aep utilities presentation to edison electric institute conference s/eei fall 09... ·...

43
AEP Utilities Presentation to Edison Electric Institute Conference Conference AEP Utilities H P f I t Human Performance Improvement October 4, 2009

Upload: others

Post on 10-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

AEP Utilities Presentation to Edison Electric Institute

ConferenceConference

AEP UtilitiesH P f I tHuman Performance Improvement

October 4, 2009

Page 2: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Background - Why HPI in AEP Utilities?Background Why HPI in AEP Utilities?

In 2008, AEP Utilities was top quartile in safety performance – BUT:performance BUT:Three significant injuries mid-year 2008

The last being a line mechanic that lost both arms while working on a capacitor bankarms while working on a capacitor bank

AEP is a safe place to work, but employees are still getting hurt

Human Performance Improvement will provide the tools we can use to reduce errors and avoid injuries at work and at homeinjuries at work and at home

2

Page 3: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Scope of HPI within AEP Utilities

The AEP Utilities effort is focused on safety

Two areas of focus (phased/sequenced approach):

Di ib iDistributionCustomer Services/MRO

3

Page 4: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Performance Improvement International (PII)Performance Improvement International (PII)

Bob Powers brought in Dr. Chong Chiu from PII to evaluate our safety culture and make recommendations on how HPI could be utilized to improve our safetycould be utilized to improve our safety performance

4

Page 5: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

PII Assessment MethodPII Assessment Method

Review of past injury events to find key areas to focus

Cultural survey for readiness andCultural survey for readiness and sustainability

Field assessment to observe non-compliance and (N-1) activitiesp ( )

5

Page 6: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Organizational Structure for HPI in AEP Utilities

6

Page 7: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Distribution and MRO Steering CommitteesDistribution and MRO Steering Committees

Purpose:Purpose:Set the strategic direction for the associated group’s HPI plan and legitimize the need amonggroup s HPI plan and legitimize the need among the top key stakeholders

7

Page 8: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Distribution and MRO Core TeamsDistribution and MRO Core Teams

Purpose:pCreate and execute a plan for the implementation of HPI for the utility groupProvide cross section of knowledge and expertise toProvide cross-section of knowledge and expertise to projectCreate and execute a plan for the implementation of HPI f th tilitfor the utility groupLead cross-opco subteamsLead opco implementationLead opco implementationCommunicate team’s work and messages to their respective operating companies and leadership

8

Page 9: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Decision Making and Module DevelopmentDecision Making and Module Development

DSC/MSC•Review recommendations from core teamand sub-teamsand sub-teams•Resolve issues core team and sub-teamscannot bring to consensus

Distribution/MRO Core Teams•Lead champion from each operating unit•Members represent operating unit

/•Lead sub-teams/workstreams•Insure sub-team plans integrate•Interface with operating unit leadership•Consensus decision making approach

Sub-Teams•Cross operating unit teams

9

•Cross operating unit teams•Members represent operating unit•Interface with operating unit•Assigned to individual work streams•Consensus decision making approach

Page 10: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Champion DutiesHuman Performance•Tools•Tasks

“Bringing It AllTogether”g

Project

ChangeManagement

&R l ti hiProject

Management•Tasks•Work plan

Education•Plan•Develop•Teach

Relationships

•Scorecard•Communications

•Teach

10

Page 11: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

The 7 Work Streams for DistributionThe 7 Work Streams for Distribution

1.1. Peer CoachingPeer Coaching2. Pre-Job Brief3. N-1 Activities4 Lif S i R l4. Life Saving Rules5. Skill/Behavior

Trainingg6. Technical Training7. Updating Safety

Materials and Procedures

11

Page 12: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Skills Behavior Training – 7 HPI ToolsSkills Behavior Training 7 HPI Tools

Change Awareness & Tracking (CAT)STAR – Stop, Think, Act & ReviewProcedures/Standards CompliancePeer CoachingQuestioning AttitudegStop when Unsure or UnsafeClear CommunicationClear Communication

12

Page 13: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Building Block Approach and Current StatusBuilding Block Approach and Current Status

Technical Training Module 1

Technical Training Module 2

Technical Training Module 3

Technical Training Module 4

Technical Training Module 5

Technical Training Module 6

LSR and Stop

3Q 20102Q 2009 3Q 2009 4Q 2009 1Q 2010 2Q 2010

LSR and Stop Work LSR and CAT

N-1 and Procedure Compliance

N-1 and Questioning Attitude

N-1, Procedure Compliance, and/or Questioning Attitude Review

N-1, Procedure Compliance, and/or Questioning Attitude Review

Pre-Job Brief PJB, STAR, PJB, STAR, PJB, STAR, PJB, STAR,

HPI Foundation - Individual Components Reviewed, as needed to support each Technical Training Module

Pre-Job Brief and STAR

and Clear Communication

and/or Clear Communication Review

and/or Clear Communication Review

and/or Clear Communication Review

and/or Clear Communication Review

Peer Coaching

Peer Coaching Review

Peer Coaching Review

Peer Coaching Review

Peer Coaching Review

Peer Coaching Review

Peer Coaching Review

HPI Overview Review

HPI Overview Review

HPI Overview Review

HPI Overview Review

HPI Overview Review

HPI Overview Review

HPI Overview Review

HPI Overview Review

HPI Overview Review

HPI Overview Review

HPI Overview Review

HPI Overview Review

HPI Overview ReviewHPI Overview

May-09 Jun-09 Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10

13

Page 14: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

HPI Areas of Focus for MROHPI Areas of Focus for MRO

Based on PII’s analysis and recommendations AEP should focus MRO HPI efforts on the following areas:

OHPI OverviewPeer Coaching Culture and PracticesCommunications Improvements

Pre-job Briefing, STAR and Stop when unsure…Clear CommunicationsClear CommunicationsProject team internal and external communications support

Elimination or Mitigation of N-1 SituationsAnalysisN-1 Theory TrainingHPI Tools - Procedure Compliance and Questioning AttitudeHPI Tools Procedure Compliance and Questioning Attitude

Slips/Trips/Falls Injury Reduction PoliciesApplicable Zero Harm Rules and N-1 HPI Tools – Three U’s (Unproven, Unqualified, Unseen) and CAT (Change Awareness and Tracking)

Dog Bite Injury Reduction PoliciesA li bl Z H R l d N 1Applicable Zero Harm Rules and N-1HPI Tools – HOP (History, Observe, Prepare)

Vehicle Accident Injury Reduction PoliciesApplicable Zero Harm Rules and N-1HPI Tools – Distractions/Awareness Training

14

Page 15: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

MRO Timeline and Next StepsMRO Timeline and Next Steps

Forming StageForming StageMSC Kick-off – week of September 28Kick-off meeting for core team MSC and PMO –Kick off meeting for core team, MSC and PMO November 4th and 5th

Subteams lead by Core Team Champions Kick-Off week of November 9th

HPI Overview Training to front line employees –J 2010January 2010New modules throughout 2010

15

Page 16: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Magnitude of Training EffortMagnitude of Training Effort

Distribution54 people developing and training

120,000 hours in 2009 & 20102 00 l i d h h2,500 employees trained each month

90,000 hours of training in 2009 & 2010

MROMRO54 people developing and training1 400 employees trained each month1,400 employees trained each month starting in 2010

16

Page 17: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

AEP Service TerritoryAEP Service Territory

5M Electric Customers in 11 States Corporate Headquarters inl b hiColumbus, Ohio

21,000 Total Employees

172,500 Sq. MilesOf Service Territory

17

, p y2,500 Distribution Line Workforce1,500 Meter Revenue Operations Workforce

Page 18: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Change Management

18

Page 19: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Key Questions…..Key Questions…..

Given that change is often on a sliding scale, what is the depth of this initiative?

Shallow - use of tools to compliment existing policies and practicesDeep - paradigm shifting changes in the culture and expectationseep pa ad g s g c a ges e cu u e a d e pec a o s

What are the ramifications of this initiative?Who has ultimate ownership and accountability for implementation and execution?Where is there a need for standardization and where should there beWhere is there a need for standardization and where should there be customization?

Bottom line hat is going to change da to da for o r emplo ees?Bottom line, what is going to change day-to-day for our employees?What behavioral changes are expected to occur?What is the timeframe between implementation and expected outcomes?

19

Page 20: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Key Questions…..Key Questions…..

What resources will be required and who provides those resources?What rewards and reinforcement are needed?What is the key message behind the implementation and how will we get that message across?that message across?How will progress and the degree of change be monitored?What resistance is expected?

What is the role of the safety organization?How does this combine with / replace / coordinate with existing safety and performance initiatives?What is the role of field leadership (MDS and SDS) and higher level leadership (field VP & corporate)?Who will be responsible for providing long term support to the initiative?

20

Page 21: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

What Are We After?What Are We After?

Maximizing the Acceptance & Internalization of HPI Shift from primarily corporate driven program to locally led and operated approach to “theShift from primarily corporate driven program, to locally led and operated approach to the way we do things” Op Co leaders personalize their own acceptance & “maintenance” strategies for HPIOp Co leaders carry the “lead voice” for HPI Ch i & f t li l d th t t f th i l d hiChampions & front-line leaders see the strong support of their leadership

Boosting Our Own Leadership Effectiveness Operationalize the leader’s role with HPI pClear expectations – leadership observation checklists – specifying the highest impact leader actions that will be key to advancing HPI Define and support roles/expectations for leaders at each level, President to LCS

Providing Ways to Monitor and Adapt the HPI Roll-out Periodic critiques - “reality checks” to test for effectiveness of HPI acceptance, as well as the operational quality Position for eventual phase out of champions as HPI becomes a way of life

21

Position for eventual phase out of champions as HPI becomes a way of life Alignment of other commitments to safety

Page 22: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

First Steps to Get ThereFirst Steps to Get There

Stage 1: Create Framework for Op Co Acceptance StrategyDeveloped by small crew drawn from HPI PMO, HR, DSC, etc., that includes: p y , , , ,

A general path for follow Some “non-negotiable’s” for what needs to be in an acceptance strategy, e.g., stakeholder analysis, performance expectations, infrastructure alignment tools, etc.

Stage 2: Facilitate Op Co Acceptance Strategy SessionsOp Co President and his/her leadership team, plus

Lead HPI champions, Safety, Corp Comm & HR Field leadsFacilitated by OD Consultant y

Purpose – build Op Co-specific acceptance strategies and communication plans that you own and deliver

Stage 3: Implement “The Leaders Role in HPI” For front-line leaders, a consistent learning experience across all Op Co’s, providing substantial:

Depth in HPI concepts and toolsClarity regarding their roles/expectations

22

Line leadership would have an active, visible role in the implementation

Page 23: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

What Will Success Look Like?What Will Success Look Like?(From Distribution Phase I)

Before we begin a task we will consider what could go wrong.

Work gets stopped because people are using the tools they areWork gets stopped because people are using the tools they are taught.

Open and active peer coaching culture where every individualOpen and active peer coaching culture where every individual gives and receives coaching.

’HPI is common discussion item and is actively on people’s minds.

23

Page 24: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Sustaining HPI

24

Page 25: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Sustaining HPISustaining HPI

Distribution Line TrainingIncorporate into current training program

New hire trainingR f h t i iRefresher training

Change ManagementL d hi /O hiLeadership/Ownership

25

Page 26: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Importance of Communications

26

Page 27: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Key MessagesKey Messages

Even when the job at hand is something you’ve done safely day after day, year after year – there are no guarantees. People are fallible and even the best make mistakes.People are fallible and even the best make mistakes.Striving for Zero Harm is the goal. Zero Harm does not suggest that employees can be or are expected to be perfect. Instead, it reinforces that we can prevent life-altering injuries and fatalitiesthat we can prevent life-altering injuries and fatalities.We can predict, manage and prevent harm for ourselves and our peers with an increased knowledge of HPI principles and the use of HPI tools.HPI id t l t d t k d t hHPI provides tools you can use to reduce errors at work and at home.We should ask ourselves everyday: “What am I going to do today to achieve Zero Harm?”

27

Page 28: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

StrategiesStrategies

Consistent branding and messaging across operating companiesProvide the tools and resources to speak with one voiceProvide the tools and resources to speak with one voiceChampions/peers deliver the messageFocus on communication mediums that the audience is

f t bl ith dcomfortable with and can accessShare materials with front line leaders in advanceUse employee stories and past safety data to build the casep y p yDemonstrate that Zero Harm is possibleFind opportunities to bring HPI out of “training” and into everyday discussions and work habits

28

everyday discussions and work habits

Page 29: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Status UpdatesStatus Updates

Sent weeklyChampionsProject management partnerspartnersLeadership

29

Page 30: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

NewsletterNewsletter

MonthlyCorresponds with monthly t i i t itraining topicHighlights corresponding toolstoolsPreview of what’s coming next month

30

Page 31: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Dock TalksDock Talks

Introducing in OctoberBring HPI out of the “ l ” d t th“classroom” and onto the dock and out to the fieldPut training materials inPut training materials in supervisor’s handsCan be used in safety

ti f t h ddlmeetings, safety huddles or any other opportunity

31

Page 32: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

N-1 BulletinsN 1 Bulletins

Cover tasks with too few layers of protectionD i ti f t kDescription of taskLayers of protection availableKey HPI conceptsKey HPI conceptsAction requiredTopics for further discussionp

32

Page 33: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Talking PointsTalking Points

Provide tools for supervisors and champions to answerchampions to answer questions about controversial issuesMore consistent message

33

Page 34: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

VideoVideo

Two videos completeAdditional videos in th kthe works:

Pre-job brief and SAFER modelLine of Fire/Stored EnergyHPI Overview forHPI Overview for MROHPI Tools

34

Page 35: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

BrochureBrochure

OPCO-specific w/Champion contact infocontact info

35

Page 36: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Participant GuidesParticipant Guides

Different formats for different training topicstopicsIncludes exercises, fill-in-the-blank questions

36

Page 37: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

PostersPosters

1-2 posters per month

37

Page 38: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Wallet/ID badge cardsWallet/ID badge cards

Two wallet cardsPeer coachingPh tiPhonetic alphabet/top 10 error traps

38

Page 39: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Intranet siteIntranet site

Launching soonIncludes training

t i lmaterialsDistributionCustomerCustomer Services & Marketing

39

Page 40: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Lessons Learned and Next Steps

40

Page 41: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Lessons Learned (to date)Lessons Learned (to date)

Communicate, Communicate, CommunicateInvolve the people doing the workAddress change management issuesg gSeek feedback and adjust as neededDon’t make the training sessions too longg gKeep It Simple!

41

Page 42: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

HPI Key Messages (to date with Distribution)HPI Key Messages (to date with Distribution)

Keep It SimpleKeep It SimpleHumans are fallible and make mistakesPeer Coaching – framework for HPIgEffective Pre-Job Brief will insure everyone knows the tasks to be performed, identifies potential hazards and ways to mitigate the hazardsHPI Tools:

STAR - Stop, Think, Act and ReviewSTOP when uncertainClear Communications

Every day, every time, every job

42

Page 43: AEP Utilities Presentation to Edison Electric Institute Conference s/EEI Fall 09... · 2011-10-25 · AEP Utilities Presentation to Edison Electric Institute Conference AEP Utilities

Feedback and Questions

43