Agnico-Eagle Mines Limited Agnico-Eagle Mines Limited Kittilä Update – November, 2008 Kittilä Update – November, 2008

Upload: others

Post on 17-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Agnico-Eagle Mines LimitedAgnico-Eagle Mines LimitedKittilä Update – November, 2008Kittilä Update – November, 2008

Page 2: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Forward Looking Statements

The information in this document has been prepared as at October 29, 2008. Certain statements contained in this document constitute “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward looking information under the provisions of Canadian provincial securities laws. When used in this document, the words “anticipate”, “expect”, “estimate”, “forecast”, “will”, “planned”, and similar expressions are intended to identify forward-looking statements or information.

Such statements and information include without limitation: statements regarding timing and amounts of capital expenditures and other assumptions; estimates of future reserves, resources, mineral production and sales; estimates of mine life; estimates of future mining costs, cash costs, minesite costs and other expenses; estimates of future capital expenditures and other cash needs, and expectations as to the funding thereof; statements and information as to the projected development of certain ore deposits, including estimates of exploration, development and production and other capital costs, and estimates of the timing of such exploration, development and production or decisions with respect to such exploration, development and production; estimates of reserves and resources, and statements and information regarding anticipated future exploration; the anticipated timing of events with respect to the Company's minesites and statements and information regarding the sufficiency of the Company's cash resources. Such statements and information reflect the Company's views as at the date of this document and are subject to certain risks, uncertainties and assumptions, and undue reliance should not be placed on such statements and information. Many factors, known and unknown could cause the actual results to be materially different from those expressed or implied by such forward looking statements and information. Such risks include, but are not limited to: the volatility of prices of gold and other metals; uncertainty of mineral reserves, mineral resources, mineral grades and mineral recovery estimates; uncertainty of future production, capital expenditures, and other costs; currency fluctuations; financing of additional capital requirements; cost of exploration and development programs; mining risks; risks associated with foreign operations; governmental and environmental regulation; the volatility of the Company's stock price; and risks associated with the Company's byproduct metal derivative strategies. For a more detailed discussion of such risks and other factors that may affect the Company’s ability to achieve the expectations set forth in the forward-looking statements contained in this document, see Company's Annual Information Form and Annual Report on Form 20-F for the

year ended December 31, 2007, as well as the Company's other filings with the Canadian Securities Administrators and the U.S. Securities and Exchange Commission. The Company does not intend, and does not assume any obligation, to update these forward-looking statements and information.

2

Page 3: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

3

Note to Investors Regarding the Use of Non-GAAP Financial MeasuresThis document presents estimates of future "total cash cost per ounce" and "minesite cost per tonne" that are not recognized measures under United States generally accepted accounting principles ("US GAAP"). This data may not be comparable to data presented by other gold producers. These future estimates are based upon the total cash costs per ounce and minesite costs per tonne that the Company expects to incur to mine gold at the applicable projects and do not include production costs attributable to accretion expense and other asset retirement costs, which will vary over time as each project is developed and mined. It is therefore not practicable to reconcile these forward-looking non-GAAP financial measures to the most comparable GAAP measure. A reconciliation of the Company's total cash cost per ounce and minesite cost per tonne to the most comparable financial measures calculated and presented in accordance with US GAAP for the Company's historical results of operations is set forth in the notes to the financial statements included in the Company's Annual Information Form and Annual Report on Form 20-F, for the year ended December 31, 2007, as well as the Company's other filings with the Canadian Securities Administrators and the SEC.

Notes To Investors

Page 4: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Global GrowthThree mines now operating. Three new gold mines under construction

AEM’s growth projects 100% owned, with low total acquisition costs

Located in mining friendly regions of low political risk

Each project region has long-term mining camp potential

2008 through 2010 capex estimated at $1.4 billion. Approximately $680 million spent at Sept. 30, 2008. 70% of remainder committed.

4

Page 5: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Industry Leading1 Gold Production Growth Estimates

1 For an intermediate or senior gold producer* Total cash costs for 2008 are calculated at current spot metals and currency exchange rates. All subsequent years were calculated using the following trailing 3-year average metals prices and exchange

rates: $10.55/oz Ag; $2,596/t Zn; $5,628/t Cu; C$/US$ of 1.15; US$/Euro of 1.29

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

1,600,000

2008E 2009E 2010E 2011E 2012E 2013E 2014E 2015E 2016E 2017E0

150

300

Payable Gold Production(ounces)

Total Cash Costs (weighted average)

Total Cash Costs($/oz)*

LaRonde Goldex Lapa Kittila MeadowbankPinos Altos

5

Page 6: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Rovaniemi

Kittilä

Murmansk

KiirunaMine

Sweden Russia

Norway

55 km north of Kittilä800 km north of HelsinkiExcellent Infrastructure: roads, airports, communication

Arctic Circle

Kittilä Mine Location

25 km

Page 7: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

7

Kittilä Mine History

Gold mineralization discovered in 1986 by the Geological Survey of Finland;In April 1998, Riddarhyttan Resources AB purchased the deposit through public tender;Between 1999 to 2005, more than 136,000 metres Exploration Drilling Program to investigate main Suurikuusikko auriferous structure; In 2002, Riddarhyttan granted an environmental permit for mining (open pit and underground) at Suurikuusikko;In 2003, Riddarhyttan granted mining licence and permit for the Suurikuusikko deposit;In 2004, Agnico-Eagle Mines Limited purchased initial interest in Riddarhyttan;From 2004 to 2005, resources increased from 2.0 Moz Gold to 3.7 Moz Gold;In 2005, Agnico-Eagle acquired the remainder of the shares of Riddarhyttan;June 2006, Agnico Eagle announces production decision.September 2008, gold resources and reserves increased to 5.7 Moz

Page 8: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

8

Kittilä Mine Introduction

Project Overview

Hosts reserves of 18.2 million tonnes at 5.12 g/t gold (3 Moz/93 tonnes) – open along strike and at depth

Resources of 21.2 million tonnes containing an additional 2.7 Moz (83 tonnes) gold

Excellent exploration – camp potential

Average production planned at 150,000 oz/yr (4.8 tonnes) with approximate total cash costs of $300/oz, assuming US$/Euro of 1.3

Mining by using Surface and Underground mining methods.

Pro mining region – excellent infrastructure

Page 9: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine Current Status

Mining and Processing Underway

High voltage (110 KV) power line/electrical substation constructed and public road upgraded from Kiistala village to mine

Site services, buildings and infrastructure established and operational

Ramp and underground development ongoing since 2006

Fully permitted

Open pit mining started in May 2008 – self mining – October 1, 2008

Gold concentrate production started in September 2008

Autoclave commissioning ongoing

Examining options to optimize production rate of growing deposit

Page 10: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine Areal View August 2008

Tailings Facility

Processing, Admin and Services

Suurikuusikko Pit

Page 11: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine

Infrastructure Aerial View April 2008

Page 12: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

OPEN PIT LOCATIONS

ROURAVAARA PITROURAVAARA PIT

NORTH SUURIKUUSIKKO PITNORTH SUURIKUUSIKKO PIT

SUURIKUUSIKKO PITSUURIKUUSIKKO PIT

ETELETELÄÄ PITPIT

KETOLKETOLÄÄ PITPIT

Kittilä Mine Surface Plan

Page 13: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine Plant Site

Page 14: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

14

Kittilä Mine Mining

N

Open pit mining, followed by underground mining phased in over 3-4 years

Decline to provide platform from which to convert Resource to Reserves

Test deposit at depth

1 km

Suurikuusikko

View Northeast

Etelä

Ketola

Roura

Page 15: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Aug. 2008

Mining Equipment2 x Sandvik Ranger 7001 x AC Roc D93 x Cat385 excavators7 x Cat777 trucks2 x Cat D6/8 bulldozers

Kittilä Mine Open Pit Mining

Suurikuusikko and Rouravaara pits, total excavation 35 Mt

Started in September 2007

Ore Mining started May 2008

Ore stockpiles totaled 235,000 tonnes at 4.6 g/t gold (Nov.14, 08)

Self Mining – Oct.1, 2008

Geological parametersDilution 15 % at 0.7 g/tOre Recovery 95%

Page 16: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine Open Pit Mining

Page 17: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

OPEN PITS AND UNDERGROUND MINE

Kittilä Mine Mining

Page 18: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine Underground Development

TUNNELING4,900 m completed to date4,000 m/year from 2009Decline 90 m/month

5.3 m

5.5

m Gradient 1:7

Page 19: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

FAR2EAR1

450 Exploration drive

Main Access Ramp

Final Pit

N

Rouravaara Zone Suurikuusikko Zone

Construction Rock Pit

Kittilä Mine Simplified Longitudinal View

Mechanized transverse open stoping with delayed backfill

Stope heights40 m in Rouravaara (to be tested by trial mining)25 m in Suurikuusikko, possibility to increase

Truck haul to surface

SupportEastern side + Ore horizon

Bolting : 3 m long cement grouted rebars, 4 bolts / mShotcrete on back and walls: 5 cm thick 30 kg/m3

Western sideShotcreting on back: 5 cm thick

Page 20: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine Underground Mining

25 -40 m

15 m

5 -20 m

Primary Stopes:

Cemented Rockfill (or Paste Fill)

Secondary Stopes:

Rockfill

The first secondary stope (9) can be mined after all surrounding primary stopes (1, 2, 5 and 6) are mined out and backfilled

TYPICAL LEVEL PLAN

MINING SEQUENCE-Transversal Stopes

Page 21: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine Production Profile (Dec. 2007)

32313231Mine Site Costs€/t

150,056171,687160,595134,673Payable

Ounces

87 %87 %84 %84 %Mill

Recovery

5.095.885.714.81Grades g/t

1056104510491044Ore tonnes

000’s

2012-2017

average

201120102009Operations

Summary

Page 22: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

22

Kittilä Mine Ore Processing

Page 23: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine Flow Sheet

Sulphur Flotation

NeutralisationAcidulation Autoclave

CCDCircuit

Process Water

Acid Water

Sulphur Concentrate

Doré Bar

Leaching(C.I.L. ) Carbon

Stripping

Cyanide Destruction

C.I.L Tailing DisposalFlotation Tailing Disposal

Reclaim Water

S.A.G.

Surge Bin

Pit & Underground

Crushing

OxygenPlant

Sulphur Flotation Tailing

CarbonFlotation

Carbon Concentrate

Grinding

Page 24: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine Ore Processing

Phase 1: concentrate production started in September.

Phase 2: startup and commissioning final stages of processing (autoclave) ongoing

Page 25: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mill Control Room

Page 26: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mill Production Target 2009

Production 2009 Mined ore tonnes 1.050.000 T Gold grade in ore 5,24 g/t Recovery in flotation % 92,0 % Recovery in leaching % 92,0 % Global Recovery 84,6 % Global Gold production, Ozs 150.000 T

Page 27: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mill Autoclave

Page 28: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Construction of tailings pond completed September 2008

Waterproof bitumen geo-membrane bottom layer in pond.

Water pumping stationbuilt at Seurujoki River

28

Kittilä Mine Tailings Facility

Page 29: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

1100 km

550 km

300 km

550 km

LARGE GREENSTONE BELT

Greenstone Belt extending from the Nowegian coast, through Sweden and Finland and into Russia.

Similar to large greenstone belts in Australia, North America and Africa.

Unexplored compared to other Greenstone Belts.

In spite of this, several notable deposits have been found and mined:

Pahtohavare (Cu, Au)Viscaria (Cu, Au)Kautokeino (Cu, Au)Saattopora (Au 200 000 oz, 3.6 g/t)Pahtavaara (Au 300 000 oz, 3.5 g/t)

Suurikuusikko, in the Kittilä greenstones, is centrally located in the belt.

Anomalous in size - unique

Gold Deposits in Lapland

Page 30: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

30

Kittilä Mine Reserves and Resources

Diamond Drilling at SuurikusikkoGTK: (1987-1997)

77 holes - 9 km Riddarhyttan: (1998-2005)

468 holes -143 kmAEM: 2006-2008

575 holes - 140 kmCurrent

Total 8 drills - 4 on exploration

KITTILÄ RESERVES AND RESOURCESTonnes (Mt) Au g/t Au Moz

Probable Mineral ReserveProbable Mineral Reserve 18.2 5.1 3.0Indicated Mineral ResourceIndicated Mineral Resource 5.4 3.0 0.5Inferred Mineral ResourceInferred Mineral Resource 15.7 4.3 2.2GRAND TOTALGRAND TOTAL 39.4 4.5 5.7

Page 31: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 Est.

Target:18 - 20

LaRonde Goldex Lapa Kittila MeadowbankPinos Altos

Kittilä currently AEM’s second largest in term of reserves and resources

Targeting additional reserve conversion

Positioned for further growth

Kittilä Mine Growth Potential

(Millions of Ounces)

3.0 3.3 3.3 4.0

10.47.97.9

1.3

12.5

16.7

31

Page 32: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

N

Kittilä Mine Ore Lenses

PLAN VIEW

LONGSECTIONKetola Etelä Suurikuusikko Roura Rimpi

1 km

Page 33: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Recent deep drilling has continued to expand gold resource at depth

Drilling ongoing to convert large gold resource into reserves and extend the zones

Discovery Cost $5 per ounce

Drilling planned for 2009 Exploration drilling - over 40 km7 surface drill rigs and 1 underground rigBranching of deep drill holesResource-to-Reserve conversion drilling -over 25 km

33

Kittilä Mine Mine Exploration

Page 34: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine New Gold Zones at Depth

Ketola Etelä Suuri North Roura RimpiCentral Roura

1000 m

Latest Drill HolesGold g/t / True Width meters

9000

N

1000 m1000 m

0 m0 m

8000

N

7000

N

6000

N

5000

N

SUU070152.7 / 3.0 4.7 / 5.9

SUU070166.7/ 3.0

Exploration upside Probable Reserve Mineral Resource

ROU080012.16 / 47.5

Incl.8.3 / 3.0

4.17 / 3.95.43 / 6.3 11.3 / 2.4

ROU070104.64 / 7.6

SUU08001B5.39 / 3.9 4.36 / 3.46.30 /16.6

SUU080032.86/ 3.2

8.08/ 11.6 4.21/ 3.2

SUU070191.07 / 2.9 4.69 / 3.9

Longitudinal SectionLongitudinal Section

SUU061065.5 / 4.9

2,195

527

2,996

Au (000’s oz)

15,7364.34Inferred Resource

5,4163.03Indicated Reserve

18,2055.12Probable Reserve

Tonnage (000’s t)Au (g/t)Kittilä

Reserve & Resource July 2008

SUU070038.3 / 15.1

Page 35: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine New Gold Zones at Depth

Ketola Etelä Suuri North Roura RimpiCentral Roura

1000 m

Latest Drill HolesGold g/t / True Width meters

9000

N

1000 m1000 m

0 m0 m

8000

N

7000

N

6000

N

5000

N

SUU070152.7 / 3.0 4.7 / 5.9

SUU070166.7/ 3.0

Exploration upside Probable Reserve Mineral Resource

ROU080012.16 / 47.5

Incl.8.3 / 3.0

4.17 / 3.95.43 / 6.3 11.3 / 2.4

ROU070104.64 / 7.6

SUU080032.86/ 3.2

8.08/ 11.6 4.21/ 3.2

SUU070191.07 / 2.9 4.69 / 3.9

Longitudinal SectionLongitudinal Section

SUU061065.5 / 4.9

SUU070038.3 / 15.1

Section 36500 N

SUU08001B5.39 / 3.9 4.36 / 3.46.30 /16.6

Probable reserves 3.0 Moz Resource Potential

Roura Deep (600 – 1100m)

Suuri - Roura Deep (1100 – 1400m)

Parallel zones (East ,West and Central)

Reserve potential (resource conversion)Kittila Mine (0- 800m) -Indicated 0.5 Moz

-Inferred 1.2 MozSuuri Deep (800 – 1100 m) -Inferred 1.0 Moz

Indicated 0.5 Indicated 0.5 MozMozInferred 1.2 Inferred 1.2 MozMoz

Kittila MineKittila Mine

Inferred 1.0 Inferred 1.0 MozMoz

1100 m

800 m

1400 m

Page 36: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

0 m

500 m

1000 m

5800

0 E

5850

0 E

5900

0 E

Potential

West Zone

Potential

Central Zone

Potential

East Zone

Pit Outline

Kittila Mine Section 36500N Looking North

Latest Drill HolesGold g/t / True Width meters

ProbableReserve

Mineral Resource

SUU080034.21 / 3.2

SUU080032.86 / 3.2

8.08 / 11.6

New Lens

?

?

250 m

Resource Potential in parallel zones

WW EE

Page 37: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

N

Ketola Etela Suuri Roura Rimpi

PLAN VIEW

LONGSECTION

Surface

UndergroundExploration Drilling 2009 41.9 km diamond drilling

39.7 km surface2.2 km underground

Suuri and Roura Deep (800-1400 level)

Devico (branching) drilling

Other areas 300-800m

Kittilä Mine Mine Exploration Drill targets

Page 38: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine

Page 39: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

REGIONAL EXPLORATION TARGET RANKING BASED ON:

•Potential to add ounces

•Recent Drilling Results

•Closeness to Kittilä Mine

•Prospective Geology

•20 km of strike length potentialat Suuri

Drilling 2009 Suurikusikko Trend - Main Targets:

Hako, test extensions to previous gold intersections Retu, test extensions to the know gold zones Total 10 km drilling

Other Areas of Central Lapland 1.5 km driling on several targets

Suurikuusikko

Central Lapland

Oijärvi

Agnico-Eagle Landholdings in Finland

Exploration - Finland

100 Km

Page 40: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

EXPLORATION/OIJÄRVI

Exploration - Finland

Page 41: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

LODE 1

LODE 2

Paralell zone

EXPLORATION/OIJÄRVI/ KYLMÄKANGAS

Exploration - Finland

Page 42: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine Challenges

Shortage of experienced workforce – manpower

Optimise the process plant

Develop underground mine

Page 43: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine Opportunities

Lower dilution

Expanding deposit – potential production increase

Optimise the process plant

Well educated workforce, gaining experience daily

Page 44: Agnico-Eagle Mines Limited Kittilä Update – November, 2008€¦ · Mining Equipment 2 x Sandvik Ranger 700 1 x AC Roc D9 3 x Cat385 excavators 7 x Cat777 trucks 2 x Cat D6/8 bulldozers

Kittilä Mine Summary

Open pit & U/G performing according to plan

Processing plant operational

Workforce challenges appear to be softening

Deposit continues to grow