air traffic regulation office (atro) april.2012 caac ads-b implementation introduction
TRANSCRIPT
![Page 1: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/1.jpg)
Air Traffic Regulation Office (ATRO)April.2012
CAAC ADS-B Implementation Introduction
![Page 2: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/2.jpg)
Contents
1.CAAC ADS-B Implementation Preliminary Work
2.CAAC Next Phase Work
3. “ADS-B General Plan and Implementation of CAAC” release schedules
![Page 3: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/3.jpg)
Preliminary Work — Policy, Specification and Standards
2010,CAAC ATRO Published CAAC Surveillance Technology
Implementation Policy (AC-115-TM-2010-01),Includes ADS-B
Application Strategy.
2011,CAAC ATRO and ATMB Published ADS-B ATC Operation
Specification (AC-93-TM-2011-01)
2012,CAAC ATRO finished ADS-B 1090MHz ES Ground
Station(Receive) Technology Specification
![Page 4: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/4.jpg)
2008,CAAC Flight Standards Department Published ADS-B
Flight Operation(IB-FS-2008-002 )
2010,CAAC Aircraft Airworthiness and Flight Standards
Department Published Airworthiness and Operational Approval of
ADS-B Application in non-radar areas via 1090MHz
ES(AC-91-FS/AA-2010-14)
Preliminary Work — Policy, Specification and Standards
![Page 5: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/5.jpg)
2010, CAAC Aircraft Airworthiness Published ADS-B and TIS-B
Airborne Equipment Standards (CTSO-C166b)
2011, ATMB Began to Preparation of ADS-B Implementation
Road Map.
Preliminary Work — Policy, Specification and Standards
![Page 6: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/6.jpg)
Feb.2012 , CAAC ATRO Authorize TEDC.CO.LTD ADS-B Ground Station Lisence
Preliminary Work — ADS-B Equipment Certification
![Page 7: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/7.jpg)
Oct.2009 , ATMB ChengDu—JiuZhai Route Archive to ADS-B
surveillance coverage, including 2 ADS-B Ground Station.
Preliminary Work — ADS-B Route Surveillance Verification
![Page 8: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/8.jpg)
May, 2011, ChengDu—LaSha Route ADS-B began Trail
Operation , including 6 Ground Station.
Preliminary Work — ADS-B Application and Trail Operation
![Page 9: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/9.jpg)
July.2011,Z1 route archive to ADS-B
aurveillance coverage, ATMB is in charge of
ADS-B trail operation, CAACSRI responsble for
the whole project build.The project includes six
ADS-B ground station
Preliminary Work — ADS-B Route Surveillance Application
![Page 10: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/10.jpg)
Aug.2011 , ADS-B Application Seminar held in
ChengDu CAAC decides on ADS-B data link:
Transport Aviation: 1090MHz ES data link
General Aviation:1090MHz ES data link
Preliminary Work — ADS-B Application Seminar
![Page 11: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/11.jpg)
Contents
1.CAAC ADS-B Implementation Preliminary Work
2.CAAC Next Phase Work
3. “ADS-B General Plan and Implementation of CAAC” release schedules
![Page 12: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/12.jpg)
CAAC ADS-B Next Phase Work
Preparation of CAAC ADS-B Overall Planning and implementation of program
Standards, specifications and supporting polices of ADS-B application formulation and amendment.
ADS-B application problem research, includes: ADS-B anti-spoof and jamming studying ADS-B signal mixed fruit studying Compass2 integrity impacts on ADS-B Data Fusion of ads-b and other surveillance source
![Page 13: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/13.jpg)
Launch a series of ADS-B technology and function application verification projects, such as:
air-air surveillance application based on ADS-B IN function. includes Commercial and General Aviation
ADS-B ground station TIS-B/FIS-B function application verification.
ADS-B airborne equipment application verification based on GNSS(GPS + Compass2)
CAAC ADS-B Next Phase Work
![Page 14: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/14.jpg)
Contents
1.CAAC ADS-B Implementation Preliminary Work
2.CAAC Next Phase Work
3. “ADS-B General Plan and Implementation of CAAC” release schedules
![Page 15: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/15.jpg)
CAAC ADS-B Implement Office & Work Group
Feb.2012,CAAC ADS-B implement office & workgroup
established. The Organization includes members of unit:
CAAC Flight Standards Department
CAAC Aircraft Airworthiness
CAAC Air Traffic Regulation Office (ATRO)
CAAC Air Traffic Management Bureau (ATMB)
The Second Research Institute of CAAC(CAACSRI)
![Page 16: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/16.jpg)
ADS-B Implementation Task Division of CAAC department
ATRO and CAACSRI responsible for preparation of “ADS-B
General Plan and implementation solution of CAAC”
CAAC Flight Standards Department responsible for formulating
airborne equipment updating plan and flight crew training
CAAC Aircraft Airworthiness and Flight Standards Department
responsible for ADS-B airborne equipment airworthiness certification
![Page 17: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/17.jpg)
ATRO responsible for the promulgation of the ADS-
B ground station standard and ADS-B ground station equipment
certification
ATMB excutes CAAC ADS-B implement program and
responsible for preparation of the specification of ATC operation,
equipment operation and staff training.
Task Division of CAAC department in ADS-B implement
![Page 18: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/18.jpg)
May.2012 Complement the draft of “ADS-B General Plan and
Implementation Solution of CAAC”.
June.2012 Submit to the ADS-B Implement office the
comments edition of “ADS-B General Plan and Implementation
Solution of CAAC”.
July.2012 CAAC authority release official version.
Release Schedules
![Page 19: Air Traffic Regulation Office (ATRO) April.2012 CAAC ADS-B Implementation Introduction](https://reader036.vdocument.in/reader036/viewer/2022062404/551548e25503465e608b638b/html5/thumbnails/19.jpg)
Thanks!