alternative positioning, navigation & timing (apnt) study ... · pdf filealternative...

31
Federal Aviation Administration Alternative Positioning, Navigation & Timing (APNT) Study Update November 9, 2011

Upload: dangdan

Post on 17-Mar-2018

232 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

Federal Aviation Administration

Alternative Positioning,

Navigation & Timing

(APNT)

Study Update

November 9, 2011

Page 2: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

2 Federal Aviation Administration November 9, 2011

Why APNT?

• The transformation of the National Airspace System (NAS) to the Next

Generation Air Transportation System (NextGen) relies on GPS-Based

PNT services and suitable alternate PNT services

– Current ATC system cannot be scaled up to handle 2X traffic

– 2X traffic is more than a controller can handle using radar vectors

– RNAV and RNP procedures for trajectory-based operations (TBO)

– Automation will separate aircraft performing trajectory based operations (TBO)

– Controllers intercede to provide “control by exception”

• TBO Operations may require PNT performance that exceeds

DME/DME/IRU

• GPS vulnerability to radio frequency interference (RFI) requires

mitigation

– Waiting for the source of the interference to be located and turned off is not an acceptable alternative

Page 3: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

3 Federal Aviation Administration November 9, 2011

PBN Benefits

• Radar vectors are less

efficient use of the airspace

• Use of RNAV departures

enable nearly two fold

increase in capacity.

Page 4: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

4 Federal Aviation Administration November 9, 2011

GNSS Challenges: GPS Testing by DOD

•139,795 •66,018 •455,805

•Geographical Area Impacted

•Maximum •Miles •2 •Minimum

•Miles •2 •Average

•Miles •2

139,795 66,018 455,805

Geographical Area Impacted

Maximum Miles 2 Minimum

Miles 2 Average

Miles 2

•782 Hours •90 days

•Cumulative

•Duration •141 •NOTAMs

•Shortest •1.0 hour

•Average •6.63 hours

•Longest •72 hours

782 Hours 90 days

Cumulative

9 Month Duration 141 NOTAMs

Shortest 1.0 hour

Average 6.63 hours

Longest 72 hours

Page 5: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

5 Federal Aviation Administration November 9, 2011

Commercially Available GPS Jammer (so called “Personal Privacy Device”)

Page 6: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

6 Federal Aviation Administration November 9, 2011

Zeta “SnapShot” System Data

•Baseline/Nominal L1 RF •Broadband RFI straddling L1

Page 7: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

7 Federal Aviation Administration November 9, 2011

… and a few more “Personal Privacy Devices”

$55 Ebay

$110 Ebay $335 Ebay

$92 Ebay

$152 Ebay

$40 GPS&GSM

www.chinavasion.com

$83 GPS&GSM

www.Tayx.co.uk

Page 8: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

8 Federal Aviation Administration November 9, 2011

APNT Alternatives Analysis

APNT Study will investigate three alternatives:

• Distance Measuring Equipment (DME)

Expansion of the DME network, and improve the performance of the DME systems to enable RNAV-0.3 operations without avioncs changes

• Wide Area Multilateration (WAM)

Use WAM systems to compute aircraft position and send this information to the aircraft. This alternative would leverage ADS-B In avionics, which the standards are still being developed

• Pseudolite (PDL)

The DME and possibly GBT facilities would be modified to also transmit a pseudolite signal that aircraft would use to computes its position. It would require new equipment in the aircraft and on the ground.

Page 9: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

9 Federal Aviation Administration November 9, 2011

PNT Performance Zones

5 SM of Airport

Zone- 1

Enroute High CONUS

FL-600

FL-180

5000’ AGL

Zone- 2

Enroute Low CONUS Zone-3 Terminal

OEPs + Next 100 Busiest Airports

2° Slope from 500’ AGL

27 SM 89 SM

Page 10: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

10 Federal Aviation Administration November 9, 2011

Zone 1, 2, and 3 Geographic Areas

Page 11: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

11 Federal Aviation Administration November 9, 2011

APNT Alternative 1 Optimized DME Network

Page 12: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

12 Federal Aviation Administration November 9, 2011

1100 DMEs in Current Nework

Page 13: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

13 Federal Aviation Administration November 9, 2011

Assumed Upgraded DME-DME Coverage

18,000 ft MSL

13

Page 14: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

14 Federal Aviation Administration November 9, 2011

DME Next Steps

• Propose requirements changes for the current DME

program

– Enable RNAV 0.3 accuracy without avionics changes

– SELEX will require resources to access the impacts

• Prepare a P3I feasibility study for SELEX

– Potential to achieve ADS-B 92.6 meter accuracy requirement

– Use of DME stations to receive MLAT signals

– Potential use of DME stations as combined/MLAT/GBT stations

Page 15: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

15 Federal Aviation Administration November 9, 2011

APNT Alternative 2 Wide Area Multi-Lateration

Page 16: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

16 Federal Aviation Administration November 9, 2011

Passive Wide-Area Multi-Lateration

(WAM)

Combined DME/GBT Network

2 - WAM Receives Signal

3 - Aircraft Position Determined

4 - Aircraft Position Sent to GBT’s

1 –Aircraft Transmits ADS-B Signal

6 – Aircraft Uses Own Position for Navigation

5 - TIS-B Sends

Position to Aircraft

Page 17: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

17 Federal Aviation Administration November 9, 2011

SBS Site Locations

335 Sites Reporting on Network.

345 Sites Constructed.

84 Sites in Planning or

Construction.

Page 18: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

18 Federal Aviation Administration November 9, 2011

Combined DME and GBT Sites

Page 19: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

19 Federal Aviation Administration November 9, 2011

Compatibility of DME/GBT

• DME’s and ADS-B Ground Stations can add passive MLAT Receivers to existing systems

• ADS-B/MLAT and DME can share the same antenna since they are in the same frequency band

• Independent, precise position of the WAM stations is established and through measuring the time of squitter signal arrival the position of the aircraft is determined

• Backup timing and synchronization method will need to be identified to compensate for loss of GPS time sync

• Distributed receivers in DME and ADS-B GS measures TOA and forwards to WAM master stations where aircraft position and integrity bounds are computed

• Aircraft position information is broadcast back to the user via TIS-B to support determining its navigation solution

Page 20: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

20 Federal Aviation Administration November 9, 2011

WAM - Initial Analysis Data

Washington Dulles San Francisco

Philadelphia

Page 21: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

21 Federal Aviation Administration November 9, 2011

WAM Next Steps

• Industry resources are needed to fully investigate

this alternative

• APNT team has prepared a statement of work and

IGCE for an Industry Study Contract

– Use of ITT contract under SBS program

Page 22: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

22 Federal Aviation Administration November 9, 2011

APNT Alternative 3 DME Pseudolites (DMPL)

Page 23: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

23 Federal Aviation Administration November 9, 2011

Pseudolite Alternative Concept

• Combined Network of DME/GBTs etc

• GPS-Independent Time Reference

• 1 Hz Message ID and Time @ Transmit

• PNT Data Broadcast Channel

• Aircraft Calculates Position

• RAIM Based Integrity Solution

Page 24: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

24 Federal Aviation Administration November 9, 2011

Combined DME and GBT Sites

Page 25: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

25 Federal Aviation Administration November 9, 2011

Pseudolite Technologies

Ground Based

Transceivers DME

DME (RNAV) Enhanced 978-1215 MHz

SM PL 960-977 MHz

One possibility 1. Commercial uses DME and/or DME PL + UAT PL 2. GA uses DME PL + UAT PL 3. Legacy user can still use DME

UAT (PL) 978 MHz

DME PL 978-1215 MHz

• APNT can use existing systems + new avionics

• DME PL+UAT PL can use single antenna

Page 26: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

26 Federal Aviation Administration November 9, 2011

Pseudolite Next Steps

• Investigate expansion of Locata technology for

nationwide service

– Air Force Institute of Technology proposal – $500K

– Cooperation with 746 Test Squadron, Holloman AFB, NM

• Stanford University continue to research DME –

pseudolite concept

– Modulate heartbeat signal on existing DMEs

– Use of 960 – 978 Mhz frequency band for PDL broadcast

– Possible use of nation wide DME channel for PDL

Page 27: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

27 Federal Aviation Administration November 9, 2011

APNT Timing Service

Page 28: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

28 Federal Aviation Administration November 9, 2011

DMEs + Planned DMEs + GBTs

Ground-to-Ground Time Synchronization

30 dB of

processing

gain

GEO: WAAS L5

MEO: GNSS

LEO: MSS

Page 29: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

29 Federal Aviation Administration November 9, 2011

J F M A M J J A S O N D J F M A M J J A S 0 N D J F M A M J J A S O N D J F M A M J J A S O N 2011

Program Goals 2012

1. Preliminary ACAT Determination

2. Preliminary Shortfall Analysis Report

3. Concept Requirements Definition Plan

4. CRD Readiness Decision

5. Enterprise Architecture Roadmap Update

6. CONOPS Documentation

7. Shortfall Analysis Report

8. Functional Analysis Document

9. Range of Alternatives

10. Enterprise Architecture Products

11. Award Industry Study Contract

12. Safety Risk Management

13. Preliminary Requirements Document

14. Estimate Cost and Benefits

15. Investment Analysis Plan

16. Final ACAT Designation

17. Investment Analysis Readiness Decision

18. Manage Industry Study Contract

2013

2014

Page 30: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

30 Federal Aviation Administration November 9, 2011

Summary

• NextGen Operational Improvements enabled by performance based navigation capabilities increases dependence on GPS and alternate PNT services

• GPS vulnerability to radio frequency interference needs to be addressed for trajectory based operations at some locations

• Alternatives are being studied for further consideration

Page 31: Alternative Positioning, Navigation & Timing (APNT) Study ... · PDF fileAlternative Positioning, Navigation & Timing (APNT) Study Update November 9, ... existing systems + new avionics

APNT Study Brief to PNTAB

31 Federal Aviation Administration November 9, 2011

Questions