air/ground atn implementation status · 2013. 3. 20. · petal iie project overview petal = p...

31
ATNSI, ATN Seminar 1 Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December 2001 - Mike Murphy Mike Murphy ATN Systems, Inc. (ATNSI) ATN Systems, Inc. (ATNSI) 703 703 - - 412 412 - - 2900, [email protected] 2900, [email protected]

Upload: others

Post on 04-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 1

Air/Ground ATN Implementation StatusATN Seminar, Chiang Mai

- 11/14 December 2001 -

Mike MurphyMike MurphyATN Systems, Inc. (ATNSI)ATN Systems, Inc. (ATNSI)

703703--412412--2900, [email protected], [email protected]

Page 2: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 2

Presentation Overview

�� An Approach to Defining CPDLC/ATN BenefitsAn Approach to Defining CPDLC/ATN Benefits�� Air/Ground CPDLC/ATN Implementation StatusAir/Ground CPDLC/ATN Implementation Status

�� EUROCONTROL PETAL IIE ProjectEUROCONTROL PETAL IIE Project�� FAA CPDLC ProgramsFAA CPDLC Programs�� Airline/Avionics ProgramsAirline/Avionics Programs

�� Next Steps/Future InitiativesNext Steps/Future Initiatives�� RTCA CPDLC Benefits ActivityRTCA CPDLC Benefits Activity�� FANS 1/A AccommodationFANS 1/A Accommodation�� Security InitiativesSecurity Initiatives

�� ConclusionsConclusions

Page 3: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 3

ATN Infrastructure Upgrade

ACARSInfrastructure

ATNInfrastructure

Applications Operational, andAdministrative

Services and initialAir Traffic Services

Expanded AirTraffic, Operational,Administrative, andPassenger Services

Network ACARS ATN

Sub-Networks CharacterOriented

BitOriented

Page 4: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 4

Air/Ground ATN Infrastructure

Air/Ground SubnetworksVHF

SatelliteHF

Public/PrivateGround Networks FAA/

CAAs

Aircraft

ATN= ATN

Components

ATN

ATN

ATN ATN

ATN

Airlines/OtherUsers

Page 5: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 5

ATN - Why Invest

�� Only Alternative for Only Alternative for StrategicStrategic, Common, World, Common, World--Wide Data Communication Wide Data Communication Infrastructure Upgrade for the Aeronautical IndustryInfrastructure Upgrade for the Aeronautical Industry

�� Enables Common Systems to accommodate Air Traffic Services, OperEnables Common Systems to accommodate Air Traffic Services, Operational ational and Administrative Services, and Passenger Services (possibly)and Administrative Services, and Passenger Services (possibly)

�� Facilitates Reduction in Development/Operational CostsFacilitates Reduction in Development/Operational Costs�� Creates Larger Market facilitating reduced “per unit” PricingCreates Larger Market facilitating reduced “per unit” Pricing�� Facilitates System Development Vendor Competition by basing Facilitates System Development Vendor Competition by basing

Requirements on Open StandardsRequirements on Open Standards�� Facilitates “Real Time” Data Communication Service Provider Facilitates “Real Time” Data Communication Service Provider

Competition for Ground/Ground and Air/Ground Operational ServiceCompetition for Ground/Ground and Air/Ground Operational Servicess�� Supports Contract Requirements based on Required Communication Supports Contract Requirements based on Required Communication

Performance (RCP)Performance (RCP)�� Future Proof Future Proof -- Enables integration of emerging “bitEnables integration of emerging “bit--oriented” Data oriented” Data

Communication SubnetworksCommunication Subnetworks

Page 6: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 6

ATN - Impact of No Investment

�� Industry (CAAs and Airspace Users, Including Airlines)Industry (CAAs and Airspace Users, Including Airlines)�� Loss of Opportunity to Baseline System Automation Upgrades Loss of Opportunity to Baseline System Automation Upgrades

against Data Communication Infrastructureagainst Data Communication Infrastructure�� Delay in Realization of Improved Air Traffic Services Delay in Realization of Improved Air Traffic Services

�� Exposure to NonExposure to Non--Compliant RequirementsCompliant Requirements�� Increase in Development Costs and Operational Service CostsIncrease in Development Costs and Operational Service Costs�� Negative Impact on Utility of Common Systems for WorldNegative Impact on Utility of Common Systems for World--Wide Wide

OperationsOperations

�� Delay in Realization of Benefits based on User EquipageDelay in Realization of Benefits based on User Equipage�� AirlinesAirlines

�� Missed “Window of Opportunity” for Updated Avionics on Missed “Window of Opportunity” for Updated Avionics on New Aircraft OrdersNew Aircraft Orders

Page 7: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 7

ATN - Investment Perspective

�� The Data Communication Infrastructure is a The Data Communication Infrastructure is a LongLong--Term InvestmentTerm Investment

�� Industry MUST agree on a Common Data Industry MUST agree on a Common Data Communication Infrastructure Upgrade PathCommunication Infrastructure Upgrade Path

�� The ATN is on the Upgrade PathThe ATN is on the Upgrade Path�� Decisions as to “When” to Equip with ATN will Decisions as to “When” to Equip with ATN will

be based on Internal Economic Analysesbe based on Internal Economic Analyses

Page 8: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 8

Air/Ground ATN Application Services

�� Air Traffic Control (ATC) ServicesAir Traffic Control (ATC) Services�� Controller Pilot Data Link Communications (CPDLC)Controller Pilot Data Link Communications (CPDLC)�� Automatic Dependant Surveillance (ADS)Automatic Dependant Surveillance (ADS)�� Flight Information Services (FIS)Flight Information Services (FIS)�� Context Management (CMA)Context Management (CMA)

�� Other Potential ServicesOther Potential Services�� Aeronautical Operational Control (AOC)Aeronautical Operational Control (AOC)�� Aeronautical Administrative Communication (AAC)Aeronautical Administrative Communication (AAC)�� Aeronautical Passenger Communications (APC)Aeronautical Passenger Communications (APC)

Page 9: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 9

ATC Service Benefits

OperationalImprovements

ServiceImprovements

SafetyBenefits

Direct CostAvoidance

Indirect CostAvoidance

OpportunityCost Avoidance

• Increased Capacity• Operational Efficiencies

(e.g. Delay Reduction,Reduced Restrictions)

• Improved Service Availability

• Operational Predictability• Bank Integrity

• Reduced Comm Errors• Additional Comm

Mechanisms• Improved Information

Flow

Loss of access to Service Benefitsbecause of delay in Service Implementation

Page 10: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 10

First Step: Controller Communications Workload

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

50%

Strip Mgmt Ext Coord Int Coord Conf Srch R/T Rdr Coord Rdr Super Rdr Interv

"SYSCO" Approximate Controller Workload Distribution

Page 11: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 11

Problem: Voice Congestion

Page 12: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 12

Solution: Data Communications

Page 13: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 13

Example: FAA Study

FL230

FL29011,000 ft

FL350 FL350

TRACON

EN ROUTEARTCC

Arrival Sector

FL290

FL240

Departure Sector

Page 14: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 14

FAA Study: Reduction in Holding

Problem Solution

Page 15: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 15

FAA Study: Radio Occupation Time

Page 16: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 16

Air/Ground ATN Implementation Status

ATNNetwork

Page 17: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 17

Air/Ground ATN Implementation Programs

2001 2003 2005 2007 2009

EUROCONTROLPETAL IIE Project

FAA CPDLCBuild 1/1A Programs

FAA CPDLC Build 2 Programand

Link 2000+ Initiatives

Page 18: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 18

PETAL IIE Project Overview

�� PETAL = PETAL = PPreliminary reliminary EEurocontrol urocontrol TTest of est of AAir/Ground Data ir/Ground Data LLinkink�� PETAL IIE = Extension of PETAL Project to include ATN OperationsPETAL IIE = Extension of PETAL Project to include ATN Operations

�� Single Site: Maastricht Upper Area Control CentreSingle Site: Maastricht Upper Area Control Centre�� Operational ServicesOperational Services

�� Transfer of Voice Communication, Initial Contact, Altimeter SettTransfer of Voice Communication, Initial Contact, Altimeter Setting ing �� Clearances and Requests: Flight Level, Route and Heading, SpeedClearances and Requests: Flight Level, Route and Heading, Speed�� “Passive” Requests (e.g. Preferred Level, Top of Descent)“Passive” Requests (e.g. Preferred Level, Top of Descent)

�� Uses VDL Mode 2 as Air/Ground SubnetworkUses VDL Mode 2 as Air/Ground Subnetwork�� American Airlines is the Launch AirlineAmerican Airlines is the Launch Airline

www.eurocontrol.be/projects/eatchip/petal2/

Page 19: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 19

PETAL IIE Overview

Status:- MISSION COMPLETE- PETAL II Link Bridge Project (P2L)

to start in January 2002

Page 20: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 20

FAA CPDLC Build 1 Overview

�� Single Site: Miami Air Route Traffic Control CenterSingle Site: Miami Air Route Traffic Control Center�� Provides 4 Operational ServicesProvides 4 Operational Services

�� Transfer of Voice Communication Transfer of Voice Communication �� Initial Contact Initial Contact �� Altimeter Setting Altimeter Setting �� Informational Free Text (menu capability built by supervisor inpInformational Free Text (menu capability built by supervisor inputs)uts)

�� Uses VDL Mode 2 as Air/Ground SubnetworkUses VDL Mode 2 as Air/Ground Subnetwork�� American Airlines is the Launch AirlineAmerican Airlines is the Launch Airline

www.adl.tc.faa.gov

Page 21: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 21

FAA CPDLC Build 1A Overview

�� National Deployment: All Air Route Traffic Control CentersNational Deployment: All Air Route Traffic Control Centers�� Provides Additional Operational ServicesProvides Additional Operational Services

�� Larger Message Set accommodating assignment of Speeds, Headings,Larger Message Set accommodating assignment of Speeds, Headings, and and Altitudes Altitudes

�� Includes Route Clearance FunctionIncludes Route Clearance Function�� Capability to accommodate PilotCapability to accommodate Pilot--Initiated Altitude Requests Initiated Altitude Requests

�� Uses VDL Mode 2 as Air/Ground SubnetworkUses VDL Mode 2 as Air/Ground Subnetwork�� American Airlines is the Launch AirlineAmerican Airlines is the Launch Airline�� Widespread Industry Participation is AnticipatedWidespread Industry Participation is Anticipated

www.adl.tc.faa.gov

Page 22: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 22

FAA CPDLC Build 1/1A Architecture

VDL Mode 2 GroundStations

Display CMU/ATSU(ATN compliant)

VDR Multi-ModeTransceivers

VDL Mode 2 Data Link CPDLC

Processor(ATN compliant)

HOST Router

Display

NADIN IINational Airspace

System Local Network

ContextManagementApplication

(ATN compliant)

FAA En Route CPDLC Ground System

A/G ATNRouter

G/G ATNRouterG/G ATN

Router

Page 23: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 23

CPDLC/ATN Avionics: Functional Overview

CPDLCATN

(End System/RouterConfiguration)

Pilot Interface• Control/Display Unit• Alerting• Dedicated Display

Initial ArchitectureArchitecture Upgrade

Air/Ground Subnetworks• VHF Digital Radio - Mode 2• SATCOM Data 3• Other ICAO-Compliant

Subnetworks

Flight ManagementSystem Integration

Page 24: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 24

ATNSI Airlines: Target Fleet Types

American Continental Delta Northwest United US AirwaysAirbus

Fleet Types All N/A N/A Some All All

BoeingFleet Types All Most Most Some Most None

Regional JetFleet Types(affiliations)

All UnderConsideration

UnderConsideration

None UnderConsideration

None

N/A = Not Applicable

Preliminary Airline Data. Subject to Revision.Pre-Sep 11th Data.

Does not represent any actual or planned commitment by any airline to CPDLC equipage.

Page 25: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 25

Avionics ATN Program Status

�� Rockwell Collins Rockwell Collins �� CPDLC/ATNCPDLC/ATN--Capable CMU: Certified/Flew in PETAL IIE, Capable CMU: Certified/Flew in PETAL IIE,

Upgrade for CPDLC Build 1 Under DevelopmentUpgrade for CPDLC Build 1 Under Development

�� Honeywell Honeywell �� CPDLC/ATNCPDLC/ATN--Capable CMU: Under DevelopmentCapable CMU: Under Development

�� Thales Avionics (Sextant):Thales Avionics (Sextant):�� Software for CPDLC/ATNSoftware for CPDLC/ATN--Capable Airbus ATSU: Under Capable Airbus ATSU: Under

DevelopmentDevelopment

ATSU = Air Traffic Services UnitCMU = Communication Management Unit

Page 26: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 26

ATNSI Projects

�� Router Reference Implementation (RRI)Router Reference Implementation (RRI)�� Avionics: ATN End System and/or RouterAvionics: ATN End System and/or Router�� Ground Systems: ATN End System and/or RouterGround Systems: ATN End System and/or Router

�� Conformance Test Suite (CTS)Conformance Test Suite (CTS)�� Verification Tool for Installed RRI (Avionics or Ground Verification Tool for Installed RRI (Avionics or Ground

Systems) or other “equivalent” ATN SystemsSystems) or other “equivalent” ATN Systems�� Integrated into Common American European Reference ATN Integrated into Common American European Reference ATN

Facility (CAERAF) ProjectFacility (CAERAF) Project�� CAERAF Project is coCAERAF Project is co--sponsored by EUROCONTROL and the FAA sponsored by EUROCONTROL and the FAA

Certification OfficeCertification Office�� Use of CAERAF is not limited to America/Europe, usage is intendeUse of CAERAF is not limited to America/Europe, usage is intended d

for worldfor world--wide ATN verificationwide ATN verification

Page 27: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 27

Next StepsRTCA Free Flight Select Committee CPDLC Benefits Subgroup

�� CharterCharter��Update CPDLC Build 1A Business CaseUpdate CPDLC Build 1A Business Case��Recommend Incentives for Early EquipageRecommend Incentives for Early Equipage�� Identify Impediments and Recommend SolutionsIdentify Impediments and Recommend Solutions

�� MilestonesMilestones��Apr 2002: Final Report to RTCA Free Flight Steering Apr 2002: Final Report to RTCA Free Flight Steering

CommitteeCommittee

Page 28: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 28

Future InitiativesFANS 1/A Accommodation

ATS Provider

ATN FANS-1/A

Multi-Stack GatewayICAO CNS/ATM

Operational data and behavior

ATN VDL-2 Avionics FANS-1/A VDL-2 Avionics

a/g ATN VDL-2

a/g FANS-1/A VDL-2

Page 29: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 29

Future InitiativesSecurity Initiatives

�� Potential InitiativesPotential Initiatives�� Analysis of Security Features present in existing Analysis of Security Features present in existing

CPDLC/ATN/VDL2 ArchitectureCPDLC/ATN/VDL2 Architecture�� Implementation of Security Features in upgraded Implementation of Security Features in upgraded

CPDLC/ATN/VDL2 ArchitectureCPDLC/ATN/VDL2 Architecture�� Implementation of Security Features in new Applications and Implementation of Security Features in new Applications and

ServicesServices

�� IssuesIssues�� StandardizationStandardization�� GlobalizationGlobalization

Page 30: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 30

Conclusions

�� CPDLC/ATN BenefitsCPDLC/ATN Benefits�� Benefits can accrue Locally (dependent upon equipage)Benefits can accrue Locally (dependent upon equipage)�� Regional Jet equipage is a significant Benefits componentRegional Jet equipage is a significant Benefits component�� Delay in CPDLC implementation is an Opportunity CostDelay in CPDLC implementation is an Opportunity Cost

�� PostPost--Sep 11 ImpactsSep 11 Impacts�� NearNear--Term Lower Traffic DensitiesTerm Lower Traffic Densities�� Older Aircraft are already being removed from the FleetOlder Aircraft are already being removed from the Fleet�� Regional/Business operations are growingRegional/Business operations are growing

�� CPDLC/ATN Implementation Plans must stay in PlaceCPDLC/ATN Implementation Plans must stay in PlaceTraffic and Voice Communication Congestion will Return - CPDLC IS NEEDED!!

Page 31: Air/Ground ATN Implementation Status · 2013. 3. 20. · PETAL IIE Project Overview PETAL = P reliminary E urocontrol T est of A ir/Ground Data L ink PETAL IIE = Extension of PETAL

ATNSI, ATN Seminar 31

Air/Ground ATN Implementation StatusATN Seminar, Chiang Mai

- 11/14 December 2001 -

Mike MurphyMike MurphyATN Systems, Inc. (ATNSI)ATN Systems, Inc. (ATNSI)

703703--412412--2900, [email protected], [email protected]