Outline
• Background
• Brief review of Energy in Leisure Centres
• Comfort Conditions in Leisure Centres
• Energy – The Great Escape• Building Construction• Plant & Equipment• Building Operation & Controls
• What to do – Shopping list• Easy wins• Simple upgrades• Moderate upgrades• Bigger upgrades
• Case Study – Ascot Vale Leisure Centre
Background
• Boom in leisure centre construction in 1970’s
• Generally poor environmental design
• Over 500 aquatic facilities in Victoria, 55% local government
Background
High operating costs, carbon impact
Energy costs typically second only to labour costs
Indoor pools particularly energy intensive (maintain indoor conditions)
• Electricity Prices (AEMO) • Gas Prices (AEMO)
Brief Review of Energy
• Breakdown of energy consumption in typical leisure centres
45%
33%
10%
9%3%
Typical Pool Facility Energy Consumption(Trianti-Stourna et al)
Pool space heating & ventilation
Water heating
Heating & vent to remainder of building
Power & Lighting
Hot water (ie. showers)
Comfort Conditions in Leisure Centres
Comfort Conditions in Leisure Centres
• Pool hall
28-30°C
High vent rate
Comfort Conditions in Leisure Centres
• Pool hall
28-30°C
High vent rate
Comfort Conditions in Leisure Centres
• Exercise rooms (bikes, aerobics etc.)
18°C
Comfort Conditions in Leisure Centres
• Low activity rooms – Yoga, pilates, meditation
21-24°C
Energy – The Great Escape
• Main factors affecting energy loss in leisure centres:• Building Construction
• Plant & Equipment
• Building Operation & Controls
Building Construction
Building Construction
• Roof & Wall Conduction
Building Construction
• Roof & Wall Construction – Thermal Bridging
Building Construction
• Window Conduction
Building Construction
• Window Conduction
Building Construction
• Floor Conduction
Building Construction
• Ventilation & Air Infiltration
Building Construction
• Ventilation & Air Infiltration• Air locks on entrances
Building Construction
• Airtightness• Blower door test
Building Construction
• Airtightness• Fix leaks at construction joints, windows & doors
• Generally disruptive
Plant & Equipment
• Typical plant & energy savings
Plant & Internal Conditions
• Pool Hall AHUs
Plant & Equipment
• Exercise rooms & ‘yoga’ rooms
Plant & Equipment
• Other plant – Hot water heaters, pumps, refrigerant systems
Plant & Equipment
• A bit more on Boilers & Pumps…
Building Operation & Controls
• Automatic Controls – Building Management System (BMS)
Building Operation & Controls
• Automatic Controls – Building Management System
Building Operation & Controls
• Pool AHU• Time scheduling – ie. weekends
• Monitor/Control temp & humidity
• Reduce ventilation & temp overnight
• Schedule early warm-up (comfort)
• If pool can be opened to outside –link AHU operation to doors
Building Operation & Controls
• Exercise Rooms & ‘Yoga’ Rooms• Schedule plant for class times; or
• Have an ‘on’ button in room, with run-on timer – plant turns off
• Adjust temperature
• Test wider dead-band – improve energy consumption – careful of comfort
• Take advantage of free cooling
• Link operation to windows – reduce waste
Building Operation & Controls
• Lighting• Automatic ‘off’ after-hours, or when no-one
active for 30mins (occupant sensors)
• Occupant sensors for back of house areas
• Automatic dimming during good daylight
Building Operation & Controls
• Common building operation issues which impact energy/comfort• When energy is prioritised at expense of comfort
• Temperatures uncomfortably hot or cold to reduce energy
• Humidity too high due to ventilation rate being reduced
• When comfort is prioritised at expense of energy• Temperature set-points lower/higher than necessary
• Very close dead-bands - units always on
• Controls have been permanently modified or adjusted by building users
• Poor or irregular maintenance of plant
What to Do – Energy & Plant Assessments
• Energy modelling and benchmarking against other leisure centres
• Assessment of plant operation & identifying easy wins
• Create a ‘shopping list’ of improvements – set priorities & budget
What to Do - Easy wins
Improvements which don’t require upgrades:• Check AHUs, AC units and lights are switched off outside occupied hours• Match demand to supply
• Does everything need to come on at the same time?• Can some AC units switch off for parts of the day, when rooms unused?
• Check doors/windows closed during operation• Or use free cooling by opening windows & switching off AC• Check heating and cooling not operating at same time• If heat recovery present – check it’s working (particularly on pool AHUs)• Check thermostats are set to reasonable temperatures• Regular maintenance of plant to maintain efficiency• Monitor electricity and gas consumption monthly – know what is normal• Staff training & awareness – set targets & make them visible
What to Do - Simple Upgrades
Improvements involving simple upgrades:• Install a pool cover overnight – can cut pool energy by 10-30%, can allow to
turn off/turn down ventilation overnight without condensation• Replace light fittings with LEDs• Label light switches and encourage staff to switch off• Install occupant sensors to switch off lighting in back of house areas• Install time-clock controllers on plant and lighting (if not installing BMS)• If BMS or local controls are already installed
• Review temperature set-points and dead-bands – widen dead-bands where possible• If data available – check that plant is operating as expected
• Where practical, install 7 day timers on gym equipment (parasitic power)• Insulate hot water pipes where not insulated
What to Do - Moderate Upgrades
Improvements involving more moderate upgrades:
• Install simple BMS to control main plant (ie. AHUs, boilers, fans).
• Fit VSDs to pumps & fans where practical
• Refurbish AHU fans to high efficiency (ie. EC fans)
• Refurbish or install heat recovery systems if practical
• Assess whether solar water heating would be effective – free energy
• Install insulation to accessible roof and wall areas where insulation isn’t present (be careful with materials in humid areas)
What to Do - Bigger Upgrades
Bigger upgrades:
• Install full Building Management System, and connect AHUs, AC units, lighting etc.
• Make sure:• Space temperatures & dead-bands can be controlled centrally
• Plant and equipment can be time scheduled – consolidated table on BMS
• Energy saving features, ie. economy cycle operation, is clearly illustrated
• Data logging & graphing (ie. 12 months) so medium-term operation can be reviewed
• Connect electrical & gas meters where possible, for monitoring and logging
What to Do - Bigger Upgrades
Bigger upgrades:
• Where refurbishment works are already occurring, consider other disruptive upgrades:• Testing and improving airtightness of the building
• Replacing single glazing with double glazing – and frames with no thermal bridging
• Extensive replacement or installation of insulation
• Plant replacement• Replace pool AHU with heat recovery AHU, efficient EC fans
• Replace boilers where at the end of economic life
• Replace AC units in exercise rooms, gyms, yoga rooms etc. where at end of economic life
• Add economy cycle where possible for free cooling, and connect to BMS
Ascot Vale Leisure Centre
• 1970’s era leisure centre, near Flemington
• 25m indoor pool (6 lanes), learn to swim & warm water pools
• Much of the AC plant was original, or at end of economic life
Ascot Vale Leisure Centre
• Expansion to 8 lane pool & leisure pool
• HVAC refurbishment at same time
• Other areas of AVLC remained operational during works
Ascot Vale Leisure Centre
• HVAC works undertaken• Replacement of Pool AHU with heat recovery AHU
• Gym/fitness room roof AHUs replaced with high efficiency units
• Addition of BMS to monitor/control plant and AC units
• Inclusion of Economy cycle AC units where practical
Ascot Vale Leisure Centre
• Significant improvement in comfort conditions – humidity and temp
• Good control of plant operation & temperatures
• Data logging and central monitoring by building operator
Ascot Vale Leisure Centre
• Review currently underway of building operation
• Initial data over first 6 months – 10% reduction in gas, 5% reduction in electricity – before tuning
• Significant additional gains likely through tuning, including:• Re-scheduling AC operation to match occupancy
• Turn off plant early (without impacting comfort)
• Turn down pool AHU overnight
• Relaxing dead-bands in fitness rooms
• Tuning economy cycles of AHUs
• Work with operator & staff to get easy wins