Project Kids Committee
Board appointed citizen’s committee that studied long range facility and technology needs
Project Kids proposed 56 projects and prioritized their need as critical, high or desired
Board identified all critical needs projects to be included in the November 2008 bond proposal
Board held auditorium, stadium and service center for May election
Bond Proposal for 2009
Existing Facilities: Auditorium Seating Capacity : 672 or less
Located at Lowery Freshman Center
Original lights and sound
Facility hosts over 100 events year
Requires bussing students for rehearsals
Over 3000 students enrolled in Allen ISD fine arts programs (Grades 6-12)
Bond Proposal for 2009
Construction of New Auditorium 1,500 seat, 75,000 sq. ft. auditorium
Built at northeast corner of AHS
Tie into new career technology wing
Features would include:
Orchestra pit
Ticket booth and concessions
Modern sound and lighting systems
Set construction and storage areas
Estimated Cost- $23.3 million (Open Dec. 2011)
Bond Proposal for 2009
New Auditorium Details 75,000 sq. ft. auditorium
Paved & landscaped entry w/ lighting
1,000 seats at orchestra level and 500 mezzanine level
Gallery exhibition space
Open sound booth
Spotlight room
Ticket booth
Costume / prop & dressing rooms
Offices & conference room
Bond Proposal for 2009
Existing Facilities: Eagle Stadium
Permanent Seating Capacity 7,200
Temporary / Leased Bleachers 7,000
Annual lease cost of $225,000
Reserved seating capacity 4,200 Includes band section of approx. 1000 seats
Bond Proposal for 2009
Eagle Stadium Current Usage
5-6 varsity football games
9 junior varsity football games
11 freshman football games
2 Allen Sports Assn. football playoffs
12 Special Olympics Track & Field
Bond Proposal for 2009
Multipurpose Stadium 18,000 seat stadium
9,000 – home; 4,000 – student; and 5,000 visitor seating
Built at Exchange Parkway & Rivercrest on existing HS property
Includes wrestling rooms & locker room under bleachers
Improved sound, scoreboard, press box, concession and restroom facilities
Estimated Cost- $59.6 million
(Open Aug. 2012)
Bond Proposal for 2009
Multipurpose Stadium Details Entries at each corner of stadium
Concrete structure seating
Covered open air concourse on home side
Ticket booths at each corner of stadium
Concessions at each corner of stadium
18” standard seating, 21” backed reserved seating (5,000 seats)
Open film deck at press box
Dual purpose home-side lockers
Wrestling & playoff game dressing area
Golf practice area with netting
Wrestling room and office area
Bond Proposal for 2009
Multipurpose Stadium Usage
Football games – all levels
UIL Marching Band competitions
Soccer & football playoff host
Practice for football, wrestling, soccer, golf, lacrosse
Community gatherings, concerts
Bond Proposal for 2009
Existing Facilities: Service Center Existing Property on Butler Drive
6.3 acres
Shared fuel facility with City of Allen
Parking for 36 busses on site
Parking for 48 busses off site at Allen HS
Parking for 20 district vehicles
Parking for 150+ employees off-site
34,000 sq. ft. service center
Bond Proposal for 2009
Service Center & Warehouse 131,000 sq. ft. facility
Parking for 120+ school busses
Bus maintenance facility & offices
Allen ISD warehouse and distribution facility
Maintenance shops & offices
Student Nutrition bulk storage
Secure test material storage
Estimated Cost- $36.5 million (Open Dec. 2014)
Bond Proposal for 2009
Service Center Details 55 acre site
Concrete paving for large vehicle traffic
Employee and visitor parking (200)
Fuel station with two 14,000 gallon diesel tanks and one 4,000 unleaded tank
Drive through bus wash
Space allocated for expansion
Allen ISD Facility History
School Opened Age
Lowery Auditorium 1982 27
Eagle Stadium 1976* 33
*Addition in 1987
Service Center 1982 27
What Is The Tax Impact
Of This Bond Proposal
If approved – would increase the debt service rate by .02 Impact of two cent increase
$100,000 home = $20 per year or $1.67 per month
$200,000 home = $40 per year or $3.34 per month
Cannot be higher due to state cap of 50 cents on debt service rate
Allen debt service rate is currently .4303. This will increase as bonds of 2008 are sold
Tax Impact Of 2009
Bond Proposal
Year M&O Debt Total
05-06 1.5000 0.4125 1.9125
06-07 1.3700 0.4051 1.7751
07-08 1.0400 0.4303 1.4703
08-09 1.0400 0.4303 1.4703
09-10* 1.0400 0.5000 1.5400
10-11* 1.0400 0.5000 1.5400
* Projections
What If Bond Issue Is
Rejected By Voters?
Would delay or cancel the three proposed projects
Results will not impact 2008 bond projects
Based on growth projections, students and community would continue to use facilities that were not designed for the current usage or attendance