I:\18-0000\18-2089 Renne Library Testing Center Expansion\2 Project Manual Plans Specifications\Final Bid
Documents\18-2089 Renne Library Testing Cntr Addendum 1.doc
CAMPUS PLANNING, DESIGN & CONSTRUCTION Sixth Avenue and Grant Street • P.O. Box 172760 • Bozeman, Montana 59717-2760
Phone: (406) 994-5413 • Fax: (406) 994-5665
ADDENDUM NO. 1 - OUTLINE AND SUMMARY INFORMATION
Project Name: Renne Library Testing Center Renovation PPA No.: 18-2089
Location: Renne Libary Date: October 31, 2018
Owner: Montana State University
Bozeman, MT
To: All Plan Holders of Record
The Plans and Specification prepared by Hip and Humble Architecture dated October 15, 2018, shall be clarified and
added as follow. The bidder proposes to perform all the following clarifications or changes. It is understood that the Base
Bid shall include any modification of Work or Additional Work that may be required by reason of the following change or
clarifications.
The Bidders are to acknowledge the receipt of this Addendum by inserting its number and date into their Bid
Forms. Failure to acknowledge may subject the Bidder to disqualification and rejection of the bid. This
Addendum forms part of the Contract Documents as if bound therein and modifies them as follows:
I. AMENDMENTS TO THE PROJECT MANUAL
A. Bid Form: Contractor is to provide an alternate price (alternate no. 3) for premanufactured carrels, in the
design as shown on the drawings, as manufactured by:
• KI Corporation, Green Bay, WI; 800-424-2432, basis of design. A local supplier for KI is 360
Office Solutions, contact Jeremy Turner at [email protected] or 406-600-6238.
• Worden Company, Holland, MI; 800-748-0561
• Smith System, Plano, TX; 800-328-1061
B. Spec Section 08-1416 Flush Wood Doors; subsection 2.08 Hardware – Item E: CHANGE Add Alternate
#2 ADA compliant door opener from Dormakaba Model ED900 to Norton/Assa Abloy 5800 series
ADAEZ low energy (wireless) operator with ADAEZ PRO installation kit including narrow style push
buttons with wireless transmitters and all other components required for a complete and fully functioning
system.
C. Spec Section 23-0000 General Provisions for HVAC Work: Add the sections indicated on the attached
Addendum No. 1 from Three Rivers Engineering.
D. Spec Section 23-0946 Temperature Controls: Add the sections indicated on the attached Addendum No. 1
from Three Rivers Engineering.
I:\18-0000\18-2089 Renne Library Testing Center Expansion\2 Project Manual Plans Specifications\Final Bid
Documents\18-2089 Renne Library Testing Cntr Addendum 1.doc
II. AMENDMENTS TO THE DRAWINGS
A. Sheet M2-1 – Mechanical Plan: MODIFY notes on Mechanical Plan as shown in bubbled areas on the
attached Addendum No. 1 from Three Rivers Engineering.
B. Sheet M3-1 – Mechanical Schedules: ADD note to Heat Recovery Unit Schedule as shown in bubbled
area on the attached Addendum No. 1 from Three Rivers Engineering.
III. GENERAL INFORMATION – NOT USED
IV. ATTACHMENTS
A. Addendum No. 1 from Three Rivers Engineering dated 10/30/18.
END OF ADDENDUM NO. 1
24 S. Willson Ave, Suite A1 Bozeman, MT 59715
406 - 582 - 8288 www.tremt.com
Three Rivers Engineering, Inc.
Mechanical, Electrical, Energy
ADDENDUM NO. 1 TO CONTRACT DOCUMENTS
Project: Renne Library
Testing Center Expansion #18-2089
Architect: Hip & Humble Architecture 418 South 5th Avenue Bozeman, MT59715
Pages: 1 + Drawing M2.1 & M3.1 Date: 10/30/2018
• The additions, omissions, corrections and clarifications contained in this addendum shall be included as part of the contract documents as provided under the General Conditions of the Contract.
• This addendum is a contract document and may apply to any or all contracts and sub-contracts. Unless otherwise specified herein, all work required by this addendum shall be in complete accord with the contract documents and subsequent addendum thereto.
• This addendum shall become part of the bid. The bidder shall acknowledge the receipt of this addendum in the proposal form.
Mechanical Changes:
• Modify Sheet M2-1 as shown in the bubbled areas.
• Modify sheet M3-1 as shown in the bubbled areas.
Specification Changes: Make the following specification changes as noted. (Strikethrough = remove, Underline = add) Add the following to section 230000 General Provisions for HVAC Work
Part 1 General, 1.19 Submittals and Brochures of Equipment (O&M Manuals), E. 10. See Section 013000 for additional requirements of submittals. F. 8. See Section 017823 for additional requirements of Operations and Maintenance
Manuals. Part 3 Execution, 3.3 Demonstration and Training
A. See section 179000 for additional requirements for demonstration and training of mechanical and electrical systems.
Add the following to section 230946 Temperature Controls
Part 1 General, 1.1 Work Included, A… 4. Install freeze stat for automatic shutdown of HRV-2 if supply temperature drops
below 40F. Include alarm on campus facilities automation system. System to allow auto restart 3x prior to required manual restart from DDC system.
Part 3 Execution, 3.3 Demonstration and Training
A. See section 179000 for additional requirements for demonstration and training of mechanical and electrical systems.
RELOCATED FREEZE PROTECTION TEMPERATURE SENSOR.
BOTTOM OF DUCT MINIMUM 94" AFF
CONNECT NEW DUCT TO EXISTING LOUVER.
MAINTAIN CLEARANCE FOR EXHAUST FAN MAINENANCE.
EXPAND DUCT TO 12X12 AT HEATING COIL.
OFFSET DUCT BELOW EXISTING PIPE WITH SMOOTH 30DEG RADIUS ELBOWS.
PROVIDE MOTORIZED DAMPERS WITH DUCT ACCESS DOORS - ON INLET AND
EXHAUST OF EACH HRV. CONTRACTOR MAY REUSE EXISTING ACTUATORS FOR
HRV-1.
EXTEND 14X14 DUCT THROUGH EXISTING EXTERIOR WALL OPENING. PROVIDE WALL
HOOD.
DIGITAL DUCT TEMPERATURE SENSOR. INTERLOCK WITH HRV-2 TO SHUTDOWN IF
TEMP IS BELOW 40F. SEE SPECIFICATIONS FOR DETAILS.
KEYED NOTES:GENERAL NOTES:
BALANCE ALL DEVICES TO AIRFLOW INDICATED. 1
2
1.)
3
4
5
6
7
8
A1
A1
9
EG-E
150
EG-E
55
SD-E
55
SD-E
150
AC
1
AC
4
AC
7
AC
5
RG-N
180
110 CFM OA
EG-E
125
EG-E
20
SD-E
20
D
D
SD-E
125
RG
EG-E
20
AC
2
EG-E
110
8Ø
EXISTING
BRANCH PROVIDER BOX
RG
RL
4Ø
6Ø
3/4" DRAIN
UP
UP
DN
D
D
RG
RL
RG
RL
RG
RL
RG
RL
4Ø
D
(E) COND. DRAIN
UP
UP
DN
9x8
9x8
14x10
14Ø
14Ø
CND
9x8
9x8
9x8
1
T
2
AC
3
AC
1
AC
4
AC
5
AC
2
NEW BRANCH DIVIDER BOX
18x10
8Ø8Ø
8Ø8Ø
8Ø8Ø
8Ø8Ø
AC
6
SD-1
140
10x8
10x8
AC
8
EXISTING
HRV-1
ABOVE
EG-E
375
10x1010x10
12x1012x10
RG-1
565
16x1016x10
24x624x6
RG-2
100
RG-2
100
RG-2
100
SD-1
140
SD-1
140
SD-1
140
ETS TESTING
ROOM
019F
STORAGE
019G
ADA TESTING
ROOM
019I
DIRECTOR'S
OFFICE
019H
SPECIAL
ACCOMODATIONS
019E
EXIST. WAITING
AREA
019
EXIST. P-VUE
TESTING ROOM
019A
EXIST. PROCTOR
OFFICE
019B
CHECK-IN OFFICE
019C
SPECIAL
ACCOMODATIONS
019D
440 CFM
60 CFM
SD-2
100
RG-1
500
EDH
2
EXISTING
ELEC DUCT COIL
EDC-1
3
M
M
M
8
4
EXISTING EF
REBALANCE TO AIRFLOW
INDICATED
HRV
2
NEW HRV-2
BELOW
12x10
12x1012x10
8
x
1
0
8
x
1
0
8x108x10
SD-2
100
SD-2
100
D
3/4" DRAIN
T
5
6x4
10x10
6
3/4" DRAIN TO EXISTING
CONDENSATE PUMP
14x14
14x14
7
M
14x10 TO EACH
HRV
1
4
x
1
4
1
4
x
1
4
14x1414x14
EXTERIOR INSULATION
(TYPICAL - OUTSIDE
AND EXHAUST AIR)
A1
EXISTING EXHAUST/RELIEF
LOUVER
A1
D
SERVICE
CLEARANCE
(TYPICAL)
A1
A1
T
9
MODIFY EXISTING FIRE SUPPRESSION SYSTEM
IN THIS AREA AS AS REQUIRED FOR NEW WALLS
AND LAY-IN CEILING,
SEE SPECIFICATIONS FOR DETAILS
ADA TESTING
ROOM
019I
M2-1
MECHANICAL
1/4" = 1'-0"M2-1
1MECHANICAL
PPA#18-2089
REV. DESCRIPTION DATEREVIEWED BY:DRAWN BY:
SHEET
DATE
SHEET TITLE
10.17.18
RE
NN
E L
IB.
TE
ST
ING
CE
NT
ER
EX
PA
NS
ION
AMJT
MO
NT
AN
A S
TA
TE
UN
IVE
RSIT
Y
ME
CH
AN
ICA
L - E
LE
CT
RIC
AL
- E
NE
RG
Y
24
S.
Wil
ls
on
, S
te
A1
, B
oz
em
an
, M
T 5
97
15
40
6-5
82
-82
88
w
ww
.TR
EM
T.c
om
Th
re
e R
ive
rs
En
gin
ee
rin
g,
Inc
.
MO
NT
AN
AST
AT
E U
NIV
ER
SIT
Y
A1 ADDENDUM#1 10/30/18
1/4" = 1'-0"M2-1
2FIRE SUPPRESSION
#
EQP
##
DIFF
###
ABBREVIATIONS
MECHANICAL LEGEND
CHILLED WATER SUPPLY
CHILLED WATER RETURN
NATURAL GAS
COMPRESSED AIR
LIQUEFIED PROPANE GAS
REFRIGERANT SUCTION
REFRIGERANT LIQUID
REFRIGERANT HOT GAS BYPASS
HEAT PUMP SUPPLY
HEAT PUMP RETURN
FIRE SPRINKLER
OXYGEN
NITROGEN
NITROUS OXIDE
VACUUM
SCAVENGER VACUUM
DISTILLED WATER
DEIONIZED WATER
REVERSE OSMOSIS
WELL WATER SUPPLY
WELL WATER RETURN
#
EQP
##
DIFF
###
ABBREVIATIONS
MECHANICAL LEGEND
CHILLED WATER SUPPLY
CHILLED WATER RETURN
NATURAL GAS
COMPRESSED AIR
LIQUEFIED PROPANE GAS
REFRIGERANT SUCTION
REFRIGERANT LIQUID
REFRIGERANT HOT GAS BYPASS
HEAT PUMP SUPPLY
HEAT PUMP RETURN
FIRE SPRINKLER
OXYGEN
NITROGEN
NITROUS OXIDE
VACUUM
SCAVENGER VACUUM
DISTILLED WATER
DEIONIZED WATER
REVERSE OSMOSIS
WELL WATER SUPPLY
WELL WATER RETURN
HUMIDISTAT OR HUMIDITY SENSOR
WITH TAMPERPROOF ENCLOSURE
THERMOSTAT OR TEMPERATURE SENSOR
THERMOSTAT OR TEMPERATURE SENSOR
RETURN/EXHAUST AIR
POSITIVE PRESSURE DUCT SECTION (SUPPLY)
NEGATIVE PRESSURE DUCT SECTION
WYE STRAINER
PIPE CAP
UNION
REDUCER
T
T
H
EXISTING TO BE REMOVED
PRESSURE REDUCING VALVE
DIFFUSER MARK
MISC. AND HVAC SYMBOLS
EQUIPMENT MARK
INDICATES EQUIP#
CEILING SUPPLY DIFFUSER
ELBOW WITH TURNING VANES
(FIRST NUMBER INDICATES FACING SIDE)
CEILING RETURN/EXHAUST REGISTER/GRILLE
ROUND DUCT (18" DIA.)
SHEET METAL DUCT
MISCELLANEOUS EQUIPMENT
VERTICAL SMOKE/FIRE DAMPER
VERTICAL FIRE DAMPER
FLEXIBLE DUCT CONNECTION
SQUARE TO ROUND TRANSITION
MBH
PLUMBING & PIPING SYMBOLS
SYMBOL
HWS
LAV
HWR
HW
FD
FC
(E)
EA
CHECK VALVE
PIPE TURNING UP
PRESSURE REGULATING
VALVE
PIPE TURNING DOWN
BUTTERFLY VALVE
BALL VALVE
RELIEF VALVE
SANITARY VENT
GATE VALVE OR BALL VALVE
PLUG VALVE
GLOBE VALVE
SUPPLY AIR
ROUNDSQUARE
ABOVE GRADE SANITARY WASTE
DOMESTIC HOT WATER
DOMESTIC COLD WATER
RECIRC. HOT WATER
DESCRIPTION
HEATING WATER RETURN
HEATING WATER SUPPLY
DOMESTIC HOT WATER
FLOOR DRAIN
EXHAUST AIR
1000 BTU/HR
LAVATORY
FANCOIL
EXISTING
#
EQP
##
DIFF
###
SYMBOL
FLOW RATE
KEYED NOTE
DESCRIPTION
WATER CLOSET
VOLUME DAMPER
VENT THROUGH ROOF
VOLTAGE
SANITARY VENT
URINAL
SANITARY SEWER
VD
(X)
WC
V OR VOLT
VTR
V
UR
SS
COTG
CONT.
CONN.
EXH
DF
DDC
CWR
CWS
CO
CA
AHU
AFF
AD
AC
ABBREVIATIONS
MECHANICAL LEGEND
DRINKING FOUNTAIN
DIRECT DIGITAL CONTROL
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CLEAN OUT TO GRADE
CONTINUATION
COMBUSTION AIR
AIR HANDLING UNIT
EXHAUST
CONNECTION
CLEAN OUT
ABOVE FINISHED FLOOR
ACCESS DOOR
AIR CONDITIONING
SHOWER
SMOKE/FIRE DAMPER
SUPPLY FAN
SUPPLY AIR
ROOF DRAIN LEADER
RETURN AIR
ON CENTER
OUTSIDE AIR
NORMALLY OPEN
SK
SH
SFD
SF
SA
RM
SINK
ROOM
RDL
RA
PRV
OC
OA
NO
NORMALLY CLOSED
MOP SINK
NC
(N)
MS
NEW
HEATING WATER SUPPLY
HEATING WATER RETURN
ACID WASTE
ACID VENT
CHILLED WATER SUPPLY
CHILLED WATER RETURN
NATURAL GAS
COMPRESSED AIR
LIQUEFIED PROPANE GAS
REFRIGERANT SUCTION
REFRIGERANT LIQUID
REFRIGERANT HOT GAS BYPASS
HEAT PUMP SUPPLY
HEAT PUMP RETURN
FIRE SPRINKLER
OXYGEN
NITROGEN
NITROUS OXIDE
VACUUM
SCAVENGER VACUUM
BELOW GRADE SANITARY WASTE
BELOW GRADE STORM SEWER
ABOVE GRADE STORM SEWER
DISTILLED WATER
DEIONIZED WATER
REVERSE OSMOSIS
WELL WATER SUPPLY
WELL WATER RETURN
(EXHAUST OR RETURN)
TYPICALTYP
BDD BACKDRAFT DAMPER
FLOOR CLEAN OUTFCO
WALL CLEAN OUTWCO
ELEC. ELECTRIC/ELECTRICAL
TEMPERATURE CONTROLTC
MECHANICALMECH.
AT THIS POINT
CONNECT NEW PIPE OR DUCT TO EXISTING
RECIRCULATING HOT WATERRHW
REVERSE ACTING THERMOSTAT
T
MOTORIZED DAMPER
M
TO BE DETERMINEDTBD
FSD FIRE/SMOKE DAMPER
HUMIDISTAT OR HUMIDITY SENSOR
WITH TAMPERPROOF ENCLOSURE
THERMOSTAT OR TEMPERATURE SENSOR
THERMOSTAT OR TEMPERATURE SENSOR
RETURN/EXHAUST AIR
POSITIVE PRESSURE DUCT SECTION (SUPPLY)
NEGATIVE PRESSURE DUCT SECTION
WYE STRAINER
PIPE CAP
UNION
REDUCER
T
T
H
EXISTING TO BE REMOVED
PRESSURE REDUCING VALVE
DIFFUSER MARK
MISC. AND HVAC SYMBOLS
EQUIPMENT MARK
INDICATES EQUIP#
CEILING SUPPLY DIFFUSER
ELBOW WITH TURNING VANES
(FIRST NUMBER INDICATES FACING SIDE)
CEILING RETURN/EXHAUST REGISTER/GRILLE
ROUND DUCT (18" DIA.)
SHEET METAL DUCT
MISCELLANEOUS EQUIPMENT
VERTICAL SMOKE/FIRE DAMPER
VERTICAL FIRE DAMPER
FLEXIBLE DUCT CONNECTION
SQUARE TO ROUND TRANSITION
MBH
PLUMBING & PIPING SYMBOLS
SYMBOL
HWS
LAV
HWR
HW
FD
FC
(E)
EA
CHECK VALVE
PIPE TURNING UP
PRESSURE REGULATING
VALVE
PIPE TURNING DOWN
BUTTERFLY VALVE
BALL VALVE
RELIEF VALVE
SANITARY VENT
GATE VALVE OR BALL VALVE
PLUG VALVE
GLOBE VALVE
SUPPLY AIR
ROUNDSQUARE
ABOVE GRADE SANITARY WASTE
DOMESTIC HOT WATER
DOMESTIC COLD WATER
RECIRC. HOT WATER
DESCRIPTION
HEATING WATER RETURN
HEATING WATER SUPPLY
DOMESTIC HOT WATER
FLOOR DRAIN
EXHAUST AIR
1000 BTU/HR
LAVATORY
FANCOIL
EXISTING
#
EQP
##
DIFF
###
SYMBOL
FLOW RATE
KEYED NOTE
DESCRIPTION
WATER CLOSET
VOLUME DAMPER
VENT THROUGH ROOF
VOLTAGE
SANITARY VENT
URINAL
SANITARY SEWER
VD
(X)
WC
V OR VOLT
VTR
V
UR
SS
COTG
CONT.
CONN.
EXH
DF
DDC
CWR
CWS
CO
CA
AHU
AFF
AD
AC
ABBREVIATIONS
MECHANICAL LEGEND
DRINKING FOUNTAIN
DIRECT DIGITAL CONTROL
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CLEAN OUT TO GRADE
CONTINUATION
COMBUSTION AIR
AIR HANDLING UNIT
EXHAUST
CONNECTION
CLEAN OUT
ABOVE FINISHED FLOOR
ACCESS DOOR
AIR CONDITIONING
SHOWER
SMOKE/FIRE DAMPER
SUPPLY FAN
SUPPLY AIR
ROOF DRAIN LEADER
RETURN AIR
ON CENTER
OUTSIDE AIR
NORMALLY OPEN
SK
SH
SFD
SF
SA
RM
SINK
ROOM
RDL
RA
PRV
OC
OA
NO
NORMALLY CLOSED
MOP SINK
NC
(N)
MS
NEW
HEATING WATER SUPPLY
HEATING WATER RETURN
ACID WASTE
ACID VENT
CHILLED WATER SUPPLY
CHILLED WATER RETURN
NATURAL GAS
COMPRESSED AIR
LIQUEFIED PROPANE GAS
REFRIGERANT SUCTION
REFRIGERANT LIQUID
REFRIGERANT HOT GAS BYPASS
HEAT PUMP SUPPLY
HEAT PUMP RETURN
FIRE SPRINKLER
OXYGEN
NITROGEN
NITROUS OXIDE
VACUUM
SCAVENGER VACUUM
BELOW GRADE SANITARY WASTE
BELOW GRADE STORM SEWER
ABOVE GRADE STORM SEWER
DISTILLED WATER
DEIONIZED WATER
REVERSE OSMOSIS
WELL WATER SUPPLY
WELL WATER RETURN
(EXHAUST OR RETURN)
TYPICALTYP
BDD BACKDRAFT DAMPER
FLOOR CLEAN OUTFCO
WALL CLEAN OUTWCO
ELEC. ELECTRIC/ELECTRICAL
TEMPERATURE CONTROLTC
MECHANICALMECH.
AT THIS POINT
CONNECT NEW PIPE OR DUCT TO EXISTING
RECIRCULATING HOT WATERRHW
REVERSE ACTING THERMOSTAT
T
MOTORIZED DAMPER
M
TO BE DETERMINEDTBD
FSD FIRE/SMOKE DAMPER
A1
M3-1
MECHANICAL
PPA#18-2089
REV. DESCRIPTION DATEREVIEWED BY:DRAWN BY:
SHEET
DATE
SHEET TITLE
10.17.18
RE
NN
E L
IB.
TE
ST
ING
CE
NT
ER
EX
PA
NS
ION
AMJT
MO
NT
AN
A S
TA
TE
UN
IVE
RSIT
Y
ME
CH
AN
ICA
L - E
LE
CT
RIC
AL
- E
NE
RG
Y
24
S.
Wil
ls
on
, S
te
A1
, B
oz
em
an
, M
T 5
97
15
40
6-5
82
-82
88
w
ww
.TR
EM
T.c
om
Th
re
e R
ive
rs
En
gin
ee
rin
g,
Inc
.
MO
NT
AN
AST
AT
E U
NIV
ER
SIT
Y
A1 ADDENDUM#1 10/30/18