increasing value from our mines - boliden · cmd 2016 20 2016-03-16 this presentation has been...

21
Mikael Staffas, President Boliden Mines Capital Markets Day 2016 | 16 March Increasing value from our mines

Upload: others

Post on 03-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

Mikael Staffas, President Boliden Mines

Capital Markets Day 2016 | 16 March

Increasing value

from our mines

Page 2: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

Increasing value from our mines

Operational excellence Focusing on profitable growth

2016-03-16 CMD 2016 2

Page 3: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

2016-03-16 3 CMD 2016

Creating value through operational excellence

Production control Mine automation

Mineral process development Preventive maintenance

Page 4: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

Centralised production control increases productivity

2016-03-16 4 CMD 2016

0

10

20

30

40

50

60

Min

e A

cti

vit

ies

24 hours

Prod. Control

Typical 3 shift

Page 5: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

2016-03-16 5 CMD 2016

>20% higher productivity through planning

Page 6: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

2016-03-16 6 CMD 2016

Mobile control systems increase efficiency at

concentrator Integrated system for mine and concentrator

Continuous real-time operational and maintenance data

24/7 off site access through mobile control room

Page 7: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

Autonomous machines adds production hours

Ability to mine 24/7

‒ Loading and hauling ore after

and during blasting/ventilation

‒ Continuous long hole drilling

‒ Autonomous transportation

between loading and unloading

~50% more time available for

autonomous activities in the mine

Improved safety

0

10

20

30

40

50

60

Min

e A

cti

vit

ies

24 hours

Autonomous

Prod. Control

Typical 3 shift

2016-03-16 7 CMD 2016

Page 8: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

Autonomous loaders – example Garpenberg

Started in 2011

18% of mining currently performed with

autonomous loaders

Target to increase autonomous utilisation

to 80% by 2019

WLAN in vital parts of the mine

‒ Operated from surface 2015

To be rolled out in other underground

mines

2016-03-16 8 CMD 2016

Page 9: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

Mineral process development

2016-03-16 9 CMD 2016

Aitik

Autogenous grinding 1968

2010 Boliden

Fenton

Thio-salts

2013

Kankberg

Gold (45 => 85%)

Tellurium (& Ag)

2014 Garpenberg

Nitrogen

removal

2015

Tara

Antimony

removal

Hot leaching AuTe

Example of completed R&D projects

Page 10: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

2016-03-16 10 CMD 2016

Tara reduced antimony emissions by 50%

Reduced emissions and maintained production

capacity

Low capex & opex solution tailored for Tara

Chemical precipitation of antimony

Fast development and execution phase

‒ Took 16 months from idea to fully-up and running

Page 11: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

Preventive maintenance lowers downtime

2016-03-16 11 CMD 2016

0

20

40

60

80

100

2012 2013 2014 2015 2016

Availability, %

Mean time between failures, hours

Higher availability of Aitik’s shovels

Page 12: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

0

5

10

15

20

25

30

Aitik Boliden Area Garpenberg Kylylahti Tara

Reserve life, years

2005 2015

Increased mine lives Our largest mines have long life and competitive positions

2016-03-16 12 CMD 2016

Page 13: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

Focused efforts in exploration

2016-03-16 13 CMD 2016

Strong exploration results in 2015

‒ Increases in mineral reserves at Aitik, Garpenberg and Tara

‒ Two new mineral resources: Nautanen (Aitik) and Rävliden (Boliden Area)

Outokumpu field

‒ Disappointing first year, 2015 – 4 years reserve life in Kylylahti

‒ Increased efforts 2016

Tara

‒ Encouraging results 2015 – 6 years reserve life

‒ Increased efforts 2016

Page 14: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

Garpenberg expansion ramped-up on time & capex

2016-03-16 14 CMD 2016

0

100

200

300

400

500

600

700

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

2014 2015

kton

Ore production Milled production

Page 15: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

Aitik expansion – what we have said and done

Phase 1: capex 600 MSEK, whereof 200 MSEK spent

Crusher reinforcement done

Water pumping done

Electric sub-station done

New surface crusher not done

2016-03-16 15 CMD 2016

Phase 2: capex not announced

New in-pit crusher including conveyor

Water treatment

De-sulphurization

Page 16: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

Revised plan for Aitik – focus on availability

New environmental permit Q1 2016

Reserve Cu grade 0.23 (0.22)

Extended reserve life

New crusher set-up

‒ Surface crusher – commissioning 2018

‒ In-pit crusher – decision after 2020

De-sulphurization – after 2020 (if needed)

2016-03-16 16 CMD 2016

Revised production plan

Copper grades

‒ 2016: 0.21

‒ 2017-19: Above reserve grade

45 Mton 2020

Page 17: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

New surface crusher to improve reliability

Construction 2016-2017, commissioning 2018

Built in double-crusher

Facilitate maintenance

Capacity 8,000 ton/h

2016-03-16 17 CMD 2016

Page 18: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

This plan delivers improved control

Higher availability from the mine

Higher visibility in production, grade and cost

Remaining capex of 1 BSEK (2016-2018)

‒ New surface crusher

‒ Water treatment

‒ Power supply

2016-03-16 18 CMD 2016

Page 19: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

Increasing value from

our mines

Q&A

Operational excellence

Focusing on profitable growth

Page 20: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

Disclaimer

2016-03-16 20 CMD 2016

This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden does not undertake any obligation to correct or update the information or any statements made therein. Certain statements in this presentation are forward-looking and are subject to risks and uncertainties.

Nothing contained herein shall constitute any representation or warranty as to accuracy or completeness. Boliden has not made any independent verification of the information obtained from third parties.

Nothing in this material shall be construed as an offer or solicitation to buy or sell any security or product, or to engage in or refrain from engaging in any transaction.

Boliden does not accept any liability whatsoever arising from or in connection with the use of this information.

Save as by prior approval in writing, this material may not be copied, transmitted or disclosed, whether in print, electronic or any other format. All rights to the material are reserved.

Page 21: Increasing value from our mines - Boliden · CMD 2016 20 2016-03-16 This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden

Capital Markets Day

2016 | 16 March

CMD Continuing to deliver stable performance