Multi&story+Wood+

Frame+Structures+

Introduction+to+How+to+Build+

Bigger+and+Taller+

+Answering)the)most)frequently)asked)questions)about)Mid8rise)construction)

Outline+/+Learning+Objectives+

+

•  Mid8rise)Construction)Overview)

•  Maximizing)Height)and)Area)

•  Understanding)Shrinkage)

•  Detailing)Considerations)Recognize)common)detailing)used)for)exterior)wall)to)floor)intersections)across)the)country)for)multi8story)structures)

Calculate)overall)building)shrinkage)and)understand)how)to)minimize)and)compensated)for)its)effects)

Evaluate)examples)of)mid8rise)wood)buildings)with)an)emphasis)on)configurations)and)site)layouts)

Identify)International)Building)Code)(IBC))maximum)height)and)associated)allowable)are)of)wood8frame)structures)including)allowances)from)special)provisions)

Outline+

•  Mid8rise)Construction)Overview)

•  Maximizing)Height)and)Area)

•  Understanding)Shrinkage)•  Detailing)Considerations)

Mid&Rise+Construction+Overview+

Urban+Infill+Development+

Walk&up/+Tuck+Under+

Benefits:)

•  Eliminates)need)for)S82)parking)garage)

•  Can)be)all)wood)

•  Least)expensive)overall)but)lowest)densification)rates)

)

)

First)floor)walk)up)units)with)private)garage)

Wrap&Around++

Benefits:)

•  enhanced)security))

•  Centralized)access)to)parking)

•  Visual)appeal)from)street)

•  More)expensive)than)walk/up)tuck8under)

•  5)story)yields)60880)units/acre))

)

)

)

)

Walk)up)units)surround)parking)structure)

)

)

Podium+

Benefits:)•  Increased)number)

of)stories)•  Accommodates)

Mixed8use)occupancies)

•  Most)expensive)but)can)allow)increased)density)

)))

Multiple)stories)of)wood)over)an)elevated)concrete)deck)

)

)

Podium+

4)stories)of)residential)over)podium)(parking)or)retail)))

•  60880)units/acre)

)

)

Inman)Park)Condos,)Atlanta,)GA)Davis)&)Church)

Podium+

5)stories)over)subterranean)parking)

5)stories)over)retail)

•  1008120)units/acre)

)

)

)

AvalonBay)Stadium,)Anaheim,)CA)VanDorpe)Chou)Associates)

Inman)Park)Condos,)Atlanta,)GA)Davis)&)Church)

Podium+

5)stories)over)residential)podium)

•  1208140)units/acre)

)

)

)

Podium+

5)stories)with)mezzanine)+)residential)podium)

•  1258145)units/acre)

)

)

)

120)Union,)San)Diego,)CA)Togawa)Smith)Martin)

Sloped+Sites+

Seattle,)WA)PB)Architects)

Fashion)Valley,)CA)AvalonBay)Communities))

Fashion)Valley,)CA)AvalonBay)Communities))

Sloped+Sites+

(2009)IBC))

626)Dekalb)Avenue,)Atlanta,)GA))Matt)Church)8)Davis)Church)Structural)Engineers)

GRADE+PLANE.+A)reference)plane)representing)the)average)of)finished)ground)level)adjoining)the)building)at)exterior'walls.)Where)the)finished)ground)level)slopes)away)from)the)exterior'walls,)the)reference)plane)shall)be)established)by)the)lowest)points)within)the)area)between)the)building)and)the)lot'line'or,)where)the)lot'line'is)more)than)6)feet)(1829)mm))from)the)building,)between)the)building)and)a)point)6)feet)(1829)mm))from)the)building.)

HEIGHT,+BUILDING.+The)vertical)distance)from)grade'plane'to)the)average)height)of)the)highest)roof)surface.)

Definition+–+IBC+202+

Hotels)(R81))

Apartments)(R82))

Condominiums)(R82))

Student)housing)(R82))

Live/work)units)(R82))

Assisted)living)(R84))

Nursing)homes)(I82))

Typical+Mid&rise+Occupancy+

(A82))Restaurants/cafeterias)

(A83))Workout)facilities)

(A83))Meeting)rooms))

(B))Offices))

(M))Shops))

(S82))Parking))

(S81))Storage)

(B))Offices))

Maximizing+Height+and+Area+

•  Mid8rise)Construction)Overview)

•  Steps)to)Maximizing)Height)and)Area)

1.  Tabulate)Areas)2.  Allowable)increases)

3.  Maximum)Building)Area)

4.  Mezzanine)&)Special)Design)Provisions)•  Understanding)Shrinkage)•  Detailing)Considerations)

)

Type+I+and+II+Construction+

)Building)Elements)are)of)noncombustible)materials)except)as)permitted)by)IBC)603)

) • Non)combustible)only)

•  Fire)Retardant)Treated)• Non8bearing)ext.)walls)w/)no)fire)rating)

• Roof)EXCEPT)in)Type))IA)of)2)stories))or)more)where)roof)is)<)20’)from)floor)below)

))

• Heavy)Timber)• Roof)except)IA)where)fire)rating)is)1hr)or)less)))

))

Type+III+Construction+

)Exterior)walls)are)of)noncombustible)materials)and)interior)building)elements)are)of)any)material.)FRT)is)permitted)in)exterior)wall)of)2hr)fire)rating)or)less.)

))

•  Non)combustible)•  Exterior)walls)

•  Fire)Retardant)Treated)allowed))•  Exterior)walls)if)fire)rating)is)2hr)or)less)

))

•  Heavy)Timber)•  HT)used)in)place)of)1hr)rating)or)less)

•  Untreated)Lumber)•  All)interior)elements)

))

Heights+and+Areas+–+IBC+Table+503+

Step+1+–+Tabulated+Height+and+Area+

Type)IIA)

)

)

)65’)(4))

65’)(4))

Type)IIIA)

)

)

)

Occupancy+ IIA+ IIIA+

R81)) 24,000) 24,000)

R82) 24,000) 24,000)

Type)IIB)

)

)

)55’)(4))

55’)(4))

Occupancy+ IIB+ IIIB+

R81)) 16,000) 16,000)

R82) 16,000) 16,000)

Type)IIIB)

)

)

)

Step+1+–+Tabulated+Height+and+Area+

Type)VA)

)

)

)50’)(3))

40’)(2))

Occupancy+ VA+ VB+

R81) 12,000) 7,000)

R82) 12,000) 7,000)

Type)VB)

)

)

)

Step+1+–+Tabulated+Height+and+Area+

Height+Modification+–+IBC+504+

IBC+504.2+++Where)a)building)is)equipped)throughout)with)an)approved)sprinkler)system…)

! )))maximum)height)is)increased)by)20)feet))

! )))maximum)number)of)stories)is)increased)by)one.)

Can+be+combined+w/+frontage+area+increase+&+506.2+

Can+be+combined+w/+sprinkler+area+increase+&+506.3+

•  EXCEPT)for)I82)occupancy)of)Type)IIB,)III)and)V)construction)and)H)occupancies)or)where)sprinklers)are)used)as)substitution)for)1hr)fire)resistance.)

'

504.2+Automatic+sprinkler+system+increase.+

….For)Group)R)buildings)equipped)throughout)with)an)approved)automatic)sprinkler)system)in)accordance)with)Section)903.3.1.2,)the)value)specified)in)Table)503)for)maximum)building)height)is)increased)by)20)feet)(6096)mm))and)the)maximum)number)of)stories)is)increased)by)one,)but)shall)not)exceed)60)feet)(18)288)mm))or)four)stories),)respectively.)

)

•  Section)903.3.1.2)references)NFPA)13R)sprinkler)system.)

•  This)limitation)does)not)apply)when)using)NFPA)13)Sprinkler)System)

Automatic+Sprinkler+Increase+–+504.2+

Area+Modification+–+IBC+506+

(Equation)581)))

Aa)=)At))+)[At)x)If])+)[At)x)Is]))

Aa)=)Allowable)area)per)story)(sq.)ft.))At)=)Tabular)area)per)story)(sq.)ft.))If)=)Area)increase)factor)due)to)frontage)))(IBC)506.2))If)max)=).75)Is)=)Area)increase)factor)due)to)sprinkler)protection))(IBC)506.3))Is=3)for)1)story,)Is=2)for)>)1)story)

In)2012)code,)there)is)further)clarification)between)“W”)for)area)increases)and)Fire)Separation)Distance)for)purposes)of)fire)resistance)ratings)of)walls)and)openings)

Bldg.)1)W)≠)FSD)

Bldg.)2)

Frontage+Increases+–+IBC+506.2.1++

Bldg.)1)

W)Bldg.)2)

For)two)buildings)on)DIFFERENT)lots)

FSD)

)lot)line)

Frontage+Increases+–+IBC+506.2.1++

Bldg.)1)

W)Bldg.)2)

For)two)buildings)on)the)SAME)lot)

FSD)

imag

inary)lot)line)

Frontage+Increases+–+IBC+506.2.1++

Bldg.)1)

W)Bldg.)2)

centerline)of)public)way)

Buildings)near)public)right)of)ways:)

FSD)

)lot)line)

FSD)

W)

Frontage+Increases+–+IBC+506.2.1++

Step+2+–+Increased+Height+&+Story+Area+

Type)IIA)

)

)

)85’)(5))

85’)**)(5))

Type)IIIA)

)

)

)

Occupancy+ IIA+(ft2)*+ IIIA+(ft2)*+

R81)) 72,000)+18,000)(max)frontage)) 72,000)+18,000)(max)frontage))

R82) 72,000)+18,000)(max)frontage)) 72,000)+18,000)(max)frontage))*Areas)reflect)PER)STORY)max.)Total)building)max)may)limit)area)further.)**ASCE7)12.281)limits)wood)shear)wall)seismic)systems)to)65’)in)height))in)SDC)D,E,F))))

NFPA13)

)

)

)

NFPA13)

)

)

)

Type)IIB)

)

)

)75’)(5))

75’**)(5))

Type)IIIB)

)

)

)

*Areas)reflect)PER)STORY)max.)Total)building)max)may)limit)area)further.))))

Occupancy+ IIB+(ft2)*+ IIIB+(ft2)*+

R81)) 48,000)+12,000(max)frontage)) 48,000)+12,000(max)frontage))

R82) 48,000)+12,000(max)frontage)) 48,000)+12,000(max)frontage))

NFPA13)

)

)

)

NFPA13)

)

)

)

Step+2+–+Increased+Height+&+Story+Area+

Type+IIIB+for+R+Occupancy+

711.3+

…)Horizontal)assemblies)separating))dwelling)units)in)the)same)building)and)horizontal)assemblies)separating))sleeping)units)in)the)same))building)shall)be)a)minimum)of)18hour)fire8resistance8rated)construction.)EXCEPTION)Dwelling)unit))and)sleeping)unit))separations)in)buildings)of)Type)IIB,)IIIB)and)VB)construction)shall)have)fire8resistance)ratings))of)not)less)than)1)/2))hour)in)buildings)equipped)throughout)with)an)automatic)sprinkler)system))in)accordance)with)Section)903.3.1.1.)

Type)VA)

)

)

)70’**)(4))

60’)(3))

Type)VB)

)

)

)

*Areas)reflect)PER)STORY)max.)Total)building)max)may)limit)area)further.)**ASCE7)12.281)limits)wood)shear)wall)seismic)systems)to)65’)in)height))in)SDC)D,E,F))))

Occupancy+ VA+(ft2)*+ VB+(ft2)+

R81) 36,000)+9,000(max)frontage)) 21,000)+5,250(max)frontage))

R82) 36,000)+9,000(max)frontage)) 21,000)+5,250(max)frontage))

NFPA13)

)

)

)

NFPA13)

)

)

)

Step+2+–+Increased+Height+&+Story+Area+

Opportunity+for+Office+Occupancy+(B)+

Type)IIIA)

)

)

)85’**)(6))

85’**)(6))

Type)IV)

)

)

)

Occupancy+ IIIA+(ft2)*+ IV+(ft2)*+

B) 85,500)+21,375(max)frontage)) 108,000)+27,000(max)frontage))

*Areas)reflect)PER)STORY)max.)Total)building)max)may)limit)area)further.)**ASCE7)12.281)limits)wood)shear)wall)seismic)systems)to)65’)in)height))in)SDC)D,E,F))))

NFPA13)

)

)

)

NFPA13)

)

)

)

Building Heights and Stories by Building Type With NFPA 13 Sprinklers

Occupancy IIIA IIIB VA VB 85 ft 75 ft 70 ft 60 ft

R-1/R-2/R-4 5 5 4 3 A-2/A-3 4 3 3 2 B 6 4 4 3 M 5 3 4 2 S-2 5 4 5 3 S-1 4 3 4 2

Summary+of+Building+Heights+

**ASCE7)12.281)limits)wood)shear)wall)seismic)systems)to)65’)in)height))in)SDC)D,E,F)

)

)

Maximum+Building+Area+–+506.4+

Single+Occupancy+Area+determination+

!  Two)stories)above)grade:)– Maximum)Building)Area))=))Aa)x)2)

!  Three)stories)or)more)above)grade:))– Maximum)Building)Area))=))Aa)x)3)

!  No)Story)shall)exceed)Aa))

Exceptions++

!  Unlimited)area)buildings)!  Buildings)with)NFPA)13R)sprinkler)system)

Aa)–)Allowable)Area)PER)STORY)

)

)

)

Step+3+–+Max+Building+vs.+Story+Areas+

Type)IIIA)

)

)

)85’**)(5))

**ASCE7)12.281)limits)wood)shear)wall)seismic)systems)to)65’)in)height)in)SDC)D,E,F)

)

)

Type)VA)

)

)

)70’**)(4))

Occupancy+ IIIA+ VA+

Story)Area) 72,000)+18,000)(max)frontage)) 36,000)+9,000(max)frontage))

Building)Area) 216,000)+54,000)(max)frontage)) 108,000)+27,000)(max)frontage))

NFPA13)

)

)

)

NFPA13)

)

)

)

Type)IIIA)

)

)

)85’**)(5))

**ASCE7)12.281)limits)wood)shear)wall)seismic)systems)to)65’)in)height)in)SDC)D,E,F)

)

)

Type)IIIA)

Or))Type)VA)

)

)

)

60’**)(4))

Occupancy+ IIIA+(NFPA+13)+ IIIA+(NFPA+13R)+ VA+(NFPA+13R)+

Story)Area) 72,000)(3x)tabulated)) 24,000)(=tabulated)) 12,000)(=tabulated))

Building)Area) 216,000)(3x)story)) 96,000)(4x)story)) 48,000)(4x)story))

NFPA13R)

)

)

)

NFPA13)

)

)

)

Step+3+–+Max+Building+vs.+Story+Areas+

Case+Study:+Innovations+in+Wood+

Architect:)Cooper)Carry,)The)Preston)Partnership)

Engineer:)Ellinwood)+)Machado,)Pruitt)Eberly)Stone)

Contractor:)Fortune8Johnson)Contracting)

Completed:)2012)

Photo)credit:)Gables)Residential)

Emory+Point+

Location:)Atlanta,)GA)

3)buildings)complete)8)Luxury)Apt.,)retail,)restaurants)

•  (1))5)story)Type)III)wood)frame)over)slab)on)grade)

•  (2))4)stories)of)wood)over)1)story)concrete)podium)

35%)savings))

•  $14/sf)(wood)concept)))

•  $22/sf)(PT)conc.)Slab)and)frame))

)

)

)

)

)

Mixed+Use+Occupancy+

Located)at)woodworks.org)–)design)tools)–)online)calculators)–)Heights)and)Areas)Calculator)

Mixed+Use+Occupancy+

Located)at)woodworks.org)–)design)tools)–)online)calculators)–)Heights)and)Areas)Calculator)

An)intermediate)level)or)levels)between)the)floor)and)ceiling)of)any)story)and)in)accordance)with)IBC)Section)505.)

Step+4–Addition+of+Mezzanine+

85’)**)(5+)mez))

Type)IIIA)

)

)

)

)*Areas)reflect)PER)STORY)max.)Total)building)max)may)limit)area)further.)**ASCE7)12.281)limits)wood)shear)wall)seismic)systems)to)65’)in)height))in)SDC)D,E,F))))))

Occupancy+ IIIA+(NFPA+13)+

Story)Area) 72,000)(3x)tabulated))

Building)Area) 216,000)(3x)story)area))

Mezzanines+–+IBC+505+

Not+counted+toward+building+area**)or+height+if:+

•  Maximum)1/3)floor)area)of)room)or)space)where)located)

•  Special)egress)provisions)apply)

•  Must)be)open)and)unobstructed)to)room)in)which)it’s)located)(walls)≤)42”)allowed))

•  Several)exceptions)•  Slightly)different)for)equipment)platforms)

**Does)count)toward)fire)area)with)regard)to)fire)protection)in)Chapter)9)

)

)

)

Case+Study:+Maximizing+View+and+Value+With+Wood+

Architect:)PB)Architects)

Engineer:)Yu)&)Trochalakis)

Contractor:)Norcon,)NW)

Completed:)2009)

Photo)Credit:)Matt)Todd)Photography)

Marselle+Condominiums+

Location:)Seattle)WA)

Type)IIIA)condo)complex)

5)81/2)stories)of)wood)over)2)stories)of)concrete)

mezzanine)added)$250K)cost)but)$1M)in)value)

30%)cost)savings)over)concrete)

Time)savings)over)steel)

Step+4&Horizontal+Building+Separation+

Horizontal)Assembly)=)a)fire8resistance8rated)floor)or)roof)assembly)of)materials)designed)to)restrict)the)spread)of)fire)in)which)continuity)is)maintained)

85’))

**ASCE7)12.281)limits)wood)shear)wall)seismic)systems)to)65’)in)height))

)

)

Type)IIIA)

)

85’)**)(5+)mez))

Considered)separate)buildings)above)and)below)for)purposes)of)area)calculations)if:)

•  overall)height)is)still)limited)to)min)of)either)building)

•  3hr)rated)horizontal)assembly)

•  Building)below)is)one)story)above)grade))

•  Building)below)is)Type)1A)with)sprinklers))

•  Enclosures)penetrating)horizontal)assembly)are)2hr)rated)

•  occupancy)above)is)A,)B,)M,)R)or)S)

•  occupancy)below)is)A,)B,)M,)R)or)S82)

)

Horizontal+Building+Separation+–+510.2+

AvalonBay+Stadium+

Location:)Anaheim,)CA)

251)Apts.,)13K)sf)retail/restaurant)

Type)III)modified)

50%)of)their)projects)are)podium)

Semi8balloon)framed)with)16”)I8joist)at)exterior)walls)

)

)

Case+Study:+Wood+Buildings+Aim+High+

Architect:)Withee)Malcolm)Architects)

Engineer:)VanDorpe)Chou)Associates)

Developer/Contractor:)AvalonBay)Communities)

Photo)credit:)Arden)Photography)

Carbon+Case+Study:+High+Density+Ava

lonB

ay)Stadium

8)Ana

heim

,)CA)

Parking+Beneath+Group+R+–+IBC+510.4+

Possibility)of)a)Type)IV)podium)where)number)of)stories)starts)above)parking)when:)

•  Occupancy)above)is)R)and)below)is)S82)

•  Lower)floor)is)open)Type)IV)parking)with)grade)entrance)

•  Horizontal)assembly)between)1st)and)2nd)floor)shall)be)

!  Type)IV)

!  Have)1)hr)fire)resistance)rating)when)sprinklered)

!  Have)2)hr)fire)resistance)rating)when)not)sprinklered)

•  overall)height)is)still)limited)to)occupancy))

Change)This)Footer)by)going)to)View)8>)Header)and)Footer)…))

APA&+N110:+Parking+beneath+Group+R+

Oceano)at)Warner)Center)

Location:)Woodland)Hills,)CA)

Architect:)RC)AlleyIII)

Galt)Place)

Location:)Galt,)CA)

Architect:)Michael)Malinowski)

Parking+Beneath+Group+R+

2012+Code+Conforming+Wood+

Available)for)Free)Download:)www.awc.org))))

)

)

Overview+

•  Mid8rise)Construction)Overview)

•  Maximizing)Height)and)Area)

•  Understanding)Shrinkage)

•  Concepts)•  Calculations)•  Recommendations)

•  Detailing)Considerations)

)

IBC+2009+on+Shrinkage+

2304.3.3))Shrinkage.))Wood)walls)and)bearing)partitions)shall)not)support)more)than)two)floors)and)a)roof)unless)an)analysis)satisfactory)to)the)building)official)shows)that)shrinkage)of)the)wood)framing)will)not)have)adverse)effects)on)the)structure)or)any)plumbing,)electrical)or)mechanical)systems,)or)other)equipment)installed)therein)due)to)excessive)shrinkage)or)differential)movements)caused)by)shrinkage.))The)analysis)shall)also)show)that)the)roof)drainage)system)and)the)foregoing)systems)or)equipment)will)not)be)adversely)affected)or,)as)an)alternative,)such)systems)shall)be)designed)to)accommodate)the)differential)shrinkage)or)movements.)

Key+Factors+Influencing+Shrinkage+

•  Pre8construction)moisture)content)(MC))

•  In8service)EMC)

•  Cumulative)thickness)of)cross8grain)wood)contributing)to)shrinkage))

(Wood)species)has)relatively)little)impact)since)most)species)used)in)commercial)construction)have)similar)shrinkage)properties.)))

)

Moisture)changes)cause)dimensional)changes)perpendicular)to)grain))

)

)

Growing)tree)is)filled)with)water)

As)wood)dries,)it)shrinks)perp.)to)grain)

Basic+Wood+Theory+

Image:'Wood'Handbook,'Wood'as'an'Engineering'Material,'USDA'Forest'Service,'Forest'Products'Laboratory,'2010'

)Wider)&)Thicker)888)NOT)Taller)

Shrinkage)in)lumber)expected)ACROSS)the)grain.)

Longitudinal)shrinkage)is)negligible.)

)

Basic+Wood+Theory+

Basic+Wood+Theory+

+Zone+of+Movement+

Shrinkage)occurs)primarily)in)horizontal)members))

•  wall)plates)

•  Floors)

+

Be+aware+of+

cumulative+

shrinkage.+

Pre&Construction+Moisture+Content+

Mi)=)19%)

Mi)=)28%)

Minimize+Pre&Construction+Moisture+Content+

1.  Minimize)storage)of)material)on)site)where)rain)and)standing)water)can)increase)moisture)content.)

2.  Keep)unused)framing)material)covered)

3.  Inspect)pre8built)wall)panels)prior)to)installation)for)proper)material)and)quality)of)mechanical)fasteners.)

4.  “Dry8in”)the)structure)as)quickly)as)possible.)))5.  Immediately)remove)any)standing)water)from)floor)

framing)after)rain)showers.)

)

Shrinkage+Resources+–+www.wwpa.com+

In#service*EMC*(Average*EMC#*July)*

64)

Map courtesy of US Forest Products Laboratory

In#service*EMC*(Average*EMC#*January)*

65)

Map courtesy of US Forest Products Laboratory

Comprehensive+Shrinkage+Estimation+

For)MC)between+6+to+14%+the)formula)is:)

) ( )[ ]iFTi MMCDS −=

Calculating+Shrinkage!

S'=)shrinkage)(in)inches))

Di)=)initial)dimension)(in)inches))

CT)/)CR=)dimension)change)coefficient,)tangential/radial)direction)

CT)=)0.00319)for)Douglas)Fir8Larch)

CT)=)0.00323)for)Hem8Fir)

CT)=)0.00263)for)Spruce8Pine8Fir)

CT)=)0.00263)for)Southern)Pine)MF)=)final)moisture)content)(percent))

Mi)=)initial)moisture)content)(percent))

)

Comprehensive+Shrinkage+Estimation+

For)MC)outside+the+range+of+6+to+14%+:)

( )

iT

iFi

MS

MMDS

+−

−=

30)100(30

Calculating+Shrinkage!

S'=)shrinkage)(in)inches))

Di)=)initial)dimension)(in)inches))

ST)/SR=)tangential/radial)shrinkage)(%))from)green)to)oven)dry)

MF)=)final)moisture)content)(percent))

Mi)=)initial)moisture)content)(percent))

))

)

Calculating+Shrinkage+–+Resources+

Wood)Handbook:)www.fpl.fs.fed.us))

•  Chapter)13)–)CT,)CR)

•  Chapter)4)–)ST,)SR)

Example+Shrinkage+Calculation+

Assume:)S8Dry)lumber)Find:)4x4)shrinkage)

Quick+Shrinkage+Estimation:+

+

Again)assuming)the)initial)MC)(Mi))is)19)percent)and)the)final)MC)(MF))is)12)percent))

Our)approximated)shrinkage)is:)

For)Doug)Fir)Larch:)

))

For)Southern)Pine:)

S =CDi MF −Mi( ) = 0.00319×3.5 12−19( ) = −0.078 inch

Example+Shrinkage+Calculation+

S =CDi MF −Mi( ) = 0.00263×3.5 12−19( ) = −0.064 inch

Minimizing+Shrinkage+

)

)

Balloon)framing))•  minimizes)inter8floor)

shrinkage)from)the)wall)assembly))

•  limited)in)height))•  Complicated)

connections))•  limited)floor)loads))+

Typically+not+used+in+

projects+over+2+stories+in+

height.+

Minimizing+Shrinkage+

Semi8balloon)framing))•  incorporates)floor)framing)

hanging)from)top)plates))•  Eliminates)tangential)

shrinkage)in)zone)of)movement))

•  Floor)framing)doesn’t)contribute)to)overall)building)shrinkage)

)Non&standard+stud+lengths+

and+increased+hardware+

requirements+are+a+result.+

Inman+Park+Condominiums+

Location:)Atlanta,)GA)Architect:)Brown)Doane)Architects)

Engineer:)Davis)&)Church)

Case+Study:+Wood+Buildings+Aim+High+

4)stories)of)wood)over)2)stories)of)concrete)parking))

11)7/8”)I8joists)to)maximize)headroom)and)not)exceed)building)height)(10’)plate))

Drop)ceilings)for)MEP)at)perimeter)of)some)rooms)

)

Differential+Movement+

Movement)between)wood)frame)elements)and)other)materials)that…))

•  do)not)shrink)at)all)

))

•  shrink)much)less)

))

•  expand)

Finish+Considerations+

Large)expanses)of)interior)and)exterior)drywall,)paneling)and)siding)need)to)be)looked)at)specifically.))Employ)expansion)joint)and)slip8type)detailing.)

Solution+1&+Plain+Unreinforced+Brick&h>30’+

Allows)for)vertical))shrinkage)of)wood))framing)

Veneer)must)be)designed))per)ACI)530)section)2.2)as))plain)unreinforced)masonry)

Anchors/ties)to)be))spaced)a)maximum))of)32”)o.c.)horiz.)And))18”)o.c.)vert.)(except))seismic))

Requires)steel))lintel)at)openings)

Joints)must)allow)for)all)differential))movement)(lateral)drift)and))vertical)shrinkage)of)wood)Framing)Etc.).)Weight)of)brick)must)not))be)supported)by)wood)Framing))

Wood)backer)studs)

Brick)goes)into))flexure)when)wall))studs)deflect)

Design+must+be+in+

strict+conformance+

with+ACI+530+section+

6.2.1&Alt.+design+

method+(engineered)+

+

Design+to+section+2.2+

(ASD)+or+3.2.2+

(strength)+

Unreinforced+masonry+

+

Brick+veneer+must+be+

self+supporting+and+

not+supported+off+of+

the+wood+framing+

Solution+2&+Structural+Reinforced+Brick+

Brick+units+are+similar+to+

CMU’s+where+vertical+and+

horizontal+reinforcing+can+

be+installed+

•  Veneer+spans+floor+to+

floor+without+transferring+

loads+to+walls.+

•  Loads+are+dumped+

directly+into+floor+

diaphragms++

•  Steel+lintels+over+

openings+are+not+required+

•  Intermediate+anchors/ties+

are+not+required+

•  Wall+spans+vert.+&+horiz.+

Between+spaced+anchors+

+

Reinf.)horizontal)bond))beam)or)lintel)units))over)openings)

Spaced)anchors)must)allow))for)all)differential)movement))(lateral)drift,)vertical)shrinkage))of)wood)Framing,)etc.).)Weight))of)brick)must)not)be)supported))by)wood)Framing))

Wood)backer)studs)

Reinforcement))reduces)expansion)and)cracking)

Anchors/ties)are))tied)directly)into))floor)diaphragms)

Veneer)acts)as)complete))unit,)not)as)individual))Segments.)Supports)self))weight)plus)out8of8plane))loads)

#3)or)#4)rebar)(typ.))

Heavier)anchors)are))not)as)prone)to)fire))damage)

4”+nom.+or+greater+

Façade+Considerations+&+Resources+

Brick)Industry)Association–)www.gobrick.com))

Door+and+Window+Considerations+

[1/4”+per+floor]+wide)sealant)joint)sized)to)allow)shrinkage)of)wood)frame)and)expansion)of)brick)

MEP+Considerations+

)

)

Fully)compress)wall)framing)by)completing)all)dead)load)potential)PRIOR)to)mechanical)installations.))Avoid)rigid)vertical)piping)in)mechanical)and)plumbing)systems.))Flexible)members)allow)for)shrinkage)between)floors.))

MEP+Considerations+

)

)

Vertical)vent)stacks)should)not)be)installed)prior)to)full)completion)of)framing.))Vent)stacks)require)special)attention)and)must)be)designed)to)allow)for)vertical)movement)due)to)shrinkage)between)floors.))))

Facade+Considerations+

Panels)should)not)extend)across)he)zone)of)movement)if)platform)framed.)))Allow)for)up)to)½”))gap)between)abutting)panel)edges)to)prevent)panel)buckling)when)using)platform)framing)and)sawn)lumber)joists.)))))))

Structural+Considerations+

)

)

Strap)holdowns)will)buckle)with)too)much)accumulated)movement.))

Anchor)type)holdowns)should)re8tightened)before)installing)finishes.))

Threaded)rod)holdowns)with)shrinkage)compensating)devices)work)well)for)4)sorties)and)above)with)stacking)units.))

)

Deck+Considerations+

White)Paper:)

Multi8Story)Wood8Frame)Shrinkage)Effects)on)Exterior)Deck)Drainage:)A)Case)Study))by)Zeno)Martin,)Wood)Design)Focus)Fall)2010)

Detailing+Tips+

Mitigate)distress)to)finishes)arising)from)cumulative)differential)movement:)

• Be)acutely)aware)of)the)fact)that)there)will)be)

differential)movement)

• Address)it)in)detailing)and)specifications)• Consider)where)distress)will)occur)

• Provide)details)to)relieve)or)avoid)it)))

Outline+

•  Mid8rise)Construction)Overview)

•  Maximizing)Height)and)Area)

•  Understanding)Shrinkage)•  Detailing)Considerations)

Structural))•  Direct)bearing/)no)add’l)

hardware)Constructability)•  Framing)can)be)completed)

before)drywall)and)insulation)are)installed)

•  Common)length)studs)

Platform+Framing+

No)Scale)

Structural))•  Additional)hardware/no)direct)

bearing)Rated)Assemblies)•  May)accommodate)continuity)

in)exterior)walls)in)Type)III)construction)

Constructability)•  Framing)can)be)completed)

before)drywall)and)insulation)are)installed)

•  Custom)length)studs)•  Can)help)minimize)building)

shrinkage)

Semi&balloon+Framing+

Case+Study:+University+of+Washington+

UW+West+Campus+Student+Housing+

Location:)Seattle,)WA)

1700)beds)in)3)halls)and)2)apt)bldgs)

$177/sf)

4/5)bldgs)met)2030)challenge)(60%)reduction)in)energy)consumption))

Architect:)Mahlum)Architects)

Engineer:)Coughlin)Porter)Lundeen)

Contractor:)Walsh)Construction)

Key Differences in Fire Ratings for Construction Types++

IIIA IIIB VA Exterior wall framing FRT FRT non-FRT Exterior wall fire rating 2 hr 2 hr 1 hr Floor assembly fire rating 1 hr 0 hr 1 hr Fire wall rating 3 hr 3 hr 2 hr

Detailing+for+Fire+Resistance+

Different)areas)of)fire)design:)•  Combustibility)•  Fire)resistance)•  Fire)Class)•  Fire)Protection))))

Fire+Resistance+Rating+

Basic)assumption)is)that)fires)begin)at)the)interior)and)rated)wall)assemblies)are)not)required)from)the)exterior)unless)close)to)another)structure.)))

Interior)

Exterior)

Fire)Protection)on)Inside)of)Building)

Fire+Resistance+Rating+&IBC+Table+601+

Fire+Resistance+Rating+–+IBC+705.5++

Exterior+Walls+

Fire)Separation)>)10’)–))shall)be)rated)for)exposure)from)the)inside)in)accordance)with)601)and)602)Fire)Separation)<)10’)–)shall)be)rated)for)exposure)to)both)sides)in)accordance)with)601)and)602))

Interior+

Exterior)

Fire)Protection)on)Exterior)Walls))When)<)30’)

)X)<)10’)

Lot)L

ine)

Table)601)&)602)

Fire+Resistance+Rating+–+IBC+Table+602+

Exterior)Fire)Resistance)Rating)!  Table)601))!  Table)602)establishes)requirements)!  structures)separated)by)10’830’)they)are)typically)0)or)1)hour)rated))

FIRE%SEPARATION%

DISTANCE%=%X%(feet)

TYPE%OF%

CONSTRUCTION

OCCUPANCY%GROUP%

H

OCCUPANCY%GROUP%F9

1,%M,%S91

OCCUPANCY%GROUP%A,%B,%

E,%F92,%I,%R,%S92,%Ub

X%<%5c

All 3 2 1

5%<%X%<10 IA 3 2 1

Others 2 1 1

10%<%X%<%30 IA,%IB 2 1 1d

IIB,%VB 1 0 0

Others 1 1 1d

X%>%30 All 0 0 0

For%SI:%1%foot%=%304.8%mm.

e.%The%fire9resistance%rating%of%an%exterior%wall%is%determined%based%upon%the%fire%separation%distance%of%the%exterior%wall%and%the%story%in%which%the%

wall%is%located.

TABLE&602FIRE-RESISTANCE&RATING&REQUIREMENTS&FOR&EXTERIOR&WALLS&BASED&ON&FIRE&SEPARATION&DISTANCEa,&e

a.%Load9bearing%exterior%walls%shall%also%comply%with%the%fire9resistance%rating%requirements%of%Table%601.

b.%For%special%requirements%for%Group%U%occupancies%see%Section%406.1.2

c.%See%Section%705.1.1%for%party%walls.

d.%Open%parking%garages%complying%with%Section%406%shall%not%be%required%to%have%a%fire9resistance%rating.

Choosing+Fire+Rated+Assemblies+

Tested)assemblies)(ASTM)E119))per)IBC703.2:)•  UL:)http://database.ul.com)))•  Gypsum)Catalog:)www.gypsum.org))•  Other)tools:)www.usgdesignstudio.com)•  AWC)DCA3)•  APA)Fire)Rated)Systems:)

http://www.apacad.org/cad_detail.cfm?id=2))

Alternate)Methods)per)IBC703.3)•  Deemed)to)comply)tables)per)IBC721)•  Calculated)Fire)Resistance)per)IBC722)

2"HOUR EXTERIOR WALL

FRAMING AT 16" O.C.. MIN. 2 X 4

1 LAYER 5/8" FIBERGLASS MAT GYPSUM SHEATHING

STRUCTURAL WOOD PANEL(S)

WHERE REQUIRED FOR SHEAR

2"HOUR RATING PER UL DESIGN NO. U371

EXTERIOR CEMENT PLASTER, MIN. THICKNESS

3/4" TO FACE OF LATH

MIN. 3" THICK MINERAL

WOOL BATT INSULATION

2 LAYERS 5/8" TYPE 'X' GYPSUM

BOARD AT INTERIOR CONDITIONS

EXTERIOR CEMENT PLASTER OVER FIBERGLASS MAT GYPSUM

SHEATHING AT EXTERIOR CONDITIONS

2+HR+Exterior+Wall+Assembly+–+Type+III+

Common)issues)with)tested)assemblies:)

•  Assembly)Asymmetry8)separate)assemblies)for)each)side)

)

)

Adding+lateral+resistance+

Common)issues)with)tested)assemblies:)

•  Inclusion)of)wood)structural)panel)–)ESR2586)

•  FRT)may)also)be)substituted)for)untreated)wood)

)

)

Fire+Wall+Assemblies+

IBC+706.3+–)Fire)walls)shall)be)of)any)approved)non8combustible)materials.)

)Exception:+Buildings)of)Type)V)construction)

)

)

2+HR+Fire+Wall–+Type+V+

2"HOUR FIRE WALL ASSEMBLY

2 1/2" METAL STUDS AT 24" O.C.

2 LAYERS 5/8" TYPE 'X' GYP. BD. ON EACH SIDE OF METAL STUDS

WOOD STRUCTURAL PANELS WHERE REQUIRED FOR SHEAR

2"HOUR RATING PER GA FILE NO. WP 1548

WOOD STUD WALLS ON EITHERSIDE OF FIRE WALL

AIR

GA

P

0' "

1"

AIR

GA

P

0' "

1"

INTERIOR OR EXTERIOR FINISH AS REQUIRED

BATT INSULATION (OPTIONAL)

http://www.usgdesignstudio.com/wall8selector.asp?framingType=18708&bldgSystem=18620))))))))))))))))

CAD)&)Revit)Details:)www.woodworks.org))

3hr+Fire+Wall+Assemblies+–+Type+III+

3"HOUR FIRE WALL ASSEMBLY

1 5/8" METAL STUDS AT 24" O.C. MAX.

3 LAYERS 1/2" TYPE 'X' GYP. BD. ON EACH SIDE OF METAL STUDS

WOOD STRUCTURAL PANELS WHERE REQUIRED FOR SHEAR

3 HOURS PER UL DESIGN NO. U435

WOOD STUD WALLS ON EITHERSIDE OF FIRE WALL

AIR

GAP

0' "

1"

AIR

GAP

0' "

1"

INTERIOR OR EXTERIOR FINISH AS REQUIRED

BATT INSULATION (OPTIONAL)

Other)options:)•  NFPA)221)6.5.1)))

)

Fire+wall+Detailing+

CAD)&)Revit)Details:)www.woodworks.org)))

3"HOUR FIRE WALL AT FLOOR/CEILING

3"HR. ASSEMBLY: 1 5/8" METALSTUDS WITH 3 LAYERS 1/2" TYPE 'X'

GYP. BD. EACH SIDE

3"HOUR FIRE CAULKING

1" AIR GAP

RESILIENT CHANNELS

2 X 4 STUD WALL EACH SIDE, WITHSTRUCTURAL WOOD PANELS AS

REQUIRED FOR SHEAR AND 1 LAYER5/8" TYPE 'X' GYP. BD.

CONTINUOUS 13 1/2" WIDE 14 GA. GALV.SHT. METAL

CONTINUOUS 16 GA. TRACK TOP ANDBOTTOM

FIRE SAFING

CONTINUOUS 16 GA. COMP. CHANNEL

WOOD TRUSS FRAMING WITHOUT WOOD PANEL DIAPHRAGM RUNNING THROUGH FIRE WALL3"HOUR FIRE WALL AT FLOOR/CEILING

3"HR. ASSEMBLY: 1 5/8" METALSTUDS WITH 3 LAYERS 1/2" TYPE 'X'

GYP. BD. EACH SIDE

CONTINUOUS STRUCTURAL WOODPANELS " USE FIRE"TREATED PANELS

THROUGH WALL CAVITY¹

¹CONSULT LOCAL JURISDICTION HAVING AUTHORITY FOR ACCEPTANCE OF FIRE"TREATED WOODPANELS RUNNING THROUGH 3"HOUR ASSEMBLY IN THIS APPLICATION.

RIM JOIST WITH SOLID BLOCKING

3"HOUR FIRE CAULKING

1" AIR GAP

RESILIENT CHANNELS

2 X 4 STUD WALL EACH SIDE, WITHSTRUCTURAL WOOD PANELS AS

REQUIRED FOR SHEAR AND 1 LAYER5/8" TYPE 'X' GYP. BD.

I"JOIST FRAMING WITH WOOD PANEL DIAPHRAGM RUNNING THROUGH FIRE WALL

1hr+rated+floor+assemblies+–+Type+IIIA/VA+

Common)issues)with)UL)approved)assemblies:)

•  Shallow)Floor)depth8))

•  Use)prescriptive)assemblies)8)IBC)

721.1(2))assembly)

1481.1))

•  Or)use)the)CAM)

method)in)IBC)722))

Acoustic+Detailing+

Acoustic+Detailing+

Acoustic+Detailing+

No)Scale)

A) B) C)

Type+V+Construction+Detail+Examples+

No)Scale)

•  5/8”)Type)X)GWB)•  1)layer)for)1hr)rating)•  2)layers)for)2hr)rating)

•  Fire)Retardant)Treated)• Wall)studs,)plates)and)sheathing)))

• Untreated)Lumber)•  Floor)framing)(solid)sawn)or)engineered))

•  Floor)sheathing)))

Type+III+Construction+

1)

No)Scale)

•  5/8”)Type)X)GWB)•  1)layer)for)1hr)rating)•  2)layers)for)2hr)rating)

•  Fire)Retardant)Treated)• Wall)studs,)plates)and)sheathing)))

• Untreated)Lumber)•  Floor)framing)(solid)sawn)or)engineered))

•  Floor)sheathing)))

Continuity+of+FRT+

2)

No)Scale)

•  5/8”)Type)X)GWB)•  1)layer)for)1hr)rating)•  2)layers)for)2hr)rating)

•  Fire)Retardant)Treated)• Wall)tuds,)plates)and)sheathing)•  [2x)Blocking)(counts)for)1hr)fire)protection)per)NDS)16.2.1)])

•  [Floor)sheathing)4’88’)in])))

• Untreated)Lumber)•  Floor)framing)(solid)sawn)or)engineered))

•  Floor)sheathing)))

Type+III+Construction+Detail+Example+

3)

No)Scale)

•  5/8”)Type)X)GWB)•  1)layer)for)1hr)rating)•  2)layers)for)2hr)rating)

•  Fire)Retardant)Treated)•  Studs,)plates)and)sheathing)•  2x)Blocking)(counts)for)1hr)fire)protection)per)NDS)16.2.1))

•  [Floor)sheathing)4’88’)in])))

• Untreated)Lumber)•  Floor)framing)(solid)sawn)or)engineered))

•  Floor)sheathing)))

Type+III+Construction+Detail+Example+

4)

CONTINUE)GYPSUM)TO)BOTTOM)OF)SHEATHING)

•  5/8”)Type)X)GWB)•  1)layer)for)1hr)rating)•  2)layers)for)2hr)rating)

•  Fire)Retardant)Treated)•  Studs,)plates)and)sheathing)•  [Floor)sheathing)4’88’)in])))

• Untreated)Lumber)•  Floor)framing)(solid)sawn)or)engineered))

•  Floor)sheathing)))

Type+III+Construction+Detail+Example+

5)

Type+III+Construction+Detail+Example+

What+is+being+enforced+in+jurisdictions+

you+are+working+in?+

+

+

Balconies+–+IBC+1406.3+

Balconies)of)combustible)construction)and)not)FRT)shall)be:)•  Rated)in)accordance)w/)Table)601)for)floors)•  Or)be)of)Type)IV))•  And)shall)not)exceed)50%)of)bldg)perimeter)Exceptions)•  Balconies)in)Type)III,)IV)and)V)can)be)of)type)V)const)

and)shall)not)have)fire)resistance)rating)if)sprinkler)protection)provided)

•  Untreated)wood)is)permitted)for)rails)and)guardrails))

Balconies+–+IBC+1406.3+

So….)

For)Type)III)or)V)balcony)options)are:)

1.  Non8combustible)–)no)sprinklers/no)fire)rating)

2.  FRT)–)no)fire)sprinklers/no)fire)rating)

3.  Type)IV–)no)fire)sprinklers/no)fire)rating)

4.  Non)treated)–)fire)sprinkler/no)fire)rating)

5.  Non)treated)–)fire)rated)per)601)&)602/)no)sprinkler)

)

Balconies+

Outline+

•  Mid8rise)Construction)Overview)

•  Maximizing)Height)and)Area)

•  Understanding)Shrinkage)•  Detailing)Considerations)

Questions?+

This)concludes)The)American)Institute)of)Architects)Continuing)Education)Systems)Course) Speaker+Name+

Speaker)organization)Speaker)email)address)

top related