1 frpa quiz show harvesting & roads module frpa training program february 2004

Post on 16-Jan-2016

213 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

1

FRPA Quiz Show

Harvesting & Roads Module

FRPA Training Program

February 2004

Harvesting & Roads Module

2

Practice Requirements

The practice requirements in FPPR can be changed through an approved:

a) Exemption to some practice requirements

b) Alternative in FSP to “default results and strategies” in FPPR

c) Both “a” and “b”d) “a” only

Harvesting & Roads Module

3

Practice Requirements

Answer: C – “a” and “b”

The practice requirements in FPPR can be changed through an approved:

a) Exemption to some practice requirements

b) Alternative in FSP to “default results and strategies” in FPPR

Harvesting & Roads Module

4

Transition to FRPA

Harvesting under a cutting permit issued for areas under an approved FDP can continue once FRPA is in effect.

True

False

Harvesting & Roads Module

5

Transition to FRPA

Answer: True – in this case, harvesting follows the requirements of the FPC

Harvesting under a cutting permit issued for areas under an approved FDP can continue once FRPA is in effect.

Harvesting & Roads Module

6

Notify Government

Licensees must notify government before:

a) Starting timber harvesting

b) Starting construction of roads that are permanent access structures

c) Starting layout of cutblocks and roads

d) All of the above

e) “a” and “b”

Harvesting & Roads Module

7

Notify Government

Answer: E – “a” and “b”

Licensees must notify government before:

a) Starting timber harvesting

b) Starting construction of roads that are permanent access structures

Harvesting & Roads Module

8

Maximum Cutblock Size

An alternative result or strategy to the maximum cutblock size of 40 ha and 60 ha can be proposed in the FSP.

True

False

Harvesting & Roads Module

9

Maximum Cutblock Size

Answer: True

An alternative result or strategy to the maximum cutblock size of 40 ha and 60 ha can be proposed in the FSP.

Harvesting & Roads Module

10

Green-up

An exemption to the requirement for harvesting adjacent to another cutblock can be obtained from the Minister of Forests.

True

False

Harvesting & Roads Module

11

Green-up

Answer: False – an alternative result and/or strategy can be proposed in the FSP but not an exemption.

An exemption to the requirement for harvesting adjacent to another cutblock [cannot] be obtained from the Minister of Forests.

Harvesting & Roads Module

12

Wildlife Trees Retention Areas

An alternative result or strategy to the restriction on harvesting in a wildlife tree retention area can be proposed in the FSP.

True

False

Harvesting & Roads Module

13

Wildlife Trees Retention Areas

Answer: True -- an exemption can also be requested from the Minister of Forests.

An alternative result or strategy to the restriction on harvesting in a wildlife tree retention area can be proposed in the FSP.

Harvesting & Roads Module

14

Course Woody Debris

Course woody debris requirements include retaining at least 4 logs per hectare on a cutblock.

True

False

Harvesting & Roads Module

15

Course Woody Debris

Answer: True

Course woody debris requirements include retaining at least 4 logs per hectare on a cutblock.

Harvesting & Roads Module

16

Defences under FRPA

Defences under FRPA are:a) Due Diligence

b) Mistake of Fact

c) Officially Induced Error

d) Consistency with objectives

e) “a”, “b” and “c” only

f) All of the above

Harvesting & Roads Module

17

Defences under FRPA

Answer: E – “a”, “b” and “c”

Defences under FRPA are:a) Due Diligence

b) Mistake of Fact

c) Officially Induced Error

Harvesting & Roads Module

18

Annual Report

One of the items to report in the Annual Report is the location of wildlife habitat features in or contiguous to a cutblock/road that has not previously been reported (and required to be reported).

True

False

Harvesting & Roads Module

19

Annual Report

Answer: True

One of the items to report in the Annual Report is the location of wildlife habitat features in or contiguous to a cutblock/road that has not previously been reported (and required to be reported).

Harvesting & Roads Module

20

Road Layout and Design

RLAD plans are required but not approved under FRPA .

True

False

Harvesting & Roads Module

21

Road Layout and Design

Answer: False -- FRPA requires roads and structures to be constructed such that they are structurally sound and safe and to engineering requirements were established.

RLAD are not referred to, nor required, nor approved under FRPA.

Harvesting & Roads Module

22

Road Deactivation

Under FRPA , how long does a District Manager have to approve or disapprove a licensee’s declaration that a road is deactivated?

a) 60 days

b) 15 months

c) 15 years

d) Length specified by licensee in declaration

Harvesting & Roads Module

23

Road Deactivation

Answer: B

Under FRPA , how long does a District Manager have to approve or disapprove a licensee’s declaration that a road is deactivated?

b) 15 months

Harvesting & Roads Module

24

Responsibilities

When harvesting and constructing roads under FRPA , licensees are responsible for:

a) Delivery of results and strategies in an approved FSP

b) Delivery of government objectivesc) Meeting practice requirements in

regulationd) All of the abovee) “a” and “c”

Harvesting & Roads Module

25

Responsibilities

Answer: E – “a” and “c”

When harvesting and constructing roads under FRPA , licensees are responsible for:

a) Delivery of results and strategies in an approved FSP

c) Meeting practice requirements in regulation

top related