    Agenda for 234th meeting of

    Municipal Corporation Chandigarh

    Date : 30.08.2016

    Time : 11.00 a.m.

    Venue : Assembly Hall

    Municipal Corporation New Deluxe Building, Sector -17E,

    Chandigarh – 160017

  • 2

    MUNICIPAL CORPORATION CHANDIGARH (Agenda Branch)

    No.MCC/Secy/SAA/2016/449 Dated:26.08.2016

    To All Councillors and ex-officio member (MP), Municipal Corporation, Chandigarh.

    234thSubject : - Agenda for meeting of General House of the Corporation to be held on 30.08.2016 at 11.00 a.m.

    Please find enclosed herewith an agenda for 234th

    meeting of the General House of the Corporation

    to be held on 30.08.2016 at 11.00 a.m. in the Assembly Hall of the Municipal Corporation, Chandigarh for

    information.

    You are, therefore, requested to attend the said meeting on the stipulated date and time.

    Sd/-Secretary, Municipal Corporation, Chandigarh.

    Endst. No.MCC/Secy/SAA/2016/450 Dated:26.08.2016

    A copy is forwarded to the following for information and necessary action:-1. Joint Commissioner-I 2. Joint Commissioner-II 3. Chief Engineer 4. S.E.(B&R)/S.E.(P.H.) 5. C.A.O./Chief Examiner 6. M.O.H./S.S.H 7. E.E.(Roads Division – I, II & III) 8. E.E.(Electrical / Horticulture Division/W&E) 9. E.E.(P.H. Division No.1,2,3 & 4) 10. O.S.D. II /S.D.O.(Buildings)/S.D.E.(HQ) 11. A.O.(P&PF)/Supdt.E-I 12. Law Officer/ A.P.R.O. 13. Computer Cell/Fire Branch 14. Estate Branch/Tax Branch Sd/-

    Secretary, Municipal Corporation, Chandigarh.

    Endst. No. MCC/Secy/SAA/2016/451 Dated:26.08.2016

    A copy is forwarded to the following for information and necessary action:-

    1. PS to Commissioner 2. PA to Mayor 3. PA to Secretary Sd/-

    Secretary, Municipal Corporation, Chandigarh.

  • 3

    INDEX

    Agenda

    item

    No.

    Subject Page

    No.

    1. 233rdConfirmation of the meeting of the General House held on

    29.7.2016 at 11.00 a.m. in the Assembly Hall of the M.C., Chandigarh.

    4

    2. Rough cost estimate for providing and fixing 330x330x35 mm thick

    grass paver in side park in front of H.No.1 to 1290 and 2400 to 2440 in

    Dadu Majra Colony, Chandigarh.

    Rs.55.09 lac

    5-8

    3. Rough cost estimate for providing and fixing 330x330x35mm thick grass

    paver blocks on the left out space in between M.S railing and pavement

    of various parks in Sector 38, Chandigarh.

    Rs.61.57 lac

    9-12

    4. Special Sanitation Campaign under Swachha Bharat Mission-regarding. 13

    5. Re-carpeting on V-5 roads in Sector 49 A&B, Chandigarh.

    Rs.51.66 lac

    14-16

    6. Development of Green Parks/Belt in pockets at Sector 48, Chandigarh.

    Rs.157.73 lac

    17-22

    7. Estimate for the work of providing and laying of irrigation pipe line for

    supplying T.T water to Sector 33, Chandigarh.

    Rs.55.38 lac

    23-28

    8. Rough cost estimate for providing and laying 60 mm thick paver blocks

    along V-5 road, Milk Colony, Dhanas, Chandigarh.

    Rs. 235.16 lac

    29-31

  • 4

    AGENDA ITEM NO. 234.1

    Subject:- Confirmation of the 232nd meeting of the General House held on 29.06.2016 at

    11.00 a.m. in the Assembly Hall of the M.C., Chandigarh.

  • ITEM NO

    Subject: Rough cost estimate• for Providing and fixing 330x330x35 mm thick grass paver in side park in front of H .No. 1 to 1290 and 2400 to 2440 in Dadu Majra Colony, Chandigarh.

    (Amount: Rs . 55.09 lacs)

    The rough cost estimate has been framed to cover the probable cost

    of providing and fixing 330x330x35rnm thick grass paver in side park in front of H .No.

    1 to 1290, 2400 to 2440 in Dadumajra Colony, Chandigarh . These parks are used by

    the residents for staking of waste m aterial and dumping of malba. The roads of colony

    are very narrow and people parks their vehicles in front of their houses on the road,

    which causes accidents . After insta lling grass paver, the residents can park their

    v eh icles in this area . The site for above said area was inspected by the undersigned

    along with the SOE and it was observed that there is need of paved these parks for

    facilities to general public. The Area Councillor has also given his consent for this

    work .

    Accordingly , the rough cost estimate amounting to Rs. 55.09 lacs has

    been prepared by taking item explained in the scope of work . This estimate is

    submitted for arranging administrative approval and allotment of funds under the

    appropriate head of Municipal Corporation of Chandigarh . The following scope of work

    has been taken in the estimate:

    1 . Earth work in excavation

    2 . Carriage of earth

    3 . Preparation of sub grade.

    4 . Providing and laying granular sub base.

    5 . Supply and filling of choe sand .

    6 . Supply and laying grass pavers of make ovilite , vendera textiles honeycomb

    panel.

    It is certified that scope of work taken in this estimate has not earlier

    included in any of the estimate .

    The expenditure on this work will be charged under Head "Basic Amenities in

    Rehabilitation Colonies" . . The budget estimate, budget allocation, amount of

    already approved estimate and expenditure under this head for Roads Division No.3

    is as under:-

    i. Budget Allocation for the year 2016-17 Rs.6000.00 lacs

    ii. Amount of estimates sanctioned after Rs.6426 .87 lacs 01 .04.2016

    iii . Expenditure incurred during c urrent financial Rs . 55 .09 lacs year.

    The matter is placed before the General House of Municipal Corporation,

    Chandigarh for consideration and decis ion please .

    S .E .(B&R), M .C .

    5

    AGENDA ITEM NO. 234.2

  • ABSTRACT OF COST

    ROUGH COST ESTIMATE

    Name of work:· Providin g and fixing 330x330x35mm thick Grass paver in side park in front of# 1 to 129

    0 & 2400 to 2440 in Oadu Majra, Colony, Chandigarh

    S.No Description of item Ref to OSR Unit Qty Rate Amount

    ./ c:.,,/ L~I--

    __ ,.. ......-

    1 Earthwork in excavation by mechanical means (Hydraulic excavator)/ manual means over areas ( exc

    eeding 30cm 2.6.1-2.36 Cum 1825 175 319375 v-

    in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth , lead up to 50m an

    d lift ,,--

    up to 1 Sm. and excluding disposed earth to be levelled and neatly dressed. All kinds of soil complete in all re

    spect

    to the e!ltire satisfaction of the Engineer-In-Charge. (DSR 2.6.1-2.36 as per DSR)

    ~ _,, ...,..-/ __,.-/ /

    2 Carriage of earth by mechanical transport including loading , unloading Lead of 2 km complete in all r

    espect to the 1.1.2 Cum 1a2y 113.29 206754

    entire satisfaction of the Engineer-In-Charge.

    ;'i----

    / v-

    ./ / /

    3 Preparation of sub-grade including trenching , rough dressing of soil , final dressing of earth to gi

    ve level and N.S Sqm 5990 3.00 17970

    camber, watering , rolling with a road roller and compaction of bed complete in all respect to the entire satisfa

    ction / ~

    of the Engineer-In-Charge ✓- ,,.-- / /

    4 Construction of compacted granular sub base by providing and laying , spreading and compacting course g

    raded N.S Cum 913 1096 1000648

    ~ub base material sand , morrow, graval, crushed stone of combination thereof confi rm ing to grading -I I of

    table / ,,..--

    400.2 of MORTH specification (5th revision) . The material shall be mixed by mix in place method or with moti

    vator

    at OMC and carried to site, spread in uniform layers and compacted with 8-10 tones smooth heeledNibratory

    roller

    to achieve desired density. Complete in all respect as per clause 401 of MORT&H specification (5th revision) /

    ✓ - .,. - < / 5 Providing and laying Choe sand including , wa

    tering , ramming consolidation and dressing complete in all respect N.S Cum 303 ,.. 944

    2~6032 v--

    ot the entire satisfaction of the Engineer-I n-Charge. / ,

    (

    6

  • 6 -

    Supply and laying Grass pavers of make ovilite. vendera textiles honeycomb panels with self anchoring made . HOPE (high density polyethylene) Each grass paver should be 330mm x 330mm made of high inspect resistant

    and 35mm in height consisting of four floral shaped structure of 125mm open cell and nine round cell opening of 45mm dia Each of the open cell are connected with a web i1ke structure for strength and stability. Base of he panel is equipped with "' slot opening for drainage and four round struts for anchoring purpose. The grass pavers should have interlock system to lock each and other. The grass paver should have compressive strength to minimum 150 tonne/Sqm . capable to iake load of fire tender, The panel should have high level of porosity greater than 90% porous for grass, shrubs and low planters complete as per TERI guidelines, CAUT drawing No. 29 job No. 2617 and to the entire satisfaction of the engineer-In-charge.

    TOTAL

    Add 5% contingency and petty charges

    TOTAL

    Cert ified that quanitity, rate and amount has been chaecked by me

    rhe Qty/Rates as Taken in Thi, F.~timate Framed by Executive Engineer tiave Tentatively beer Taker: for Estimating "urpose Only The Work Should t,e :::,ot Car;ied by E.E as pe, C,,daf Rulf'.s !;·-:Act to Lov·,·$1 C'...:irr-rr::?tiv~ ii';.. ;r: ~ ·:~·":":-:~~.!-=-~ii\• S&f1:. D:::-siun

    Say Rs

    SDEK-8 MCC

    / NS Sqm

    -v~ 55.09 Lacs

    ,,,,.---- ,,,,.----5590 _ 611 3415490

    /' / ,/

    ,----5246269 ----262313 ,,,--r' 5508582 ---,,------

    7

  • 8

  • ·:·; '" .:·!r n·, .~.,,1 ·,t·

    J." '

    AGENDA ITEMi NO

    Subject: Roi .. gh cost estimate for Providing and fixing 330x330x35 mm thick grass paver blocl

  • 1.

    2.

    3.

    4.

    5.

    6.

    7.

    8.

    Rough cost estimate P/F 330x330x35mm thick grass paver block on the left out space in between M.S.railing and pavement of various park in Sector 38, Chd.

    Abstract of cost

    Descri~tion of item Ref. to DSR. Qn'. Unit Rate Amount. /

    /

    Earthwork in excavation by mechanical means (Hydraulic excavator)/ 2.6.1 1895.52 Cum 175/-/ 331716.00 / V manual means over areas ( exceeding 30cm in depth. I.Sm in width as well / as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up tc 1.5mm disposed earth to be leveled and neatly dressed. All kind of soi l. / Dismantling of.existing kerb and stacking service able properly at site & disposal of N.S. 866.46 v- Rmt 71- / 6065.00 / /-the unsen•iceable kerb up to average lead 2 kms. ,--

    / Dismantling of existing channel and stacking service able properly at site & disposal N.S 866.46/ Rmt 101../ 8665.00 // c--of the unserviceable channel up to average lead 2 kms.

    / Fixing of old PCC kerbs after excavating/ filling the earth to required level N.S. 519.87 V Rmt 241-/ 12477.00 / v-and grade complete in all respects. The rate also includes cost of filling and / pointing of joints with cement mortar I :4

    / Providing and fixing PCC kerbs of size 2'-0" x9" having 4" thickness at N.S 602.53 Rmt 156/ / 73995.00 1/' bottom and 3" thickness at top made of plain cement concrete 1:2:4 duly / vibrated and compacted. The rate also includes the cost of filling and pointing of joints between kerbs with cement mortar I :4 ( I cement : 4

    / coarse sand) complete in all respects. Fixing of old PCC channel after excavating/ filling the earth to required level N.S 519.87 Rmt 24/-/ 12477.0~ , and grade complete in all respects. The rate also includes cost of filling and / , pointing of joints with cement mortar I :4

    / ✓ Providing and fixing PCC channels of size 2'-0" x I' having 3" thickness made of N.S. 346.58 Rmt 167/- ' 57879.00/ plain cement concrete 1:2:4 duly vibrated and compacted. The rate also includes the cost of filling and pointing of joints between channels with cement mortar 1:4 (1 Cement: 4 coarse sand) complete in all respects. / / V Carriage of earth by mechanical transport including loading and unloading N.S 1895.52 :t.U: ...... 113.29"' 214743.00 /' lead up of2 kms.

    10

  • Construction of compacted Granu lar Sub-Base by providing, laying, N.S 947.76 .,,,.... l,.enm / 1096/-/ 1038745.~ spreading and compacting coarse graded sub base material - sand, moorum, < gravel crushed stone or combination .½i ereof conforming to Grading-II of Table 40fl-2 o[ MORT&H specifications.

    / 10. P/L choe sand including making ramming consolidation and dressing N.S 303.21/ Cum / 944/-/ 286296.oo;:::. y complete in all respect of the entire satisfaction of the Engineer-in-cliarge. t---- ·

    / '/ Supply and laying grass pllvers of make ovi li te vendera textiles honeycomb µanels N.S 6220.3/ Sqm / 3800628.00/

    I I.

    611/- I with self anchoring made, made of high insp~ct resistant IiDPE (High density /

    polyethylene) each grass paver should be 330mmx330mm x35mm in height consisting of four floral shaped structure of 125mm open cell and nine round cell opening of 45mm dia . Each of the open cell are connected with a web like structure for strength and stability. Base of the panel is equipped with a slot opening for drainage and four round struts for anchoring purpose. The grass pavers should have interlock system to lock each and other. The grass paver should have compressive strength to minimum 150 rnnne/sqm, capable to take load of fire tender. The panel should have high level of porosity greater than 90% porous for grass, shrubs and low planters complete as per TERI guidelines, CAUT drawing No.29 Job No.2617 and to the entire satisfaction of the engineer-in-charee.

    ,.-/ V

    /I 5863686.oo · Add 5% contingencies charges 293184.0lr,, V L

    V / / 6 lsd'870.00 ,, Tair-en iii i ."-Say Rs.61.57 lacs rP.ates as Ellecut1·-1t,

    Ex cuti e Engineer,

    Roa No.3pd.

    cJ,._,_,_µ f,,~ . 61 ,J71!,,_,__ ~~ ~\\

    11

  • ~.....,===--------------------... .._. _____ - ~·- ---

    l],"''- 144 ...

    Go,n . MOOCL ): IG,tSC. l'••L

    12

  • 13

    AGENDA ITEM NO. 234.4

    Subject: Special Sanitation Campaign under Swachha Bharat Mission - regarding.

    An agenda item no. 231.7 was placed before the Gen. House of the Corporation in its 231st

    meeting held on 30.05.2016 for granting extension after 08.05.2016 to the sanitation staff and

    equipment/machinery for special sanitation campaign under Swachha Bharat Mission. And the Gen.

    House has resolved as under;

    “The House considered & granted extension with majority for further three months from 09.05.2016 to 08.08.2016 to the following for special sanitation campaign under Swachha Bharat Mission amounting to Rs. 37.12 lacs:-

    (i) 60 No. of Safaikaramcharies through existing firm i.e. M/s Sudarshan Facilities Pvt. Ltd. @ 1.63% administrative cost on D.C. rates + statutory payment as applicable.

    (ii) 06 No. of tractor trolleys i.e. three from M/s Malwa Engineering Works and three from M/s Capital Security Services on the same terms & conditions.”

    Now, the term of existing workers i.e. 60 nos. of Safaikaramcharis has been expired on

    08.08.2016 whereas, in order to carry out Special Sanitation Campaign under Swachha Bharat Mission

    thereby 60 nos. of Safaikaramcharis are utmost required.

    So far as the hiring of 06 nos. of tractor trolleys are concerned, the office is already in

    process to hire 34 nos. of tractor trolleys thereby now these 06 tractor trolleys out of 34 nos. of tractor

    trolleys will be deployed for special sanitation campaign under Swachha Bharat Mission.

    In view of the position explained above, the following proposal is placed before the Gen.

    House for consideration & approval:-

    Ex-post-facto extension of 60 nos. of Safaikaramcharis under Swachha Bharat Mission for further six months w.e.f. 09.08.2016 to 08.02.2017.

    i) 09.08.2016 to 30.09.2016 from M/s Sudarshan Facilities Pvt. Ltd. as the contract of said firm is going to expire on 30.09.2016.

    ii) 01.10.2016 to 08.02.2017 through the contractor, who will be available at the lowest admin. charges on the same terms & conditions.

    The total tentative expenditure of above would be Rs. 48.00 lacs only. The funds are

    available under Swachha Bharat Mission Plan.

    Sd/-MOH

  • 14

    AGENDA ITEM NO. 234.5

    Subject: Recarpeting on V-5 roads in Sector 49 A & B, Chandigarh.

    (Amount: Rs. 51.66 Lac)

    The inspection of parking and road from V-5 was carried out by the undersigned along with SDER-10 and observed that lot of potholes and depression have developed on this road parking area in Sector 49 A & B, Chandigarh. The condition of this parking & road is very poor and needs immediately recarpeting. These parking & road was earlier carpeted during the year June 2011 respectively. This road are also due for recarpeting as per prevailing practice in Municipal Corporation i.e. the road are recarpeted after a gap of 5 years and thus it is proposed to recarpet the road & parking. Keeping in view the conditions of parking & road patch work for equivalent to 3.51% sqm area has been taken.

    Accordingly, the rough cost estimate amounting to Rs.51.66 lac has been framed by including the

    following scope of work.

    1. P/A tack coat 3kg/10 sqm. 2. P/L 30mm thick bituminous concrete. 3. P/L 40mm thick bituminous concrete. 4. Dismantling of existing kerbs/channels. 5. Fixing of old PCC kerbs/channels. 6. P/F PCC kerbs of size 1` x 1` having 4” thickness. 7. P/F PCC channels of size 2`-0” x 1` having 3” thickness.

    The scope of work taken in the estimate has not been included in any other already approved

    estimate, amount of already approved estimates and expenditure under this Head for Roads Division No.1 is as

    under:-

    i) Budget Allocation : Rs. 1600.00 lac.

    ii) Total amount of spillover works 31.03.2016 : Rs. 2602.04 lac.

    iii) Total amount of estimate sanctioned after 1.4.2016 : Rs. 653.52 lac.

    iv) Total of Sr. No. II & III : Rs. 3255.56 lac.

    v) Expenditure incurred during current financial year : Rs. 1094.28 lac.

    The matter is placed before the General House of the Municipal Corporation, Chandigarh for

    consideration and approval please.

    Sd/- Sd/-S.E.(B&R), M.C. E.E.Roads Divn. No.1, M.C.

    http:Rs.51.66

  • -Fixing of,,-old PCC Channels after excavating/fi llin

    g the ea11h rn .v

    required leve! and grade complete in al l respects. The rate also includes

    7 cost of filling and pointing of joinrs with cement mortar I :4. ( l Cement: 4

    coarse sand).

    Provid ing and fixing PCC kerbs of size I' x l' having 4" thickness with

    round top edge made of plain cement concrote 1 :2:4 duly vibrated and

    8 compacted. The rate also includes the cost of filli

    ng and pointing of joints

    befween kerbs with cement mortar 1:3 after earth work Ill

    excavation/fi lling and removing the same from site of work complete in

    all respects.

    Providing and fix ing PCC channels of size 2"-0" X I , having

    ,, ,, j

    thickness made of plain cement concrete I :2:4 duly vibrated and

    9 compacted. The rate also includes the cost of fill ing and pointing ofjoints

    between channels with cement mortar 1:4 (I Cement: 4 coarse sand)

    complete in all respects.

    1Tot2I

    !Add 5% co:1tingency and petty establishment charges

    !Gran

  • 17

    AGENDA ITEM NO. 234.6

    Subject: Development of Green Park/Belt in pockets at Sector 48, Chandigarh.

    (Amount: Rs. 157.73 Lac) This land has been earmarked for development of Green belt/park. There is two pocket of land

    earmarked for green belt/green park in Sector 48 D consisting the area of land 2.29 acre approx. This area is southern tail end of Chandigarh and beginning of SAS Nagar Mohali (Punjab). This is low lying pocket. A concept plan has been prepared for provision of open air theatre. Yoga platform, fountain, waking tracks etc. for development of Green park/belt. All basic amenities have been considered to develop the green park considering the requirement of residents/visitors. This park will facilitate residents of Chandigarh as well as SAS Nagar (Punjab) to upkeep their health and green environment inside the locality. Municipal Corporation has planned to develop this park under M.C. funds and AMRUT Scheme Funds. Accordingly, the estimate has been prepared for the work of development of Green Belt in Sector 48 D, Chandigarh for the components to be carried out by M.C. Chandigarh.

    Accordingly, the rough cost estimate amounting to ` 157.73 lac has been framed by including the following scope of work. 1. Earth work in excavation. 2. Carriage of earth. 3. Leveling, dressing, and watering of excavated earth. 4. Construction of boundary wall of size 3`-9” high. 5. Provision for construction of Artistic entrance gate and entry area. 6. P/L choe sand. 7. P/L cement concrete 1”5:10. 8. P/L 40mm thick fine dressed stone flooring. 9. P/L kota stone slab flooring. 10. P/L cobble stone flooring. 11. P/L cement concrete pavement with 1:2:4. 12. Provision for sprinkler system for irrigation. 13. Provision for excess storm water, drainage from park. 14. Provision for illumination of walkways/garden. 15. Provision for construction of open air theatre. 16. Provision for paragola designs in both pocket. 17. Provision for landscaping, construction of mounds. 18. Provision for miscellaneous unforeseen/hidden items. 19. Provision for green land scaping work. 20. P/F concrete/iron benches. 21. P/F dustbins. 22. P/F multiplay system-1. 23. P/F big size multiplay system.

    The scope of work taken in the estimate has not been included in any other already approved estimate, amount of already approved estimates and expenditure under this Head for Roads Division No.1 is as under:-

    vi) Budget Allocation : Rs. 1600.00 lac. vii) Total amount of spillover works 31.03.2016 : Rs. 2602.04 lac. viii) Total amount of estimate sanctioned after 1.4.2016 : Rs. 653.52 lac. ix) Total of Sr. No. II & III : Rs. 3255.56 lac. x) Expenditure incurred during current financial year : Rs. 1094.28 lac.

    The matter is placed before the General House of the Municipal Corporation, Chandigarh for consideration and approval please.

    Sd/- Sd/-S.E.(B&R), M.C. E.E.Roads Divn. No.1, M.C.

  • 11 I I I " I I

    N ,1111 11 .. , 1/111111- lh•11 11l111,1u1111I 11! 1,111,111 J'111 H ll 11 h Ill ' '" ' ... . ,

    .,. "' · ,,.,'"' ~It 1,, ' 11111,,llu ,11!1

    "'" 11,1111 , 1,.1 11 111 111 " " " '

    J\1111,1111 1

    1 I ,II Il l W o t k (1 111111!) C 'lrrl,l gtJ , lovol1119 etc.)

    2 Construction of fcncmg and entry gates (Boundary wall and entry gate

    s)

    3 Construction of pavement work of walkways

    4 Public Health work( sprinkler system, drainage system toilet and drink

    ing water arrangement etc)

    5 Electrical work (illumination of walk ways, garden and parking

    6 Provision for Surveying, Designing , planning , preparation of drawing

    fe,r execution of detailed work etc.

    7 Construction of various features (construction of open Air Theatre,

    one fountain , parabola, mounds , sitting arrangement

    and artistic feature , yoga platform)

    8 Horticulture work (turning of garden, P/F shrubs, creepers, climb

    ers and ground covers, P/F rare/ornamental plants,

    concrete/iron Benches, ornamental Victoria Huts, Dustbins and multiply

    system for children corner etc)

    ._, , . .; :\i;c X. P' l",;-~~?'i,:.:1Uv Suh:

    SD~ M.C C

    E.E.R-1 ,

    M.C.~

    1111 I ' I/ Ill

    .-55'0 112'0

    1452751 ..,

    Proposed to be

    executed under ✓ AMRUT Scheme

    /

    18

  • I ------------------ - ---1

    -r----------- ABS TRACT OF COST

    ' .. -~ ------------- ----- ---- -------------- --------~---- ~--~---~----~ -Amount Ref to DSR Unit Qty Rate

    C:. .No 1Des cription of Item - l --------- ·-· -· ------ - ----------------- - -------...-----1--,~--+-.-'--/ -...-~---+---~ 1 IEar:h ~~~------· -· .. _ -- _ ------------··--··· --- - _______ _.._ ___ ,..- ✓-1--v-~.:-/ ___ =-i...~I/ ___ _,_,~ /.---···-v

    , C ,,.,, ,-,,, '" " ' ., .. , : , · , .,, . , r ., ., . .,,,, (Hyd>acl,c "'·"' on. namd , "'""' o,e, ace as , 2 6 1 2 3]:'·"' I 2051 4 175 3 589950 ,,xcEe,!.rg 'lOcm 1: 1 aep· :r. , .. •. : i:: · ,.·,. welt as 1c sq,n on pifl': 1 1nctud,ng d:sposal of excavated

    \eaGh lead up to 50,,, c1nd ;ift t.;,:> to 1 5 ;1 and excluding disposed ea1h to be levelled and neatly \ing an ,'1 water ing of excavated ear:h during f1!ltng of low lying site (Provision for N S L S Provision 600000

    Iex•. ,,•,;:;ror-cum· !oade1 trac•o1 tro•• ey Karaha roller e:c) v ~ L- ----~-P---~---,- -b---,--1-d ____ -----_,----!--.--- ' ' -· NS / S 7 3 3 ·v.,, "229 / · 11 v,, reparation o . . u grac.e inc u 1ng tre:'chI11g rough uressIng o soil 1inal dressing o, eart1i to give I qm 1 4 v , jtpvel and camot:-r wate:ing roi:,,·,g v,1th a road roller and compaction 01 bed compiete 1n all respect . \ ,1

    I I 6519210 ,/·

    5c,~.b'll'' l-~-~C:rn,Uoo of teo,;:-:::::,, gates ----·-------+-----+---+---- -- , ~ :~~~ L , •/

    11 --- (1) Coristrc1c :on of boundary wall of 3'-9" rigr, from ground level complete 111 all respect to the N S ---!~-=-+· ···, 920 , ·- -ifc~,_ 53011 ie\-1 1 ,,-~

  • I ------- -- - -,-- - - -- -

    .. -· ----- --- ------- - --- - --- ---- - ---- -· ----- --- -------·'--- --faf---......-1'---~f------"'=-+----- --< ,,: ;::-, ·. \:iding and ,,,1 ---.·: (

  • ,,.,) ,Prov1s1or fo1 excES$ s,c "r w2 : . ,, ,-, ,•11ng •ow ly1, .(; arpa)

    --- - --------- ---- - ------- -

    ! - - - -- - -- - - --,_j_ _ ---;---

    ·- ---- -- -

    • ill'd to1m wa l;;-drn-1n_a_g oT ___ ·--.---L--s-=--,-----.--~~0000 /

    ± 00000 , 5 Electrical Works I

    ----- --- -I ' Pco"'"" lo, '"""'""'"" of we'k,,eys , ga,deos aod 1,ghl"g ,c lhe pa •k "9 a,ea ,o late e,eo,og hoc,l

    LS i 800000 etc -- - -,__ - -- - ------- - - - -- - - - -- - ----------- - ·--- - ------ . --· -- ·--· -- - -----

  • -- ------- - - -------(i v) P;ov,d1ng and i:x,Py rnult1play sy~i,_ ,,,

    I r

    - --- ----------r--j

    --· -- - -------- -+---- -+----+- -

    so~ MC Chd

    Executive Engineer

    Roads Division No 1.

    l'v1 C Chandigarh-4:i

    - --, !

    --- -~

    22

  • nd:i 10 . ____ _

    uuject: E Li mate for the work of pro iding and laying of irrigation pipe lin for ·uppl_ ing T.T. \>\att:r t eel r- 3, handigarh .

    There is no T.T. water n L\ ork laid in c1or 33 for uppl, T.T. \\31 r to hou e

    parks. pi:;r am •nded ne~ , ter bye la\ $. the Teniar l"reated , acer nnection j ~ mandatof) l"M th·

    how; s hn ing ar I Knnnl and abo e in hn.ndigarh. There are about 46 - hou e · ha ing are;.i I kanal.

    I 69hou es have orca krmal in thi tor. The potable ,, 1er i not allowed to be u cd for irrigmi 11

    of la\ n purp ordingly 1he c timat has b en prepared for providing and la ing of irrig.i1io11

    pipe lin for uppl ing T.T. \ uter lo cctor-33. ha11digarh. Pr ision for pro id 90mm di:i I !DP

    pipe line including HOP p.: ials. sluic alves, irrigation hydrant . e1c h:is be n wkcn III th·

    timat •. n provi ion f r makin~ onne tion has also be n taken in th e ti mat .

    As su h, :ui c timaie amounti ng to Rs. - -.38La duly allO\~ed b the compe1e111

    authority i plac d before th eneral Hou ·e of the Iunicipal orporation for its on iJcra1ion and

    appro al. Thee ·penditur shall be ch rg able t the I lead:- 4402 Minor irrigation .

    Bud t detail :-

    Major He-0d/Hcad of ccount

    iv) AmOLmL o 1hi · timalc

    .'.'.E. I. .P.H.

    4402 linor irrigation

    R .200.00 n

    R .26-. I OLac

    R. 5A3La

    Rs. -- .38La s--

    ~ E.E .. . P.H.- ~

    23

    AGENDA ITEM NO. 234.7

  • &un,ato fo• th work of providing and laying of irrigation pipe lbe for supplying 'r.T. water to Sector-33, Chandigarh.

    Subjel;lt 2.8.1

    parks As pt ·:

    ho ·

    es1imn c. TI,:

    .Desc.;p1ion o£iteins

    7, Supplying and fll

  • 10/ NSl

    11 1 NS!

    12.

    i if i'ii) 13.

    i 141

    16,83

    1S1 NS! i) il}

    iii)

    ~

    I

    Providins -S, fixing of imgation hyd"IJlts or M,S. c.hltt,p for 11°""'1 pipe. M,S. Sooket SOmm; Gl Nipple, 50mm of lmtr, Socket 50mm wilh plug, nuts and ruboer 811Sket ~ GI fitting etc. compl~te including exeewtion end n:fillin•. Providing and flxlng or hydnu!l haudic-, with I 0" i/d NP·2 clas,, RCC pipe of 2'-6'' lcqgth with 2½" thick PCC ~ted eirelllar lid.a-protect the hydrapts includlng cutting. making, surface good ~inted red in colour for easy · detection of hydrants, sand filling in ponion between hvdrant & RCC oine comolcte in t1ll 11!S=IS. Labour for mnldng ilmlns•mc~t for connection or proposed HOPE pipe with the existing pipe line including cost Cl,\tting of existing pipe. lnbour, tool, rent of 11en, set and weldin• .,., dewaterin.11 & refillinl! etc. 3" dia to 7" dia 3' din to 3" dia :i.o 3w dia to 4" dia ProvJdlng and fixing of 11 mm thick MS flange .for r1xing the sluice valv11 including tho cos( of nut bolt rubber sheet etc. eomolc10,in all r""""cl~. 80mmdia wl 3.77kllfm.70/-P ~" . Taking out existing CC inteiloc:klng paver blocks from footpath/ central verge, including removal ,of rubbish etc., clisposal of \UISCrviceab!e material to the dumping ground, for which payment shali be made separately and stacking of serviceable ma~al within SO mell'e load u per direction of Engineer-in-Charge. 2 l03m,x0,60= 1261.S0«>m" Ptovision for roa~ culto be paid to B&R wing

    . /

    Road CUI · 203 mtr or·t.M tft. Paver Cut • 2103 m'tf-or 6900 rft,

    Katcb.a Cut• 2984-mtr or 9788-rft , .. ,, . Detail ofKntcha Cut / 1'otal Length = 6196.00mtr / I By Boring a(·) 957.00mtr ., ~ .. In park • (·) 1S2.l)Omtr / P/Cut ;(.) 2)03.00mtr /

    e 2984i00mtr or 9788rft

    Add 5¾-Cootinoencv & Pettv. Estt. Cnaraes.

    Adil.l~cc ''lax~ of ~~ cost Rs~8r6ffl- i.e. OD Rs.2 , . . J./A _

    --9ol .... ~-n,·:q J ✓ . I I Jh5~4~ Say ,Rs.68:$.2Lacs

    §~Z8

    t~~ yyr-"' _:...:--~ / I /

    35 nos/ V 1880,00 658( .oo ~ I V!_~) '

    ./ ,/ ,I/ 35 nos. V 150.00 2625 .00 V

    " {t1) "

    / , / / 2no. 2000.0Q 4000,-00 ✓ -n no.~ ,, 1890.00' 1,1. IS nos./ 1890,00 ' 28350,00 ~ .

    CpA..) ' / V 1/ ~ -

    4_Nos.r 264.00 10S6.w ,- ,,,,.;, 1261.80 I"" 51.90 65487;00 rv sqm /I 0,~D

    , / I/ 665 rft. t ll0.001 731S0.00

    ~ 6900 f , 1S9.00 :1 1097100.00 rfl. ! ,

    9788 rll < 1/ "33.00 II 32J004., ~ I

    I

    ~ Bs.t 14J1;.,, TolAI sree· - ,w

    J:. ,._.,,, 'I IMll84,80 TolAI 1~4'16s.oo" ,/J,l/!J"

    l063~ $,Q, ~ I-""' G. Total ~"" -""

    WB,V1r q/ ~

    -

    Jt is certified tlmt Quantit):, rate and amount has been checked by me

    25

  • 10

    20

    30

    40

    50

    of Quantities of Le.It out area ofSector-33 (T.T. water) ~kN"o Sector R~fere;t)Cc HDP8 Pipe Rond Paver 'frenchless Qnantil}:of

    Size infrQm of GatC$ Pipe Required I 33 n29,334 ' 90mm - 200'-0" ' 420'-0" 2 33 11-312-317 90mm . , 50'-0" 140'-0" 420'-0" 3 33 #274-279 I 90mm . . 120·-0· 320'-0" 4 33 #257-318 I 90mm 40'-0" 300'-0" 40'·0" ! 720'-0" 5 33 #280-2S5 1 90mm 20'-0" 100·-0· 40'-0" I 320'-0" 6 33 #286-291 i 9-0mnt . 300'-0" . ' 320' -0" 7 33 In Park # 286- ' 90mm - . . 300'-0"

    29l I 8 33 #251-259 I 90mm 20'-0" 150'-0" 40'·0" 450'-0" 9 33 # 188-196 90mm 20'---0" 350'-0" 20'--0" 450'-0"

    33 # 187(frontl I 90mm . . 50'-0" 11 33 /1169- 175 90mm 20'-01 . 140'-0" ' 370'-0" 12 3J fl 176-179 I 90mm 20'-0" 50'-0" 20'-0" 200'-0" 13 33 fl 197°202 90mJn 360'-0" . 360'-0' 14 33 #203-208 I 90mm . 360'-0' . 360'-0' 15 33 II 521-514 90mm . . 2001•0" 580'-0" 16 33 C 521-524 ' 90mm . 100·.o· 270'-0" 17 33 # 537-548 I 90mm 10'-0" . 125'•0" 420''-0" 18 33 # 529-531 ' 90mn, 20'•0" . 75,.on I 260"-0" 19 Jj Ii $47-552 I 90n11:n - . 150'-0" 560'-0"

    33 # 559-561 ' 90mm - I 1(,0'-0" 21 33 #601.(;08 90mm 20'-0" 380'-0" - 400'-0" 22 13 /1630-637 90mm . . 200'-0" 400'v0" 23 33 II 638-645 ' 90mm 20'-0" 100'-0" 40'-0" I 440'-0" 24 33 11625-629 90mm . 260'-0" I 270'•0" 25 33 11646-655 90mm . 250'-0" I 500'-0" 26 33 Ii ll 19-Il22 90mm . 220'-0" 240'-0" 27 33 II 1352-ll370 -90mm . 150'-0" 175'-0" I 700'-0' 28 33 It 1331-ll394 90mm so·-o· 280'-0" 40'-0" 700'-0" 29 33 # 1397-1404 , 90mm . . 160'-0' I 700'-0"

    33 # 1331-0349 I 90mm . 125'-0" 700'-0" 31 33 // J136(P).l150 , 90mm 60'-0" 250'-0" . ' 480'·0" 32 JJ ./J ll36(P).l34Si 90mm 30'-0", 240C0" . 480'-0" 33 33 f;!Jll9-1125 90mm - . . : 240'·0" 34 33 #1119 to parl< 90mm 30'-0' . 160'-0•

    nnn, of 11 16 35 33 .1n 122 10 park , 90mm 30'-0" 2QCQ" 160'-0"

    ooo.of1L26 36 33 ·/11501-1509 I 90mm . 450'-0" . ' 450'-0" 37 33 II 15 i8-Front 90mm . . I 50'-0" 38 33 ii 152S-1S30 I 90mm . 300'·0"' . I 300'-0" 39 33 II 1531-b538 I 90mm 20'·0" . . I 420'-0"

    33 # 1539-1546 90.mm 20'-0" 200'-0" 40'-0" 400'-0" 41 33 # IS63-t 57I ' 90mm 40'-0" 150'-0" 40'-0" 400'-0" 42 33 # 1572-1576 90mm 20'-0" 200'-0' 250'-0" 43 33 # lo park lo 90mm . . . 200·-0·

    !root of# 1570 44 33 # Is11. I ssi 90mm 20'-0" 150'-0" 20'-0' 30-0'-0" 45 33 #1585-1588 I 90mm 2S'--0'' . 60'-0' 250'-0" 46 33 # 1662-1666 90mm 20'-0" . 10-0'-0" 270'-0" 47 33 # 1692-1697 I 90mm . . 120·--0• 320'-0" 48 33 # 1683-1 691 90mm 20'-0" 300'-0" 20'-0" 470'-0" 49 33 /11721-1729 90mm 20'-0" 300'-0" 20'-0" 470'-0"

    33 # 1730-1736 90mm 20'-0" 100·.o· ' 350'-0" 51 33 # 1713-] 720 I 90mm 20• .. 011 300'--0" 400'·0" 52 33 # 1737-1747 90mm . 550'-0" 550'-0" 53 33 # 1801-1812 90mru . . 300'-0" 600'-0"

    I

    66$'-0" Qr 6900'-0"or 3 140'-0" 0( 20330' .o• or 202,69 2103.12 957mu· 6196.S8111tr

    mlr m!r

    I .c S•~ Sa~ l, Say 957 mtr _j Say 6196 mtr mtr mtr ~ ~ ......... : • ,,;,'!:: '?---- ,,_...

    26

  • ants Proposed in Sector 33

    Sr_No. Sector Parks in front Quantity of of H.No. Hydrant

    1 33 286&290 2 Nos.

    2 33 198 & 201 2Nos.

    3 33 204&207 2Nos.

    4 33 530 & ;;31 2Nos.

    5 33 605 &607 2Nos.

    6 33 628 &626 2Nos.

    7 33 1132 & 1135 2 Nos.

    8 33 1140 & 1142 2 Nos.

    9 33 1350 & 1352 2 Nos.

    10 33 1376 & 1377 2 Nos.

    11 33 1224, 1228 & 3 Nos. 1240

    12 33 1598 1 No.

    13 33 1532, 1535 & 3Nos. 1537

    14 33 1574 ·1 No.

    15 33 1673 1 No.

    16 33 1687 & 1690 2Nos.

    17 33 1722'& 1725 2Nos.

    18 33 1147&,1144 2 Nos.

    35 Nos.

    --=-

    ~. Sub"'·~ M.c.r ., . _.. .•. .sion Nop.. Chanaigarn ~

    /

    ~ eu MCPH Div1 No. 3 Cb.mclii;arij 'Q,,

    ~

    27

  • & Roads

    .)

    =- "·"""· - ....

    Sector33 47

    -

    28

    Sectors

  • ITEM NO

    Subject: Rough Cost estimate for providing and laying 60 mm t

    hick paver blocks

    along V-6 road, Milk Colony, Dhanas, Chandigarh.

    (Amount : Rs . 235.16 lacs)

    The rough cost estimate has been framed to meet th e expenses for the work of

    providing and fixing 60 mm thick paver blocks along V - 6 road, Milk Colon

    y, Dhanas,

    Chandigarl1 . The Area Counci llo r des ired to paved the road berm with 60 mm

    thick paver

    blocks on the road of Milk Colony , Cattle a re frequently walking in groups . For pe

    destrians, it

    is very difficu lt to pass the road safely. To solve the problem , the road berm be

    paved with

    paver blocks . The agenda of this work was deferred in th e 23 1 •• meeting of the Ge

    neral House

    of M .C ., C handigarh held on 30 .05 .201G due to the finalization of policy of paver b

    locks . Now,

    th e p o licy h as been approved in the 232nd meeting of General H ouse held on 29 .06

    .2016 a nd

    this estimate is covered under the policy of paver blocks.

    Accordingly , the Rough Cost estimate for providing and laying 60 mm thick

    paver blocks along V-6 road, Milk Cc,lony , Dhanas Chandigarh. amou nting

    to Rs . 235.16

    lacs has bee n prepared . The following scope of work has been taken in the estim

    ate:

    1 . Dismantling of existing kerb a n d chan nel.

    2 . Earth work in excavation .

    3 . Carriage of earth .

    4 . Fixing of o ld kerb .

    5. Fixing o ld channels .

    6 . Providing and fixing PCC k e rbs .

    7 . Providing and fi x ing PCC channels .

    8 . Providing and laying PCC 1 :8 :16

    9 . Providing and fixing 60 mm thick paver blocks.

    It is certified that scope of wol'k taken in this estimate has not earlier included in

    a n y of

    the estimate.

    The expenditure o n this work will be charged under Head "Basic Amenities

    in

    Rehabilitation Colonies" . The budget estimate, budget allocation, amount of a

    lready approved

    estimate and expenditure under this head for Roads Division No.3 is as under:-

    i. Budget Allocation for the year 2016-17 Rs .500 .00 lacs

    ii . Total amount of estimates sanctioned after Rs .502 .07 lacs

    01 .04 .2016

    iii . Expenditure incurred during current financial year. Rs .235. 16 lacs

    - ·

    The matter is p laced before the Genera l House of Municipal Corporation, Chandig

    arh

    for consideration and decision please .

    ~ E .(B&R) , M .C .

    AGENDA

    29

    AGENDA ITEM NO. 234.8

  • ! - --------

    - ------

    v ROUGH COST ESTIMATE ----- - - ---- -- ABSTRACT Or COST

    -· - -- --- - ----- -

    Name of v;crk: - Providing and fixing 60m,11 th;c;~ p;c:·.-e: block· along V-6 road, M

    ilk Co!ony, Dhanas, Chandigarh.

  • - - - -' I

    {

    - - -- -- ---- - ---- -----·

    6 I: roviding and fixing PCC ~.r,;;:11,sl of :::·-o· X 1'-0" ,: '.:." ; :L· duly vibrated

    ,,1eclwnically & compected made of PCC ': 2:4 duiy cumd ~ nc: . niched. The rat

    es

    .,.:sc, ;,·,t:lucie~ t:,e cost of fiili,-,y and pc•intir,; of joints Letrn:!<

    c .... ~JJ. . !? ? "1." (

    ~

    e Engrneer,

    R ds i~~i\t: 3,(~ C) Cha · ~ ,

    .

    ~ e«(Mlb Mu1"11cipel CorporatJoo

    ewlp,~ - , . - ~lfl{/.(

    r-

    31

  • 32

    Structure BookmarksFigureFigureFigureFigureFigureFigureFigure

    Subject: Page No: 1: 4: 2: 58: 3: 912: 4_2: Special Sanitation Campaign under Swachha Bharat Missionregarding: 13: 5: 1416: 6: 1722: 7: 2328: 8: 2931: Budget Allocation for the year 201617: Rs600000 lacs: ii: Rs642687 lacs: iii: Rs 5509 lacs: ABSTRACT OF COST: ROUGH COST ESTIMATERow1: Name of work Providing and fixing 330x330x35mm ihick Grass paver in side park in front of 1 to 1290 2400 to 2440 in Dadu Majra Colony Chandigarh: Description of item: Amount: 1_2: 175: 2_2: 3_2: 4_3: ramming consolidation and dressing complete in all respect: Cum: 5_2: 944: 286032: NSTOTAL: 611TOTAL: 5246269: 611Row2: TOTAL: v: 611: Say Rs: 5509: Lacs: 611Lacs: 5508582Lacs: Certified that quanitity rate and amount has been chaecked by me: i: Budget Allocation for the year 201617_2: ii_2: Amount of estimates sanctioned after 01042016: Rs690634 lacs: iii_2: Rs 6157 lacs: SNo: Ref to DSRDescription of item: Unit: Rate: Amount_2: 1_3: 261: Cum_2: 175_2: 33171600: 2_3: Dismantling of existing kerb and stacking service able properly at site disposal of the unserviceable kerb up to average lead 2 kms: s: Rmt: 71: 606500: 3_3: Dismantling of existing channel and stacking service able properly at site disposal of the unserviceable channel up to average lead 2 kms: NS: Rmt_2: IO: 866500: 4_4: NS_2: Rmt_3: 24: 1247700: 5_3: NS_3: Rmt_4: 156: 73995001: 6_2: NS_4: Rmt_5: 24_2: 1247701: 7_2: NS_5: Rmt_6: 5787900: 8_2: NS_6: 189552: c: 11329: I21474300: 9: NS_7: xum: 1096: NS_8: Cum_3: 944: 10 ILRow1: NSAdd 5 contingencies charges: 622034 Add 5 contingencies charges: Sqm Add 5 contingencies charges: 611 IAdd 5 contingencies charges: 10 ILRow2: Add 5 contingencies chargesRow1: NSRow2: 622034 Row2: 611 IL: 10 ILRow3: 3ien 1: 611 I: undefined: undefined_2: undefined_3: S No Description of 1vorkRow1: NS_9: 12: 19021: r: 12768: NSSqm: 276: 7: 21357: I SRmt: 28000: I SRow2: undefined_4: 16: Rmt_7: NS_10: 40320: 220: Rmt_8: NS_11: 226: 275720: 184800: 11211Tot2I: Rmt1Tot2I: S1Tot2I: 1651Tot2I: 1121Add 5 coatingency and petty establishmenl charges: RmtAdd 5 coatingency and petty establishmenl charges: SAdd 5 coatingency and petty establishmenl charges: 165Add 5 coatingency and petty establishmenl charges: 1121Gram Total: RmtGram Total: SGram Total: 165Gram Total: undefined_5: undefined_6: undefined_7: undefined_8: undefined_9: undefined_10: undefined_11: undefined_12: undefined_13: undefined_14: 800000: 5 Electrical work illumination of walk ways garden and parking 800000: 6 Provision for Surveying Designing planning preparation of drawing fer execution of detailed work etc: 7 Construction of various features construction of open Air Theatre one fountain parabola mounds sitting arrangement: concreteiron Benches ornamental Victoria Huts Dustbins and multiply system for children corner etc: Say R: ceif JQlS c: undefined_15: undefined_16: undefined_17: undefined_18: ABS TRACT OF COST: undefined_19: I: 1_4: fill_10: undefined_20: undefined_21: i_2: undefined_22: undefined_23: L cocstoctoo of Art gate eof LS 20oonol: c L: JTota11s66 12v 1: undefined_24: Prov1s1or fo1 excE5sstCe r11Ic19c f1on1 ra1k 1 sIc111 w1 r11d 101111 WdlPr01c11nagP oT: undefined_25: i Toial 800000i: 111ii Provisior for aragoli deg1gns in botr ocket: t1: i1 Provicing and tIxing concreliron Benchs: Proposed to be executed under AMRUT Scheme: undefined_26: undefined_27: Row1: undefined_28: undefined_29: undefined_30: undefined_31: undefined_32: undefined_33: undefined_34: i I: undefined_35: undefined_36: undefined_37: undefined_38: undefined_39: undefined_40: undefined_41: j: undefined_42: undefined_43: fill_21: IAdda contingency and petty chages: undefined_44: undefined_45: undefined_46: undefined_47: Say Rs acs I 1Fi730c: undefined_48: undefined_49: o ndi 10: i_3: iii Expdt incurred durin: iv Amount o thi timalc Rs: 4402 linor irrigation: clamp for uitablc of pipe line 1 din GI pifll Gt: Construction of brick masonry chamber for sluic valv including excavation 1st cl ss brick work in ment: size 3 x 3 x 3: size 3 X 3 X 4: undefined_50: Row1_2: 1683 footpath central verge including removal of rubbish: 298400mtr or 9788rfl: SrJlo: Secor: Re Ference: P3vr: Road90mm: Road90mm_2: Road90mm_3: 50090mm: 20090mm: 4003000: 7_3: 33: 200Row2: 3000Row1: 3000: 200: 20090mm_2: 3600: 90mm: 90mm_2: 90mm_3: 200_2: fill_16: 90mm_4: 90mm_5: fill_50: 4002600: 90mm_6: 260090mm: 50090mm_2: 50090mm_3: 90mm_7: 12502500: 12502400: 30090mm: 240090mm: 34: 33_2: 90mm_8: 300: fill_29: 1600: 35: 33_3: 90mm_9: 300_2: 30090mm_2: 2004500: 30090mm_3: 30090mm_4: 3000_2: fill_36: 4002000: 43: 33_4: 90mm_10: fill_71: 400: 200_3: 20090mm_3: 90mm_11: 2001000: 2003000: 33_5: 90mm_12: 550090mm: 18011812Row1: 90mmRow1: 31400 or 957mtr: 53Row2: 33Row2: 18011812Row2: he: isay: fill_52: fill_51: SrNo: Sector: 11: 33_6: 3 Nos: 12_2: 13_2: 33_7: 3 Nos_2: 17: 18Row1: 33Row1: 1147 1144Row1: AGENDA ITEM NO 2348: Budget Allocation for the year 201617_3: Rs50000 lacs: Total amount of estimates sanctioned after 01042016: Rs50207 lacs: Expenditure incurred during current financial year: Rs23516 lacs: r_2: undefined_51: undefined_52: undefined_53: Providing and fixing 60m11 thci p r bloc along V6 road Milk Coiony Dhanas Chandigarh: ABSTRACT OF COSTRow1: SNo_2: of serviceable: undefined_54: NS_12: 1100925: 712707: undefined_55: NS_13: complete in all respect The rate also includes cost of filling and pointing of joints with cement mortar 1 4 1 Cement 4 coarse sand: 162528: undefined_56: kerbs with cement mortar 1 4 1 cement 4 coarse sand complete in all respect to: NS_14: 2400: undefined_57: undefined_58: undefined_59: undefined_60: undefined_61: r_3: 5 roroviding and fixing PCC 1amel of 20 x 0 cf luly vibrated NS Rmt: undefined_62: undefined_63: 2258: 1echanically compected made of PCC 24 duiy cured 1c i1icl1ed The rates 2sc lrclucies the cost of fiiliiy and pcintirfJ uf joinl5 beh1cen cc1111els with cement mortar 1 3 1 cement 3 couIse sand Complete in Bil respect to the entire satisfaction of Enaineer In Charge: 9 Providing and laying in position cement concrete 1816 1 cement 8 coarse and NS: Cum_4: 297300: 4676529: 10 Providing and laying 60mm thick factory made cement concrete interlocking paver: Row1_3: 157300: bRow1: bRow2: Add 5 Contingency and petty charge: 971746: bRow3: bRow4: bRow5: Certified that the quantity rates taken in the estimate checked by me: undefined_64: u: