Page 1: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

Aitik presentation at CMD 2019Hans Jönsson, General Manager

Page 2: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

Welcome to Aitik – Agenda March 14, 2019

08.15 Hans Jönsson, General Manager Boliden Aitik09.00 Pause and change of clothes09.30 Guided tour (2 groups) 11.30 Pause and change of clothes12.00 Lunch including final Q& A session with Group Management13.15 Departure Aitik mine14.30 Departure Gällivare Airport16.00 Arrival Arlanda Airport

Boliden CMD 2019 2 2019-03-14

Page 4: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

Boliden CMD 20194

1968 Production starts, 2 Mtonnes throughput

2010 ~6 BSEK investment, 36 Mtonnes

2020 45 Mtonnes

1973 6 Mtonnes, 1983: 11 Mtonnes, 1992: 18 Mtonnes

1932 The Aitik deposit discovered

Brief history of Aitik

2018 860 MSEK, new surface crusherAitik ore profile

Boliden CMD 2019 4 2019-03-14

Page 5: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

Production overview at Aitik

Boliden CMD 2019 5 2019-03-14

Page 6: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

Aitik from above

7,000 ha

Boliden CMD 2019 6 2019-03-14

Page 7: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

Europe’s largest and the world’s most productive open pit copper mine

Easily accessible ore Favourable stripping ratio 1:1 Large scale operations Efficient logistics Committed and competent employees High level of automation, advanced technology

2019-03-147Boliden CMD 2019

Aitik

0

5

10

15

20

25

30

35

0 20 40 60 80 100 120 140

Mille

d or

e to

nnes

/man

hour

Million tonnes of ore milled

Copper mine productivity 2018Open pit mines with concentrator

Source: Wood Mackenzie

Page 8: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

Aitik – Increased productivity

New Haul trucks Mineral reserves have increased 80% since 2008 despite the fact that yearly throughput has increased 100%.

Electric test lane ~700 meters and is expected to save 830 m3 diesel per year.

New trucks enable automation and cost reductions.

Remote controlled/autonomous drill rigsTruck trolley

New Aitik electric trolley

New Komatsu 830E-5 intended for Kevitsaand Komatsu 930E-5 intended for Aitik

Boliden CMD 2019 8 2019-03-14

Page 9: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

Aitik – EBIT and throughput since 2009

0

500

1 000

1 500

2 000

2 500

3 000

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Aitik- EBIT (MSEK)

0

10 000

20 000

30 000

40 000

50 000

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Aitik - Milled production (Ktonnes)

Boliden CMD 2019 9 2019-03-14

Page 10: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

Aitik Opex/ tonne since 2009

2019-03-14

0

10

20

30

40

50

60

70

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Aitik - Operating costs (excl. depr.), SEK/milled tonne

Boliden CMD 2019 10

Page 11: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

Boliden CMD 201911

Aitik – Pushback scenarios

Boliden CMD 2019 11 2019-03-14

Page 12: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

Aitik - New crusher station (KiD2)*

0

500

1 000

1 500

2 000

2 500

Apr May Jun Jul Aug Sep Oct Nov Dec

Kto

nnes

KiD2 production from start

*KiD2 = Surface crusher 2

Boliden CMD 2019 12 2019-03-14

Page 13: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

Aitik - Pebbles crushing

Pebbles crushing will be installed in connection to the two autogenous mills Will increase capacity when low grindability Commissioning during Q2 2019

Boliden CMD 2019 2019-03-1413

Page 14: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

LiikavaaraShort facts “Low-grade” Cu-Au mineralisation, approx. 3 km east of Aitik Discovered by Boliden in 1930´s Conceptual study in 2009-10, approx. 40 Mtonnes at 0.28%

Cu Included in Aitik LoMP, 2023-30

Status Feasibility 2018 indicate 58 Mtonnes at 0.26% Cu

‒ Satellite to Aitik pit‒ Hauling ore and acid forming waste rock to Aitik‒ Processing in Aitik

Application for mining concession filed at mining inspectorate

Application for environmental permit filed at environmental court

Risks Permits

2019-03-14

NESW

Boliden CMD 2019 14

Page 15: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

Nautanen

Short facts Cu-Au mineralisation, approx. 15 km NW of Aitik Discovered by Boliden in 2011 ”High grade” (1.5% Cu) known from ca 200 m to 600 m below

surface, still open Mineral Resource

‒ Indicated: 8.2 Mtonnes at 1.7% Cu, 0.9 g/tonnes Au, 5 g/tonnes Ag‒ Inferred: 7.5 Mtonnes at 1.5% Cu, 0.6 g/tonnes Au, 7 g/tonnes Ag

Conceptual study in 2014

Status Pre-feasibility 2015-2019 on-going

‒ Underground mine, open stoping‒ Transport to Aitik and processing in Aitik‒ Application for mining concession‒ Water treatment‒ More drilling

Risks Permits

Boliden CMD 2019 2019-03-1415

Page 16: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

2019-03-14

Prioritised areas of work• Safety culture• Water management and dam safety• Reducing emissions to water and air• Energy savings• Decommissioning and reclamation of land• Reducing waste and spillage

Aitik from an EHS perspective

0

1000

2000

3000

4000

5000

1979 1984 1989 1994 1999 2004 2009 2014

Kg/

year

Aitik mine - Emissions of copper per year

Boliden CMD 2019 16

Page 17: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

At Boliden, safety is number one

Keep your phone/camera in your pocket or bag until photo opportunity is announced

Ongoing production, pay attention

Heavy traffic

Listen to and follow the instructions given to you

We are all equally responsible for the safety of ourselves and each other

Boliden CMD 2019 17 2019-03-14

Page 18: Aitik presentation at CMD 2019 - Boliden · 2019-03-12 · • Reducing emissions to water and air • Energy savings ... mine - Emissions of copper per year. Boliden CMD 2019. 16

2019-03-14

This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden does not undertake any obligation to correct or update the information or any statements made therein. Certain statements in this presentation are forward-looking and are subject to risks and uncertainties.

Nothing contained herein shall constitute any representation or warranty as to accuracy or completeness. Boliden has not madeany independent verification of the information obtained from third parties.

Nothing in this material shall be construed as an offer or solicitation to buy or sell any security or product, or to engage in or refrain from engaging in any transaction.

Boliden does not accept any liability whatsoever arising from or in connection with the use of this information.

Save as by prior approval in writing, this material may not be copied, transmitted or disclosed, whether in print, electronic or any other format. All rights to the material are reserved.

Disclaimer

18Boliden CMD 2019