

    DESCRIPTION DESCRIPTION

    Date

    Consultant's Signature

    Professional's Signature

    Date

    SEALSEAL

    SITE 47, I-81 NORTH BOUND

    EAST HANOVER TOWNSHIP, DAUPHIN COUNTY

    PENNSYLVANIA

    HARRISBURG, PENNSYLVANIA

    AS-BUILT REVISIONS

    DEPARTMENT OF GENERAL SERVICES

    COMMONWEALTH OF PENNSYLVANIA

    PROJECT NO. D.G.S. 251-45 Phase 1

    RENOVATION OF SAFETY REST AREA

    I:\Jobs 2008\2008.0231.04\04 C

    ivil\D

    esign D

    ocum

    ents\D

    esign-P

    erm

    it D

    ocum

    ents\A

    ctive\1-M

    inor M

    odification 2018\2008.0231.04_C

    -N

    B.dw

    g 10/24/18 10:29.41 A

    M E

    ST

    320 N. GEORGE ST.

    YORK, PA 17401

    (717) 845.8383

    C-5

    SITE UTILITY PLAN

    09/19/2018

    DAK

    DDW

    AS SHOWN

    00 50' 100'

    SCALE: 1" = 50'

    00 50' 100'

    SCALE: 1" = 50'

    00 50' 100'

    SCALE: 1" = 50'

    NOTE:

    ELECTRIC LINES AND FACILITIES ARE SUBJECT TO FIRSTENERGY CORP.

    RIGHTS-OF-WAY AND RESTRICTIONS THEREOF. AUTHORIZATION FROM

    FIRST ENERGY CORP (GPU ENERGY) SHALL BE ESTABLISHED PRIOR TO

    ANY WORK WITHIN 20' OF THE ELECTRIC FACILITIES.

    N

    BAR IS ONE (1) INCH LONG

    ON ORIGINAL DRAWING:

    IF BAR IS NOT ONE (1)

    INCH LONG, ADJUST

    SCALE ACCORDINGLY

    10

    VERIFY SCALE

    ISSUED FOR BIDDING 09/19/2018

    N

    N

    All work on this Drawing is to

    be included by the ____,

    except work noted to be by:

    ____________

    GC

    EC, PC

    SEAL

    11/13/2018

    03/05/201904/26/2019

    PC

    PVC

    ADDENDUM 11

    12 FT AS

    06/12/2019

    NEEDED BY PC.

  • 1

    A-10

    2

    A-10

    2" STANDING SEAM METAL ROOF SYSTEM OVER WATERPROOFING UNDERLAYMENT ON STRUCTURAL INSULATED PANELS

    SNOW GUARD, TYP. SEE 8/A-12.

    METAL COPING ON MECHANICAL SCREEN WALL. REFER TO 6/A-12.

    ROOF CRICKET

    FACE OF WALLBELOW - TYPICAL

    SOLAR WATER HEATING PANEL BY .03 CONTR., STRUCTURE BY .01., ELECTRICAL BY .04 CONTRACTOR, REFER TOPLUMBING FOR PANEL ORIENTATION

    2

    A-12

    3

    A-12

    MECHANICALAREA 115 BELOW

    MECHANICALAREA 101 BELOW

    STACK VENTS, PENETRATION AND SEALS BY .01 CONTRACTOR

    1/2" / 12" 1/2" / 12"

    1 1

    /2"

    / 12

    "

    5" ALUMINUM GUTTERS

    3" ALUMINUM DOWNSPOUTS TO UNDERGROUND - SEEDETAIL 3/ A-4

    3" ALUMINUM DOWNSPOUTSTO UNDERGROUND BY .01 CONTR. SEE DETAIL 3/ A-45" ALUMINUM GUTTERS

    3" ALUMINUM DOWNSPOUTS TO UNDERGROUND BY .01 CONTR. - SEE DETAIL 3/ A-4

    1 1

    /2"

    / 12

    "

    1 1

    /2"

    / 12

    "

    1 1

    /2"

    / 12

    "

    3" ALUMINUM DOWNSPOUTS TO UNDERGROUND BY .01 CONTR. - SEE DETAIL 3/ A-4

    HIGHWAY INTERSTATE SIDE

    4

    A-4GUTTER SPLASH GUARD TYP @ CRICKETS

    GUTTER SPLASH GUARD TYP @ CRICKETS

    66' - 1 3/16" 27' - 10" 66' - 1 1/8"

    10

    ' -

    9 5

    /8"

    32

    ' -

    5 1

    /2"

    10

    ' -

    9 1

    /4"

    D.S. D.S.D.S.D.S. D.S. D.S.

    4

    A-11

    CRICKET -METAL OVERINSULATION

    STACK VENTS, PENETRATION AND SEALS BY .01 CONTRACTOR

    VENTILATOR BY HVAC CONTRACTOR, PENETRATION AND SEAL BY GENERAL CONTRACTOR

    6

    A-12

    A-4

    5

    EQUIPMENTPADS

    EQUIPMENTPADS

    SOLAR WATER HEATING PANEL BY .03 CONTR., STRUCTURE BY .01., ELECTRICAL BY .04 CONTRACTOR, REFER TOPLUMBING FOR PANEL ORIENTATION

    METAL COPING ON MECHANICAL SCREEN WALL. REFER TO 6/A-12.

    NOTES:

    1. PRE-MOLDED PIPE SEAL MUST HAVE INTACTRIB AT TOP EDGE, REGARDLESS OF PIPE DIAMETER

    PRE-MOLDED PIPE SEAL -RATED FOR 400º SERVICE

    WATER CUT-OFF MASTIC

    SEALANT

    2 PIECE FLASHING

    STAINLESS STEELCLAMPING RING

    2. APPLY IN-SEAM SEALANT 1/2" FROM INSIDEEDGE OF PIPE SEAL FLANGE

    3. DECK FLANGES OF THE PRE-MOLDED PIPEFLASHING SHALL NOT BE OVERLAPPED,CUT OR APPLIED OVER ANY ANGLE CHANGE

    4. INSTALL PIPE PENETRATION BETWEENROOFING PANEL SEAMS.

    5. INSTALL SNOW GUARD 12" UPSLOPE FROM PENETRATION.

    VENT THRU ROOFBY PLUMBINGCONTRACTOR - TYP

    1' -

    2 3

    /4"

    CENTER PIPE BETWEENSTANDING SEAMS

    DOWNSPOUT

    GRADE

    CAST IRON DOWNSPOUT BOOT

    COUPLER

    CAST IRON SOLID PIPE LONG SWEEP BEND (90 DEGREE) BY GENERAL CONTRACTOR

    CLEANOUT ACCESS

    SEE CIVIL DRAWINGS FOR CONTINUATION OF STORM

    8" GRAVEL BED

    GEOTEXTILE FABRIC

    12

    " M

    IN

    REFER TO CIVIL FOR INVERT ELEVATIONS.

    WOOD BLOCKING BETWEEN SIP & TUBE STEEL

    STEEL BEAM

    VENTED ALUMINUM SOFFIT

    CLEAR ANODIZED ALUMINUMOVER BEAM INSULATION

    2"

    TY

    P

    STRUCTURAL INSULATED PANEL

    2" STANDING SEAM ROOF

    WATERPROOFING UNDERLAYMENT

    2x TREATED WOOD FURRING IN HERRINGBONEPATTERN @ 16" O.C.

    1/2" TREATED WOOD SHEATHING

    2x CONTINUOUS TREATED WOOD BLOCKING

    ALUMINUM FASCIA

    2x TREATED WOOD FURRING @ 16" O.C.

    1' - 0"

    2" TYP

    EDGE OF SADDLE TO MATCHWIDTH OF GUTTER

    4" HIGH SPLASH GUARD

    6"

    18"

    EDGE OF ROOFING

    GUTTER

    EDGE OF ROOFING

    SADDLE

    BAR IS ONE (1) INCH LONG ON ORIGINAL

    DRAWING:

    IF BAR IS NOT ONE (1) INCH LONG, ADJUST

    SCALE ACCORDINGLY

    10

    VERIFY SCALE

    SCALECHECKED BY

    DRAWING NO.DRAWN BY DATE

    DESCRIPTION DESCRIPTION

    Date Consultant's SignatureProfessional's Signature Date

    HARRISBURG, PENNSYLVANIA

    AS-BUILT REVISIONS

    DEPARTMENT OF GENERAL SERVICESCOMMONWEALTH OF PENNSYLVANIA

    PROJECT NO. D.G.S. 251-45 PHASE 1

    RENOVATION OF SAFETY REST AREA

    MPP/ BJD 03/05/2019

    AS NOTEDREF

    EAST HANOVER TOWNSHIP, DAUPHIN COUNTY

    PENNSYLVANIA

    SITE 47, I-81 NORTH BOUND

    SEALSEAL

    A-4

    ROOF PLAN AND DETAILS

    SCALE: 1/8" = 1'-0"A-4

    ROOF PLAN1

    SCALE: 1 1/2" = 1'-0"A-4

    ROOF PENETRATION2SCALE: 1 1/2" = 1'-0"A-4

    DOWNSPOUT TO UNDERGROUND STORM3SCALE: 1 1/2" = 1'-0"A-4

    BEAM WRAP DETAIL4

    SCALE: 1" = 1'-0"A-4

    ROOF PLAN - SADDLE5N

    1 ADDENDUM 1

    06/12/2019

    1

  • A-11

    6

    A-11

    5

    VENTED ALUMINUM SOFFIT

    STRUCTURAL INSULATEDPANEL

    2x WOOD FURRING IN HERRINGBONEPATTERN @ 16" O.C.

    STONE

    4" CONC SLAB

    2x TREATED CONTINUOUS WOOD BLOCKING

    STONE

    4" HEATED CONC SLAB

    2" RIGID PERIMETER INSULATION

    CMU - SEE STRUCTURAL DWGS

    REINFORCED CONCRETE FOOTING

    VAPOR RETARDER

    CLEAR ANODIZED ALUMINUMOVER 2" RIGID INSULATION

    WATERPROOFING UNDERLAYMENT

    ALUMINUM FASCIA

    REINFORCED TURNDOWN SLAB

    SLOPE 1/4"/FT

    BO

    TT

    OM

    OF

    FIX

    TU

    RE

    6' -

    9 3

    /16

    "

    LOBBY

    107

    HIGHWAY INTERSTATE SIDE

    2" STANDING SEAM ROOF

    1/2" TREATED WOOD SHEATHING

    13

    ' - 1

    1 1

    /16

    "

    2x WOOD FURING @ 16" O.C.

    CONC SLAB - REFERTO CIVIL FOR CONSTRUCTION

    LOBBY

    107

    A-11

    7

    STONE

    4" CONCRETE SLAB

    STONE

    4" HEATED CONC SLAB -SLOPED 1/4"/ FT

    2" RIGID PERIMETER INSULATION

    CMU

    REINFORCED CONCRETE FOOTING

    VAPOR RETARDER

    A-11

    6

    MIN

    2' - 0"

    REAR SIDE

    TOP OF STEEL

    11'- 0 7/16"

    A-11

    8

    VENTED ALUMINUM SOFFIT

    STRUCTURAL INSULATED PANEL

    2x CONTINUOUSTREATED WOOD BLOCKING

    BRICK VENEERW/ ANCHORS AT 16" O.C.

    AIRSPACE

    2 1/2" RIGID INSULATION

    8" CMU WITHANCHORS AT 16" O.C.

    STONE

    4" CONCRETE SLAB

    2" RIGID PERIMETER INSULATION

    CMU

    REINFORCED CONCRETE FOOTING

    2" STANDING SEAM ROOF

    VAPOR RETARDER

    WATERPROOFING UNDERLAYMENT

    ALUMINUM FASCIA

    116

    STORAGE

    116

    MECHANICAL

    AREA

    101

    A-11

    92x WOOD FURRING IN HERRINGBONE PATTERN @ 16" O.C.

    5/8" TREATED WOOD SHEATHING

    2x WOOD FURRING @ 16" O.C.

    HVAC UNIT BY HVAC CONTRACTOR

    DUCTWORK BY HVAC CONTRACTOR

    PROVIDE END DAM FLASHING @ THRU WALL PENETRATIONS

    1

    1' - 3 1/4"

    TO

    P O

    F M

    AS

    ON

    RY

    8' -

    0"

    METAL CLIP W/ FASTENERS

    OFFSET CLEAT W/ FASTENERS

    FILL END OF SEAMS WITHURETHANE SEALANT -COLORED TO MATCH PANEL

    STAINLESS STEEL VALLEY TRIM

    WATERPROOFING UNDERLAYMENT

    PREFINISHED STANDINGSEAM METAL ROOF PANEL

    STRUCTURAL INSULATED PANEL

    4"

    VENTED ALUMINUM SOFFIT WOOD CEILING

    WOOD BLOCKING BETWEENSIP AND TUBE STEEL

    EXTERIOR LOBBY INTERIOR

    2x WOOD BLOCKING

    CLEAR ANODIZED ALUMINUMOVER BEAM INSULATION

    4"

    METAL OVER 1/2" PROTECTION BOARD OVER TAPERED INSULATION

    2x WOOD BLOCKING

    STEEL ANGLE. REFER TO STRUCTURAL DRAWINGS.

    TOP OF STEEL

    11'- 0 7/16"

    WOOD BLOCKINGWOOD CEILING

    CLEAR ANODIZED ALUMINUM OVER BEAM INSULATION

    WOOD BLOCKING BETWEEN SIP AND TUBE STEEL

    VENTED ALUMINUM SOFFIT

    STRUCTURAL INSULATEDPANEL

    2x WOOD FURRING IN HERRINGBONEPATTERN @ 16" O.C.

    WATERPROOFING UNDERLAYMENT

    2" STANDING SEAM ROOF

    1/2" TREATED WOOD SHEATHING

    CLEAR ANODIZED ALUMINUM OVER BEAM INSULATION

    SLOPE ALUM FLASHING W/ HEMMED DRIP EDGE

    4" BRICK VENEER

    BEVELED 2xTREATED WOOD BLOCKING

    AIRSPACE

    2 1/2" RIGID INSULATION

    5/4" PTD WOOD TRIM

    ALUM STOREFRONT SYSTEM

    SEALANT

    SEALANT

    STEEL ANGLE

    BOND BEAM

    111 1/4"

    1 1/2" 4 1/2"

    1 1/4"

    4"

    SEALANT

    1/4

    "

    4"

    STONE

    4" CONC SLAB

    STONE

    4" HEATED CONC SLAB

    VAPOR RETARDER

    1/2" SLAB ISOLATIONJOINT FILLER

    CURTAINWALL

    PERIMETER INSULATION

    OUTSIDE INSIDE

    12" LONG, #4 BARS AT 12" O.C.

    ALUMINUM SOFFIT

    WOOD BLOCKING

    PRE-FINISHEDSTEEL ANGLE.SEE STRUCTURAL DRAWINGS

    PREFINISHED ALUM TRIM

    3"

    CLEAR2 1/4"

    5/4"x 4" WOOD TRIM- FINISH & SPECIES TOMATCH CLG.

    STRUCTURAL INSULATED PANEL

    2" STANDING SEAM ROOF

    WATERPROOFING UNDERLAYMENT

    2x WOOD FURRING IN HERRINGBONEPATTERN @ 16" O.C.

    1/2" TREATED WOOD SHEATHING

    1

    PAINT TUBE STEEL PRIORTO GLAZING

    VENTED ALUMINUM SOFFIT

    STRUCTURAL INSULATED PANEL

    2x CONTINUOUSTREATEDWOOD BLOCKING

    BRICK VENEER WITH ANCHORS AT 16" O.C.

    AIRSPACE

    2 1/2" RIGID INSULATION

    8" CMU WITHANCHORS AT 16" 0.C.

    STONE

    4" SEALED CONCRETE SLAB

    2" RIGID PERIMETER INSULATION

    CMU - SEE STRUCTURAL DWGS

    REINFORCED CONCRETE FOOTING

    2" STANDING SEAM ROOF

    VAPOR RETARDER

    WATERPROOFING UNDERLAYMENT

    ALUMINUM FASCIA

    AIRSPACE

    2" RIGID INSULATION

    6" CMU

    WOOD BLOCKING

    WOOD BLOCKING

    STEEL ANGLE

    RIGID INSULATION

    2x WOOD FURRING IN HERRINGBONEPATTERN @ 16" O.C.

    1/2" TREATED WOOD SHEATHING

    2x WOOD FURRING @ 16" O.C.

    STORAGE

    116

    MECHANICAL

    AREA

    101

    STAINLESS STEEL DRIP W/ HEMMED EDGE

    WEEP HOLE @ 24" O.C. (MIN)

    THRU-WALL FLASHING

    MORTAR NET

    TERMINATION BAR W/ SEALANT @ CMU

    WEATHER BARRIER

    PROVIDE METAL WRAP@ PENETRATION

    GROUT SOLID

    8"

    1

    1' - 3 1/4"

    OVERLAP FLASHING 16" EA.SIDE OF PENETRATION W/END DAMS

    SEAL FLANGE, FULL PERIMETER OF OPENING

    TO

    P O

    F B

    RIC

    K

    8' -

    0"

    SEE STRUCTURAL DOCSFOR SIZE AND FASTNERS FOR DEFLECTION TRACK

    11

    BAR IS ONE (1) INCH LONG ON ORIGINAL

    DRAWING:

    IF BAR IS NOT ONE (1) INCH LONG, ADJUST

    SCALE ACCORDINGLY

    10

    VERIFY SCALE

    SCALECHECKED BY

    DRAWING NO.DRAWN BY DATE

    DESCRIPTION DESCRIPTION

    Date Consultant's SignatureProfessional's Signature Date

    HARRISBURG, PENNSYLVANIA

    AS-BUILT REVISIONS

    DEPARTMENT OF GENERAL SERVICESCOMMONWEALTH OF PENNSYLVANIA

    PROJECT NO. D.G.S. 251-45 PHASE 1

    RENOVATION OF SAFETY REST AREA

    MPP/ BJD 03/05/2019

    AS NOTEDREF

    EAST HANOVER TOWNSHIP, DAUPHIN COUNTY

    PENNSYLVANIA

    SITE 47, I-81 NORTH BOUND

    SEALSEAL

    A-11

    SECTIONS

    SCALE: 3/4" = 1'-0"A-11

    WALL SECTION - INTERSTATE SIDE1SCALE: 3/4" = 1'-0"A-11

    WALL SECTION - REAR SIDE2SCALE: 3/4" = 1'-0"A-11

    WALL SECTION THRU AL-83

    SCALE: 1 1/2" = 1'-0"A-11

    SIP - VALLEY DETAIL7SCALE: 1 1/2" = 1'-0"A-11

    DETAIL5SCALE: 1 1/2" = 1'-0"A-11

    TYP SILL DETAIL8SCALE: 1 1/2" = 1'-0"A-11

    DETAIL6

    SCALE: 1 1/2" = 1'-0"A-11

    DETAIL9

    SCALE: 3/4" = 1'-0"A-11

    WALL SECTION THRU AL-8 SPANDREL4

    N

    1

    1

    1 ADDENDUM 1

    06/12/2019

  • I

    -

    8

    1

    S

    O

    U

    T

    H

    B

    O

    U

    N

    D

    S

    O

    U

    T

    H

    B

    O

    U

    N

    D

    L

    A

    N

    E

    S

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    COM.

    VAULT

    N/F

    BRADLEY T. & BARBARA A. SHUTT

    DEED BOOK 5267, PAGE 227

    PARCEL ID. 25-010-012

    N

    E

    W

    R

    E

    S

    T

    A

    R

    E

    A

    F

    A

    C

    I

    L

    I

    T

    Y

    5

    ,

    3

    3

    5

    ±

    S

    Q

    .

    F

    T

    .

    F

    .

    F

    .

    E

    L

    E

    V

    .

    =

    5

    2

    3

    .

    0

    0

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    l

    l

    l

    l

    l

    l

    l

    S

    A

    N

    S

    A

    N

    S

    A

    N

    XX

    X

    X

    X

    X

    X

    X

    X

    X

    X

    DOG AREA

    251-46 LIMIT OF CONTRACT

    LINE

    (OFFSET 3' FOR CLARITY)

    (OFFSET 3' FOR CLARITY)

    LAWN

    SOD

    LAWN

    LAWN

    LAWN

    SOD

    LAWN

    LAWN

    LAWN

    M

    E

    C

    H

    P

    A

    D

    &

    E

    N

    C

    L

    .

    M

    E

    C

    H

    P

    A

    D

    &

    E

    N

    C

    L

    .

    X

    X

    X

    X

    4

    9

    0

    X

    X

    X

    S

    O

    U

    T

    H

    B

    O

    U

    N

    D

    4

    9

    0

    LIMITS OF

    FUTURE PAVING,

    CURB, GATES, & BUILDING

    (N.I.C.)

    S

    T

    O

    R

    A

    G

    E

    /

    M

    A

    I

    N

    T

    .

    F

    A

    C

    I

    L

    I

    T

    Y

    (

    4

    0

    '

    X

    6

    0

    '

    )

    SWM BASIN 1

    SWM BASIN 2

    U

    /

    E

    U

    /

    E

    U

    /

    E

    CONTRACTOR TRAILER

    & LAYDOWN AREA

    FINAL LOCATION TO BE

    APPROVED BY THE DEPARTMENT

    X

    X

    S

    A

    N

    251-46 LIMIT OF CONTRACT

    LINE

    (OFFSET 3' FOR CLARITY)

    BASIN OUTLET STRUCTURE

    (SEE DETAIL 10/C11, 11/C11,

    BMP: STORMWATER

    INFILTRATION BASIN

    (SEE DETAIL 7/C-71)

    BMP: SPECIALTY SEED MIX AT

    RETENTION BASIN BOTTOM

    (SEE NOTES SHT. C65)

    6FT HERITAGE RIVER BIRCH

    (SEE LANDSCAPE PLAN

    FOR FURTHER INFORMATION)

    o

    o

    o

    o

    Billboard

    482

    4

    8

    3

    N/F

    Eugene Kristel Inst.

    20070006890

    N/F

    Robert E. Latsha Jr.

    & Rebecca Mazzaro

    DB 3171-312

    N/F

    CLIFFORD A. JR. & SANDRA L. RIGGS

    DB 101-503

    N/F

    BNG ASSOCIATES

    DB 3501-105

    N/F

    BNG ASSOCIATES

    DB 3501-105

    Sewer MH

    Rim 473.61

    Inv 463.37

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    S

    S

    O

    U

    T

    H

    B

    O

    U

    N

    D

    L

    A

    N

    E

    S

    I

    -

    8

    1

    S

    O

    U

    T

    H

    B

    O

    U

    N

    D

    S

    h

    e

    lls

    C

    h

    u

    rc

    h

    R

    o

    a

    d

    (T

    -5

    2

    3

    )

    E

    E

    E

    E

    E

    E

    E

    E

    E

    S

    MRH

    AS SHOWN

    SCALE

    SCALECHECKED BY

    DRAWING NO.

    DRAWN BY

    DATE

    DESCRIPTION DESCRIPTION

    Date Consultant's SignatureProfessional's Signature Date

    SEALSEAL

    SITE 48, I-81 SOUTH BOUND

    EAST HANOVER TOWNSHIP, DAUPHIN COUNTY

    PENNSYLVANIA

    HARRISBURG, PENNSYLVANIA

    AS-BUILT REVISIONS

    DEPARTMENT OF GENERAL SERVICES

    COMMONWEALTH OF PENNSYLVANIA

    PROJECT NO. D.G.S. 251-46 Phase 1

    RENOVATION OF SAFETY REST AREA

    320 N. GEORGE ST.

    YORK, PA 17401

    (717) 845.8383

    I:\Jobs 2008\2008.0231.05\04 C

    ivil\D

    esign D

    ocum

    ents\D

    esign-P

    erm

    it D

    ocum

    ents\A

    ctive\Interim

    -F

    inal C

    Ds - 2018 revisions\2008023105_S

    B_C

    D 3D

    .dw

    g 09/19/18 8:58.58 A

    M E

    ST

    C-3D

    SITE LAYOUT PLAN BASE BID 1

    09/19/2018

    DAK

    00 50' 100'

    SCALE: 1" = 50'

    GENERAL NOTES

    1. REFER TO PLAN SHEET C-7 FOR IDENTIFICATION OF ALL PROPOSED SITE SIGNAGE.

    2. N.I.C. = NOT IN CONTRACT

    3. ELECTRIC LINES AND FACILITES ARE SUBJECT TO FIRST ENERGY CORP. (GPU ENERGY)

    RIGHTS-OF-WAY AND RESTRICTIONS THEREOF. AUTHORIZATION FROM FIRST ENERGY CORP. (GPU

    ENERGY) SHALL BE ESTABLISHED PRIOR TO ANY WORK WITHIN 20' OF ELECTRIC FACILITIES.

    STANDARD ASPHALT PAVEMENT

    CONCRETE PAVEMENT

    HEAVY DUTY ASPHALT PAVEMENT

    M

    A

    T

    C

    H

    L

    I

    N

    E

    B

    M

    A

    T

    C

    H

    L

    I

    N

    E

    B

    N

    BAR IS ONE (1) INCH LONG

    ON ORIGINAL DRAWING:

    IF BAR IS NOT ONE (1)

    INCH LONG, ADJUST

    SCALE ACCORDINGLY

    10

    VERIFY SCALE

    ISSUED FOR BIDDING 09/19/2018

    BASE BID 1

    AS SHOWN

    GRADING, STORMWATER AND UTILITIES TO BE INSTALLED PER

    PERMITTED DOCUMENTS

    11/13/201310/13/201803/05/201904/26/201903/05/2019

    8" VERTICAL CURB EN

    TREATMENT

    8" VERTICAL CURB EN

    TREATMENT

    8" VERTICAL CURB EN

    TREATMENT

    8" VERTICAL CURB EN

    TREATMENT

    1

    1

    1 ADDENDUM 1

    06/12/2019

  • WELL HEAD

    D

    D

    I

    -

    8

    1

    S

    O

    U

    T

    H

    B

    O

    U

    N

    D

    S

    O

    U

    T

    H

    B

    O

    U

    N

    D

    L

    A

    N

    E

    S

    U/E

    U/E

    U/E

    U/E

    U/E

    U/E

    U/E

    U/E

    U/E

    U/E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /E

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    D

    D

    COM.

    VAULT

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    L

    O

    C

    A

    T

    E

    D

    F

    R

    O

    M

    A

    S

    -

    B

    U

    I

    L

    T

    D

    R

    A

    W

    I

    N

    G

    S

    N/F

    BRADLEY T. & BARBARA A. SHUTT

    DEED BOOK 5267, PAGE 227

    PARCEL ID. 25-010-012

    B.M.

    P

    R

    O

    P

    E

    R

    T

    Y

    /

    H

    I

    G

    H

    W

    A

    Y

    R

    I

    G

    H

    T

    -

    O

    F

    -

    W

    A

    Y

    L

    I

    N

    E

    P

    R

    O

    P

    E

    R

    T

    Y

    /

    H

    I

    G

    H

    W

    A

    Y

    R

    I

    G

    H

    T

    -

    O

    F

    -

    W

    A

    Y

    L

    I

    N

    E

    D

    D

    D

    D

    D

    D

    D

    D

    N

    E

    W

    R

    E

    S

    T

    A

    R

    E

    A

    F

    A

    C

    I

    L

    I

    T

    Y

    5

    ,

    3

    3

    5

    ±

    S

    Q

    .

    F

    T

    .

    F

    .

    F

    .

    E

    L

    E

    V

    .

    =

    5

    2

    3

    .

    0

    0

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    U

    /

    T

    W

    W

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    l

    l

    l

    l

    l

    l

    l

    D

    MH-B2

    I-C1

    I-C2 (WQ)

    HW-C1

    I-D1 (WQ)

    HW-D1

    D

    I-E1 (WQ)

    HW-E1

    D

    I-F1

    D

    MH-F1

    I-F2

    I-F3

    I-F4

    I-F5 (WQ)

    HW-F1

    I-B7

    I-B1

    I-B2 (WQ)

    HW-B1

    D

    EX. I-A1

    D

    EX. I-A2

    D

    EX. I-A4

    D

    EX. I-A5

    D

    D

    D

    D

    D

    D

    EX. I-A3

    D

    D

    D

    D

    D

    EX. MH

    S

    M

    H

    -

    3

    S

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    EX. I-B1

    EX. I-B3

    D

    D

    D

    D

    EX. I-B2

    XX

    X

    X

    X

    X

    X

    X

    X

    X

    X

    D

    D

    OS-1

    I-A1

    S

    SAN. MH-1

    S

    SAN. MH-2

    S

    A

    N

    S

    A

    N

    S

    S

    A

    N

    .

    M

    H

    -

    3

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    SAN. MH-4

    SAN

    SAN

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    S

    A

    N

    W

    W

    W

    D

    MH-B1

    I-B3 (WQ)

    8

    "

    ∅ PV

    C

    8" ∅ PVC

    8

    "

    ∅ PV

    C

    8

    "

    P

    V

    C

    8

    "

    ∅ P

    V

    C

    15" ∅ RCP

    1

    8

    "

    R

    C

    P

    15" RCP

    SANITARY SEWER TIE IN POINT

    (STRUCTURE TO REMAIN, MODIFY AS NEEDED)

    HW-A1

    251-46 LIMIT OF CONTRACT

    LINE

    (OFFSET 3' FOR CLARITY)

    251-46 LIMIT OF CONTRACT

    LINE

    (OFFSET 3' FOR CLARITY)

    M

    E

    C

    H

    P

    A

    D

    &

    E

    N

    C

    L

    .

    M

    E

    C

    H

    P

    A

    D

    &

    E

    N

    C

    L

    .

    LOOP DETECTION

    FOR BUSES

    I-B9

    I-B8

    SSWR MANHOLE TYP.

    (SEE RC39/C18-20)

    EMERGENCY SPILLWAY

    (SEE DETAIL 12/C-12)

    NEW WELL TREATMENT

    BUILDING FF 519.25

    NEW WATER TANK &

    TREATMENT SYSTEM

    BY GC

    X

    X

    X

    X

    B

    U

    S

    L

    O

    A

    D

    IN

    G

    STORM SEWER

    TIE IN POINT

    MODIFY BOX

    AS NEEDED

    X

    X

    X

    X

    X

    X

    S

    O

    U

    T

    H

    B

    O

    U

    N

    D

    L

    A

    N

    E

    S

    I

    -

    8

    1

    S

    O

    U

    T

    H

    B

    O

    U

    N

    D

    LIMITS OF

    FUTURE PAVING,

    CURB, GATES, & BUILDING

    (N.I.C.)

    S

    T

    O

    R

    A

    G

    E

    /

    M

    A

    I

    N

    T

    .

    F

    A

    C

    I

    L

    I

    T

    Y

    (

    4

    0

    '

    X

    6

    0

    '

    )

    TELEPHONE SERVICE

    CONNECTION

    AT EXISTING TELEPHONE

    SERVICE PEDESTAL

    BY EC

    BEGIN PAVEMENT

    RECONSTRUCTION

    DUMPSTER PAD

    W/ PVC SCREEN

    FENCE ENCLOSURE

    (SEE 13/C11, 16/C-11, 17/C-11)

    SLIDE GATE

    (N.I.C.)

    SLIDE GATE

    (N.I.C.)

    6' WIDE GATE

    W/ PAD LOCK

    (SEE RC61/C-41)

    4' HIGH FENCE

    W/ 6' WIDE DOUBLE

    LEAF GATE W/ TRASH

    & ASH RECEPTACLES

    (SEE DETAILS 1 & 2/C-4)

    6' WIDE GATE

    (SEE RC61/C-38 - C-40)

    LOCATION OF TYPE 1

    RIGHT-OF-WAY FENCE

    (SEE RC60/C-38 - C-40)

    12' WIDE DOUBLE

    LEAF VEHICLE GATE

    W/ PAD LOCK & BASIN

    WARNING SIGN

    (SEE DETAILS 1 & 2/C-4)

    6' WIDE GATE

    W/ PAD LOCK

    (SEE DETAILS 1 & 2/C-4)

    EMERGENCY SPILLWAY

    (SEE DETAIL 12/C-12)

    NEW FENCE TIE-IN

    TO EXISTING FENCE

    NEW FENCE TIE-IN

    TO EXISTING FENCE

    BASIN EMBANKMENT

    (SEE DETAIL 8/C12, 2/C12,

    3/C-12)

    6' WIDE GATE

    W/ PAD LOCK

    (SEE DETAILS 1 & 2/C-4)

    I-F6

    D

    I-B4

    I-F7

    I-B5

    I-B6

    I-F8

    SWM BASIN 1

    SWM BASIN 2

    ASPHALT SHOULDER

    ASPHALT PATH

    (SEE DETAIL 9/C-11)

    8' CHAIN LINK FENCE

    (SEE DETAILS 1 & 2/C-4)

    8' CHAIN LINK FENCE

    (SEE DETAILS 1 & 2/C-4)

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    B

    U

    S

    L

    O

    A

    D

    IN

    G

    12' WIDE DOUBLE

    LEAF VEHICLE GATE

    W/ PAD LOCK & BASIN

    WARNING SIGN

    (SEE RC61/C-41)

    D

    OS-2

    BASIN EMBANKMENT

    (SEE DETAIL 8/C-12, 2/C-12,

    3/C-12)

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    DS

    DS

    DS

    DS

    DS

    DS

    DS

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    INSTALL NEW PUMP TO MATCH

    EXISTING PUMP SPECS AND

    INSTALL A NEW LOCKABLE

    SECURE WELL CAP, EXTEND

    WELL CASING AS NEEDED BY

    GC (USING AGENCY TO

    SUPPLY LOCK)

    S

    1

    5

    " ∅ R

    C

    P

    15" ∅

    RCP

    1

    8

    " ∅ R

    C

    P

    1

    5

    "

    ∅ RCP

    1

    5

    " ∅ R

    C

    P

    1

    5

    "

    ∅ RC

    P

    1

    5

    "

    RCP

    1

    5

    "

    ∅ RCP

    1

    5

    "

    ∅ R

    C

    P

    1

    5

    "

    ∅ RC

    P

    1

    5

    "

    ∅ RC

    P

    1

    5

    "

    ∅ RC

    P

    1

    5

    "

    ∅ RC

    P

    1

    8

    "

    ∅ RC

    P

    15" ∅

    RCP

    15" ∅

    RCP

    15" ∅

    RCP

    18" ∅

    RCP

    1

    5

    " ∅

    RCP

    1

    5

    "

    ∅ R

    C

    P

    1

    5

    "

    ∅ RC

    P

    15" ∅

    RCP

    1

    5

    "

    ∅ R

    C

    P

    15" ∅ RCP

    6

    "

    C

    P

    V

    C

    3

    "

    C

    P

    V

    C

    1

    5

    "

    ∅ R

    C

    P

    1

    8

    "

    ∅ RC

    P

    1

    5

    "

    ∅ RC

    P

    U/E

    U/E

    U/E

    U/E

    U/E

    U

    /

    E

    EXISTING TRANSFORMER TO BE

    REMOVED AND CONVERTED

    INTO PULL BOX BY EC.

    SINGLE PHASE ELECTRIC

    SERVICE EXTENDED FROM

    TRANSFORMER TO BUILDING

    BY POWER COMPANY

    PROPOSED SINGLE

    PHASE ELECTRICAL

    TRANSFORMER BY EC.

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    TEMPORARY 6'

    SECURITY FENCE

    TEMPORARY 6'

    SECURITY FENCE

    TEMPORARY 6'

    SECURITY FENCE

    GATE

    GATE

    U/E

    P

    R

    O

    P

    E

    R

    T

    Y

    /

    H

    I

    G

    H

    W

    A

    Y

    R

    I

    G

    H

    T

    -

    O

    F

    -

    W

    A

    Y

    L

    I

    N

    E

    S

    X

    X

    EX. MH

    S

    A

    N

    G

    G

    o

    o

    o

    o

    S

    S

    S

    S

    Met Ed

    30106

    38244

    38230

    30056

    Met Ed

    Pole

    4883-6

    Pole

    283-15

    Inv 468.02

    TG 473.66

    TG 469.29

    Inv 463.43

    Inv 463.53

    TG 481.86

    Inv 477.06

    Billboard

    Inv 459.74

    482

    4

    8

    3

    N/F

    Eugene Kristel Inst.

    20070006890

    N/F

    Robert E. Latsha Jr.

    & Rebecca Mazzaro

    DB 3171-312

    N/F

    CLIFFORD A. JR. & SANDRA L. RIGGS

    DB 101-503

    N/F

    BNG ASSOCIATES

    DB 3501-105

    N/F

    BNG ASSOCIATES

    DB 3501-105

    Sewer MH

    Rim 473.61

    Inv 463.37

    Storm MH

    Rim 472.88

    Inv 464.33

    Met Ed

    30060

    38237

    T

    T

    D

    D

    D

    D

    D

    D

    D

    D

    D

    D

    X

    X

    X

    X

    X

    X

    X

    X

    X

    XX

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    S

    S

    O

    U

    T

    H

    B

    O

    U

    N

    D

    L

    A

    N

    E

    S

    I

    -

    8

    1

    S

    O

    U

    T

    H

    B

    O

    U

    N

    D

    S

    h

    e

    lls

    C

    h

    u

    rc

    h

    R

    o

    a

    d

    (T

    -5

    2

    3

    )

    E

    E

    E

    E

    E

    E

    E

    E

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    U

    /

    E

    S

    X

    MRH

    AS SHOWN

    SCALE

    SCALECHECKED BY

    DRAWING NO.

    DRAWN BY

    DATE

    DESCRIPTION DESCRIPTION

    Date Consultant's SignatureProfessional's Signature Date

    SEALSEAL

    SITE 48, I-81 SOUTH BOUND

    EAST HANOVER TOWNSHIP, DAUPHIN COUNTY

    PENNSYLVANIA

    HARRISBURG, PENNSYLVANIA

    AS-BUILT REVISIONS

    DEPARTMENT OF GENERAL SERVICES

    COMMONWEALTH OF PENNSYLVANIA

    PROJECT NO. D.G.S. 251-46 Phase 1

    RENOVATION OF SAFETY REST AREA

    320 N. GEORGE ST.

    YORK, PA 17401

    (717) 845.8383

    I:\Jobs 2008\2008.0231.05\04 C

    ivil\D

    esign D

    ocum

    ents\D

    esign-P

    erm

    it D

    ocum

    ents\A

    ctive\1-M

    inor M

    odification\2008.0231.05_C

    _S

    B.dw

    g 04/10/19 3:38.28 P

    M E

    ST

    C-5

    UTILITY PLAN

    09/19/2018

    DAK

    00 50' 100'

    SCALE: 1" = 50'

    GENERAL NOTES

    1. ELECTRIC LINES AND FACILITES ARE SUBJECT TO FIRST ENERGY CORP. (GPU ENERGY)

    RIGHTS-OF-WAY AND RESTRICTIONS THEREOF. AUTHORIZATION FROM FIRST ENERGY CORP. (GPU

    ENERGY) SHALL BE ESTABLISHED PRIOR TO ANY WORK WITHIN 20' OF ELECTRIC FACILITIES.

    M

    A

    T

    C

    H

    L

    I

    N

    E

    M

    A

    T

    C

    H

    L

    I

    N

    E

    N

    BAR IS ONE (1) INCH LONG

    ON ORIGINAL DRAWING:

    IF BAR IS NOT ONE (1)

    INCH LONG, ADJUST

    SCALE ACCORDINGLY

    10

    VERIFY SCALE

    GC

    EC, PC

    All work on this Drawing is to

    be included by the ____,

    except work noted to be by:

    ____________

    1 PER REVISED ELECTRIC DESIGN05/31/2018

    ISSUED FOR BIDDING 09/19/2018

    03/05/201904/26/201903/05/2019

    2 ADDENDUM 1

    PC

    2

    06/12/2019

    2

  • 1

    A-10

    2

    A-10

    2" STANDING SEAM METAL ROOF SYSTEM OVER WATERPROOFING UNDERLAYMENT ON STRUCTURAL INSULATED PANELS

    SNOW GUARD, TYP. SEE 8/A-12.

    METAL COPING ON MECHANICAL SCREEN WALL. REFER TO 6/A-12.

    ROOF CRICKET

    FACE OF WALLBELOW - TYPICAL

    SOLAR WATER HEATING PANEL BY .03 CONTR., STRUCTURE BY .01., ELECTRICAL BY .04 CONTRACTOR, REFER TOPLUMBING FOR PANEL ORIENTATION

    2

    A-12

    3

    A-12

    MECHANICALAREA 115 BELOW

    MECHANICALAREA 101 BELOW

    STACK VENTS, PENETRATION AND SEALS BY .01 CONTRACTOR

    1/2" / 12" 1/2" / 12"

    1 1

    /2"

    / 12

    "

    5" ALUMINUM GUTTERS

    3" ALUMINUM DOWNSPOUTS TO UNDERGROUND - SEEDETAIL 3/ A-4

    3" ALUMINUM DOWNSPOUTSTO UNDERGROUND BY .01 CONTR. SEE DETAIL 3/ A-45" ALUMINUM GUTTERS

    3" ALUMINUM DOWNSPOUTS TO UNDERGROUND BY .01 CONTR. - SEE DETAIL 3/ A-4

    1 1

    /2"

    / 12

    "

    1 1

    /2"

    / 12

    "

    1 1

    /2"

    / 12

    "

    3" ALUMINUM DOWNSPOUTS TO UNDERGROUND BY .01 CONTR. - SEE DETAIL 3/ A-4

    HIGHWAY INTERSTATE SIDE

    4

    A-4GUTTER SPLASH GUARD TYP @ CRICKETS

    GUTTER SPLASH GUARD TYP @ CRICKETS

    66' - 1 3/16" 27' - 10" 66' - 1 1/8"

    10

    ' -

    9 5

    /8"

    32

    ' -

    5 1

    /2"

    10

    ' -

    9 1

    /4"

    D.S. D.S.D.S.D.S. D.S. D.S.

    4

    A-11

    CRICKET -METAL OVERINSULATION

    STACK VENTS, PENETRATION AND SEALS BY .01 CONTRACTOR

    VENTILATOR BY HVAC CONTRACTOR, PENETRATION AND SEAL BY GENERAL CONTRACTOR

    6

    A-12

    A-4

    5

    EQUIPMENTPADS

    EQUIPMENTPADS

    SOLAR WATER HEATING PANEL BY .03 CONTR., STRUCTURE BY .01., ELECTRICAL BY .04 CONTRACTOR, REFER TOPLUMBING FOR PANEL ORIENTATION

    METAL COPING ON MECHANICAL SCREEN WALL. REFER TO 6/A-12.

    NOTES:

    1. PRE-MOLDED PIPE SEAL MUST HAVE INTACTRIB AT TOP EDGE, REGARDLESS OF PIPE DIAMETER

    PRE-MOLDED PIPE SEAL -RATED FOR 400º SERVICE

    WATER CUT-OFF MASTIC

    SEALANT

    2 PIECE FLASHING

    STAINLESS STEELCLAMPING RING

    2. APPLY IN-SEAM SEALANT 1/2" FROM INSIDEEDGE OF PIPE SEAL FLANGE

    3. DECK FLANGES OF THE PRE-MOLDED PIPEFLASHING SHALL NOT BE OVERLAPPED,CUT OR APPLIED OVER ANY ANGLE CHANGE

    4. INSTALL PIPE PENETRATION BETWEENROOFING PANEL SEAMS.

    5. INSTALL SNOW GUARD 12" UPSLOPE FROM PENETRATION.

    VENT THRU ROOFBY PLUMBINGCONTRACTOR - TYP

    1' -

    2 3

    /4"

    CENTER PIPE BETWEENSTANDING SEAMS

    DOWNSPOUT

    GRADE

    CAST IRON DOWNSPOUT BOOT

    COUPLER

    CAST IRON SOLID PIPE LONG SWEEP BEND (90 DEGREE) BY GENERAL CONTRACTOR

    CLEANOUT ACCESS

    SEE CIVIL DRAWINGS FOR CONTINUATION OF STORM

    8" GRAVEL BED

    GEOTEXTILE FABRIC

    12

    " M

    IN

    REFER TO CIVIL FOR INVERT ELEVATIONS.

    WOOD BLOCKING BETWEEN SIP & TUBE STEEL

    STEEL BEAM

    VENTED ALUMINUM SOFFIT

    CLEAR ANODIZED ALUMINUMOVER BEAM INSULATION

    2"

    TY

    P

    STRUCTURAL INSULATED PANEL

    2" STANDING SEAM ROOF

    WATERPROOFING UNDERLAYMENT

    2x TREATED WOOD FURRING IN HERRINGBONEPATTERN @ 16" O.C.

    1/2" TREATED WOOD SHEATHING

    2x CONTINUOUS TREATED WOOD BLOCKING

    ALUMINUM FASCIA

    2x TREATED WOOD FURRING @ 16" O.C.

    1' - 0"

    2" TYP

    EDGE OF SADDLE TO MATCHWIDTH OF GUTTER

    4" HIGH SPLASH GUARD

    6"

    18"

    EDGE OF ROOFING

    GUTTER

    EDGE OF ROOFING

    SADDLE

    BAR IS ONE (1) INCH LONG ON ORIGINAL

    DRAWING:

    IF BAR IS NOT ONE (1) INCH LONG, ADJUST

    SCALE ACCORDINGLY

    10

    VERIFY SCALE

    SCALECHECKED BY

    DRAWING NO.DRAWN BY DATE

    DESCRIPTION DESCRIPTION

    Date Consultant's SignatureProfessional's Signature Date

    HARRISBURG, PENNSYLVANIA

    AS-BUILT REVISIONS

    DEPARTMENT OF GENERAL SERVICESCOMMONWEALTH OF PENNSYLVANIA

    PROJECT NO. D.G.S. 251-46 PHASE 1

    RENOVATION OF SAFETY REST AREA

    MPP/ BJD 03/05/2019

    AS NOTEDREF

    EAST HANOVER TOWNSHIP, DAUPHIN COUNTY

    SITE 48, I-81 SOUTH BOUND

    PENNSYLVANIA

    SEALSEAL

    A-4

    ROOF PLAN AND DETAILS

    SCALE: 1/8" = 1'-0"A-4

    ROOF PLAN1

    SCALE: 1 1/2" = 1'-0"A-4

    ROOF PENETRATION2SCALE: 1 1/2" = 1'-0"A-4

    DOWNSPOUT TO UNDERGROUND STORM3SCALE: 1 1/2" = 1'-0"A-4

    BEAM WRAP DETAIL4

    SCALE: 1" = 1'-0"A-4

    ROOF PLAN - SADDLE5

    1 ADDENDUM 1

    06/12/2019

    1

    N

    bdeckPolyLine

    bdeckSnapshot

  • A-11

    6

    A-11

    5

    VENTED ALUMINUM SOFFIT

    STRUCTURAL INSULATEDPANEL

    2x WOOD FURRING IN HERRINGBONEPATTERN @ 16" O.C.

    STONE

    4" CONC SLAB

    2x TREATED CONTINUOUS WOOD BLOCKING

    STONE

    4" HEATED CONC SLAB

    2" RIGID PERIMETER INSULATION

    CMU - SEE STRUCTURAL DWGS

    REINFORCED CONCRETE FOOTING

    VAPOR RETARDER

    CLEAR ANODIZED ALUMINUMOVER 2" RIGID INSULATION

    WATERPROOFING UNDERLAYMENT

    ALUMINUM FASCIA

    REINFORCED TURNDOWN SLAB

    SLOPE 1/4"/FT

    BO

    TT

    OM

    OF

    FIX

    TU

    RE

    6' -

    9 3

    /16

    "

    LOBBY

    107

    HIGHWAY INTERSTATE SIDE

    2" STANDING SEAM ROOF

    1/2" TREATED WOOD SHEATHING

    13

    ' - 1

    1 1

    /16

    "

    2x WOOD FURING @ 16" O.C.

    CONC SLAB - REFERTO CIVIL FOR CONSTRUCTION

    LOBBY

    107

    A-11

    7

    STONE

    4" CONCRETE SLAB

    STONE

    4" HEATED CONC SLAB -SLOPED 1/4"/ FT

    2" RIGID PERIMETER INSULATION

    CMU

    REINFORCED CONCRETE FOOTING

    VAPOR RETARDER

    A-11

    6

    MIN

    2' - 0"

    REAR SIDE

    TOP OF STEEL

    11'- 0 7/16"

    A-11

    8

    VENTED ALUMINUM SOFFIT

    STRUCTURAL INSULATED PANEL

    2x CONTINUOUSTREATED WOOD BLOCKING

    BRICK VENEERW/ ANCHORS AT 16" O.C.

    AIRSPACE

    2 1/2" RIGID INSULATION

    8" CMU WITHANCHORS AT 16" O.C.

    STONE

    4" CONCRETE SLAB

    2" RIGID PERIMETER INSULATION

    CMU

    REINFORCED CONCRETE FOOTING

    2" STANDING SEAM ROOF

    VAPOR RETARDER

    WATERPROOFING UNDERLAYMENT

    ALUMINUM FASCIA

    116

    STORAGE

    116

    MECHANICAL

    AREA

    101

    A-11

    92x WOOD FURRING IN HERRINGBONE PATTERN @ 16" O.C.

    5/8" TREATED WOOD SHEATHING

    2x WOOD FURRING @ 16" O.C.

    HVAC UNIT BY HVAC CONTRACTOR

    DUCTWORK BY HVAC CONTRACTOR

    PROVIDE END DAM FLASHING @ THRU WALL PENETRATIONS

    1

    1' - 3 1/4"

    TO

    P O

    F M

    AS

    ON

    RY

    8' -

    0"

    METAL CLIP W/ FASTENERS

    OFFSET CLEAT W/ FASTENERS

    FILL END OF SEAMS WITHURETHANE SEALANT -COLORED TO MATCH PANEL

    STAINLESS STEEL VALLEY TRIM

    WATERPROOFING UNDERLAYMENT

    PREFINISHED STANDINGSEAM METAL ROOF PANEL

    STRUCTURAL INSULATED PANEL

    4"

    VENTED ALUMINUM SOFFIT WOOD CEILING

    WOOD BLOCKING BETWEENSIP AND TUBE STEEL

    EXTERIOR LOBBY INTERIOR

    2x WOOD BLOCKING

    CLEAR ANODIZED ALUMINUMOVER BEAM INSULATION

    4"

    METAL OVER 1/2" PROTECTION BOARD OVER TAPERED INSULATION

    2x WOOD BLOCKING

    STEEL ANGLE. REFER TO STRUCTURAL DRAWINGS.

    TOP OF STEEL

    11'- 0 7/16"

    WOOD BLOCKINGWOOD CEILING

    CLEAR ANODIZED ALUMINUM OVER BEAM INSULATION

    WOOD BLOCKING BETWEEN SIP AND TUBE STEEL

    VENTED ALUMINUM SOFFIT

    STRUCTURAL INSULATEDPANEL

    2x WOOD FURRING IN HERRINGBONEPATTERN @ 16" O.C.

    WATERPROOFING UNDERLAYMENT

    2" STANDING SEAM ROOF

    1/2" TREATED WOOD SHEATHING

    CLEAR ANODIZED ALUMINUM OVER BEAM INSULATION

    SLOPE ALUM FLASHING W/ HEMMED DRIP EDGE

    4" BRICK VENEER

    BEVELED 2xTREATED WOOD BLOCKING

    AIRSPACE

    2 1/2" RIGID INSULATION

    5/4" PTD WOOD TRIM

    ALUM STOREFRONT SYSTEM

    SEALANT

    SEALANT

    STEEL ANGLE

    BOND BEAM

    111 1/4"

    1 1/2" 4 1/2"

    1 1/4"

    4"

    SEALANT

    1/4

    "

    4"

    STONE

    4" CONC SLAB

    STONE

    4" HEATED CONC SLAB

    VAPOR RETARDER

    1/2" SLAB ISOLATIONJOINT FILLER

    CURTAINWALL

    PERIMETER INSULATION

    OUTSIDE INSIDE

    12" LONG, #4 BARS AT 12" O.C.

    ALUMINUM SOFFIT

    WOOD BLOCKING

    PRE-FINISHEDSTEEL ANGLE.SEE STRUCTURAL DRAWINGS

    PREFINISHED ALUM TRIM

    3"

    CLEAR2 1/4"

    5/4"x 4" WOOD TRIM- FINISH & SPECIES TOMATCH CLG.

    STRUCTURAL INSULATED PANEL

    2" STANDING SEAM ROOF

    WATERPROOFING UNDERLAYMENT

    2x WOOD FURRING IN HERRINGBONEPATTERN @ 16" O.C.

    1/2" TREATED WOOD SHEATHING

    1

    PAINT TUBE STEEL PRIORTO GLAZING

    VENTED ALUMINUM SOFFIT

    STRUCTURAL INSULATED PANEL

    2x CONTINUOUSTREATEDWOOD BLOCKING

    BRICK VENEER WITH ANCHORS AT 16" O.C.

    AIRSPACE

    2 1/2" RIGID INSULATION

    8" CMU WITHANCHORS AT 16" 0.C.

    STONE

    4" SEALED CONCRETE SLAB

    2" RIGID PERIMETER INSULATION

    CMU - SEE STRUCTURAL DWGS

    REINFORCED CONCRETE FOOTING

    2" STANDING SEAM ROOF

    VAPOR RETARDER

    WATERPROOFING UNDERLAYMENT

    ALUMINUM FASCIA

    AIRSPACE

    2" RIGID INSULATION

    6" CMU

    WOOD BLOCKING

    WOOD BLOCKING

    STEEL ANGLE

    RIGID INSULATION

    2x WOOD FURRING IN HERRINGBONEPATTERN @ 16" O.C.

    1/2" TREATED WOOD SHEATHING

    2x WOOD FURRING @ 16" O.C.

    STORAGE

    116

    MECHANICAL

    AREA

    101

    STAINLESS STEEL DRIP W/ HEMMED EDGE

    WEEP HOLE @ 24" O.C. (MIN)

    THRU-WALL FLASHING

    MORTAR NET

    TERMINATION BAR W/ SEALANT @ CMU

    WEATHER BARRIER

    PROVIDE METAL WRAP@ PENETRATION

    GROUT SOLID

    8"

    1

    1' - 3 1/4"

    OVERLAP FLASHING 16" EA.SIDE OF PENETRATION W/END DAMS

    SEAL FLANGE, FULL PERIMETER OF OPENING

    TO

    P O

    F B

    RIC

    K

    8' -

    0"

    SEE STRUCTURAL DOCSFOR SIZE AND FASTNERS FOR DEFLECTION TRACK

    11

    BAR IS ONE (1) INCH LONG ON ORIGINAL

    DRAWING:

    IF BAR IS NOT ONE (1) INCH LONG, ADJUST

    SCALE ACCORDINGLY

    10

    VERIFY SCALE

    SCALECHECKED BY

    DRAWING NO.DRAWN BY DATE

    DESCRIPTION DESCRIPTION

    Date Consultant's SignatureProfessional's Signature Date

    HARRISBURG, PENNSYLVANIA

    AS-BUILT REVISIONS

    DEPARTMENT OF GENERAL SERVICESCOMMONWEALTH OF PENNSYLVANIA

    PROJECT NO. D.G.S. 251-46 PHASE 1

    RENOVATION OF SAFETY REST AREA

    MPP/ BJD 03/05/2019

    AS NOTEDREF

    EAST HANOVER TOWNSHIP, DAUPHIN COUNTY

    SITE 48, I-81 SOUTH BOUND

    PENNSYLVANIA

    SEALSEAL

    A-11

    SECTIONS

    SCALE: 3/4" = 1'-0"A-11

    WALL SECTION - INTERSTATE SIDE1SCALE: 3/4" = 1'-0"A-11

    WALL SECTION - REAR SIDE2SCALE: 3/4" = 1'-0"A-11

    WALL SECTION THRU AL-83

    SCALE: 1 1/2" = 1'-0"A-11

    SIP - VALLEY DETAIL7SCALE: 1 1/2" = 1'-0"A-11

    DETAIL5SCALE: 1 1/2" = 1'-0"A-11

    TYP SILL DETAIL8SCALE: 1 1/2" = 1'-0"A-11

    DETAIL6

    SCALE: 1 1/2" = 1'-0"A-11

    DETAIL9

    SCALE: 3/4" = 1'-0"A-11

    WALL SECTION THRU AL-8 SPANDREL4

    1

    1

    1 ADDENDUM 1

    06/12/2019

    N

    bdeckPolyLine

    bdeckSnapshot

    DGS 251-45 Phase 1 - C-3D Addendum NorhtboundDGS 251-45 Phase 1 - C-5 Addendum NorthboundDGS 251-45 Phase 1 - A-4 Addendum 1 NorthDGS 251-45 Phase 1 - A-11 Addendum 1 NorthC-3 Addendum SouthboundC-5 Addendum SouthboundDGS 251-46 Phase 1 - A-4 Addendum 1 SouthDGS 251-46 Phase 1 - A-11 Addendum 1 South