Founded in 2011, AKON executes turn key construction and installation of:
• Petrochemical Plants
• Power Plants
• Water Treatment / Desalination Plants
• Steel Smelters
• Pipelines
• Buildings, Shopping Centers
www.akoninternational.com
Our mission is to use our experience in the construction industry for unconditional customer satisfaction and highest quality, while respecting human health and environment at every stage of our operation.
Our vision is to successfully finish each Akon International Project with the power of our professional experience and commitment.
www.akoninternational.com
MISSION and VISION
2011
• AKON International LLC founded in Jeddah, Kingdom of Saudi Arabia.
• King Khalid University Project civil works contract signed.
• Jabal Omar Project H8 and H9 Towers Project civil works contract signed.
• Haramain Railway Station Project platform civil works contract signed.
2012
• Jabal Omar Project - Phase II civil works contract signed.
• Petrorabigh NPB Project civil and electromechanical works contract signed.
2015
• Petrorabigh II – Initial Start Up Team Accommodation Project civil works contract signed
• Petrorabigh II – Blast Proof Manufacturing Buildings Project civil and electromechanical workscontract signed
• Yanbu Power and Desalination Plant Project Aeration Basin and Building civil works contractsigned
• East Dammam Aramco Housing Projects civil, architectural, electrical and mechanical workscontract signed
www.akoninternational.com
MILESTONES
2016
• Rabigh II Refining and Petrochemical Project Naphtha and Aromatics Package (RP2) - Area R410 & R420 Project civil works contract signed.
• Safety Achievement Award for 3,000,000 Manhours without Lost time Injury received from Petrorabigh.
2017
• Petrorabigh Clean Fuel Project/ Sulphur Recovery Unit Project civil and building works contract signed.
• AKON payroll reached to 2107 direct personnel and 513 indirect personnel, all time high.
2018
• Metito KAEC SOLAR Water Desalination Plant Project civil and building works contract signed.
2019
• Metito Duba Water Desalination Plant Project civil and building works contract signed.
• Shuqaiq Satellite Desalination Plant Project civil and building works contract signed.
www.akoninternational.com
MILESTONES
www.akoninternational.com
ORGANIZATION CHART
HSE practices at highest standards are adopted and exercised in our job site to reduce occupational risks
www.akoninternational.com
HEALTH AND SAFETY MANAGEMENT
www.akoninternational.com
MANHOUR
613.628
1.375.600
1.675.876
2.752.721
3.611.969
3.268.120
1.625.360
900.6931.027.036
0
2.000.000
4.000.000
6.000.000
8.000.000
10.000.000
12.000.000
14.000.000
16.000.000
18.000.000
0
500.000
1.000.000
1.500.000
2.000.000
2.500.000
3.000.000
3.500.000
4.000.000
2011 2012 2013 2014 2015 2016 2017 2018 2019
MH Cumulative
www.akoninternational.com
TURNOVER (USD)
103.885,07
13.315.840,53
33.522.409,07
35.707.129,33
44.807.168,53
115.654.736,53
50.476.350,93
11.210.973,07
29.213.524,63
0,00
50.000.000,00
100.000.000,00
150.000.000,00
200.000.000,00
250.000.000,00
300.000.000,00
350.000.000,00
400.000.000,00
-
20.000.000,00
40.000.000,00
60.000.000,00
80.000.000,00
100.000.000,00
120.000.000,00
140.000.000,00
2011 2012 2013 2014 2015 2016 2017 2018 2019
USD Cumulative
39
57
215
KSD023 DSD024 SDP025
910
34
5
6
98
Management Site Engineers Site Supervisors HSE Officers
QA/QC Finance&Admin Support
DIRECT PERSONNEL INDIRECT PERSONNEL
Direct Indirect Total
KSD023 39 28 67
DSD024 57 32 89
SDP025 215 75 290
TOTALS 311 135 446
Direct Indirect Total
Turkish 207 39 246
Pakistani 26 37 63
Indian 21 24 45
Bangladesh 47 15 62
Others 10 20 30
TOTALS 311 135 446
www.akoninternational.com
PERSONNEL
ONGOING PROJECTS
www.akoninternational.com
SHUQAIQ SATELLITE DESALINATION PLANT PROJECT
Turnkey civil, architectural and steel structure procurement and installation works for the Shuqaiq Satellite Desalination Plant Project.
Works included Sea Water Intake & Outfall, Pretreatment Area & Wastewater Area, RO Building, Electrical and Control Building,Post Treatment Area and Chemical Storage Building.
Scope included 56,531 m3 excavation, 92,370 m3 filling and 12,932 m³ concrete work.
Project No: SDP025
Client: SWCC / Rawafid
Location: Shuqaiq, KSA
Project Start: Dec 2019
Project Duration: 10 Months
Expected Completion: Sep 2020
Peak Manpower: 250 people
Average Manpower: 208 people
Contract Value: 15,030,859 USD
www.akoninternational.com
ONGOING PROJECTS
DUBA WATER DESALINATION PLANT
Turnkey civil and architectural works for the Duba Water Desalination Plant Project.
Works included Machine Foundations, RO Building, Admin Building, Electrical Building, Intake Electrical Building, Intake PumpStation, Product Water Storage, Neutralization Tank and Guard House, total area of 45,468 m2.
Scope included 17,558 m3 Concrete, 2,016 ton Reinforcing Bar work.
Project No: DSD024
Client: SWCC / Metito Saudi Limited
Location: Duba, KSA
Project Start: Feb 2019
Project Duration: 13 Months
Expected Completion: Mar 2020
Peak Manpower: 153 people
Average Manpower: 109 people
Contract Value: 11,066,667 USD
www.akoninternational.com
ONGOING PROJECTS
KAEC SOLAR WATER DESALINATION PLANT
Turnkey civil and architectural works for King Abdullah Economic City sea water RO Project.
Works included General Site Works, Machine Foundations, RO Building, Admin Building, Electrical Building, Intake Electrical Building, Intake Pump Station, Product Water Storage, Neutralization Tank and Guard House, total area of 68,400 m2.
Scope included 15,227 m3 Concrete, 1,531 ton Reinforcing Bar work.
Project No: KSD023
Client: Emaar, the Economic City (EEC)/ Metito Saudi Limited
Location: Jeddah, KSA
Project Start: Dec 2018
Project Duration: 16 Months
Expected Completion: Apr 2020
Peak Manpower: 197 people
Average Manpower: 141 people
Contract Value: 9,466,607 USD
www.akoninternational.com
ONGOING PROJECTS
COMPLETED PROJECTS
www.akoninternational.com
PETRORABIGH CLEAN FUEL / SULPHUR RECOVERY UNIT
Turnkey construction works for the PETRO RABIGH CFP/ SRU project.
Works included R225 - CFP (Clean Fuel Unit), R311 - SRU 3 (Sulphur Recovery Unit), SS27 (Electrical substation) and PIB27 (Process Interface Room) packages.
Scope included 22,000 m3 structural concrete, 3 km U/G FRP Piping Works and 3 buildings works.
Project No: PCF021
Client: Saudi ARAMCO / KineticsTechnology
Location: Rabigh, KSA
Project Start: July 2017
Project Duration: 21 months
Date of Completion: May 2019
Peak Manpower: 240 people
Average Manpower: 120 people
Contract Value: 14,425,788 USD
www.akoninternational.com
COMPLETED PROJECTS
PETRORABIGH II BLAST PROOF MANUFACTURING BDG.S PROJECT
Works included construction of blast proof buildings, including all work civil, structural, MEP works and external utilities tie-ins.
Scope included Polymer Satellite Maintenance Office Building (828 m2), U&OM Satellite Maintenance Office Building (828 m2), Refinery Satellite Maintenance Office Building (828 m2) and Monomer Satellite Maintenance Office Building (996 m2), Monomer Satellite Maintenance Office Building II (790 m2), Polymer Satellite Maintenance Office Building II (790 m2)
Project No: PRB008B
Client: Saudi ARAMCO & SUMITOMO / Baytur
Location: Rabigh, KSA
Project Start: Oct 2015
Project Duration:943 days
Date of Completion: May 2018
Peak Manpower: 216 people
Average Manpower: 83 people
Contract Value: 20,000,000 USD
www.akoninternational.com
COMPLETED PROJECTS
PETRORABIGH II NON-PROCESS BDG.S CONSTRUCTION PROJECT
Turnkey construction and facility maintenance works for the Petrorabigh II Non Process Buildings facilities, total OF 76,000 m2
Scope included supply and construction of Administration Building, Product Warehouse Building, client camp and catering facilities for further construction of Petrorabigh II, client offices, additional buildings for maintenance, laboratory and canteen buildings inside the existing PRB facilities, renovation of main mess hall facilities for Petrorabigh, operation and maintenance of all facilities for 1500 days.
The original scope of the contract has been extended.
Project No: PRB008
Client: Saudi ARAMCO & SUMITOMO / Baytur
Location: Rabigh , KSA
Project Start: Jan 2012
Project Duration: 2500 days
Date of Completion : Dec 2018
Peak Manpower: 1300 people
Average Manpower: 800 people
Contract Value: 79,000,000 USD
www.akoninternational.com
COMPLETED PROJECTS
RABIGH II REFINING AND PETROCHEMICAL PROJECT - NAPHTHA AND AROMATICS PACKAGE (RP2) - AREA R410 & R420
Miscellaneous excavation, backfilling, reinforced concrete, steel, equipment installation, process piping and instrumentation works.
Scope included 10.000 m3 excavation, 985 m³ concrete, 12 ton chequered plate cover, 12.570 m2 protective coating works.
Project No: SNA019
Client: Saudi ARAMCO / SAIPEM
Location: Rabigh, KSA
Project Start: Sep 2016
Project Duration: 6 months
Date of Completion : Mar 2017
Peak Manpower: 104 people
Average Manpower: 80 people
Contract Value: 2,786,787 USD
www.akoninternational.com
COMPLETED PROJECTS
EAST DAMMAM ARAMCO HOUSING PROJECT
Lump sum MEP, Finishing and Landscaping Works of 218 premium villas for Saudi Aramco management personnel.
Scope included 104,000 m2 closed area.
Project No: DMH018
Client: Saudi ARAMCO / Baytur
Location: Dammam, KSA
Project Start: Nov 2015
Project Duration: 486 days
Date of Completion: Mar 2017
Peak Manpower: 750 people
Average Manpower: 400 people
Contract Value: 64,575,817 USD
www.akoninternational.com
COMPLETED PROJECTS
YANBU POWER AND DESALINATION PLANT
Civil works for Aeration Basin, Mixing Basin, Bypass Basin, Discharge Basin, pipe racks and buildings.
Scope included 350,000 m3 excavation, 93,000 m3 concrete, 10,000 ton rebar work.
Project No: YPR016
Client: SWCC / Samsung Engineering
Location: Yanbu, KSA
Project Start: May 2015
Project Duration: 505 days
Date of Completion : Sep 2016
Peak Manpower: 760 people
Average Manpower: 580 people
Contract Value: 27,055,000 USD
www.akoninternational.com
COMPLETED PROJECTS
HARAMAIN RAIL LINK PHASE 1 PACKAGE 2 MADINAH STATION STRUCTURAL WORKS
Civil works of the Madinah Station of the Haramain High Speed Railway.
Scope included 120,000 m3 concrete, 11,300 tons reinforcement,, 169,300 m2 formworks works with supply.
Project No: HHR006
Client: Saudi Railways / Yapı Merkezi
Location: Madinah, KSA.
Project Start: Dec 2011
Project Duration: 1 year
Date of Completion : Dec 2012
Peak Manpower: 450 people
Average Manpower: 250 people
Contract Value: 10,130,000 USD
www.akoninternational.com
COMPLETED PROJECTS
PETRORABIGH II INITIAL START-UP TEAM ACCOMODATION PROJECT
Construction of Camp Facilities, 200 Bachelor Accommodation Units and 48 Family Residence Units, including all MEP utilities and infrastructure works, total of 108,000 m2 covered area.
Scope included structural, mechanical, electrical, plumbing works and landscaping.
Project No: PRB008A
Client: Saudi ARAMCO & SUMITOMO / Baytur
Location: Rabigh, KSA
Project Start: July 2015
Project Duration:243 days
Date of Completion: Mar 2016
Peak Manpower: 343 people
Average Manpower: 200 people
Contract Value: 26,666,667 USD
www.akoninternational.com
COMPLETED PROJECTS
KING SAUD UNIVERSITY AGRICULTURAL ENG. FACULTY BUILDING
Civil works of the 3 floors, 12,000 m2 faculty building.
Scope included 2,700 m3 concrete and 400 tons reinforcement works.
Project No: KSU002
Client: Binladin / RenaissanceConstruction KSA
Location: Riyad, KSA
Project Start: Mar 2011
Project Duration: 6 months
Peak Manpower: 150 people
Average Manpower: 75 people
Date of Completion: 30.09.2011
Contract Value: 1,200,000 USD
www.akoninternational.com
COMPLETED PROJECTS
JABAL OMAR H12, H13A, H13B and H13C TOWERS PROJECT
Civil works of the 34 floors, 58,000 m2 hotel towers in Jabal Omar Project.
Scope included 36,000 m3 concrete and 5,200 tons reinforcement work.
Project No: JOD003
Client: Jabal Omar Development Co. / NESMA
Location: Makkah, KSA
Project Start: Feb 2011
Project Duration: 26 months
Peak Manpower: 450 people
Average Manpower: 300 people
Date of Completion : 30.03.2013
Contract Value: 14,133,000 USD
www.akoninternational.com
COMPLETED PROJECTS
KING KHALID UNIVERSITY CONFERENCE HALL BUILDING
Civil works of the 28,000 m3 conference hall building in King Khalid University Project, Phase 3 Works.
Scope included 10,700 m3 concrete and 1,200 tons reinforcement works.
Project No: KKU004
Client: Ministry of Education / Baytur
Location: Abha, KSA
Project Start: Apr 2012
Peak Manpower: 130 people
Average Manpower: 100 people
Date of Completion : 15.08.2013
Contract Value: 2,800,000 USD
www.akoninternational.com
COMPLETED PROJECTS
KING KHALID UNIVERSITY GENERAL ADMINISTRATION BUILDING
Civil works of the 32,000 m2 General Administration Building in King Khalid University Project, Phase 3 Works.
Scope included 15,300 m3 concrete, 1,700 tons reinforcement and precast slabs installation works.
Project No: KKU004
Client: Ministry of Education / Baytur
Location: Abha, KSA
Project Start: Apr 2012
Project Duration: 16 months
Peak Manpower: 100 people
Average Manpower: 70 people
Date of Completion : 15.08.2013
Contract Value: 2,800,000 USD
www.akoninternational.com
COMPLETED PROJECTS
PRINCESS NOURA UNIVERSITY FAMILY and CONSUMER SCIENCES FACULTY BUILDING
Civil works of the 80,000 m2 faculty building.
Project No: PNU001
Client: Saudi Oger / RenaissanceConstruction KSA
Location: Riyad, KSA
Project Start: Jul 2011
Project Duration: 7 months
Peak Manpower: 400 people
Average Manpower: 150 people
Date of Completion : 01.02.2012
Contract Value: 3,533,000 USD
www.akoninternational.com
COMPLETED PROJECTS
CERTIFICATES and AWARDS
www.akoninternational.com
www.akoninternational.com
CERTIFICATES and AWARDS
VENDOR APPROVAL
www.akoninternational.com
www.akoninternational.com
AKON VENDOR APPROVAL NUMBERS
LOGO CERTIFIER COMPANY TITLE VENDOR CODE
SAUDI ARABIAN MINING COMPANY 12893
SAUDI ARAMCO 10054797
SAUDI BASIC INDUTRIES CORPORATION 507721
ROYAL COMMISSION FOR JUBAIL AND YANBU RCY000107
KING ABDULLAH ECONOMIC CITY 4331
SAUDI ELECTRICITY CO.VD006816
5005096
PETRORABIGH - RABIGH REFINING & PETHROCHEMICAL COMPANY 103093
ENERJİSA ENERJİ ÜRETİM A.Ş. 37420
OUR CLIENTS
www.akoninternational.com
www.akoninternational.com
OUR CLIENTS
THANK YOU
www.akoninternational.com