• Visit from Dennis Schrumpf / Matt Schaeffer, ConocoPhillips Wood River in January 2008
– Request of improvements with alignment of driver to pump.
– Request for elimination of dowel pinning or reworking procedures.
– Request was specific to Sundyne OH3 Bearing Box Pump (Sundyne LMV-80x Series).
– LMV 80x pumps shown in earlier slides are API OH5 designs with the impeller mounted directly on the driver shaft. Add a bearing housing (bearing box) to convert to OH3 design.
Timeline of Events
• API OH3 Compliant• Back-to-Back Angular Contact
Bearings• More Modular
– Uses same coupling housing as Gear-Driven Units
Overview of Bearing Box Changes
Coupling Housing Change
• Previous Design:Fabricated from Steel
• New Design:Cast Aluminum
• Request for Improved Alignment Well Timed:– New Design Being Implemented
• One Piece Casting– All configurations with 3 castings– Ability to hold high tolerances
• Aluminum (Light Weight)• Non-Sparking• All DBSE Problems Addressed• Coupling Alignment Issues
Addressed
Overview of Coupling Housing Changes
Coupling Alignment Fix
• Change was Implemented Across All Sundyne LMxProducts – Direct Drive and Gear Driven– Fix was considered a global
product improvement.
Proposed Changes• Change:
– Dimensions– Tolerances
• 0.005 Unilateral to 0.004 Equilateral
Bearing Box / Gearbox
Coupling Housing
MotorNominal – 0.0015
±0.002
Nominal + 0.0015±0.002
Nominal – 0.0015±0.002
HO13AA03HO13AA04HO13AB03
HO06AA16HO06AA19HO06AB01HO06AA05HO06AG04HO06AW03
• To Date:– Data taken on 4 sets of
hardware, 16 combinations.– Data as Follows:
TIR Conc TIR AngAvg 0.007125 0.002625Max 0.014 0.005Min 0.0015 0.0005
Preliminary Results
TIR Conc TIR AngAvg 0.005542 0.002417Max 0.011 0.005Min 0.0015 0.0005
• To Date:– One housing appears to give
consistently bad values.– Inspection being performed to
determine cause. Without housing, data as follows:
Preliminary Results
• Sundyne feels confident it can achieve:
TIR Conc. TIR Ang.Avg. 0.005 0.003Max 0.010 0.005
• Future Plans: – Evaluate Per PN 41.25-52 30
units to see actual results– Revise, if necessary, assumptions
and design to achieve goal
Preliminary Results
• Process note 41.25-52 attached• ISO Form 2910 attached
– Alignment Verification Report – Included in Final Documentation