alice 5 o’clock meeting
DESCRIPTION
ALICE 5 o’clock meeting. Wk 2 - 2011. INDICO. You’ll find this meeting here: http://indico.cern.ch/categoryDisplay.py?categId=2957 The full shutdown planning is here: http://indico.cern.ch/conferenceDisplay.py?confId=118265. Access request Cavern and surface. - PowerPoint PPT PresentationTRANSCRIPT
11/1/11 1
ALICE 5 o’clock meeting
Wk 2 - 2011
11/1/11 2
INDICO
• You’ll find this meeting here:– http://indico.cern.ch/categoryDisplay.py?categId=2957
• The full shutdown planning is here:– http://indico.cern.ch/conferenceDisplay.py?confId=118265
11/1/11 5 o’clock meeting 3
Access requestCavern and surface
• You should submit an ADI and a task procedure
Two persons minimum
Work breakdown structure – risk associated at each step
ADIhttps://edh.cern.ch/Document/ADI
Task procedureTemplate EDMS 1103355
Attach task procedure
11/1/11 5 o’clock meeting 4
ALICE Christmas break schedule
OpenOpenExperimentExperiment
TRDTRDEMCalEMCal
CloseCloseExperimentExperiment
Open L3 doors
Close L3doors
11/1/11 5 o’clock meeting 5
UX25 access
Rules for access restrictions:Removal/installation of shielding (restriction includes RB24 triplets)
• PX24 blocks: no access CR5 and UX25• PX24 beams (35t): no access CR1-5, Expo, and UX-25• All other blocks: no access to UX-25
LHC evacuation test (7/12 after 18:00 and 24/12) – no access UX25Gas functional test (10/12 - 2 hrs) – no access UX25 and CR1-5AUG test (20/1) (Arrêt Urgence General – General Emergency Stop) – no access UX25DSO test (12-13/1) (Department Safety Officer) – no access UX25
No access SX2 during manipulation of blocks in SX2 (except ACR and WRs)
11/1/11 5 o’clock meeting 6
L3 (and MNF) access
EMCal
EMCal
EMCal
NoVentilation
Wks 50 and 5: access (TPC) to be coordinated with TC (transport)
Wks 1-2: no access during EMCal SMs insertion inside L3 (see day-by-day)When moving from low-beta to yellow platform: no access to MNFWhen inserting the module: no access L3 and MNF
Watcher needed in wk 49 and from wk 4 onwards
Wk 6 or 7 (tbd): Kr calibration – TPC T stability (all interventions to be agreed by TC/RC)
31
Evac.
NoVentilation
243NoVentilation
13 7
Lift
Day-by-day schedule
UX25 and MNF - Wk 2
11/1/11 5 o’clock meeting 8
Activities in UX25 - Week 2 - 10/1 Monday
TPC cooling
VIP visit (Mr Herman Josef Lamberti, Deutschen Bank) 16:50-17:25
Mu
on
TR
G:
RP
C (
PM
)
Check gas tightness on few RPC detectors, repair 2 gas distribution channels. Replace 1 HV cable (need both nacelles)
SDD/SSD
Laser
SDD: calibration of 78 pressure sensors (10-12/1)SSD: replacement CAEN module (C-side) + repair bad temperature signal (C-side)
TOF TRM
TP
C F
EC
Visits: 9:00 University of Frankfurt - 50 persons. Kai Schweda14:00 Private school, St. Leon, Germany - 30 persons. Kai Schweda
Install new Ekspla laser
Philippe: install PHOS temporary cooling pipes
Yannick: re-install TPC cooling pipes MNF (I-side)
11/1/11 5 o’clock meeting 9
Activities in MNF - Week 2 - 10/1 Monday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
11/1/11 5 o’clock meeting 10
Activities in UX25 - Week 2 – 11/1 Tuesday
SSD/SDD cooling
Mu
on
TR
G:
RP
C
SPD cooling
Laser
TOF TRM
TP
C F
EC
Mu
on
TR
K:
bu
s-p
atch
es
EN-EL: pull control cables L3-Dipole lights – from CR5 to cupboard A-I side
Visit (15 people at 14:00). Werner
Philippe + A.Vinogradov: 9:00 switch PHOS cooling on tap water
Wash 4 bad sectors + repair heater (nacelle)
2 tables (DAQ)
Use RED nacelle
15:00: stop Ar/H2, C2H2F4, Isobutane, CH4 and SF6
SSD: removal of cooling pipe from corrosion test setup
Move new laser down to platform
TRP cables
Power cut: 9:05 – 9:45
11/1/11 5 o’clock meeting 11
Activities in MNF - Week 2 - 11/1 Tuesday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
11/1/11 5 o’clock meeting 12
Activities in UX25 - Week 2 - 12/1 Wednesday
Cooling towers maintenance (start 14:00) (No primary water)
SNIFFER maintenance
Install EMCal 80deg-C
SM9
Lower SM10 onto low beta platform
EM
C S
urv
ey
Mu
on
TR
G:
RP
C
SPD cooling
SDD/SSD
Laser
Cleaning rack filters (Philippe)
Maintenance UPS EBS106/2X and EBS128/2X (transparent)
PH-DT: new gas monitoring
TP
C F
EC
Euronews visit 10.20 - 11.30
Mu
on
TR
K:
bu
s-p
atch
es
TPC cooling
Visit (P-A.Giudici + 3 persons)
11/1/11 5 o’clock meeting 13
Activities in MNF - Week 2 - 12/1 Wednesday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
11/1/11 5 o’clock meeting 14
Activities in UX25 - Week 2 - 13/1 Thursday
Cooling towers maintenance (No primary water)
HM
PID
c
oo
lin
g
RAMSES: radiation source testsEN/CV: maintenance SG2 ventilation
DSS modification. Will stop the full DSS, trigger all interlocks, including stopping power to all racks
SNIFFER maintenance
Install EMCal 80deg-A
SM10E
MC
Su
rve
y
SPD cooling
SDD
Visit: (15 p.) Danish high school class (C. Søgaard)
TP
C F
EC
Mu
on
TR
G:
RP
C
Mu
on
TR
K:
bu
s-p
atch
es
Laser
TR
D L
V
TPC cooling
11/1/11 5 o’clock meeting 15
Activities in MNF - Week 2 - 13/1 Thursday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
11/1/11 5 o’clock meeting 16
Activities in UX25 - Week 2 - 14/1 Friday
Cooling towers maintenance (No primary water)
SPD cooling
SNIFFER maintenance
EN/CV: maintenance SG2 ventilation
RAMSES: radiation source tests
VA
C
EM
C S
urv
ey
EM
C S
urv
ey
SPD cooling
SDD
LACS: revision UX25 access doors
Removal EMCal
infrastructure
TP
C F
EC
Start pumping out
Mu
on
TR
K:
bu
s-p
atch
es
Laser
Visit (2 people). Resp. L.Pinsky
TR
D L
V
11/1/11 5 o’clock meeting 17
Activities in MNF - Week 2 - 14/1 Friday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
11/1/11 5 o’clock meeting 18
Activities in UX25 - Week 2 - 15/1 Saturday
Cooling towers maintenance (No primary water)
11/1/11 5 o’clock meeting 19
Activities in MNF - Week 2 - 15/1 Saturday
11/1/11 5 o’clock meeting 20
Activities in UX25 - Week 2 - 16/1 Sunday
Cooling towers maintenance (No primary water)
D.Budnikov at CERN
PHOS: maintenance crystal cooling plant
PHOScooling
11/1/11 5 o’clock meeting 21
Activities in MNF - Week 2 - 16/1 Sunday
11/1/11 5 o’clock meeting 22
AOB
• -