ags rsvp weekly meeting p. pile 2 december 2004 ags rsvp weekly meeting 2 dec 2004 useful links:...
TRANSCRIPT
AGS RSVP Weekly MeetingP. Pile2 December 2004
AGS RSVP Weekly Meeting2 Dec 2004
Useful Links:
• RSVP Project: http://rsvp.bnl.gov
• C-AD AGS Project: Office http://server.c-ad.bnl.gov/esfd/RSVP/RSVP_AGS_WBS.htm
Agenda– Guidance and Upcoming reviews (Pile)– Update on AGS/BOOSTER WBS 1.4.1 cost
scrubbing & short term spending plan (Brown)– Update on beam development plan (Ahrens)– Status of resource loaded schedules and short
term spending plan for Switchyard (Pendzick)
AGS RSVP Weekly MeetingP. Pile2 December 2004
Preliminary Guidance – our plan(subject to change – we have not yet received guidance from Willis/Kotcher
as result of 4-5 Nov AGS Review – no change since 18 Nov meeting)
• Continue cost scrubbing and schedule development
• Highest priority to AGS/BOOSTER WBS 1.4.1– Cost scrubbing, what can we postpone until operations phase? etc…– Schedule – in particular a plan to get the AGS/BOOSTER in shape for high intensity
beam development --- by beginning of 3rd year of construction?– Beam development plan that fits within constant effort RHIC budget scenario with 2
beams – i.e. figure on 80 hrs/week and 15 weeks/year• Case 1: Beam development during entire 5 year construction period• Case 2: Beam development beginning 3rd year of construction
• The construction plan should be developed consistent with no beam development in first two years of the project (Case 2 above)
– D-line decommissioned– C-Line available beginning of 3rd year for tests– there’s a risk (small) that we may have to revert back to the original plan (Case 1).
AGS RSVP Weekly MeetingP. Pile2 December 2004
Milestone Date Status, Comments
Discussion of Baseline Expectations, Timeline with Experiments
September 13 Held
MECO Magnet Review Sun-Tue, Oct 10-12 Held
AGS Review Thu-Fri, Nov 4-5 Held
Internal discussion of resource-loaded schedules (RLS) for all projects
Thu, Dec 9 Includes PO, NSF PM, ALD + experiments. One full day.
Simulations & Backgrounds Review Tue-Thu, Jan 11-13 Set, reviewers assembled, held at NYU
Initial review of RLS for all projects Tue-Thu, Jan 18-20 Reviewed by LOG. Dates TBF.
Reviews of other sub-projects Weeks of Jan 24 – Feb 21 Series of LOG-based reviews of RSVP sub-systems
Draft versions of PMP, PEP, Conceptual Design Report completed
Mon, Feb 14
Operations Review Week of Mar 7
Project startup pre-review Week of Mar 15 Comprehensive preparatory review of full project, proposal
Project startup review Week of Apr 18 Final project startup review, iteration of above. NSF review.
Finalize documentation for May submission to NSF
Week of Apr 25
Product submitted to NSF/NSB Mon, May 2
next significant events
•AGS/Booster cost and schedule ~complete•Case1 and Case2 beam development plans ~complete•DRAFT Resource Loaded Schedule available•Experiment WBS’s work-in-progress
Roadmap to Resource Loaded Schedule understood, some cost scrubbing
K0PI0 and MECO Experiment Simulations Review
AGS RSVP Weekly MeetingP. Pile2 December 2004
RSVP Cost and Schedule Review, 9 Dec 2004
Goals and expectations of the meeting:
– This meeting is intended to provide the opportunity for an open, frank discussion of the projects' status and outlook– Status report of what is in place with regard to project planning for the three projects– The current confidence of the Project Managers in the estimates they have so far. – Project Managers' plans for how any missing or incomplete items will be tackled over the coming months.
Agenda: (Orange Room, Physics, attendance by invitation)
– 2 hours each: KOPIO (M. Marx), MECO (M. Hebert) and AGS (P. Pile)
Detailed Guidance: http://server.c-ad.bnl.gov/esfd/RSVP/guidance.pdf
AGS RSVP Weekly MeetingP. Pile2 December 2004
RSVP Cost and Schedule Review, 9 Dec 2004
AGS RSVP Weekly MeetingP. Pile2 December 2004
RSVP Cost and Schedule Review, 9 Dec 2004
AGS RSVP Weekly MeetingP. Pile2 December 2004
RSVP Cost and Schedule Review, 9 Dec 2004
AGS RSVP Weekly MeetingP. Pile2 December 2004
RSVP Detector Capabilities, Simulations and Backgrounds Review
(11-13 Jan 2005 at NYU)
AGS RSVP Weekly MeetingP. Pile2 December 2004
RSVP Detector Capabilities, Simulations and Backgrounds Review
(11-13 Jan 2005 at NYU)
AGS RSVP Weekly MeetingP. Pile2 December 2004
RSVP Simulation and Background Review Committee
–Ed Blucher, University of Chicago –Martin Cooper, Los Alamos–Cy Hoffman, Los Alamos–Patty McBride, Fermilab–Jack Ritchie (Chair), University of Texas, Austin–Mike Shupe, University of Arizona–Bob Tschirhart, Fermilab–Koji Yoshimura, Osaka University
Charge and Agenda: http://server.c-ad.bnl.gov/esfd/RSVP/RSVP_Simulations_ChargeAgenda_.pdf
RSVP Detector Capabilities, Simulations and Backgrounds Review
(11-13 Jan 2005 at NYU)
AGS RSVP Weekly MeetingP. Pile2 December 2004
Next Meeting
• 16 Dec 2004
• Agenda
– TBD