GRID Alstom Grid Analyst Day Nantes 28 th February 2013 Grégoire Poux-Guillaume

Upload: others

Post on 14-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

GRID

Alstom GridAnalyst Day

Nantes28th February 2013

Grégoire Poux-Guillaume

Page 2: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

2

Agenda

I. Grid within Alstom

IV. Focus on HVDC

V. Focus on Smart Grid

II. Growing but challenging market

VI. Conclusion

III. Grid 3 strategic priorities

P 2

Page 3: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

3

• Overheads cost synergies

• Use of Global Power Sales network

• ALSTOM Group a Top 5 customer

Grid successfully integrated within ALSTOM

THERMAL POWER

RENEWABLEPOWER

• Boost local presence of Grid Services leveraging Thermal Services sites

• GCB and e Bop offering to connect power plants

• Automation & control technologies synergies

• Optimised AC and DC solutions for wind farms

• Smart Grid solutions for renewable power generation

• Energy storage for solar & wind through power conversion

GRID

P 3

Page 4: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

4

Alstom Grid Scope

What we do• Transformers and Switchgear for HV, and associated service• Automation and Network Management for HV, MV and Smart Cities• Power Electronics (HVDC, FACTS)• EPC to sell products

What we don’t do• Transformers and Switchgear for MV• LV products• EPC for the sake of EPC

P 4

Page 5: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

5* Consolidated for 10 months (from June 2010 to March 2011)

Orders progressing – Book to Bill > 1

• Good dynamics on order intake

• H1 Book to Bill of 1.2

• 2 HVDC projects booked LTM− ca. €250m South West Link in Dec ‘11 − ca. €400m Champa in Aug ‘12

• Well balanced by region

• Customers slowing down projects, impacting sales

+18%

H1 2012/13

2,180

FY 2010/11*

3,434

FY 2011/12

1,853

H1 2011/12

4,003

H1 2012/13

1,8631,844

FY 2010/11*

3,653

H1 2011/12

4,013+1%

FY 2011/12

Orders (€ million)

Sales (€ million)

P 5

Page 6: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

6

Margin resilient despite difficult market conditions

• Performance driven by strongexecution and cost optimisation

• Ramp-up of sales key to support performance improvement

218 248

107 113

H12012/13

+6%

6.1%

H12011/12

5.8%

FY2011/12

6.2%

FY*2010/11

6.0%

* Consolidated for 10 months (from June 2010 to March 2011)

Income From Operation (€ million and % of sales)

P 6

Page 7: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

7

Orders mix shifting towards more HVDC and Smart Grid

Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c)

1.31.4 1.4

10/11 (a) 11/12 12/13 (b)

1.61.7

1.9

10/11 (a) 11/12 12/13 (b)

0.2

0.50.7

10/11 (a) 11/12 12/13 (b)

0.30.5 0.5

10/11 (a) 11/12 12/13 (b)

• Significant HVDC and Smart Grid increase• Products flat, in line with market trend• Turnkey mix moving towards more Power Generation, Industry and Oil & Gas

(a) Consolidated for 10 months (from June 2010 to March 2011)(b) 12/13 values are April – Dec 12 linearised over 12 months(c) Automation and Network management

-1%

+10%

+31%+7%

P 7

Page 8: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

8

Europe 40 Manufacturing & Engineering sites 3 R&D Technology centres 30% of global order intake

Europe 40 Manufacturing & Engineering sites 3 R&D Technology centres 30% of global order intake

Middle East & Africa 13 Manufacturing & Engineering sites 20% of global order intake

Middle East & Africa 13 Manufacturing & Engineering sites 20% of global order intake

Asia 22 Manufacturing & Engineering sites 1 R&D Technology centre 30% of global order intake

Asia 22 Manufacturing & Engineering sites 1 R&D Technology centre 30% of global order intake

Industrial footprint and orders balanced

Americas 13 Manufacturing & Engineering sites 1 R&D Technology centre 20% of global order intake

Americas 13 Manufacturing & Engineering sites 1 R&D Technology centre 20% of global order intake

P 8

Page 9: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

9

Agenda

I. Grid within Alstom

IV. Focus on HVDC

V. Focus on Smart Grid

II. Growing but challenging market

VI. Conclusion

III. Grid 3 strategic priorities

P 9

Page 10: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

10

Solid long term market fundamentals

Increase of Renewables

within Energy mix

Electricity Consumption &

Generation

Ageing of the installed

infrastructure

Long term Drivers Impact on Grid Market

Medium LowHighImpact of driver on segment

Global Importance

• Main driver for Grid expansion, new substations and related HV products

• Challenge to improve Energy efficiency across the value chain

• Challenge to maintain Grid stability• Impact on HVDC for interconnections

and offshore wind tie-in• Impact on Smart Grid for renewable

energy management systems

HV Products

Segment

Smart Grid Power Electronics Service

• Challenge to maintain Grid reliability• Driver for Replacement market

Source: AlstomP 10

Page 11: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

11

50

40

30

20

60

FY15/16eFY14/15eFY12/13e

Alstom Grid Scope

FY13/14eFY11/12

Conventional AC

HVDC

Service

Smart Grid

€40 billion market with 3% CAGR• Growth driven by HVDC and Smart Grid

• Conventional AC flat

• Service and Industrial growing faster

CAGR12/13 – 15/16

1%

28 %

4 %

11 %

In € billion

Smart Grid not addressed by ALSTOM: Meters, Telecomfor Distribution, MDMS, Secondary Distribution Automation

Smart Grid addressed by ALSTOM: Network management systems, Telecom for Transmission, HV and Primary Distribution Automation

HVDC and Smart Grid as key market growth drivers

P 11 Source: Alstom

Page 12: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

12

65

70

75

80

85

90

95

100

• Price erosion stabilizing at low level

• Price pressure maintained by

− Over-capacity in AC products − EPC contractors packaging

third party equipment

• Some disparities between regions

− Anti-dumping in USA for Power Transformers: price increase?

− Slight uptick in China− Price erosion continuing in India

Last 8 awarded

Sources: Alstom, market data

2009 2010 2011 2012

6065707580859095

100

Project 1(Aug

2008)

Project 2(Aug

2008)

Project 3(Oct

2010)

Project 4(Dec

2010)

Project 5(Mar2011)

Project 6(Aug

2011)

Project 7(Sept2011)

Project 8(Dec

2012)

AC price stabilising - at low level

Grid market price evolution

Example: Koweit 400kV GIS S/S

P 12

Page 13: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

13

Agenda

I. Grid within Alstom

IV. Focus on HVDC

V. Focus on Smart Grid

II. Growing but challenging market

VI. Conclusion

III. Grid 3 strategic priorities

P 13

Page 14: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

14

Strategic prioritiesFocus on high value segments and growth drivers1

HVDC• Growing market with high barriers to entry• 2 key technologies: LCC and VSC• Major recent commercial successes in 800kV LCC and VSC• More to come?

Smart Grid• 3 priorities

− Control Rooms (market leader)− Smart Power Electronics− Substation Automation

• 30 commercial projects, 30 ongoing demonstrators

P 14

Page 15: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

15

Strategic prioritiesFocus on high value segments and growth drivers1

Service• Achieve double digit growth without sacrificing margins• 4 key axes:

− geographical coverage− Industry & Power generation− third party services− asset management

Industry / Oil & Gas• Reinforce our positioning• Develop Smart Grid offering and Services• Comprehensive offer through targeted MV partnerships• Acquisition of O&G SCADA company

P 15

Page 16: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

16

2012Commercial successes

• Abu Dhabi –TRANSCO: 2 GIS substations of 220 kV and 400 kV

• India – Power Grid: world’s first 1,200 kV optical instrument transformer and disconnector

• USA – Florida Power & Light: fleet managementfor 350 transformers

• Chile – Transelec: first contract for 550 kV GIS substation

• Germany – Tennet and TransnetBW: MSCDN system and switchgear panels for TransnetBW

• Australia – Chevron: substations for Oil & Gas Wheat Stone project

• Portfolio extended with GIS 420 kV Single chamber and AIS dead tank 362 kV

• World’s largest special Industrial transformerbuilt by Gebze factory for German Railways

• Green offering strengthened with VL 109 72.5 kV Vacuum Circuit Breaker

• First sales of new Resin Impregnated Paper (RIP) 245kV bushing technology

• Digital substations in France and Russia

• DC Circuit Breaker prototype successful tests with RTE

2012R&D successes

… while remaining a key player on AC business

P 16

Page 17: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

17

Strategic prioritiesKey partnerships to support and expand growth focus

• China: commercial and technology partnership with Shandong (SGCC) for 800/1,100 kV DC Transformers

• Korea: 49/51 JV with KEPCO to serve local HVDC market (Oct 2012)

• Russia: 50/50 JV with KER to serve local HVDC market

• France: DC converter solutions with CEA (July 2012) and industry initiative for Supergrid (IEED)

• Cisco (USA): communications and data protection solutions for digital substations (Sept 2012)

• Toshiba / Landis & Gyr (Japan): smart grid solutions for distribution systems (Sept 2012)

• Cap Gemini: cloud-based solutions and control room IT integration (Jan 2013)

• Itron: smart metering integration

• Saft: battery storage

• Bouygues: smart buildings

2

P 17

HVDC Smart Grid

Page 18: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

18

Strategic prioritiesCost optimisation to offset price pressure in AC

• Double digit % cost reduction– Redesign-to-cost on HV Products– New product introduction– Major quality initiative

• Drive down S&A– HQ downsized– Sales efficiency programme– Organisation simplification

• Sourcing Transformation – Sourcing in R&D and tender stages– Supplier panel rationalisation

3

• Adapt to market – 4 sites being closed

(Mexico, Australia, China x 2)– Rationalisation in Europe

Site redeployments Product Cost Optimisation

Sourcing leverage Overhead reduction

P 18

Page 19: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

19

Agenda

I. Grid within Alstom

IV. Focus on HVDC

V. Focus on Smart Grid

II. Growing but challenging market

VI. Conclusion

III. Grid 3 strategic priorities

P 19

Page 20: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

20

9

3

2011/12 2020/21e

• Market divided into 2 technologies− Line-commutated converters (LCC) − Voltage-sourced converters (VSC)

• Solid key drivers: bulk power transfers, renewable energy integration, Supergrid development

• Increased country interconnections in specific markets (Europe, Middle-East, North America)

• Race for higher voltages (800kV+) in Chinaand India

• Offshore wind essentially in EuropeVSC

LCC

Source: Alstom

In € billion

HVDC market to triple in 10 years

HVDC market Market Trends

Technology breakdown next 3 years

P 20

Page 21: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

21

LCC Back-to-back

LCC Point-to-point

VSC

McNeill: 150 MWNelson River OHL: 3,000 MW

Dürnrohr: 380 MWIFA2000 (Fra/UK): 2,000 MWKonti-Skan 1: 380 MWSACOI: 380 MWSouth West VSC: 2x720 MW

China-Russia: 750 MWLingbao II: 750 MW3G-Shanghai II: 3,000 MWNindong-Shandong: 4,000 MWCheju-Haenam: 300 MWCheju-Jindo: 400 MW

GCCIA: 3x600 MWCahora Bassa: 1,920 MW

Chandrapur: 2x500 MWVizag: 500 MWSasaram: 500 MWChampa: 3,000 MW

Rivera: 70 MWMelo: 500 MWRio Madeira: 3,150 MW

Alstom Grid HVDC> 30 GW installed, 50 years of experience

Source: AlstomP 21

Page 22: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

22

Porto Velho

AraraquaraSao

Paulo

Kurukshetra

Champa

• Rio Madeira (Brazil): the longest DC line in the world (2,375 km)− Technology: LCC− 600 kV - 3,150 MW− Contract award: 2009 – Completion 2013

• Champa (India): a reference in 800 kV− Technology: LCC− 800 kV - 3,000 MW− Contract award: August 2012 – Completion 2015

• South West Link (Sweden): world’s first multi-terminal VSC− Technology: VSC− 300 kV - 1,440 MW− Contract award: December 2011 – Completion 2015

Phase 2

Phase 1

Alstom Grid HVDCMain projects in execution

P 22

Page 23: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

23

• Target ~€2.5 billion orders over the next 3 years− Break into offshore wind (Germany, Baltic Sea)− Leverage partnerships for entry in Korea, China and Russia− Build talent base: R&D, Engineering, Project Management

• Be at the edge of innovation in both technologies

• Integrated offering up to 1,100 kV (valves + converter transformers+ bushings)

• Stafford Centre (UK): HVDC / UHVDC equipment up to 1,100 kV

• 4 Transformer units qualified to 800 kV

• Create world-class referencewith Svenska Kraftnät (Sweden)

• VSC 2nd Generation under development

• Controlled development in offshore

LCC VSC

Alstom Grid HVDCAmbition: sustainable 20+% market share

P 23

Page 24: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

24

Agenda

I. Grid within Alstom

IV. Focus on HVDC

V. Focus on Smart Grid

II. Growing but challenging market

VI. Conclusion

III. Grid 3 strategic priorities

P 24

Page 25: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

25

39

20

• € 20 billion market with T&D contributing to the bulk of it

• Market driven by− Renewable integration (intermittency)− Need to reduce consumption peaks− Increasing distributed generation− EV integration− Requirements for more cyber security

Source: Alstom

Smart Grid market to double in 10 years

Global Smart Grid market (in € billion)

2012 2020e

HomesBuildings

T&D

Generation

P 25

Page 26: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

26

Segment ALSTOM GridPresence

Control Rooms

Telecom

SAS-DA

Smart Meters

Power Electronics

2012 2020e

9%

4%

4%

16%

Power Electronics

SAS-DA

Control Rooms

Telecom

7%

12%Smart Meters

21

10

Full ALSTOM offering No ALSTOM offering

Alstom Grid SmartgridPresent across the value chain

Smart Grid T&D market (in € billion)

CAGR

Source: AlstomP 26

Page 27: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

27

Alstom Grid SmartgridLeader in Control Room applications

• # 1 in Control Rooms• Over €40 billion transactions per

year on our systems• > 70% of USA deregulated markets

Online Stability Renewable Integration Integrated DMS / Demand Response

Smart-Cities

Continuous integration of new control room applications

P 27

Page 28: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

28

Alstom Grid SmartgridDeploying its solutions all across the Grid

Digital substation Distribution AutomationEnergy Storage

• Leading innovator in automation and storage for the grid

• > 1,000 HV substations equipped

Extension towards new distribution automation and storage

P 28

Page 29: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

29

EU

DERMS (Grid4EU)

Alstom Grid SmartgridJoint innovation through strategic demonstrations

ERDF

DERMS (Vendée)

ERDF

DERMS (NiceGrid)

Veolia

DERMS (Reflexe)

GDF Suez

EMBIX (Greenlys)

GDF Suez

DERMS (smart campus)

Pilots

IssyLes Moulineaux

EMBIX (IssyGrid)

Duke Energy

DERMS (DOE)

RTE

Digital Substation

WPD

Distribution Automation (Falcon)

UKPN

Distribution Automation (FPP)

SNCF / Econoving

Program Gare

CEA

Meshed DC (Winpower)

ESB

Fast Charging DC (Green e-motion)

EU

DC breakers, WAMS (Twenties1)

MEW - Kuwait

DRMS

MEW - Kuwait

On-line Asset

Innovation, Prototype

Philadelphia

DERMS (Navy yard)

Strategy, Early Concept

BOUYGUES

EMBIX (Eco2charge)

EDF

DRMS B2C

Twenties +(WP2013)

EU

EMBIX (Cooperate)

Infrax

DERMS (Slim)

BPA

DRMS (DOE)

ELIA

Online Stability (AFTER)

ELIA

DERMS (e-storage)

P 29

Page 30: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

30

Alstom Grid SmartgridAmbition: double digit growth

• End-to-end offering for Transmission & Distribution• Transform our 30 R&D demonstrators into large scale commercial projects

• Consolidate key markets− USA: Demand Response, integration of renewable energies− Europe: integration of renewable energies, Smart Cities

• Roll-out of new systems − Digital Substations (Russia, France)− Smart control rooms: distributed

generation & storage management

• Co-developments on plant flexibility + offshore connections (Alstom Thermal & Renewable)

• Commercial focus: Distribution Automation (Demand Response)

• R&D: converters for renewables and storage, Demand Response IEDs

• Partnerships in Smart Buildings & Cities and public transport (Alstom Transport)

Transmission Distribution

P 30

Page 31: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

31

Agenda

I. Grid within Alstom

IV. Focus on HVDC

V. Focus on Smart Grid

II. Growing but challenging market

VI. Conclusion

III. Grid 3 strategic priorities

P 31

Page 32: Alstom Grid Analyst Day · 7 Orders mix shifting towards more HVDC and Smart Grid Loose Products Turnkey & Service HVDC & FACTS Smart Grid (c) 1.3 1.4 1.4 10/11 (a) 11/12 12/13 (b)

32

Conclusion

Well positioned to capture growth• Strong technology offering• Significant R&D spending• Key partnerships in place

Focus on operational excellence• Optimise footprint• Cut overheads• Competitiveness through new or re-designed products• Extract cost savings in sourcing, quality, project execution

Still targeting 8% operating margin• Current market tension will delay but ambition unchanged

P 32