1. main responsibilities

Post on 31-Dec-2015

31 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

1. Main Responsibilities. Corrective Maintenance Preventive Maintenance Evolution Projects for Navaids Surveillance Weather Sensors Direction Finders Installations spread over the whole country. 2. Organisation TN. 5 technicians. 11 technicians. 8 engineers. 7 technicians. - PowerPoint PPT Presentation

TRANSCRIPT

peedbirdW 7298 N2

Engadinia

Brit AirBZH 842 310 N4

AZA 306 350 N6

CHBLDE 090 WZViking

181 E

C7777622

EngiadinaHBLDE 090 WZ

TopswissEZS942 156 SZ

CLB065FM

Air PortugalTAP5327 280 W3

VikingVGK170 350 E

7777 622

AFR 2116 262 M

Air FranceAFR2104 330 M

Air FranceAFR1920 290 M

C799 3

Air FAFR3 330

TNE, Christoph Zehnder, 17.2.2004, page 1

1. Main Responsibilities

• Corrective Maintenance• Preventive Maintenance• Evolution• Projects

for

• Navaids• Surveillance• Weather Sensors• Direction Finders

Installations spread over the whole country

peedbirdW 7298 N2

Engadinia

Brit AirBZH 842 310 N4

AZA 306 350 N6

CHBLDE 090 WZViking

181 E

C7777622

EngiadinaHBLDE 090 WZ

TopswissEZS942 156 SZ

CLB065FM

Air PortugalTAP5327 280 W3

VikingVGK170 350 E

7777 622

AFR 2116 262 M

Air FranceAFR2104 330 M

Air FranceAFR1920 290 M

C799 3

Air FAFR3 330

TNE, Christoph Zehnder, 17.2.2004, page 2

2. Organisation TN

5 technicians 11 technicians 8 engineers 7 technicians 9 technicians

Region Zürich:

26 employees

Region Geneva:

22 employees

peedbirdW 7298 N2

Engadinia

Brit AirBZH 842 310 N4

AZA 306 350 N6

CHBLDE 090 WZViking

181 E

C7777622

EngiadinaHBLDE 090 WZ

TopswissEZS942 156 SZ

CLB065FM

Air PortugalTAP5327 280 W3

VikingVGK170 350 E

7777 622

AFR 2116 262 M

Air FranceAFR2104 330 M

Air FranceAFR1920 290 M

C799 3

Air FAFR3 330

TNE, Christoph Zehnder, 17.2.2004, page 3

3. Installations

• 12 ILS (localizer, Glide Path, DME), 3 of them Cat-III

• 12 VOR / DVOR• 6 NDB

• 5 Direction Finder

• 3 Primary Approach Radar• 6 Secondary Radar• 3 SMR

• All kind of weather sensors

• Self briefing Terminals

peedbirdW 7298 N2

Engadinia

Brit AirBZH 842 310 N4

AZA 306 350 N6

CHBLDE 090 WZViking

181 E

C7777622

EngiadinaHBLDE 090 WZ

TopswissEZS942 156 SZ

CLB065FM

Air PortugalTAP5327 280 W3

VikingVGK170 350 E

7777 622

AFR 2116 262 M

Air FranceAFR2104 330 M

Air FranceAFR1920 290 M

C799 3

Air FAFR3 330

TNE, Christoph Zehnder, 17.2.2004, page 4

5. Main ongoing Projects

• Mode-S implementation: 6 Stations, in close collaboration with Germany and the Netherlands

• Surface Movement and Guidance system for Geneva and Zurich

• P-RNAV: implementation of supplementary DME's for Multi-DME navigation

• Installation of 2 new ILS for Zurich Airport

• Replacement of VOR's

peedbirdW 7298 N2

Engadinia

Brit AirBZH 842 310 N4

AZA 306 350 N6

CHBLDE 090 WZViking

181 E

C7777622

EngiadinaHBLDE 090 WZ

TopswissEZS942 156 SZ

CLB065FM

Air PortugalTAP5327 280 W3

VikingVGK170 350 E

7777 622

AFR 2116 262 M

Air FranceAFR2104 330 M

Air FranceAFR1920 290 M

C799 3

Air FAFR3 330

TNE, Christoph Zehnder, 17.2.2004, page 5

ILS-Checker

Features:

• Localizer ground measurement

• Glide Path ground measurement

• Automatic reports generation

• Integrated archiving management

• Help for diagnostics

peedbirdW 7298 N2

Engadinia

Brit AirBZH 842 310 N4

AZA 306 350 N6

CHBLDE 090 WZViking

181 E

C7777622

EngiadinaHBLDE 090 WZ

TopswissEZS942 156 SZ

CLB065FM

Air PortugalTAP5327 280 W3

VikingVGK170 350 E

7777 622

AFR 2116 262 M

Air FranceAFR2104 330 M

Air FranceAFR1920 290 M

C799 3

Air FAFR3 330

TNE, Christoph Zehnder, 17.2.2004, page 6

ILS-Checker

Benefits:

• Enables systematic correlation between ground measurement and flight checks values.

• Gives more weight to ground controls

• Would allow us, after an evaluation phase, to reduce the flight checks.

• Simplifies ground maintenance procedures

peedbirdW 7298 N2

Engadinia

Brit AirBZH 842 310 N4

AZA 306 350 N6

CHBLDE 090 WZViking

181 E

C7777622

EngiadinaHBLDE 090 WZ

TopswissEZS942 156 SZ

CLB065FM

Air PortugalTAP5327 280 W3

VikingVGK170 350 E

7777 622

AFR 2116 262 M

Air FranceAFR2104 330 M

Air FranceAFR1920 290 M

C799 3

Air FAFR3 330

TNE, Christoph Zehnder, 17.2.2004, page 7

LLZ Course Structure. COU + CLR. TX1 and TX2

peedbirdW 7298 N2

Engadinia

Brit AirBZH 842 310 N4

AZA 306 350 N6

CHBLDE 090 WZViking

181 E

C7777622

EngiadinaHBLDE 090 WZ

TopswissEZS942 156 SZ

CLB065FM

Air PortugalTAP5327 280 W3

VikingVGK170 350 E

7777 622

AFR 2116 262 M

Air FranceAFR2104 330 M

Air FranceAFR1920 290 M

C799 3

Air FAFR3 330

TNE, Christoph Zehnder, 17.2.2004, page 8

End-Fire Glidepath, General Situation

peedbirdW 7298 N2

Engadinia

Brit AirBZH 842 310 N4

AZA 306 350 N6

CHBLDE 090 WZViking

181 E

C7777622

EngiadinaHBLDE 090 WZ

TopswissEZS942 156 SZ

CLB065FM

Air PortugalTAP5327 280 W3

VikingVGK170 350 E

7777 622

AFR 2116 262 M

Air FranceAFR2104 330 M

Air FranceAFR1920 290 M

C799 3

Air FAFR3 330

TNE, Christoph Zehnder, 17.2.2004, page 9

Test of the sensitive areaMc Donnell Douglas MD 11

peedbirdW 7298 N2

Engadinia

Brit AirBZH 842 310 N4

AZA 306 350 N6

CHBLDE 090 WZViking

181 E

C7777622

EngiadinaHBLDE 090 WZ

TopswissEZS942 156 SZ

CLB065FM

Air PortugalTAP5327 280 W3

VikingVGK170 350 E

7777 622

AFR 2116 262 M

Air FranceAFR2104 330 M

Air FranceAFR1920 290 M

C799 3

Air FAFR3 330

TNE, Christoph Zehnder, 17.2.2004, page 10

top related