airport division - jpz.com.myjpz.com.my/wp-content/uploads/2018/01/urb.pdf · international airport...
TRANSCRIPT
F e a t u r e d P r o j e c t sJurutera Perunding Zaaba Sdn. Bhd.
*Cost in Malaysian Ringgit (Million)
Airport Division
Start End Project Cost (mil) Client
1994 1998Kuala Lumpur International Aiport, Sepang, Selangor. (Project
Management)9,000.0 Ministry of Transport
2001 2003Terminal 3, Subang Airport (Design Consultancy Including Pre-Planning
Study)150.0 Ministry of Transport
2005 2005
The Upgrading Works For The New Large Aircraft (Nla) Ab-380 Operations
at Kl International Airport, Sepang (Up To Tender Stage Only) - Design
Consultancy (In Conjunction With Design-And-Build Contractor)
88.0
Trans Resources
Corporation Sdn. Bhd.
Malaysia Airports Sdn. Bhd.
2005 2007 External Parking Apron for MAS Hangar at KLIA 25.0 Malaysia Airlines System
2006 2008
Rehabilitation And Strengthening Of Runway Pavement at Penang
International Airport - Design Consultancy (In Conjunction With Design-And-
Build Contractor)
15.0SM Pelangi Sdn. Bhd. and
Malaysia Airports Sdn. Bhd.
2006 2009Rehabilitation Of Airfield Pavement For Parking Apron and Deepening Of
The Parking Apron Operations at Penang International Airport 25.0 Malaysia Airports Sdn. Bhd
2006 2009Redevelopment of Penang International Airport – User Requirement and
Pre-Planning StudyStudy Malaysia Airports Sdn. Bhd
2006 2009Rehabilitation of Air-field Pavement For Parking Apron Bay 3,4,5 & 6 at
Penang International Airport36
Malaysia Airports Holding
Berhad
2007 2008DCA Project In Relation To LCAT at Kl International Airport, Sepang
Package B (In Conjunction With Design-And-Build Contractor20.0
Ministry of Transport
Department of Civil Aviation
2007 2009Rehabilitation Of Taxiways At Penang International Airport ( Design
Consultancy) 12.0 Malaysia Airports Sdn. Bhd
2007 2007 Upgrading of Miri Airport 20.0 Binapuri Holdings Berhad
2007 2008 Senai International Airport, Johor Bharu, Johor 90Senai Airport Teriminal
Services Sdn.Bhd.
2008 2009Upgrading of Kuala Terengganu Air-port, Terengganu: Package IV(a) &
IV(b) Sea Reclamation & Coastal Erosion
Risk
Managemen
t
Inai Kiara Sdn. Bhd.
2008 2010Upgrading Of Kuala Terengganu Airport, Terengganu: Package IV(A) -
Runway Extension and Associated Works250.0
Trans Resources
Corporation Sdn.Bhd.
2008 2010 The proposed of aerodrome certification in Kerteh Airport 1.6 Petronas
2008 2009
Rehabilitation Of Airfield Pavement For Runway, Taxiways And Parking
Apron And All Associated Facilities At Sultan Abdul Aziz Shah International
Airport, Subang
28Malaysia Airports Holding
Berhad
2009 2013KLIA2 – Detail Design and Construction Supervision for Package AF01 –
Runway 3, Taxiway and Drainage336.0
Malaysia Airports Holdings
Berhad
2009 2011 Upgrading of Sultan Ismail Petra Airport, Kota Bharu, Kelantan 50.0 Ministry of Transport
2010 2012 Upgrading of Sultan Azlan Shah Airport, Ipoh ,Perak 47.8 Ministry of Transport
2010 2011
Privatisation Of The Proposed Rehabilitation Expansion, Development,
Operation And Maintenance Of Prince Mohammed Bin Abdulaziz
International Airport, Madinah Al-Munawarah, Kingdom Of Saudi Arabia
Masterplan
and
Preliminary
Design
Al-Bakri and Sons Holdings
Co.
Malaysia Airports Holdings
Berhad
58
F e a t u r e d P r o j e c t sJurutera Perunding Zaaba Sdn. Bhd.
*Cost in Malaysian Ringgit (Million)
Airport Division
Start End Project Cost (mil) Client
2010 2014Proposed of design & consultancy services for Apron Widening, Kerteh
Airport, Keerteh, Kemaman, Terengganu7.0 Petronas
2011 2012
A Study On Proposed Expansion And Upgrading Of Facilities To
Accommodate The Growth Of Cebu Pacific Air At Ninoy Aquino International
Airport In The Philippines
Study Cebu Pacific
2011 2012
Rehabilitation, Expansion, Development, Operation And Maintenance Of
Proposed Upgrading and Extension Works, Development, Operation And
Maintenance Of Iranian Imam Khomeini International Airport , Islamic
Republic Of Iran
– Airport Master Plan For China Railway, Amona and Imam Khomeini
International Airport Consortium
Masterplan
Amona Holdings Berhad
China Railway Group
Limited
Imam Khomeni International
Airport, Iran.
2012 2012 Upgrading of The Existing Suai Aiport, Timor-Leste 300.0
Ministry of Petroleum and
Mineral Resources,
Republic Democratic of
Timor-Leste
2012 2013
Privatisation Of The New Al-Maty International Airport, Kazakhstan
- Technical Feasibility Study And Airport Master Plan
- Detail Engneering Design
Masterplan
The Government of
Kazakhstan
Airport Limo(M) Sdn.Bhd
Malaysia Airports Holdings
Berhad
2013 2013Redang Airport, Technical feasibility study for the upgrading of the airport for
option B-737 operations and option – ATR72-600 operationsStudy
Destination Resorts and
Hotel Sdn.Bhd.
2013 2014Senai Airport Aviation Park
Planning and Detail Design Of Aviation Park36.0
Senai Airport Terminal
Services Sdn.Bhd
2013 2014 Upgrading of Sandakan Airport, Sandakan, Sabah 60.0 Ministry of Transport
2013 2017Study On The Proposed Facilities For The Development Of Subang
Skypark, Sultan Abdul Aziz International Airport, Subang145 Subang Skypark Sdn Bhd.
2013 2014
Senai Business Aviation Centre – Proposed Phase 1 Development
Construction Of Hangars and General Aviation At Senai International
Airport
40.0Senai Airport Terminal
Services Sdn. Bhd.
2014 2015 The upgrading of Sultan Ahmad Shah Airport, Kuantan, Pahang 16.9 Ministry of Transport
2014 2015
Senai Business Aviation Centre-Proposed Phase 2 development
construction of hangars and general aviation at Senai International Airport –
VVIP hangar
64MMC Engineering Services
Sdn.Bhd.
2016 2017Development Plan for Batu Berendam Airport (Land Development and Pre-
Planning Study)165.0 Ministry of Transport
2016 2017Pre-feasibility study for Thakhek Airport, Khammoun District, Lao People’s
Democratic RepublicStudy Inovica Global Sdn.Bhd.
59
KLIA2 – Runway 3, Taxiways, Drainage and Associated Works
F e a t u r e d P r o j e c t sJurutera Perunding Zaaba Sdn. Bhd.
Upgrading Of Kuala Terengganu Airport, Terengganu -
Runway Extension On Reclaimed Area and Associated
Works.
Senai Airport - VVIP Hangar and Associated Services
KLIA2 - Official Opening of Runway 3 - Trial Landing.
Airport Division
60
Sandakan Airport Passenger - Terminal Building Upgrading
F e a t u r e d P r o j e c t sJurutera Perunding Zaaba Sdn. Bhd.
Penang International Airport – Pavement Rehabilitation
Upgrading of Sultan Azlan Shah Airport, Ipoh ,Perak – Landside and Airside
Airport Division
61
Airport Division
F e a t u r e d P r o j e c t sJurutera Perunding Zaaba Sdn. Bhd.
Suai Airport, Timor-Leste - Under Construction
Suai Airport, Timor-Leste – Overall Upgrading Scope
62
Kota Bharu runway reposition and helipad
Senai Hangar, view from outside and inside of hangar.
F e a t u r e d P r o j e c t sJurutera Perunding Zaaba Sdn. Bhd.
Privatisation Project for The Expansion, Upgrading Operation And Maintenance Of Iranian Imam Khomeini International
Airport , Islamic Republic Of Iran – Airport Master Plan For China Railway, Amona and Imam Khomeini International
Airport Consortium
Privatisation Project For Prince Mohammed Bin Abdulaziz International Airport - Madinah Al-Munawarah, Kingdom Of Saudi Arabia - Airport Masterplan For Al-Bakry and Malaysia Consortium
Airport Division
63