LGCDP - Progress, Opportunities & Challenges

Som Lal Subedi

National Programme Director

2

Why LGCDP

• Poverty reduction through improved services

• Strengthening both supply & demand sides of local governance

• Aid effectiveness & harmonization through Decentralization & SWAp

• Structural reform in grant system

• Capacity building

3

Underlying Principles of LGCDP• Social inclusion & gender equity

• Downward accountability

• Performance & equity-based funding

• Rights-based community-led development

• Balancing the demand & supply sides of

development

• Harmonized & process driven approach

(aligned with Paris Declaration)

4

Major Instruments of LGCDP

• MCPM

• Information, education & communication

• Social mobilization

• LGAF

• Capacity grants & capacity development

• Topping up grants

• Blending government & TA inputs

5

Programme Opportunities

• National coverage of 75 DDCs, 58 Municipalities & 3915 VDCs

• Serving all people in all corners but targeted at those most in need

• Working with all spheres of governance - public sector, private sector & civil society

• Supported by a unified approach from government & DPs

66

AchievementsOutput One - Communities & Community Organisations Participate in the LG Process

• Social Mobilization guidelines approved

• District Social Mobilization Committee

formed in 8 Districts

• SM monitoring underway

7

88

Achievements - Output 2 Increased capacity of citizens, communities & marginalised groups to assert their rights

& hold LBs accountable• IEC guidelines developed & approved

• LGAF NC formed & active – Civil Society Representatives selected

• DAG training guidelines approved - Rs 1 lakh grant provided to all 75 DDCs

• CD of district Dalit & Janjati coordination committee guidelines approved - Rs 1 lakh grant provided to all 75 DDCs

99

Achievements - Output 3 LBs gain access to greater fiscal resources in

equitable & appropriate ways

• Topping-up grant – guidelines for DDC, VDC & Municipality approved

– Around Rs 2.5 billion provided to 67 DDCs, 56 Municipalities & 2,749 VDCs

• All 58 Municipalities assessed for MCPMs

• Overview of finance system - MCPMs, block grant guidelines, allocation completed

• QA manual for MCPM prepared & piloted in 5 DDCs & 4 Municipalities.

1010

Achievements - Output 4Appropriate CD services passed at all

levels of LG service delivery • Capacity Development manuals for all LBs

designed & approved

• CD plan preparation service providers in all DDCs & Municipalities selected

• CD grant provided to all DDCs & Municipalities

• Over 3,000 LB staff, service providers & politicians oriented on LGCDP; CD plan; social mobilization; GESI; MCPM; environmental & social safeguards & M&E

1111

Achievements - Output 5LBs’ service delivery mechanisms &

processes fine-tuned

• Sector conditional grant manual developed &

approved

• Grant provided to 5 DDCs to implement sector

conditional grant system

• EoIs for 28 activities assessed & RfPs for 9

issued

• SWAp background prepared

1212

Achievements - Output 6 Decentralisation policy enables more

effective, transparent & accountable LBs

• Operation manual on implementation of social & environment safeguard measures approved

• Environment focal desk established in 75 DDCs & grants provided

• Guide for Environment Management Plan for infrastructure projects prepared

• DIMC meeting organized

1313

Achievements - Output 7Enhanced capacity of national government

& institutions to support LBs • MLD’s CD action plan developed & approved • MLD’s HR section upgraded with IT support • MLD’s GESI section established • Exposure visits for MLD & LBFC staff • Baseline survey of 60 districts completed• Workshop on future structure & role of LBs in

federal structure organized for legislature • Policy paper on LBs’ role in federal system

prepared

1414

Achievements - Output 8 Programme implementation support

• PCU fully operational

• 11 National specialists appointed

• Cluster Units established in 5 regions & 5 Cluster Coordinators recruited

• District Facilitators recruited in 61 DDCs

• NDVS selected (100 volunteers)

• LGCDP Operations’ Manual drafted

15

Achievements -

Institutional mechanisms

• Oversight Arrangements operational – NAC, NACSC, JFA, UNJPSC meetings held

• Coordination arrangements operational– Thematic Groups functioning– Procurement evaluation teams established– Periodic review workshops underway

• QAM & Annual Technical Review underway

• Workplans & budgets prepared & updated

16

LGCDP Continues to Expand• JFA has two more signatories &

preparation for 2 more completed

• UNIFEM is a new partner

• UNDP’s Poverty & Environment Initiative linked into LGCDP

• PASRA to be aligned with Social Mobilization

• Innovative Social Protection programme about to commence

17

To Summarise

• LGCDP’s structure all in place

• Systems developed – management, funds’ flow, reporting, coordination

• Orientation well underway

• Guidelines developed, approved & disseminated

• Enabling environment created thus LGCDP now poised to start achieving its intended results

1818

Planned Achievements by end FY 09/10

Output 1:• Capacity building of around 400 local service

providers & DDC staff on social mobilization underway

• Social mobilization implementation in 1,600 VDCs

• 300 district Social mobilization committee members orientated

• Operation manual for GESI mainstreaming Output 2: • IEC core message planned• Operationalize LGAF

1919

Planned Achievements by end FY 09/10

Output 3:

• Blended block grant guidelines drafted

• MCPM assessments of DDCs completed

• MC assessments of VDCs underway

• Quality assurance assessment of MCPM

• Orientation on MCPMs well underway

• Revenue mobilization training for LBs staff

2020

Planned Achievements by end FY 09/10

Output 4:

• CD plan for 75 DDCs & 58 Municipalities being developed

• Continuation of core & standard training to LB staff, political party, civil society, & user’s group – estimated 3,000 recipients

Output 5:

• LBs’ audit guidelines drafted

• Update & refine M&E indicators

2121

Planned Achievements by end FY 09/10

Output 6:• LBs’ staffing policy review underway• Local environment policy proposals underway• Local environment policy guidelines • Train environment officers of LBs Output 7• Existing LB M&E system reviewed• Baseline survey of local bodies• Operational manual of GESI strategy drafted• Capacity development plan of MLD drafted

2222

Activities deferred to next FY Output 3• Preparation of LBs revenue operation manual• Introduce land tax in municipalities• Design revenue / expenditure computer

software packageOutput 4• Develop international standard PFM system

and training package Output 5• Pilot safety net & social assistance program

2323

Activities deferred to next FYOutput 6• Review decentralization & sector devolution

policy • Formulate investment plan for grant expenses

in the devolved sector• Preparation of action plan on sector devolution

implementation

Output 7

• Defining the role & functions of Fiscal Commission in the context of federalism

2424

Financial status JFA• Total budget of LGCDP for the FY 2009/10 –

US$ 43.70 million• Total budget delivered as of 15 Nov 2009 –

US$ 38.89 million

UNDP• US$ 255,000 budget - US$ 210,000 expenditure

UNCDF• US$ 292,000 budget - US$ 115,000 expenditure

25

Challenges • Monitoring & Evaluation of all VDCs• Transforming LGCDP into SWAp• Continuation & sustaining SM• Empowering the local political mechanism• Working with two fiscal year planning• LB staff resources & time to absorb LGCDP • Generalization vs LGCDP & LBs’

limitations• Mobilizing the LGCDP for LB restructuring

26

LGCDP’s Expectations

• Creating more conducive & supportive environment by all stakeholders