AIMS Coordinators Meeting WaterOne 09/09/10. Agenda. Current GIS Efforts and Issues GIS Usage and Analysis Geodatabase redesign Geodatabase for Water Treatment Plant Facilities GPS Collection Workflow ArcGIS Server and Mobile data collection. Budget Issues. - PowerPoint PPT PresentationTRANSCRIPT
AIMS Coordinators MeetingWaterOne
09/09/10
Agenda Current GIS Efforts and Issues GIS Usage and Analysis Geodatabase redesign Geodatabase for Water Treatment Plant Facilities GPS Collection Workflow ArcGIS Server and Mobile data collection
Budget Issues Third year in a row with revenues below
projections This years water revenues 9% less than projected Irrigation usage is down, but weather is not the
only factor Customer usage is more conservative Primarily impacts capital projects and vacant
positions
GIS Efforts and Issues Success of ArcGIS Engine application in the field Replace ArcIMS with ArcGIS Server applications Enterprise communication of field work Continue GPS efforts Non-GIS related projects
Laboratory Information Management Systems (LIMS) Chemical Pump Calibration Project
Major SAP upgrade and GIS integration
Geodatabase Redesign Project Review domain values for validity and accuracy Use meaningful codes for domain values rather
than meaningless numbers Eliminate redundant and unnecessary data Create new datasets and feature classes Reduce usage of annotation where it creates
problems and use anno more efficiently where it is needed
Annotation Issues
GIS Analysis for LIMS Laboratory Information Management System
Control workflow and documentation of test procedures
Ensure safe drinking water through regulatory requirements
Safe Drinking Water Act Kansas Department of Health and Environment
Total Coliform Rule (TCR) Lead Copper Rule (LCR)
Water Taste & Odor monitoring
Total Coliform Rule (TCR) Requires 210 water samples per month Divide the water system into zones for collecting
samples Select sampling locations from each zone Current selection is in adequate GIS provides a better tool to select good cross
section of sample sites
Lead Copper Rule (LCR) Requires 100 water samples every 6 months From single family dwellings built between Jan 1,
1983 & Dec 31, 1987 Identify qualified addresses using AIMS data GIS provides a tool to select sample sites
geographically throughout our service area
Water Taste & Odor Complaints