AIRSPACE CONCEPT WORKSHOP CASE STUDY
1
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Phuket / Krabi
2
PBN Implementation Processes
3
4Airspace Concept Activity Overview
Phuket / Krabi Info
5
Phuket/Krabi
6
Phuket / Krabi Info
7
• Facilities developed independently as traffic developed• Area Controls: Phuket and Krabi both open 24/7• Terminal Approach Radar operational: 24/7• Radar: PHK ASR 70nm / ACC SSR 250nm / PHK piped to Krabi• Phuket: Rwys 09L/R and 27L/R• Krabi: Rwys 09/27• Landing and departing to the west 85% of the time• Phuket Rwys separated by only 400 meters• Phuket/Krabi airports approximately 10nm apart• Traffic mix 88% Phuket / 12% Krabi
Phuket / Krabi Info
8
• More than 95% of operators RNAV/RNP qualified• Holds in ACC activated with little notice from APP• No published holds currently exist in APP airspace• APP vectors most aircraft• Military airspace has not been able to be used• Airspace use is inefficient due to independent operations• ANSP tasked to combine facilities and improve efficiency• ANSP tasked to take advantage of RNAV capabilities
Phuket ILS or LOC RWY 27
9
Fleet Capability
10
Total
RNAV/RNP RNP 10 RNP 4
RNAV1/RN
AV2 RNP .3 RF Leg RNP < .3
DME/DME/
IRU
SBAS/WAAS
GLS/GBAS
Flights at Phuket 330,468 4220 280,035 280,035 300,173
270,398 270,837 240,838 260,718 640 503
Percentage 1% 84% 84% 90% 82% 82% 74% 78% 1% 1%
Total
RNAV/RNP RNP 10 RNP 4
RNAV1/RN
AV2 RNP .3 RF Leg RNP < .3
DME/DME/
IRU
SBAS/WAAS
GLS/GBAS
Flights at Krabi 34,468 422 28,035 28,035 33,173 27,398 29,432 24,653 27,198 57 42
Percentage 1% 84% 84% 91% 82% 83% 74% 82% 1% 1%
Phuket/Krabi
11
Phuket/Krabi
12
MyThai No CZ
Phuket/Krabi
13
Phuket/Krabi
14
Phuket/Krabi
15
Phuket/Krabi
16
Rules of Thumb
17
CDO descent rough starting points:• 3 miles per thousand feet plus 1 mile per 10knots or• 4 miles per thousand feet
CCO climb rough starting points:• Very Slow climber - 5 miles per thousand feet• Medium climber – 3 to 4 miles per thousand feet• Faster climber – 2 miles per thousand feet• Rocket ship - 1 mile per thousand feet
• RNAV Final between 4-5 nm• Curved RNAV? A-RNP - RF prior to FAF?
Phuket/Krabi
18
Phuket/Krabi
19
Phuket/Krabi
✈Team Lead
✈Team Recorder
✈Team Name
20
Phuket/Krabi
✈Safety
✈Capacity
✈Efficiency
✈Environment
✈Access
21
1 - Agree on Operational Requirements
Fini
22