aic8790 kuda testo it uk · 9 uk the kuda operator for swing gates is an electromechanical device...
TRANSCRIPT
I UK
Operatore elettromeccanico lineareISTRUZIONI PER L’INSTALLAZIONE
Electromechanical linear operatorINSTRUCTIONS FOR INSTALLATIONS
KUDAKUDA 150 - (15000/DX-15000/SX)
KUDA 200 - (22000/DX-22000/SX)
KUDA10
UK
�
�
�
�
In the event of an operating fault or failure, cut the power upstream of the control unit and call Technical Service.Periodically check functioning of the safety devices. Any repairs must be carried out by specialised personnel using original and certified materials. The product may not be used by children or persons with reduced physical, sensorial or mental capacities, or lacking experience and knowledge, unless appropriately instructed.Do not access the circuit board for adjustments and/or maintenance.
WARNINGS FOR THE USER
CAUTION: IMPORTANT SAFETY INSTRUCTIONS.It is important to follow these instructions in order to safeguard persons.Keep this instruction booklet
9
UK
The KUDA operator for swing gates is an electromechanical device that transmits motion to the gate by means of a worm screw. It is locked when the motor is not running, it is necessary to install locks
.if fitted on blind/flush panel
doors
INTRODUCTION
WARNINGS FOR THE INSTALLER
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
Before proceeding with installation, fit a magnetothermal and differential switch with a maximum capacity of 10A upstream of the system. The switch must guarantee omnipolar separation of the contacts with an opening distance of at least 3mm.All the packaging materials must be kept out of reach of children since they are potential sources of danger.The manufacturer declines all responsibility for proper functioning of the automated device if failing to use original GIBIDI components and accessories suitable for the intended application.When installation has been completed, always carefully check proper functioning of the system and the devices used.This instruction manual addresses persons qualified for installation of “live equipment”, therefore, good technical knowledge is required exercised as profession in compliance with the regulations in force.Maintenance must be performed by qualified personnel.Before carrying out any cleaning or maintenance operation, disconnect the control unit from the mains.This product has been designed and constructed solely for the use indicated in this document. Any other use may cause damage to the product and be a source of danger.Verify the intended end use and take the necessary safety precautions.Use of the products for purposes different from the intended use has not been tested by the manufacturer and the operations performed are therefore on full responsibility of the installer. Mark the automated device with visible warning plates.Warn the user that children and animals must not play or stand near the gate.Adequately protect the danger points, for example, using a sensitive frame.Check proper installation of the earthing system; connect all the metal parts of doors, gates, etc. and all the system components equipped with earthing plate.Exclusively use original spare parts for any maintenance or repair.Do not make any modification to the components of the automated device unless expressly authorised by GIBIDI.Gi.Bi.Di. Srl reserves the right to change the technical data without prior notice in relation to product development.
WARNING: IMPORTANT SAFETY INSTRUCTIONS.It is important for the safety of persons to follow these instructions. Keep this instruction manual.
KUDA 11
UK
Encoder
KUDA 150
24 Vdc
100 W (~1000 N)
4 A (~1000 N) MAX
360 mm
24 Vdc 2600 rpm
1000 N
-20°C + 60°C
IP 44
If fitted on blind/flush panel doors it is mandatory to use an electric lock
Integrated into the motor
intensive
20 mm/s
KUDA 200
1500 N
2 m 2.5 m
400 mm
150 Kg 200 Kg
Electric system setupSet up the electric system as shown in fig.1 referring to the electric system regulations and other national regulations in force. Keep the mains power connections clearly separated from the service connections (photocells, sensitive frames, control devices, etc.).The main components are: 1- Antenna; screened coaxial cable2- Electronic control unit container3- Electric lock; 1 mm² 2-core (2x1) cable 4- Key selector; 0,5 mm² 3-core (3x0,5) cable 5- 24Vdc operators: - 1,5 mm² 2-core (2x1,5) cable power supply WHITE = + YELLOW = -
for a cable length of 6 m max., over it’s necessary increase the cable section. -0,5mm² 3-core (3x0,5) encoder cable.
6- Omnipolar magnetothermal and differential switch with minimum contact opening of 3 mm 220-230V/50-60Hz control unit power line: min. 1,5 mm² 3-core cable (3x1,5) (adhere to the regulations in force)7- 24V flashing light; 0,75 mm² 2-core (2x0,75) cable8- Connector blocks9- Photocell transmitter; 0,5 mm² 2-core (2x0,5) cable10- Photocell receiver; 0,5 mm² 4-core (4x0,5) cableA- Opening mechanical end-stop.B- Closing mechanical end-stop.
ELECTRICAL EQUIPMENT
Supply voltage
Power absorbed
Current absorbed
Electric motor
Useful travelMax thrust/traction force
Operating temperature
Frequency of use (%)Degree of protection
Maximum leaf length
Linear velocity
Operator
Type Irreversible electromechanical with worm screw
TECHNICAL DATA
Maximum leaf weight
CAUTION: It is important that an omnipolar magnetothermal and differential switch with a minimum contact opening of 3 mm be fitted upstream of the control unit.
KUDA12
UK
Check that the gate structure is in conformity with the regulations in force and that the gate movement is linear without friction.
Preliminary checks:• Check that the gate structure is sufficiently robust.• In any event, the actuator must push the leaf at a reinforced point.• Manually check that the leafs move without force along their entire travel.• Check that the gate opening and closing end-stops A-B fig.1 have been installed.• If the gate is not a new installation, check the state of wear of all the components, and repair or replace the
defective or worn parts.
The reliability and safety of the automated device is directly dependent on the condition of the gate structure.
Refer to 6 for possible installation dimensions.
The difference between A and B must not exceed 50 mm; greater differences cause irregular gate movement (the traction/thrust force and the movement speed vary during the manoeuvre).
fig.
PRELIMINARY WARNINGS
INSTALLATION DIMENSIONS
Preliminary checks:
For proper functioning of the automated device, the existing or new gate structure must meet the following requirements:
�The individual leafs must have a maximum length of 2 metres (KUDA 150) or 2,5 meters (KUDA 200)�The leaf structure must be robust and rigid�The leafs must move smoothly and uniformly without irregular friction along their entire travel �The existing hinges must be in a good condition�The mechanical end-stops A-B fig.1 must be fitted
fig. fig.
4 - Fasten the rear bracket to the pillar fig.7a .5 - Fit the operator on the rear bracket using the pin provided fig.7b .6 - Fasten the front bracket on the operator fig.8a .7- Unlock the operator (see unlocking device), pull out the operator rod fully then push it inside for 20 mm.8 - Move the leaf to closed position against the mechanical end-stop B fig.1.
Installing the operators
1 - Find the most suitable point where to fasten the front bracket of the operator and mark it.2 - Using a spirit level mark the point on the pillar where to fasten the rear bracket .3 - Identify the point where to fasten the rear bracket in relation to the dimensions A-B 6 and in relation to 3-4-5.
CAUTION: Where there are big pillars or walls, a niche must be made so that the dimensions A and B are respected.
OPERATOR INSTALLATION
13
UK
If the gate needs to be operated manually because of a power failure or operator malfunctioning:
�Remove the rubber plug fig.9a-9e .�Insert the release key to the release slot fig. 9a-9e .�Turn the release key as shown in fig.9b-9f .�Pull out the release bar and keep it pulled out fig.9c-9g .�Turn the release key to its original position to fix the release bar fig.9d-9h .
Move the gate manually only in the event of a power failure.
UNLOCKING DEVICE
If you need to install an electric lock, refer to figures 11 and 12 .1) ELECTRIC LOCK2) ELECTRIC LOCK FASTENING PLATE3) BUSHING4) END-STOP FOR BUSHING5) SPRING LATCH6) THROUGH CYLINDER (ON REQUEST)7) GATE
fig. fig.
INSTALLING THE ELECTRIC LOCK
Power the system and run a complete opening and closing cycle checking that:• The safety devices function properly;• The gate moves smoothly;• Good hold of the fastening brackets;• That the power cable moves freely;• The gate assembly conforms to EN 12453 and EN 12445;• For further details and information on the reference standards, visit our site: www.gibidi.com
FINAL CHECKS
9 - Fix the front bracket to the leaf with a clamp fig.8b .10- Use a spirit level to check that the operator is perfectly level.11 - Remove the operator from the front and rear bracket .12 - Fasten the front bracket .13- Unlock the operator (see unlocking device).14 - Fit the operator on the brackets.15 - Manually open and close the gate to its full opening and closing travel. The gate must move smoothly without
friction and the lead nut must not reach the mechanical end-stop during opening or closing. If otherwise, adjust the bracket positions.
It is recommended to leave at least 40-50 mm of cable free.
OPERATOR INSTALLATION
KUDA14
UK
Periodically check the gate structure, in particular:- Check functioning of the hinges;- Check that the leafs are correctly balanced. Excessive inclination of the leafs will result in faster wear of the
operator fastening brackets. Do the test by unlocking the operator and checking that the leafs do not move on their own;
- Check good functioning of the safety devices;- Unlock the operator and check that there are no points of friction along the entire travel;- Check that there is no dirt or debris on the worm screw, and if so, clean and then lubricate the worm screw with
lubricating grease.- Periodically check proper adjustment of the operator thrust force and the efficiency of the unlocking device for
manual operation (see the relative paragraph).- The safety devices installed on the system must be checked every six months.
For any unresolved malfunction, cut the power to the system and call in a qualified technician (installer). In the period when the gate is out of service, activate the manual unlocking device to allow manual opening and
MAINTENANCE
MALFUNCTIONING
KUDA 15
UK
CE Declaration of conformityThe manufacturer:
GI.BI.DI.
Via Abetone Brennero, 177/B,46025 Poggio Rusco (MN) ITALY
Declares that the products:
ELECTROMECHANICAL GEARMOTOR KUDA 150-200
Are in conformity with the following CEE Directives:
•
EMC Directive 2004/108/CE and subsequent amendments;
and that the following harmonised standards have been applied:
•
•
Date 26/05/14
S.r.l.
Directive and subsequent amendments;LVD 2006/95/CE
•
EN60335-1,
EN61000-6-1, EN61000-6-3
Moreover declares that the product must not be used until the machine in which it has been incorporated has not been declared in accordance with 2006/42/CE Directive.
The legal Representative
Michele Prandi
KUDAKUDA 150 - (15000/DX-15000/SX) Operatore elettromeccanico lineare
DISEGNI E SCHEMI
Electromechanical linear operatorDRAWINGS AND DIAGRAMS
I UK
KUDA 200 - (22000/DX-22000/SX)
KUDA2
991
IMPIANTO TIPO / TYPICAL INSTALLATION
1
23
4
5b
5a
6
7
8
8
10
10
9
9
A
A
B
5a 5b
LEFT OPERATOR-MOTOR 2OPERATORE SINISTRO-MOTORE 2
RIGHT OPERATOR-MOTOR 1OPERATORE DESTRO-MOTORE 1
B
922
DIMENSIONI OPERATORE / OPERATOR DIMENSIONS
98mm
46mm
93mm
400mm
799mm 29
mm
KUDA 200
17
0m
m
98mm
17
0m
m
93mm
640mm
360mm46mm
674mm
KUDA 150
29
mm
765mm
KUDA 3
48
35
15
9482
20
50
17Ø9
17
mm
15
mm
993
STAFFE / BRACKETS
Ø9
991
APERTURA VERSO L’INTERNO / INWARD OPENING
994
Min150mm
KUDA 150 MAX 120mm
KUDA 200 MAX 150mm
CHIUSURA / CLOSING
KUDA4
991
APERTURA VERSO L’ESTERNO / OUTWARD OPENING
995
Min 70mm
APERTURA / OPENING
991
QUOTE INSTALLATIVE / INSTALLATION DIMENSIONS
996 B
A
β°
120 130 140 150 160 170 180 190
120
130
140
150
160
170
180
190
BA
β>120°
β=110°
-120
°
β=100°-110°
β<90°
β=90°-100°
210
β<90°β=90°-1
00°
β=110°
-120
°β>120°
β=100°-110°
140 150 160 170 180 190 200
140
150
160
170
180
190
200
210
BA
KUDA150 KUDA200
KUDA 5
991
STAFFA POSTERIORE / REAR BRACKET
997a
991
STAFFA ANTERIORE / FRONT BRACKET
998a
991997a 991997a991997b
991998b
KUDA6
991
MANOVRA DI SBLOCCO OPERATORE SINISTRO / LEFT MOTOR UNLOCK MANEUVER
999a 991999b
991999c 991999d
991
MANOVRA DI SBLOCCO OPERATORE DESTRO / RIGHT MOTOR UNLOCK MANEUVER
999e 991999f
991999g 991999h
KUDA 7
6
5
3
4
7
2
1
3
45
64
3
5
1
2
7
991
COLLEGAMENTI ELETTRICI / ELECTRICAL CONNECTIONS
9910
.
991
COLLEGAMENTO ELETTROSERRATURA / ELECTRIC LOCK INSTALLATION
9911 9919912
1 2 3 4 5 86 7
J4
9 10 11 12 13 1614 15
J5 Motore 1 / Motor 1
GND
S1
5V
M1-
M1+
1 2 3 4 5 86 7
J4
9 10 11 12 13 1614 15
J5Motore 2 / Motor 2
GND
S2
5V
M2-
M2+
I UK
Apparecchiatura elettronicaISTRUZIONI PER L’INSTALLAZIONE
Electronic control unitINSTRUCTIONS FOR INSTALLATIONS
PC200 - (AS06050)
PC200
PC200
�Red warning LEDs for N.C. contacts and for programming.�Buttons on the circuit board for programming and learning the radio controls.�Automatic run time learning with simplified procedure.�Onboard radio receiver that can store up to 200 radio controls.�Control of the radio transmitter channels via jumpers.�Deceleration during opening and closing.�Deceleration speed adjustable via DIP switch.�Stop and motion inversion after intervention of the safety devices.�Anti-crushing function both at normal speed and in deceleration.�Amperometric reading of motor absorption for the anti-crushing function adjustable via DIP switch.�Pedestrian operation with fixed opening of 5 seconds.�Two N.C. inputs programmable via DIP switch as photocell 1, photocell 2, N.C. frame or as opening device.�Two possible operating logics: step-by-step with stop or condominium selectable via DIP switch.�Gate phase shift time adjustable via DIP switch.�Programming of automatic closing and pause time via DIP switch.�Provision for use with buffer batteries.�Soft-Start and Soft-Stop to limit mechanical shock.
2 - TECHNICAL SPECIFICATIONS/FUNCTIONS
1 - TECHNICAL SPECIFICATIONS
SC230 / AS05710
230 VAC single-phase 50/60 Hz
2
24 Vdc
24 Vdc 10W max
Integrated
-20°C +60°C
ENCODER
12 Vdc 10W max
Electronic control unit for automation of a double swing gate with 24VDC motors
Control unit
Power supply
No. of motors
Motor power supply
Flashlight
Radio receiver
Operating temperature
Run time
Accessory power supply
Type
WARNINGS: This product has been tested by GI.BI.DI. for full compliance with the requirements of the directives in force. GI.BI.DI. S.r.l. reserves the right to change the technical data without prior notice in relation to product development.
DISPOSAL: GI.BI.DI. advises recycling the plastic components and to dispose of them at special authorised centres for electronic components thus protecting the environment from polluting substances.
CAREFULLY READ THESE INSTRUCTIONS BEFORE PROCEEDING WITH INSTALLATION.
Thank you for choosing GIBIDI.
UK
11
PC200
991993991992
SW1SW2
ON
1 2 3 4 5 6 7 8OFF
ON
1 2 3 4 5 6 7 8OFF
F1 20A
+ -BAT 24V
24Vac
K5
K2 K3 K4K1
Q17
J2J1
DB1
R59
R60
Q11
Q14
PHASE
NEUTRALPE
D (N
O)
STAR
T (N
O)
GND
+12V
dcP
HO
T2 (N
C)
+12V
dc
PH
OT1
(NC)
GND
GND
+12V
dcGND
GND
+5Vd
c S2
17 18 19 20 21 2422 239 10 11 12 13 1614 15
+5Vd
c S1
1 2 3 4 5 86 7
JP3
JP1 JP2
LIT
LIT
M2M1
S2
S3S
YS
-lea
rnR
F-l
earn
ENCODER M1
ENCODER M2
LED1 LED2 LED3 LED4 LED5
ANTENNA
24Vdc10W MAX
LED1
SYS-learn
LED2
START-PED
LED3
LED4
PHOT1
LED5
PHOT2
RF-learn
LED STATUS
ON
OFF
FLASHING
25
26
J4 J5 J3 J7
RX
SCHEMA ELETTRICO / ELECTRICAL CONNECTIONS
J10
+ - + -
+ -+ -
LAT
LAT
3
GND
1 2 1 2
PC200
3
COLLEGAMENTO ALIMENTAZIONE / POWER SUPPLY CONNECTION
PHASE
NEUTRAL230Vac
PHASE
NEUTRAL
INTERRUTTORE DIFFERENZIALERESIDUAL-CURRENT DEVICE
INTERRUTTORE MAGNETOTERMICOOVERCURRENT CIRCUIT BREAKER
J10
4
COLLEGAMENTO MOTORE / MOTOR CONNECTION
.
4
1 2 3 4 5 86 7
J4
9 10 11 12 13 1614 15
J5Motore 2 / Motor 2
GND
S2
5V
M2-
M2+
1 2 3 4 5 86 7
J4
9 10 11 12 13 1614 15
J5 Motore 1 / Motor 1
GND
S1
5V
M1-
M1+
PC200
45
COLLEGAMENTO LAMPEGGIANTE / FLASHING LIGHT CONNECTION
LIT
LIT
24 Vdc 10W max
1 2 3 4 5 86 7
J4
6
COLLEGAMENTO ELETTROSERRATURA / ELECTRIC LOCK CONNECTION
1 2 3 4 5 86 7
J4
LAT
LAT
+ -
+ -
PED
(N
O)
STAR
T
(NO)
GND
COLLEGAMENTO DISPOSITIVI DI COMANDO / CONTROL DEVICES CONNECTION
47
17 18 19 20 21 2422 23
J3
5
PC200
DIP SWITCH SW2_1-2
48CO
NS
ULTA
RE
IL MA
NU
ALE
DE
LLE F
OTO
CE
LLULE
PE
R M
AG
GIO
RI D
ET
TAG
LI / RE
FE
R TO
TH
E P
HO
TOC
ELLS
MA
NU
AL F
OR
DE
TAILE
D C
ON
NE
CT
ION
DIA
GR
AM
S
2 3
RXTX
M1
1 23 4
M2
1 2 3
RXTX
M1
1 23 4
M2
1
( AU02000 )
17 18 19 20 21 2422 23
J3
9 10 11 12 13 1614 15
J5
GND
+12V
dcP
HO
T1 (N
C)GND
+12V
dc
2 3
RXTX
M1
1 23 4
M2
1 2 3
RXTX
M1
1 23 4
M2
1
( AU02000 )
17 18 19 20 21 2422 23
J3
9 10 11 12 13 1614 15
J5
GND
GND
+12V
dc
+12V
dcP
HO
T2 (N
C)
SW2ON
1 2OFF
PHOTO1
PHOTO2
1 3 42
TX
1 3 4 52
RX
1 3 42
TX
1 3 4 52
RX
( AU01900 )
17 18 19 20 21 2422 23
J3
9 10 11 12 13 1614 15
J5
GND
+12V
dcP
HO
T1 (N
C)GND
+12V
dc PHOTO1
1 3 42
TX
1 3 4 52
RX
1 3 42
TX
1 3 4 52
RX
( AU01900 )
17 18 19 20 21 2422 23
J3
9 10 11 12 13 1614 15
J5
GND
+12V
dc
PH
OT2
(NC)GN
D
+12V
dc PHOTO2
6
PC200
49
2 3
RXTX
M1
1 23 4
M2
1 2 3
RXTX
M1
1 23 4
M2
1
( AU02000 )
17 18 19 20 21 2422 23
J3
9 10 11 12 13 1614 15
J5
GND
+12V
dcP
HO
T1 (N
C)GND
+12V
dc
SW2ON
1 2OFF
PHOTO1
1 3 42
TX
1 3 4 52
RX
1 3 42
TX
1 3 4 52
RX
( AU01900 )
17 18 19 20 21 2422 23
J3
9 10 11 12 13 1614 15
J5
GND
+12V
dcP
HO
T1 (N
C)GND
+12V
dc PHOTO1
NC
NC
NC
GND
PH
OT2
(NC)
17 18 19 20 21 2422 23
J3
COSTA/
SAFETY EDGE
CO
NS
ULTA
RE
IL MA
NU
ALE
DE
LLE F
OTO
CE
LLULE
PE
R M
AG
GIO
RI D
ET
TAG
LI / RE
FE
R TO
TH
E P
HO
TOC
ELLS
MA
NU
AL F
OR
DE
TAILE
D C
ON
NE
CT
ION
DIA
GR
AM
S
DIP SWITCH SW2_1-2
7
PC200
410
SW2ON
1 2OFF
NC
NC
NC
GND
PH
OT1
(NC)
17 18 19 20 21 2422 23
J3
COSTA/
SAFETY EDGE
CO
NS
ULTA
RE
IL MA
NU
ALE
DE
LLE F
OTO
CE
LLULE
PE
R M
AG
GIO
RI D
ET
TAG
LI / RE
FE
R TO
TH
E P
HO
TOC
ELLS
MA
NU
AL F
OR
DE
TAILE
D C
ON
NE
CT
ION
DIA
GR
AM
S
2 3
RXTX
M1
1 23 4
M2
1 2 3
RXTX
M1
1 23 4
M2
1
( AU02000 )
17 18 19 20 21 2422 23
J3
9 10 11 12 13 1614 15
J5
GND
GND
+12V
dc
+12V
dcP
HO
T2 (N
C) PHOTO2
1 3 42
TX
1 3 4 52
RX
1 3 42
TX
1 3 4 52
RX
( AU01900 )
17 18 19 20 21 2422 23
J3
9 10 11 12 13 1614 15
J5
GND
+12V
dc
PH
OT2
(NC)GN
D
+12V
dc PHOTO2
DIP SWITCH SW2_1-2
8
PC200
411
2 3
RXTX
M1
1 23 4
M2
1 2 3
RXTX
M1
1 23 4
M2
1
( AU02000 )
17 18 19 20 21 2422 23
J3
9 10 11 12 13 1614 15
J5
GND
+12V
dcP
HO
T1 (N
C)GND
+12V
dc
SW2ON
1 2OFF
PHOTO1
1 3 42
TX
1 3 4 52
RX
1 3 42
TX
1 3 4 52
RX
( AU01900 )
17 18 19 20 21 2422 23
J3
9 10 11 12 13 1614 15
J5
GND
+12V
dcP
HO
T1 (N
C)GND
+12V
dc PHOTO1
CO
NS
ULTA
RE
IL MA
NU
ALE
DE
LLE F
OTO
CE
LLULE
PE
R M
AG
GIO
RI D
ET
TAG
LI / RE
FE
R TO
TH
E P
HO
TOC
ELLS
MA
NU
AL F
OR
DE
TAILE
D C
ON
NE
CT
ION
DIA
GR
AM
S
COLLEGAMENTO OROLOGIO /
EXTERNAL CLOCK
SPIRA MAGNETICA /
ELECTROMAGNETIC DETECTOR
GND
PH
OT2
(NC)
17 18 19 20 21 2422 23
J3
GND
PH
OT2
(NC)
17 18 19 20 21 2422 23
J3
DIP SWITCH SW2_1-2
9
PC200
ESEMPI IMPOSTAZIONE TASTI RADIOCOMANDO / TRANSMITTER BUTTONS SET UP EXAMPLES
412
JP3 START
PED
JP3
START
PED
JP3 START
PED
START
PEDJP3
10
PC200 11
CONFIGURAZIONI AVANZATE JUMPER JP3 / ADVANCED JP3 JUMPER CONFIGURATIONS
413
JP3 TRANSMITTER
START
PED PED
START
NOTE / NOTES
PC200
3 - INSTALLATION WARNINGS
4 - WARNINGS FOR THE USER
�In the event of an operating fault or failure, cut the power upstream of the control unit and call Technical Service. Periodically check functioning of the safety devices. Any repairs must be carried out by specialised personnel using original and certified materials.
�The product may not be used by children or persons with reduced physical, sensorial or mental capacities, or lacking experience and knowledge, unless appropriately instructed.
�Do not access the circuit board for adjustments and/or maintenance.
• Before proceeding with installation, fit a differential magnetothermal switch with a maximum capacity of 10A upstream of the system. The switch must guarantee omnipolar separation of the contacts with an opening distance of at least 3mm.To prevent possible interference, differentiate and always keep the power cables (minimum cross-section 1.5 mm²) separate from the signal cables (minimum cross-section 0.5 mm²).Make the connections referring to the following tables and to the attached screen-print. Be extremely careful to connect in series all the devices that are connected to the same N.C. (normally closed) input, and in parallel all the devices that share the same N.O. (normally open) input.Incorrect installation or improper use of the product may compromise system safety.Keep all the materials contained in the packaging away from children since they pose a potential hazard.The manufacturer declines all responsibility for improper functioning of the automated device if the original components and accessories suitable for the specific application are not used.When installation is complete, always carefully check proper functioning of the system and the devices used.This instruction manual addresses professionals qualified to install “live equipment” and therefore requires good technical knowledge and installation in compliance with the regulations in force.Maintenance must be carried out by qualified personnel.Before carrying out any cleaning or maintenance operation, disconnect the control unit from the mains.The control unit described in this document may only be used for the purpose for which it was designed.Check the intended end use and take all the necessary safety precautions.Use of the products for purposes different from the intended use has not been tested by the manufacturer and is therefore on full responsibility of the installer.Mark the automated device with visible warning plates.Warn the user that children or animals should not play or stand near the gate.Appropriately protect the dangerous points (for example, using a sensitive frame).
•
•
••
••
•••••
•••
WARNING: IMPORTANT SAFETY INSTRUCTIONS.It is important to follow these instructions to safeguard persons.Keep this instruction manual.
12
UK
PC200
Description
J4
Terminal
FLASHLIGHT power supply 24 VDC MAX 10W.1
Position Signal
LIT+
FLASHLIGHT power supply 24 VDC MAX 10W.2 LIT-
6 - ELECTRICAL CONNECTIONS: TERMINAL BOARDS
Electric lock power supply 24 VDC.3 LAT+
Electric lock power supply 24 VDC.4 LAT-
Motor 1 +5 M1+
Motor 1 -6 M1-
Motor + 2 7 M2+
Motor 2 -8 M2-
J5
Motor 1 ENCODER +5VDC power supply.9 5V
Motor 1 ENCODER signal.10 S1
Motor 1 ENCODER power and signal common.11 GND
Motor 2 ENCODER +5VDC power supply.12 5V
Motor 2 ENCODER signal.13 S2
Motor 2 ENCODER power and signal common.14 GND
External accessory power supply +12VDC MAX 10W.15 +12V
External accessory power common.16 GND
J3
START input (N.O.)17 DKEY
PEDESTRIAN input (N.O.)18 SKEY
19 GND
Programmable safety device input (N.C.), DEFAULT = PHOTOCELL 120 PHOT1
21
External accessory power and signal common.22 GND
23
24
J7Antenna braid input25 GND
Antenna signal input26 ANTENNA
5 - ELECTRICAL CONNECTIONS: CONNECTORS
Description
J1
Terminal
0 VAC from transformer1
Position
24 VAC from transformer2
J2+ Battery 24V1
- Battery 24V2
External accessory power supply +12VDC MAX 10W.+12V
Programmable safety device input (N.C.), DEFAULT = PHOTOCELL 2PHOT2
+12V External accessory power supply +12VDC MAX 10W.
External accessory power and signal common.
15A TF1
DescriptionPosition Value Type
7 - PROTECTION FUSES
Protects the circuit board
UK
13
PC200
DescriptionDIP StatusFunction
9 - DIP SWITCH SW1
The settings are stored during the rest phase (gate closed).
The default settings are highlighted in the boxes with grey background.
Disables the deceleration function.
DIP 1Enables deceleration during opening and closing.The deceleration speed is adjusted with the DIP switch SW2_6.
ON
DECELERATION
OFF
DIP 2DIP 3
OFFOFF
OFFON
ONOFF
ONON
ANTI-CRUSHING THRESHOLD
Very high sensitivity.
High sensitivity
Medium sensitivity
Low sensitivity
DIP 4DIP 5DIP 6
OFFOFFOFF
PAUSE TIME
Automatic closing disabled.
OFFOFFON
3 seconds.
OFFONOFF
10 seconds.
OFFONON
20 seconds.
ONOFFOFF
40 seconds.
ONOFFON
60 seconds.
ONONOFF
120 seconds.
ONONON
300 seconds.
8- WARNING LEDs
DescriptionPosition Colour Signal
Short flash every second: at rest in one-motor mode. Double flash every second: at rest in two-motor mode. Long flash every second: during time learning. On fixed: gate travel learning procedure not executed or failed.
Comes on when the START or PEDESTRIAN control is activated from the terminal board or the receiver.
Always off. Comes on when the contact of terminal 20 is opened.
LED1
LED2
LED3
RED
RED
RED
-
START-PED
PHOT 1
LED4 RED PHOT 2 Always off. Comes on when the contact of terminal 23 is opened.
LED5 RED Receiver Always off. Comes on when receiving a signal from the receiver.
14
UK
PC200
8 - DIP SWITCH SW1
ONSTEP-BY-STEP WITH STOP
OFFCONDOMINIUM
Operation in response to the START command:
�Gate closed OPENS
�During opening STOPS→�Gate open CLOSES→�During closing STOPS→�After a STOP inverts the motion→
→
Operation in response to the START command:
�Gate closed OPENS
�During opening UNINFLUENTIAL→�Gate open Reloads the automatic closing time if automatic closing →
is enabled, otherwise it closes.
→
DescriptionDIP StatusFunction
DIP 7
DIP 8
Enables pre-flashing of 3 seconds before motor activation during opening and closing.
Disables pre-flashing.
ON
OFF
PRE-FLASHING
10 - DIP SWITCH SW2
The settings are stored during the rest phase (gate closed).
The default settings are highlighted in the boxes with grey background.
DescriptionDIP StatusFunction
Terminal 20 functions as PHOTOCELL 1 input.Terminal 23 functions as PHOTOCELL 2 input.
DIP 1DIP 2
OFFOFF
TERMINALS 20 and 23 PROGRAMMING
Terminal 20 functions as PHOTOCELL 1 input.Terminal 23 functions as N.C. FRAME input.
ONOFF
Terminal 20 functions as PHOTOCELL 1 input.Terminal 23 functions as OPEN input.
OFFON
Terminal 20 functions as N.C. FRAME input.Terminal 23 functions as PHOTOCELL 1 input.
ONON
DIP 3DIP 4
OFFOFF
GATE PHASE SHIFT TIME
Motor 2 delay during opening: 2 seconds.Motor 1 delay during closing: 3 seconds.
ONOFF
Motor 2 delay during opening: 2 seconds.Motor 1 delay during closing: 5 seconds.
OFFON
Motor 2 delay during opening: 3 seconds.Motor 1 delay during closing: 4 seconds.
ONON
Motor 2 delay during opening: 3 seconds.Motor 1 delay during closing: 6 seconds.
UK
15
PC200
10 - DIP SWITCH SW2
DIP 5
DescriptionDIP StatusFunction
WATER HAMMER
Disables the water hammer function.
Enables the water hammer function during opening to help electric lock release.
Operation: at the START command, the following will occur in sequence:- electric lock activation;- closing pulse of 1 sec;- opening;- electric lock release after 2 sec.
ON
OFF
DIP 6
Deceleration speed equal to 50% of the maximum speed.
ONDECELERATION
SPEEDOFF
Deceleration speed equal to 70% of the maximum speed.
DIP 7
ONMOVEMENT
SPEEDOFF
Speed during normal movement equal to 100% of the maximum speed.
Speed during normal movement equal to 70% of the maximum speed.
DIP 8
ON
NUMBER OF MOTORS OFF
System configured for 2 motors.
System configured for 1 motor.
11 - TERMINALS 20 and 23 OPERATING MODE
GATE CLOSED
GATE OPEN
DURING CLOSING
DURING OPENING
GATE STATUS EFFECT
PHOTOCELL 1
-
-
RELOADS THE PAUSE TIME
OPENS
GATE CLOSED
GATE OPEN
DURING CLOSING
DURING OPENING
GATE STATUS EFFECT
PHOTOCELL 2
-
STOPS UNTIL RELEASE, THEN OPENS
RELOADS THE PAUSE TIME
OPENS
16
UK
PC200
13 - ONBOARD RADIO RECEIVER CONTROL
Storing a new transmitter in memory:1- Press and hold down the RF-learn button for 3 seconds.2- LED 5 will come on.3- Press button 1 of the radio control to be stored for 2 seconds.4- LED 5 will flash 3 times and the new radio control is stored.5- LED 5 will stay on for another 10 seconds; during this period, you can store other transmitters, restarting from
step 3.
Clearing the memory:1- Press and hold down the RF-learn button for 10 seconds.2- LED 5 will initially come on and then go off after 10 seconds.3- All the transmitters have now been deleted.
Assigning START and PED commands to the transmitter buttons:Refer to Figure 12.
GATE CLOSED
GATE OPEN
DURING CLOSING
DURING OPENING
GATE STATUS EFFECT
N.C. FRAME
-
-
RELOADS THE PAUSE TIME
STOPS, INVERTS THE MOTION FOR 2 SECONDS, STOPS UNTIL RELEASE, THEN OPENS
GATE CLOSED
GATE OPEN
DURING CLOSING
DURING OPENING
GATE STATUS EFFECT
OPENING DEVICE
-
RELOADS THE PAUSE TIME
OPENS
12 - TERMINALS 20 and 23 OPERATING MODE
STOPS, INVERTS THE MOTION FOR 2 SECONDS, STOPS UNTIL RELEASE, THEN CLOSES
OPENS
UK
17
PC200
DESRCIZIONE MENU ( A ) 15 -TROUBLESHOOTING
The gate does not move after a START command.
�Check that LED3 and LED4 are off; if not, check the devices connected to terminals 20 and 23.
�Check that LED1 is not on fixed; if it is, carry out a new gate travel learning procedure.
�Check fuse F1.�Check that the battery voltage is not below 22VDC.
The transmitter capacity is very low. Check that terminals 25 and 26 are well secured.
The gate does not fully open/close. Check the motor and encoder connections.
DESRCIZIONE MENU ( A ) 14 - GATE TRAVEL LEARNING
If using two motors, the DIP switch SW2_8 must be ON.If using only one motor, it must be connected to the terminals M1 and the DIP switch SW2_8 must be OFF.Intervention of any anti-crushing or START-PED command safety device during the learning phase results in the learning process being interrupted and exited and it will have to be repeated.
�
�
Movements during learning with 1 motor:�Motor 1 closes until meeting the mechanical end-stops on the ground.�Motor 1 opens until meeting the mechanical end-stops on the ground.�Motor 1 closes until meeting the mechanical end-stops on the ground.�End of learning; LED1 will flash briefly once a second.
Learning procedure:Release the operators and move the gates to halfway their travel.
�Lock the operators.�Check that the mechanical opening and closing stops are present on the ground.�Remove any obstacles in the range of action of the automated device.�Check that LED2, LED3, LED4 and LED5 are off.�Press and hold down the SYS-learn button for 3 seconds.�LED1 will start flashing with a long flash once a second.�Press button 1 of the radio control or give a START pulse from the terminal board.
Movements during learning with 2 motors:Motor 2 closes until meeting the mechanical end-stops on the ground.
�Motor 1 closes until meeting the mechanical end-stops on the ground.�Motor 1 opens until meeting the mechanical end-stops on the ground.�Motor 2 opens until meeting the mechanical end-stops on the ground.�Motor 2 closes until meeting the mechanical end-stops on the ground.�Motor 1 closes until meeting the mechanical end-stops on the ground.�End of learning; LED1 will flash twice a second.
18
UK
PC200
EC Declaration of conformityThe manufacturer:
GI.BI.DI.
Via Abetone Brennero, 177/B,46025 Poggio Rusco (MN) ITALY
Declares that the product:PC200 ELECTRONIC CONTROL UNIT
is in conformity with the following EEC Directives:
•
and that the following harmonised standards have been applied:
•
•
Date 26/05/14
S.r.l.
LVD Directive 2006/95/EC and subsequent amendments
• EMC Directive 2004/108/EC and subsequent amendments
EN60335-1,
EN61000-6-2, EN61000-6-3 Legal Representative
Michele Prandi
UK
19
GI.BI.DI. S.r.l.
46025 Poggio Rusco (MN) - ITALY
Tel. +39.0386.52.20.11
Fax +39.0386.52.20.31
E-mail: [email protected]
Numero Verde: 800.290156
Via Abetone Brennero, 177/B
w w w . g i b i d i . c o m
Co
d. A
IC8
79
2 -
06
/20
14
- R
ev.
00