AECOM 312-939-1000 tel 303 E. Wacker Drive, Suite 1400 312-939-4198 fax Chicago, Illinois 60606
C:\Users\kornders\Documents\2ndQrt2020\CDPH Ltr Rpt 401 N McClurg Ct.doc
July 12, 2020 Mr. Jeff Musil Project Manager John Burns Construction Company 17601 Southwest Highway Orland Park, IL 60467 RE: Streeterville Thorium Monitoring Results – Small Cell Site
CDPH Permit No.: CDOT1250968 Permit Address: 401 N. McClurg Ct., Chicago, Illinois
AECOM Project No. 60616106 Dear Mr. Musil:
Pursuant to conditions specified in the ROW form (attached) issued by the City of Chicago Department of Public Health (CDPH), radiation monitoring was required to be performed at the above referenced site. AECOM Technical Services, Inc. (AECOM) provided the required radiation surveillance on June 17-19, 22 and 24, 2020 for excavation required to install fiber and power conduit for a small cell site at 401 N. McClurg Ct. (refer to map included with ROW form).
Surveying was performed in an open trench cut into the right of way near the intersection of McClurg Ct. and North Water St. Surveying was also performed in a pole foundation excavation at the southeast corner of the intersection. Refer to the attached photographs and drawing attached to the CDPH form for the approximate location of the excavations. The trench excavation was approximately 3-feet wide, 150-feet long, and excavated to a depth of 32-inches. Screening was performed every 15-feet of trench at 12-inch depth intervals for a total of 14 sections (see attached drawing and the gamma results table). The pole foundation was approximately 3 by 3 feet and excavated to a depth of approximately 10 feet.
The monitoring did not indicate that the fill soils were above the removal action level established by the U.S. Environmental Protection Agency (USEPA) for the Streeterville area of Chicago. The USEPA removal action level for Chicago’s Streeterville area is 7.1 picocuries per gram (pCi/g) total radium (Ra-226 + Ra-228). Gamma radiation count measurements for the project were recorded using a Ludlum Model 2221 survey meter and a shielded 2 x 2 inch Nal probe (Model 44-10). For the instrument used the gamma count threshold indicative of the 7.1 pCi/g removal action level is 6,818 (S/N: 326726) counts per minute (cpm) shielded utilizing a short cord and 4,991 cpm shielded with a long cord. The field instrument fill soil background measured nearby was 2,050 cpm long cord and 2,800 cpm short cord.
Field gamma measurements within the excavation openings did not exceed the instrument thresholds previously stated and ranged from 1,560 cpm to a maximum reading of 3,040 cpm shielded. Based on field observations there was no indication of the presence of radiologically contaminated fill and/or an exceedance of the USEPA removal action level of 7.1 pCi/g total radium. A copy of the CDPH form, photographs and the tabulated gamma results are included as attachments.
As part of the permit conditions, a PDF copy of this letter will be forwarded to Terry Sheahan (CDPH) and Verneta Simon (USEPA) to fulfill the requirements of the CDPH.
Permit No.: CDOT1250968 Permit Address: 401 N. McClurg Ct., Chicago, Il Page 2
C:\Users\kornders\Documents\2ndQrt2020\CDPH Ltr Rpt 401 N McClurg Ct.doc
Please contact us with any questions you have regarding this letter or the reported results.
Regards,
Eric Sulita, P.E. Steven C. Kornder, Ph.D. Environmental Engineer III Senior Project Geochemist cc: Terry Sheahan, Chicago Department of Public Health Verneta Simon, USEPA
Attachments: CDPH Permit Form and Map Photographs and Gamma Results
CDPH PERMIT FORM
DEPARTMENT OF PUBLIC HEALTH
CITY OF CHICAGO
(STREETERVILLE Right-of-Way) Notice is hereby given that the site you have requested a pennit for is recorded with the City of Chicago Department of Public Health (CDPH) as potentially having environmental contamination on the site and adjacent right-of way. This environmental contamination could present a threat to human health and safety in connection with work performed at the site, or in the adjacent right-of-way, if proper safeguards are not employed.
A file containing detailed information regarding the aforementioned environmental contamination is available for review at CDPH at 333 S. State St., Room 200, Chicago, Illinois 60604 during normal business hours (8:30AM-4:30PM, Monday through Friday). Contact (312) 745-3152 for an appointment. This file must be reviewed and the remainder of this form completed before the permit can be issued if the ground is exposed or excavated. Please note that for some locations, additional health and safety procedures may be required by law.
Please complete the following:
I have reviewed and understand the documents, maintained by CDPH, regarding environmental contamination of the site and adjacent right-ofway. Further, I will ensure that all work at the subject site and adjacent right-of-way, and any monitoring required including but not limited to radiation monitoring. wiJI be performed in a manner that is protective of human health and the environment and in compliance with all applicable local, state, and federal laws, rules, and regulations, especially those pertaining to worker safety and waste management. I will ensure that the results of any radiation monitoring and/or surveying conducted shaJI be provided to the CDPH and the United States Environmental Protection Agency within two (2) weeks of their completion. If any elevated levels of radioactive material are detected, I will immediately contact the United States Environmental Protection Agency at (800) 424-8802.
Applicant Name (print): Signature: ------------------
Site Address and Work Location (Describe exact site location and attach map):-----------------------
Nature of Work: --------------------------------------------
Company Name, Address. Phone No.:
General/ Prin1e Contractor Name, Address, Phone No.: ------------------------------Include subconrractor information !
f
applicahle)
Safety Officer/ Phone No. ------------------------------------------
Radiation Contractor I Phone No. and email address (if applicable) __________________________ _
Check if City Department Work D Department Name:
COOT Permit No.: ------- ------------
Today's Date: ______ _ Expected Start Date: CDPH Approval I Date--------------
Please return this completed fom1 to the Chicago Department of Transportation, Division of Infrastructure Management, Public Way Permit Office, City Hall - Room 905, 121 N. LaSalle St.. Chicago, Illinois 60602 during normal business hours (8:30 AM - 4:30 PM, Monday through Friday)
For CDPH Use Only
333 SOUTH STATE STREET. HOOM :.!00, ClilCAGO. ILLJNOIS 6060'1
DOT1250968
NC
NC
NC
NC
NC
NC
NC
NC
BUILDINGBUILDING
BUILDING
DRIVE
NC
44'
\A1;44'
66'
\A1;66'
193'
\A1;193' 108'\A1;108'
40'
\A1;40'
169'
\A1;169'45' \A1;45'
89'
E N
OR
TH
WA
TE
RN McCLURG
CWALKCWALK
CW
AL
K
CW
AL
K
CWALK
DR
IVE
CWALK
CWALK
COORDINATE WITH BUILDING
OWNERS/ MANAGEMENT AND
PROJECT DEVELOPMENT FOR
DECORATIVE STREETSCAPE ADA
REPLACEMENT
1205 SQUARE YARDS OF ASPHALT
RESTORATION CONTRACTOR TO MATCH
EXISTING PAVEMENT JOINT
4 SQUARE YARDS OF PARKWAY
RESTORATION (A-3-1)
COORDINATE WITH BUILDING
OWNER OR PROJECT
DEVELOPMENT
REMOVE AND REINSTALL 2 SQUARE
YARDS OF EXISTING PAVERS; PAVER TO
BE REPLACED IN KIND (COLOR AND
MATERIAL) IF PAVERS DAMAGED
REPLACE ADA RAMPS PER CDOT
REGULATIONS
REPLACE ADA RAMPS PER CDOT
REGULATIONS
DO NOT IMPACT GRANITE RAMPS
REPLACE ADA RAMPS PER CDOT
REGULATIONS
DRAWN BY:
NO. DATE DESCRIPTION
SHEET NUMBER
OF 20
CJ
REVISIONS
PERMIT
DATE DRAWN:
6/26/18
PROJECT
NUMBER:DASC-1883-003-U06R
TITLE:
ENGINEER:
OWNER:
DEVELOPER:
OUC
NUMBER:EFP-101563
DRAWING SCALE:
OUTSIDE PLANT FIBER
OPTIC BUILD
AT&T DEARBORN
(NODE #06)
401 N MCCLURG CT,
CHICAGO, IL 60611
2649 GARDNER RD
BROADVIEW, IL 60155
OFFICE 630.572.9999
FAX 630.572.9998
930 NATIONAL PKWY.
SCHAUMBURG, IL 60173
OFFICE 847.592.3000
1351 E. IRVING PARK RD.
ITASCA, IL 60143
OFFICE 847.463.5950
FAX 630.250.1353
6/26/18
SEWER REV.17 9/18/19
RESUBMITTAL01/28/20
RCN REV.18 02/05/20
WATER & COMCAST19 02/17/20
MWRD REV.20 02/24/20
COMED REV.21 02/27/20
SEWER REV.22 03/10/20
{\LRESTORATION QUANTITY (TOTAL JOB)\P}ASPHALT W/ HMA BINDER COURSE 0 SQ. YD.{\L\P}ASPHALT W/O HMA BINDER COURSE 1205 SQ. YD.\PSIDEWALK PAVER 2 SQ. YD.; PAVER TO BE REPLACED IN KIND (COLOR AND MATERIAL) IF PAVERS DAMAGED\PPARKWAY 4 SQ. YD.\P(QUANTITY IS ESTIMATED AND SUBJECT TO CHANGE AT CONSTRUCTION)
RESTORATION QUANTITY (TOTAL JOB)
ASPHALT W/ HMA BINDER COURSE 0 SQ. YD.
ASPHALT W/O HMA BINDER COURSE 1205 SQ. YD.
SIDEWALK PAVER 2 SQ. YD.; PAVER TO BE REPLACED IN KIND (COLOR AND MATERIAL) IF PAVERS DAMAGED
PARKWAY 4 SQ. YD.
(QUANTITY IS ESTIMATED AND SUBJECT TO CHANGE AT CONSTRUCTION)
{\LRESTORATION NOTE:\P\P}1. ALL RESTORATION SHALL COMPLY WITH CDOT RULES AND REGULATIONS, LATEST EDITION.\P\pxt35;2. CONTRACTOR SHALL SEAL THE FULL PERIMETER OF ASPHALT RESTORATION LIMITS WITH HOT POURED JOINT SEALER, AS PER IDOT STANDARDS. \P\ptz;3. IF ASPHALT RESTORATION LIMIT IS LESS THAN 4' FROM THE CROSSWALK, THEN THE REPLACEMENT OF THE ADA RAMPS IS REQUIRES (IF NONCOMPLIANT)
RESTORATION NOTE:
1. ALL RESTORATION SHALL COMPLY WITH CDOT RULES AND REGULATIONS,
LATEST EDITION.
2. CONTRACTOR SHALL SEAL THE FULL PERIMETER OF ASPHALT
RESTORATION LIMITS WITH HOT POURED JOINT SEALER, AS PER IDOT
STANDARDS.
3. IF ASPHALT RESTORATION LIMIT IS LESS THAN 4' FROM THE CROSSWALK,
THEN THE REPLACEMENT OF THE ADA RAMPS IS REQUIRES (IF
NONCOMPLIANT)
1919
PAVEMENT RESTORATION
AS NOTED
20'
1" = 20'HORIZONTAL SCALE OF DRAWING
10' 0 20'
N
{\LNOTE:} \PCOORDINATE WORK HOURS AND SCHEDULING WITH CDOT-PERMITS PRIOR TO START OF WORK.
NOTE:
COORDINATE WORK HOURS AND
SCHEDULING WITH CDOT-PERMITS PRIOR
TO START OF WORK.
ASPHALT STREET
RESTORATION:
CONCRETE ALLEY
RESTORATION:
CONCRETE ALLEY APRON
RESTORATION:
ASPHALT ALLEY
RESTORATION:
CONCRETE SIDEWALK
RESTORATION:
CONCRETE STREET
RESTORATION:
SIDEWALK PAVER
RESTORATION:
RESTORATION LEGEND
AND SUMMARY
CURB AND GUTTER
RESTORATION:
2 SY
1205 SY
00 SY
00 SY
00 SY
00 SY
4 SY
0 LF
DESCRIPTION
VISIONVISIONVISIONSIONISIONSIONISIONISIONSIONSIONSIO SSSSSSSSSS
PERMIT
SEWER REV.
RESUBMITTAL
RCN RERCN REVRCN RERCN RRCN RERCN RERCN RERCN RERCN REVRCN REVN REVRCN REVRCN REVRCN REVN REVRCN RCN REEVN REVREE ..
WATER &ATER &ATEATER &ATER &ATER TER &ATER &ATER &ATER &ATER &ATER &ATER &ATER &ATER &ER &ER &ER &ATER &ATER & COMCASCOMCASCOMCCOMCASCCOMCASCOCOMCCOMCASCOCOCOMCASCOMCASCOMCCOCOCOMCASCOCO TTTTTTTT
MWRD REMMWRDMWRD RMWRD REMWRD REMWRD RMWRD RMWRD RMWRD RMWRD REMWRD REMWRDMWRD REEMWRD RMWRD WRD EVVV.VVVV.VV
EFP-101563
03/20/20
7/28/2020 3:36:37 PM
1413121110
9
8
764 123 5Lightpole Foundation
W
W
CMCT
W
S
S
S
S
S
S
W W
W
W
CE
CE
E
E
SBC
W
G
G
G
NC
NC
NC
NC
NCNC
NC
NC
RCN
RCN
BUILDING
BUILDING
DR
IVE
0368018
0368034
15062
E N
OR
TH
WA
TE
R
N McCLURG
9.91'
\A1;9.91'
14.35'
5.8
7'
5.2
1'
\A1;5.21'
2.44'
\A1;2.44'
19.6
0'
\A1;19.60'
3.57'
\A1;3.57'
25.10'
\A1;25.10'
0+
00 1+00 1+11
0+
00
0+89
4.00'
\A1;4.00'
2.00'
\A1;2.00'
2.00'
\A1;2.00'
CMCT
4.02'
PROPOSED UNDERGROUND
(1)- 16/13 2-WAY
MICRODUCT, 112' LONG @ A
MINIMUM DEPTH OF 48" BY
OPEN CUT/TRENCH
SEE WATER NOTE
(3 FT MAX. TRENCH)
SEE COMED NOTE
SEE COMED NOTE
STA 0+22
STA 1+11A
STA 0+00
CONTRACTOR TO REMOVE EXISTING
LIGHT POLE AND FOUNDATION.
REPLACE WITH NEW FOUNDATION
(DEO SPECIFICATION# 818 - 9'-0” DEEP)
AND NEW POLE (CDOT DEO
SPECIFICATION #907) (SEE SHEET 6
FOR DETAILS)
DEARBORN NODE #6
LAT: 41.889447
LONG: -87.617442
11.14' NSL (NORTH WATER)
2.49' WEL (McCLURG)
STA 0+03
PROPOSED 25" x 15" QUAZITE BOX
10.72' NSL (NORTH WATER)
2.01' EEL (McCLURG)
PROPOSED UNDERGROUND
(1)- SINGLE MICRODUCT &
(1)-1.25" PVC SCH. 80 CONDUIT,
2' LONG @ A MINIMUM DEPTH
OF 48" BY OPEN CUT/TRENCH
PROPOSED UNDERGROUND (1)- 16/13
2-WAY MICRODUCT & (1)-2.00" PVC SCH. 40
CONDUIT, 22' LONG @ A MINIMUM DEPTH
OF 48" BY OPEN CUT/TRENCH
SEE COMED NOTE
STA. 0+89
CONNECT TO EXISTING COMED
MH # 368018
19.54' SNL (NORTH WATER)
48.02' EEL (McCLURG)
PROPOSED UNDERGROUND (1)-2.00" PVC
SCH. 40 CONDUIT, 57' LONG @ A MINIMUM
DEPTH OF 48" BY OPEN CUT/TRENCH
SEE GAS NOTE
SEE GAS NOTE
SEE WATER NOTE
(3 FT MAX. TRENCH)
SEE GAS NOTE
36" SEWER SUPPORT,
SEE SHTS, 9 & 10 FOR
DETAILS
W
STA. 0+00A
CONNECT TO EXISTING
SBC MH # 15062
25.07' NSL (NORTH WATER)
7.30' WWL (McCLURG)
E
BUILDING
W
SEE SEWER NOTE
SEE SEWER NOTE
0+00
-05
00
05
10
15
-05
00
05
10
15
0+00A 0+50A 1+00A
-05
00
05
10
15
-05
00
05
10
15
18" MIN.18" MIN.
18" MIN.
18" MIN.
\A1;18" MIN.
0+50 1+00
18
" M
IN.
18
" M
IN.
18
" M
IN.
18" MIN.
\A1;18" MIN.
18
" M
IN.
\A1;18" MIN.
18" MIN.
18" MIN.
48" MIN. 48" MIN.36"
CONNECT SBC
MH #15062
TOP OF
PAVEMENT
(McCLURG)
PROPOSED
CONDUIT(S)
16" WATER12" WATER
CONNECT TO COMED
MH #368018 TOP OF PAVEMENT
(McCLURG)
PROPOSED
CONDUIT(S)
12" WATERSBC
4-COMED DEORCN8-COMED
24" STORM
(SEE SEWER NOTE)
12" STORM
2.56' INVERT
(SEE SEWER NOTE)
36" STORM
(SEE SEWER
SUPPORT DETAILS)
SBC
RCN8" GAS
STA 0+22
STA 1+11A
PROPOSED 25" x 15"
QUAZITE BOX
CONNECT TO
PROPOSED POLE
20 COMED
4" GAS
STA 1+09
STA 0+22A
2" GAS
8" GAS
18
" M
IN.
\A1;18" MIN.
DRAWN BY:
NO. DATE DESCRIPTION
SHEET NUMBER
OF 20
CJ
REVISIONS
PERMIT
DATE DRAWN:
6/26/18
PROJECT
NUMBER:DASC-1883-003-U06R
TITLE:
ENGINEER:
OWNER:
DEVELOPER:
OUC
NUMBER:EFP-101563
DRAWING SCALE:
OUTSIDE PLANT FIBER
OPTIC BUILD
AT&T DEARBORN
(NODE #06)
401 N MCCLURG CT,
CHICAGO, IL 60611
2649 GARDNER RD
BROADVIEW, IL 60155
OFFICE 630.572.9999
FAX 630.572.9998
930 NATIONAL PKWY.
SCHAUMBURG, IL 60173
OFFICE 847.592.3000
1351 E. IRVING PARK RD.
ITASCA, IL 60143
OFFICE 847.463.5950
FAX 630.250.1353
6/26/18
SEWER REV.17 9/18/19
RESUBMITTAL01/28/20
RCN REV.18 02/05/20
WATER & COMCAST19 02/17/20
MWRD REV.20 02/24/20
COMED REV.21 02/27/20
SEWER REV.22 03/10/20
{\LLOCATION: SEC 3, T39N-R14E,\PCHICAGO, COOK COUNTY, ILLINOIS}
LOCATION: SEC 3, T39N-R14E,
CHICAGO, COOK COUNTY, ILLINOIS
AS NOTED
{\fArial|b1|i0|c0|p34;\LCONSTRUCTION NOTE:\fArial|b0|i0|c0|p34;\P}FOR FIBER PULL ASSISTANCE, LEAVE STRATEGIC PULL ACCESS POINTS EXPOSED AND PLATED (WHEN NOT UNDER CONSTRUCTION) UNTIL THE FIBER PULL IS COMPLETED. ONCE THE PULL IS COMPLETED, INSTALL SPLIT DUCT ON EXPOSED ROUTE AND ENCASE IN CONCRETE. ALL RESTORATION SHOULD BE IN COMPLIANCE WITH CDOT RESTORATION GUIDELINES. (SEE SHEET 5 FOR FURTHER DETAIL.)
CONSTRUCTION NOTE:
FOR FIBER PULL ASSISTANCE, LEAVE STRATEGIC
PULL ACCESS POINTS EXPOSED AND PLATED
(WHEN NOT UNDER CONSTRUCTION) UNTIL THE
FIBER PULL IS COMPLETED. ONCE THE PULL IS
COMPLETED, INSTALL SPLIT DUCT ON EXPOSED
ROUTE AND ENCASE IN CONCRETE. ALL
RESTORATION SHOULD BE IN COMPLIANCE WITH
CDOT RESTORATION GUIDELINES. (SEE SHEET 5
FOR FURTHER DETAIL.)
2020
20'
1" = 20'HORIZONTAL SCALE OF DRAWING
10' 0 20'
PLAN
{\fArial|b1|i0|c0|p34;\LCOMED NOTE:}\PHAND DIG IS REQUIRED WHEN CROSSING COMED UNDERGROUND CABLE/CONDUITS. MAINTAIN 12 INCHES VERTICAL CLEARANCE (18 INCHES IF POSSIBLE) FROM ANY COMED FACILITIES. WHEN FIELD CONDITIONS REQUIRE COMED ASSISTANCE, PLEASE CONTACT COMED NEW BUSINESS @ 1-866-NEW-ELEC TO REACH OUT TO A PROJECT ENGINEER AT LEAST 5 WEEKS PRIOR TO CONSTRUCTION. PROJECT IS IN LINDSAY LIGHT STREETERVILLE THORIUM MONITORIING AREA, SOIL SAMPLING/MONITORING IS REQUIRED.
COMED NOTE:
HAND DIG IS REQUIRED WHEN CROSSING
COMED UNDERGROUND
CABLE/CONDUITS. MAINTAIN 12 INCHES
VERTICAL CLEARANCE (18 INCHES IF
POSSIBLE) FROM ANY COMED FACILITIES.
WHEN FIELD CONDITIONS REQUIRE
COMED ASSISTANCE, PLEASE CONTACT
COMED NEW BUSINESS @
1-866-NEW-ELEC TO REACH OUT TO A
PROJECT ENGINEER AT LEAST 5 WEEKS
PRIOR TO CONSTRUCTION. PROJECT IS IN
LINDSAY LIGHT STREETERVILLE THORIUM
MONITORIING AREA, SOIL
SAMPLING/MONITORING IS REQUIRED.
{\fArial|b1|i0|c0|p34;\LGAS NOTE:\fArial|b0|i0|c0|p34;\P}PEOPLES GAS FACILITIES ARE PRESENT WITHIN AREA OF CONSTRUCTION. USE EXTREME CAUTION NEAR ALL GAS FACILITIES DURING CONSTRUCTION AND RELATED EXCAVATION ACTIVITIES. HAND EXCAVATION IS REQUIRED TO FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF GAS MAIN(S) PRIOR TO CROSSING AND WORKING WITHIN 3 FEET OF ALL GAS FACILITIES. A MINIMUM OF 3' HORIZONTAL EDGE TO EDGE CLEARANCE IS REQUIRED FOR GAS MAINS WITH DIAMETERS OF 16" OR SMALLER, AND 5FT
GAS NOTE:
PEOPLES GAS FACILITIES ARE PRESENT
WITHIN AREA OF CONSTRUCTION. USE
EXTREME CAUTION NEAR ALL GAS FACILITIES
DURING CONSTRUCTION AND RELATED
EXCAVATION ACTIVITIES. HAND EXCAVATION
IS REQUIRED TO FIELD VERIFY THE
HORIZONTAL AND VERTICAL LOCATION OF
GAS MAIN(S) PRIOR TO CROSSING AND
WORKING WITHIN 3 FEET OF ALL GAS
FACILITIES. A MINIMUM OF 3' HORIZONTAL
EDGE TO EDGE CLEARANCE IS REQUIRED
FOR GAS MAINS WITH DIAMETERS OF 16" OR
SMALLER, AND 5FT EDGE TO EDGE
CLEARANCE FOR GAS MAINS WITH
DIAMETERS 18" AND LARGER. MAINTAIN A
MINIMUM OF 18” EDGE TO EDGE VERTICAL
CLEARANCE ON GAS MAINS 16" OR LESS IN
DIAMETER, AND 24" EDGE TO EDGE VERTICAL
CLEARANCE ON 18" AND LARGER DIAMETER
GAS MAINS. CONTACT DIGGER 312-744-7000
FOR LOCATES 48 HOURS PRIOR TO START OF
CONSTRUCTION.
THE USE OF CONCRETE, FLOW FILL, OR THE
LIKE IS PROHIBITED WITHIN 24 INCHES OF
ALL GAS FACILITIES, NOR SHALL IT ENCASE
ANY GAS FACILITY. A MINIMUM OF 6” FA-02 OR
FM-02 SAND SHALL BE USED WHEN
BACKFILLING AROUND ANY EXPOSED GAS
FACILITY. CONTRACTOR EXPOSING GAS
FACILITY IS RESPONSIBLE FOR PROVIDING
THE SAND.
PEOPLES GAS CAST IRON AND DUCTILE IRON
GAS MAINS MAY REQUIRE SUPPORT DURING
CONSTRUCTION AND RELATED EXCAVATION
ACTIVITIES. ANY EXPOSED JOINTS MUST BE
SUPPORTED AND CAST IRON JOINTS SEALED
BY GAS COMPANY PERSONNEL. CONTACT
CENTRAL SHOP ENGINEERING
SUPERVISOR,JOSHUA AUMICK, 773-542-7971,
A MINIMUM OF 5 BUSINESS DAYS PRIOR TO
EXCAVATION TO SET UP ON-SITE
INSPECTION. INSPECTION BY PEOPLES GAS
IS REQUIRED PRIOR TO BACK FILL.
N
PROFILE1" = 5'VERTICAL SCALE
0 5 102.53.755
{\fArial|b1|i0|c0|p34;\LRCN NOTE:\fArial|b0|i0|c0|p34;\P}RCN FACILITIES ARE PRESENT IN THE AREA OF CONSTRUCTION. USE EXTREME CAUTION NEAR ALL RCN FACILITIES. HAND EXCAVATION IS REQUIRED TO LOCATE AND EXPOSE FIBER OPTIC FACILITIES PRIOR TO CROSSING AND WHEN WORKING WITHIN 3 FEET OF ALL RCN FACILITIES. CONTACT DIGGER FOR LOCATES A MINIMUM OF 48 HOURS PRIOR TO START OF CONSTRUCTION.
RCN NOTE:
RCN FACILITIES ARE PRESENT IN THE AREA OF
CONSTRUCTION. USE EXTREME CAUTION NEAR ALL
RCN FACILITIES. HAND EXCAVATION IS REQUIRED
TO LOCATE AND EXPOSE FIBER OPTIC FACILITIES
PRIOR TO CROSSING AND WHEN WORKING WITHIN 3
FEET OF ALL RCN FACILITIES. CONTACT DIGGER
FOR LOCATES A MINIMUM OF 48 HOURS PRIOR TO
START OF CONSTRUCTION.
{\fArial|b1|i0|c0|p34;\LWATER NOTE:}\P{\H0.83333x;A REPRESENTATIVE OF THE DWM MUST BE PRESENT DURING THE EXCAVATION AND INSTALLATION NEAR THE EXISTING 16-INCH FEEDER MAIN. IT IS REQUIRED THAT THE FORCE ACCOUNT CONSTRUCTION MANAGER BE CONTACTED AT \L\C0;[email protected]\l\C256; TWO WEEKS PRIOR TO THE ANTICIPATED CONSTRUCTION DATE SO A RESIDENT ENGINEER CAN BE ASSIGNED TO THE PROJECT.\~ THE DWM REPRESENTATIVE WILL ADHERE TO THE SCHEDULE PROVIDED BY CCSI NETWORKS, UNLESS NOTIFIED OTHERWISE.\fArial
WATER NOTE:
A REPRESENTATIVE OF THE DWM MUST BE PRESENT DURING
THE EXCAVATION AND INSTALLATION NEAR THE EXISTING
16-INCH FEEDER MAIN. IT IS REQUIRED THAT THE FORCE
ACCOUNT CONSTRUCTION MANAGER BE CONTACTED AT
[email protected] TWO WEEKS PRIOR TO THE
ANTICIPATED CONSTRUCTION DATE SO A RESIDENT ENGINEER
CAN BE ASSIGNED TO THE PROJECT. THE DWM
REPRESENTATIVE WILL ADHERE TO THE SCHEDULE PROVIDED
BY CCSI NETWORKS, UNLESS NOTIFIED OTHERWISE. FAILURE TO
COMPLY WITH THIS REQUIREMENT MAY RESULT IN ADDITIONAL
EXPENSES TO THE PROPOSED PROJECT TO VERIFY THAT ALL
WORK CONFORMS TO DWM'S STANDARDS.
HAND EXCAVATION IS REQUIRED TO FIELD VERIFY THE
HORIZONTAL AND VERTICAL LOCATION OF THE 16-INCH WATER
MAIN PRIOR TO CROSSING. IF A TRENCHLESS METHOD OF
INSTALLATION IS USED, A MINIMUM 4-FOOT OF UNDISTURBED
SOIL IS TO REMAIN ON EITHER SIDE OF THE EXISTING WATER
MAIN. IF THE PROPOSED FACILITY WILL BE INSTALLED VIA
OPEN-CUT METHOD, THE EXCAVATION MUST BE PROPERLY
SHORED TO MAINTAIN A MAXIMUM 3-FOOT TRENCH WIDTH. THE
TRENCH SHALL BE BACKFILLED TO THE SPRINGLINE OF THE
WATER MAIN WITH CLSM BACKFILL (NON-FLY ASH), AND CA-16
FROM THE SPRINGLINE OF THE WATER MAIN TO GRADE. USE OF
POLYETHYLENE WRAP AS A BOND BREAKER BETWEEN THE
WATER MAIN AND THE CLSM BACKFILL IS REQUIRED . FAILURE
TO COMPLY WITH THESE REQUIREMENTS MAY RESULT IN
ADDITIONAL EXPENSES TO THE PROPOSED PROJECT TO VERIFY
THAT ALL WORK CONFORMS TO DWM'S STANDARDS.
{\fArial|b1|i0|c0|p34;\LCOMCAST NOTE:\fArial|b0|i0|c0|p34;\P}COMCAST HAS EXISTING UNDERGROUND IN THE AREA. PLEASE PROCEED WITH EXTREME CAUTION, MAKE SURE TO CALL DIGGER PRIOR TO START EXCAVATION, USE HAND DIGGING IN THE AREAS WHERE COMCAST FACILITIES ARE MARKED. PLEASE BE NOTED THAT COMCAST HAS RESERVES THE RIGHT TO MAINTAIN, REPLACE AND RELOCATE THEIR FACILITIES IF NEEDED AND THE COST IS 100% BILLABLE TO REQUESTER
COMCAST NOTE:
COMCAST HAS EXISTING UNDERGROUND IN THE
AREA. PLEASE PROCEED WITH EXTREME CAUTION,
MAKE SURE TO CALL DIGGER PRIOR TO START
EXCAVATION, USE HAND DIGGING IN THE AREAS
WHERE COMCAST FACILITIES ARE MARKED. PLEASE
BE NOTED THAT COMCAST HAS RESERVES THE
RIGHT TO MAINTAIN, REPLACE AND RELOCATE
THEIR FACILITIES IF NEEDED AND THE COST IS 100%
BILLABLE TO REQUESTER
{\fArial|b1|i0|c0|p34;\LMWRD NOTE:}\P{\H0.83333x;THE DISTRICT HAS FACILITIES ALONG THE NORTH WATER STREET. DISTRICT FACILITIES SHALL BE LOCATED PRIOR TO PROCEEDING WITH ANY CONSTRUCTION WORK. NO HEAVY CONSTRUCTION EQUIPMENTS AND DRIVING OF SHEET PILES IN THE VICINITY OF DISTRICT FACILITIES SHALL BE ALLOWED. IT IS REQUESTED THAT DURING CONSTRUCTION EXTRA CAUTION BE TAKEN FOR THE SAFETY AND INTEGRITY OF OUR FACILITIES. ALL ACCESS HATCHES/MANHOLE COVERS ON DISTRICT STRUCTURES/MANHOLES WITHIN PROJEC
MWRD NOTE:
THE DISTRICT HAS FACILITIES ALONG THE NORTH WATER
STREET. DISTRICT FACILITIES SHALL BE LOCATED PRIOR TO
PROCEEDING WITH ANY CONSTRUCTION WORK. NO HEAVY
CONSTRUCTION EQUIPMENTS AND DRIVING OF SHEET PILES IN
THE VICINITY OF DISTRICT FACILITIES SHALL BE ALLOWED. IT IS
REQUESTED THAT DURING CONSTRUCTION EXTRA CAUTION BE
TAKEN FOR THE SAFETY AND INTEGRITY OF OUR FACILITIES. ALL
ACCESS HATCHES/MANHOLE COVERS ON DISTRICT
STRUCTURES/MANHOLES WITHIN PROJECT AREA SHALL NOT BE
BURIED/COVERED. NO DEBRIS SHALL ENTER THE DISTRICT
STRUCTURES/SEWERS/FACILITIES
{\fArial|b1|i0|c0|p34;\LSEWER NOTE:\fArial|b0|i0|c0|p34;\P}THERE ARE NO AVAILABLE RECORDS FOR THE EXIST. 12” AND 24” DIAMETER SEWER PIPE INVERTS AT PROPOSED CONDUIT CROSSINGS. THEREFORE, PRIOR TO CONSTRUCTION CONTRACTOR SHALL VERIFY SEWER INVERTS. SEWER PIPE SUPPORTS WILL BE REQUIRED IF INSTALLATION OF CONDUITS ARE TO BE INSTALLED BELOW. IN THIS CASE, CONTRACTOR SHALL NOTIFY ENGINEER OF RECORD AND DWM- SEWER SECTION IMMEDIATELY FOR RESOLUTION. \P\P\P\P
SEWER NOTE:
THERE ARE NO AVAILABLE RECORDS FOR
THE EXIST. 12” AND 24” DIAMETER SEWER
PIPE INVERTS AT PROPOSED CONDUIT
CROSSINGS. THEREFORE, PRIOR TO
CONSTRUCTION CONTRACTOR SHALL
VERIFY SEWER INVERTS. SEWER PIPE
SUPPORTS WILL BE REQUIRED IF
INSTALLATION OF CONDUITS ARE TO BE
INSTALLED BELOW. IN THIS CASE,
CONTRACTOR SHALL NOTIFY ENGINEER OF
RECORD AND DWM- SEWER SECTION
IMMEDIATELY FOR RESOLUTION.
DESCRIPTION
VISIONVISIONVISIONSIONISIONSIONISIONISIONSIONSIONSIO SSSSSSSSSS
PERMIT
SEWER REV.
RESUBMITTAL
RCN RERCN REVRCN RERCN RRCN RERCN RERCN RERCN RERCN REVRCN REVN REVRCN REVRCN REVRCN REVN REVRCN RCN REEVN REVREE ..
WATER &ATER &ATEATER &ATER &ATER TER &ATER &ATER &ATER &ATER &ATER &ATER &ATER &ATER &ER &ER &ER &ATER &ATER & COMCASCOMCASCOMCCOMCASCCOMCASCOCOMCCOMCASCOCOCOMCASCOMCASCOMCCOCOCOMCASCOCO TTTTTTTT
MWRD REMMWRDMWRD RMWRD REMWRD REMWRD RMWRD RMWRD RMWRD RMWRD REMWRD REMWRDMWRD REEMWRD RMWRD WRD EVVV.VVVV.VV
EFP-101563
03/20/20
7/28/2020 3:36:37 PM
PHOTOGRAPHS AND GAMMA RESULTS
PICTURE 1: VIEW OF THE TRENCH EXCAVATION AT THE INTERSECTION OF MCCLURG CT AND NORTH WATER ST (LOOKING NORTHWEST).
PICTURE 2: VIEW OF THE TRENCH EXCAVATION AT THE INTERSECTION OF MCCLURG CT AND NORTH WATER ST (LOOKING EAST)
PICTURE 3: VIEW OF THE LIGHT POLE FOUNDATION EXCAVATION AT THE SOUTHEAST CORNER OF MCCLURG CT AND NORTH WATER ST.
Location Depth (inches)Maximum
Readings (cpm) Location Depth (inches)Maximum
Readings (cpm) 0‐12 concrete 0‐6 top soil12 1,900 18 2,10024 1,850 30 2,80032 2040 44 2,4000‐12 concrete 60 1,76012 1,850 80 1,69024 2,040 96 1,59032 2,550 110 1,5600‐12 concrete 122 1,62012 1,760 Notes: ‐ Long cord24 2,32032 3,0400‐12 concrete12 1,80024 2,22032 2,8500‐12 concrete12 1,70024 1,99032 2,2800‐12 concrete12 1,80024 2,05032 2,3900‐12 concrete12 2,82524 2,10032 2,0800‐12 concrete12 2,05024 2,17032 2,1900‐12 concrete12 1,95024 2,28032 1,8600‐12 concrete12 1,79024 2,12032 2,3200‐12 concrete12 1,85024 1,99532 2,0800‐12 concrete12 1,80024 1,97032 2,1600‐12 concrete12 2,20024 2,01032 2,1500‐12 concrete12 2,10024 2,09032 2,100
Gamma Survey ResultsJohn Burns Construction Company
11
12
13
14
Light Pole (Hydro‐Vac)*
6
7
8
9
10
3
5
4
Survey Results
6,818 cpm short cord
Survey Equipment
Ludlum 2221 S/N: 326720CDOT: 1250968
1
2
6/17, 18, 19, 22 and 24/2020
Date of Screening:
Location: 401 N. McClurg Ct.
E. Sulita
2,800 cpm short cord
Personnel:
Cutoff:4,991 cpm long cord
Background:2,050 cpm long cord
U:\60616106_John_Burns\400_Technical\Task 200 ‐ 401 N McClurg\Report\Gamma Results.xlsx