aip presentation 2009

19
AIP Pistons 2O09 1 1 Abilities India Piston & Rings Ltd.

Upload: chintan-acharya

Post on 31-Mar-2015

96 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

11

Abilities India Piston & Rings Ltd.

Page 2: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

22

Abilities India Piston & Rings Ltd.

Page 3: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

Abilities India Pistons & Rings Limited -- a renowned name in Piston manufacturing Established IN YEAR 1966 by Mr. R.S.Arora . Converted into a limited company in 1995 & no. of employees is 160 .

(USP) - Six Sigma Black Belt Holder

- Quality Circles In All Departments

- 5S, POKA YOKE & Kaizen part of

daily activities

- Dispensary for employees

- Canteen started for all employees

- R.O. Plant installed for drinking water

Abilities India Piston & Rings Ltd.

Page 4: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

Advantages

TECHNOLOGY We have developed here at Abilities the technology/ expertise for

manufacturing Pistons for chain saws and 2 stroke engines, right from raw material to finished product ensuring Higher Level of Quality and durability.

• Large Area 20,000 Sq Meters. • Proximity To Dry Port 3 Kms.• Well Trained Staff & Skilled Labour • 3D CAD (Pro Engineer)• 3D CAD Pro E Second Seat + TDO + Prismatic Milling • Uni-graphics one seat CAD +CAM• Well Equipped in House Tool Room including VMC from Mazak Japan• In House Development of Cam Profile (Master Cam)

Page 5: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

5

Year 1982- Started OEM supplies to Enfield (Now Greaves )

1982- Started OEM supplies (TVS Motor Company)

1995- Converted into Limited Company

1996- Started production of Piston Rings

1998- Acquired ISO 9002 Certification

2000- 1st Export to OEM Supplies

2004- Acquired ISO/TS 16949 certification

2005- Joined ACMA UNIDO Cluster program

2007- Business model changed to OEM supplier from predominantly an after market company

2007- Joined ACMA ACT Advance cluster program

2008- Received Export Excellence silver trophy from EEPC of India

2008- Joined Tifac for E-Foundry project

2008- Won ACMA Productivity & Quality award Bronze trophy

2008- Received Export Excellence Silver trophy from ACMA

2009- Achieved Export House certification from Govt. of India

2009- Received Export Excellence silver trophy from EEPC of India

2009- Achieved Gold trophy from ACMA for Excellence in Quality & Productivity

2009- Achieved Gold trophy from ACMA for Excellence in Export

Key Mile Stone

Page 6: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

6

Key Products / Product Families

Pistons & Piston rings

Page 7: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

7

Proud Achievements

ACMA Awards EEPC Awards

QCC & TS16949 Certificate

Export House

Page 8: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

8

Production Set Up

Vertical M/C Centre – MAZAK

Machine Shop Line Machinning

Ultra Sonic Cleaning Machine Pressure Die Casting

Ring Machine Shop

Page 9: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

9

Production Set Up

CNC Piston Machining

Honing Machine Piston Ring DD Grinding Machine Piston Ring

CNC Barrel Turning Piston Ring

Page 10: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

10

Image Analyzer Spectrometer

Surface Roughness Tester Roundness Tester

Current Testing Facilities

Page 11: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

11

Profile Projector CMM

Current Testing Facilities

Vision Inspection Systems

Page 12: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

12

- Started from UNIDO program

- Joined ACMA – ACT Advance Cluster Program

under the guidance of

Chief Mentor Mr. C. Narasimhan

from TVS group & Our Counselor

Mr. Rakesh Gupta

Transformation Journey

Page 13: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

13

ACMA Advance Cluster Road Map

We are part of ACMA ADVANCE CLUSTER program toupgrade our facilities to BEST IN CLASS standards.

Time in Months 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

1. Kaizen 2. QCC 3. 7 QC Tools 4. QC Story 5. 7 Management tools 6. Talent Development

30

th M

ay

'09

Month

1s

t J

un

'07

Ju

l'0

7

Au

g'0

7

Se

p'0

7

Oc

t'0

7

No

v'0

7

De

c'0

7

Ja

n'0

8

Fe

b'0

8

Ma

r'0

8

Ap

r'0

8

Ma

y'0

8

Ju

n'0

8

Ju

l'0

8

Ja

n'0

9

Fe

b'0

9

Ma

r'0

9

Ap

r'0

9

Se

p'0

8

Oc

t'0

8

No

v'0

8

De

c'0

8

Au

g'0

8

Deliverables

VAPCO VAR

Road map for Advance Cluster

Lead time ITR Process Stability - Quantity - Quality Customer Quality - PPM OEE / OLE / OPE Cost Losses

Cellular Manufacturing

(Productivity Culture )

Integrated Flow Manufacturing (Business Result Culture )

1. Concept of Cell design & Implementation 1.1 SMED (Integrate to SPF ) 1.2 LCA ( Integrate to operator fatigue / Stresses 1.3 Integrated Quality Control ( Poka-yoke , Vision Control ) 2 .Equipment Maintenance 2.1 Implement step 1, 2 ,3 & Practice 2.2 Preventive maintenance - Implement and Practice 2.3 Organisation / Management 2.4 Cost loss analysis 3. FIFO 3.1 First IN First Produced ( Integrate to quality traceability ) 3.2 Production planning & control

1. Value adding management , concepts design and Implementation 1.1 Implementation of 14 steps 1.2 Production balancing and leveling 2. Integrated cellular manufacturing - Implementation and Practice

Audit Score PQC Improvement

Total Employee Involvement Satisfaction Score Participation Kaizen / QCC

TEI (Continuous Improvement

culture through TEI )

Advance 5 S (Sustenance culture through Discipline)

1. Institutionalize all 5 S Basics 2. 6 M concept design & implementation 3. Holding gains and Corrective actions

Page 14: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

14

Training Session

Safety Audits and NC

7

28

24

9

25

39

11

41

21

7

18

10

7

28

23

9

25

38

11

41

20

6

18

10

0

5

10

15

20

25

30

35

40

45

1 2 3+4 5 6 7 8 9 10 11 7-A 11-A

Number

Cum.NC Identified

Cum.NC removed

Information Centre

K aiz en / E m ployee / m onth

1.92

2.02

3.00

0

11

22

33

4

B efore (J an' 09) After May' 09) Target (D ec' 09)

Better

Family Day Photo Safety Audit

KaizenDispensary for employees

Page 15: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

15

KaizensCompany MM/YY Sl.No.

Kaizen Theme :

Problem/Present Status: Before Improvement:

Real Root Cause Identification:After Improvement:

Result/Benefit:

How many places this Kaizen can been deployed horizontally:

Root cause

Idea to eliminate root cause

Action taken

Implemented Area: Machine shop

Implemented By: Mr.Bipin Yadav

1

Standardization :

Training material do not ignite trainee mind

Animate training material

A animated repetitive virtual training created Which stimulates trainee mind

Training SOP changedAudit frequency: Every 15 days

To Improve training effectiveness on roundness Testing machine

Training effectiveness was not up to mark

20%

0.00%

10.00%

20.00%

30.00%

40.00%

MarksMar

ks o

btai

ned

in

Tra

inin

g P

ost t

est

Training was less effective

Training was not grasped by trainee

Training material do not ignite trainee mind

Increased Min Marks Avg=(35-20) = 15%

Abilities India pistons & ring limited 09/08

For spectrometer & image AnalyzerTarget by 28Oct-08

20%

35%

0.00%

10.00%

20.00%

30.00%

40.00%

Before AfterMar

ks o

btai

ned

in

Tra

inin

g P

ost t

est

Q C S M ENV ITD ENGP

AIP PRESENTATION 09 LCA MOVIE\ROUNDNESS TRAINING MODULES FOR CENTERING.pps

AIP PRESENTATION 09 LCA MOVIE\Roundness Training Material.jpg

Page 16: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

16

Best Practices

LCA MOVIE BEFOR

E

LCA MOVIE AFTER

Low Cost Automation

No of Trials / Parts 1 2 3 4 5 6 7 8 9 10

1 1.45 1.49 1.46 1.41 1.47 1.39 1.37 1.38 1.48 1.43 Repeatability ( Equipment Variation)

2 1.46 1.48 1.46 1.42 1.47 1.39 1.38 1.38 1.47 1.43 EV = R double bar * K1

3 1.46 1.49 1.46 1.42 1.48 1.39 1.38 1.38 1.47 1.43 Reproducability ( Appraiser Variation)

Avg. Xa 1.457 1.487 1.460 1.417 1.473 1.390 1.377 1.380 1.473 1.430 AV(X diff * K2)² -(EV² / nr)}

Range Ra 0.010 0.010 0.000 0.010 0.010 0.000 0.010 0.000 0.010 0.000 Repeatability & Reproducability (R&R)

No of Trials / Parts 1 2 3 4 5 6 7 8 9 10 R & R (EV² + AV² )

1 1.45 1.49 1.46 1.41 1.47 1.39 1.38 1.38 1.48 1.44 Part Variation ( PV )

2 1.46 1.50 1.46 1.41 1.46 1.38 1.38 1.39 1.48 1.44 Pv = Rp X K3

3 1.45 1.50 1.46 1.41 1.47 1.38 1.38 1.39 1.48 1.44 Total Varaiation ( TV )

Average Xb 1.453 1.497 1.460 1.410 1.467 1.383 1.380 1.387 1.480 1.440 TV (R&R² + PV² )

Range Rb 0.010 0.010 0.000 0.000 0.010 0.010 0.000 0.010 0.000 0.000 % Equipment Variation ( EV )

No of Trials / Parts 1 2 3 4 5 6 7 8 9 10 % EV = ( EV / TV ) *100

1 1.46 1.49 1.45 1.41 1.47 1.39 1.38 1.38 1.48 1.43 % Appraiser Variation ( AV )

2 1.46 1.48 1.46 1.41 1.47 1.39 1.37 1.39 1.48 1.43 % AV = ( AV / TV ) *100

3 1.46 1.49 1.45 1.41 1.47 1.39 1.38 1.38 1.48 1.44 % Repeatability & Reproducability (R&R)

Average Xc 1.460 1.487 1.453 1.410 1.470 1.390 1.377 1.383 1.480 1.433 % R & R = ( R & R / TV ) *100

Range Rc 0.000 0.010 0.010 0.000 0.000 0.000 0.010 0.010 0.000 0.010 % Part Variation ( PV )

% PV = ( PV / TV ) * 100

X D.Bar= 1.4348 No. of Distinct Data CategoriesRp = 0.1122 ndc = 1.41 (PV / GRR)

Repeatability & Reproducability (R&R)

w.r.t Total Tolerance

A2 D3 D4 K1 K2 K3

1.023 0 2.58 0.5908 0.5231 0.3146

Analysis of Results :

Condition 1 : % GRR < 10 Acceptable Results Accepted

10 < % GRR < 30 Conditionally acceptable (if % GRR w.r.t Total tolerance is less)% GRR > 30 Not acceptable

Condition 2 : The number of out of control points in Average chart should be more than 50 % to ensure part-to-part variation Results Accepted

Condition 3 : No out of control points in the Range Chart Results Accepted

Condition 4 : The number of distinct data categories (ndc) should be greater than or equal to 5 Results Accepted

Conclusion & Remarks :

Prepared By Approved By

F/ QA/ 16

GAUGE REPEATABILITY & REPRODUCABILITY STUDY

A

P

P

R

A

I

S

E

R

RA

JN

ARA

YA

N

1.4340

1.4340

1.4350

1.4343

0.0050

RESULTS / EVALUATION

Trials / Appraisers r = n =

3 Trials 3 Appraisers Number of Parts Number of Trials

+0.10

Average

Part Average

1.4360

1.4357

0.0050

1.490 1.458 1.412 1.470

DEVEN

DER

Perf ormed By

Date

Record Number

Part Name

Gauge / Equipment Name

Gauge / Equip. Least Count

PI STON

BALL MI CROMETER

RADI AL THI CKNESS

-0.00

0.10

DATA COLLECTI ON

0.01mm

Upper Control Limit

Lower Control Limit

Tolerance

0.0013

1.478

Part Number

Gauge/ Equip. No.

Characteristics

OM-2930; Ø34MM

9M2

DHI RMENDRA

December-05

4

0.0138

1.4330

1.4340

1.4360

1.4343

0.0060

1.4350

R D.bar= {(Ra+Rb+Rc)} / 3

X Diff ={ Max X - Min X } 1.429

UCLx = {X D.bar + (A2 * R)}

LCLx = {X D.bar - (A2 * R)}

1.440

0

UCLr = R D.bar X D4

LCLr = R D.bar X D3

0.0053

LA

XM

AN

1.4360

1.457 1.388 1.378 1.383 1.434

Preventive Maintenance Gauge R & R , Calibration

Nov' 08

Dec' 08

Jan ' 09

Nov' 08

Dec' 08

Jan ' 09

Nov' 08

Dec' 08

Jan ' 09

Nov' 08

Dec' 08

Jan ' 09

Nov' 08

Dec' 08

Jan ' 09

Nov' 08

Dec' 08

Jan ' 09

1Casting machine

24 27 19 41 40 19

2 PISTON M/C SHOP Line no.

1 to 5

32 37 35 37 40 28

3Face grinders(

rings)

32 26 24 26 21

4 Cam turning 31 28 32 32 32 15

5 Boring 29 27 30 32 34 15

6Notch

grinding/milling 30 32 34 32 28 15

7 Honing 4 3 2 5 4 4

MachineSr.No.

Total DiesLess than 5

Minutes>=5 Minutes <

10 Minutes>=10 Minutes <

30 Minutes>=30 Minutes

< 1 Hour

No of dies

>=1 hour Minutes < 2

Hours

SMED Matrix

Standard Operating Procedure Example of Cp & Cpk Calculation POKA – YOKE Station

PO387 10 mm

GP Boring GP BORE DIA

FB2 20-Jan-09

x1 x2 x3 x` R x`` R` UCLA1 LCLA1 USL LSL SIGMA T Z1 Z2 CPK CP

9.9975 9.9970 9.9985 9.9977 0.0015 9.997607 0.001 9.998463 9.996749867 10 9.995 0.000497 0.005 4.815 5.244 1.61 1.68

9.9965 9.9965 9.9965 9.9965 0.00009.9970 9.9980 9.9970 9.9973 0.0010

9.9970 9.9990 9.9980 9.9980 0.00209.9985 9.9985 9.9995 9.9988 0.0010 Frequencies9.9980 9.9970 9.9975 9.9975 0.0010 9.9950- 9.9960 3.00009.9975 9.9975 9.9975 9.9975 0.0000 9.9960- 9.9965 9.00009.9975 9.9985 9.9990 9.9983 0.0015 9.9965- 9.9970 12.00009.9975 9.9985 9.9975 9.9978 0.0010 9.9970- 9.9975 26.00009.9980 9.9975 9.9970 9.9975 0.0010 9.9975- 9.9980 12.00009.9965 9.9965 9.9965 9.9965 0.0000 9.9980- 9.9985 8.00009.9980 9.9975 9.9965 9.9973 0.0015 9.9985- 9.9990 3.0000

9.9975 9.9975 9.9975 9.9975 0.0000 9.9990- 9.9995 2.0000

9.9965 9.9970 9.9975 9.9970 0.0010

9.9975 9.9975 9.9975 9.9975 0.0000

9.9975 9.9975 9.9975 9.9975 0.0000

9.9970 9.9970 9.9970 9.9970 0.0000

9.9985 9.9975 9.9990 9.9983 0.0015

9.9980 9.9975 9.9975 9.9977 0.0005

9.9990 9.9980 9.9995 9.9988 0.0015

9.9985 9.9980 9.9980 9.9982 0.0005

9.9975 9.9980 9.9975 9.9977 0.0005

9.9975 9.9980 9.9985 9.9980 0.0010

9.9980 9.9970 9.9970 9.9973 0.0010

9.9980 9.9965 9.9960 9.9968 0.0020 REMARK: DIA OF GP BORE OF PISTON x' AVG DIA OF GP BORE OF PISTON

ALL READINGS IN MM R Range

x1 ; x2 ; x3

NAME OF PARA METER :

Cp & Cpk Values

Class -IntervalNORMALANCY TEST

M/C NO

OPTIMUM SIZE

DATE

PISTON REF NO -OPERATION -

Freuency Distribution in Class -interval

0.00005.0000

10.000015.000020.000025.000030.0000

9.996

09.9

965

9.997

09.9

975

9.998

09.9

985

9.999

09.9

995

Class Inter val

Freq

uenc

y

Series2

Series1

Page 17: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

17

Best Practices

The Following Are The Areas Where We Are Working To Improve Our Competitiveness.

Aligning with customer varying demand using the tools like:- Takt Time

- Value Stream Mapping

- Production Leveling & Balancing

To Identify & Eliminate The Waste We Use- Process Mapping

- Low Cost Automation

- Operating Ratio.

- Cycle Time Study By Video Graphy

- Standard Work Combination

- Standard Operating Procedures

- CLITA Standard

Page 18: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

18

Quality Tools Used

VAR :- Before = 0.76 After = 11.95

Standardised Work Combination table REV 03

Product : PO414 Machine : LINE # 2 Required output/ day : 2000 Manual

Process : MACHINING DATE: 15 th JAN08 Department: MACHINE SHOP Takt Time : 37 Auto

1 2 3 4 5 6 7 8 910

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

1 Rough turning 7 15 222 Center bore drilling 4 43 Locating seat 5 14 194 Size turning and ring grooving & HF 6 15 215 06 Lock pin drilling, fitting & pressing 30 3078 Rough boring 10 21 319 Fine boring 11 23 34

1011 Circlip grooving 23 2312 Bore chamfer 5 5 101314 Bore burnishing 10 1015 Boss facing 6 29 3516 IBC 8 8

17 018 Oval turning 15 21 3619 PORT FILE 7 7202122 031

Step

Man

ual Time in Seconds

Auto

Tota

lCLICK HERE FOR DETAILS

Value Stream Mapping Standard Work Combination

Process Mapping

Page 19: AIP Presentation 2009

© A

IP P

isto

ns 2

O09

1919

Thank you for your attention

Abillities India Piston & Rings Ltd.

Plot No. 3, F-301, IIIrd Floor

Ashish Complex, Local Shopping Centre,

New Rajdhani Enclave Vikash Marg,

Delhi-110 092 (INDIA)Phones: 0091-11-22059744Telefax: 0091-11-22059755E-mail : [email protected]

www. aippistons.com