WELCOMETO

210 MW SIDDHIRGANJ THERMAL POWER STATIONBANGLADESH POWER DEVELOPMENT

BOARD

OBJECTIVE

Refo

rmat

ion

& Re

stru

ctur

ing

of B

PDB

Ongoing Reformation of BPDB

Vision of BPDB

Mission of BPDB

Organogram of BPDB

Installed Capacity (MW)

Generation Capacity by Plant

Generation Capacity by Fuel

Bulk electricity Sales by BPDB

Distribution System Loss (%)

Transmission SummaryTransmission Summary

Transmission Line Type Circuit Length (Km.)

400kV Transmission line 165

230kV Transmission line 3,171

132kV Transmission line 6,359

Transmission Loss (%) 2.77%

Grid Sub-Station Summary

Installations in the Siddhirganj

Sh

i ta

lakkya

Rive

r

Highway

Main Gate

Desh Energy Ltd. 210MW Siddhirganj Power station, BPDB.

2x120MW PPP, EGCB Ltd.

335MW Power plant Project, EGCB Ltd.

Substation, PGCB Ltd.

DPDC Ltd.

Adamjee EPZ Area

Total area: 88.56 acres

ORGANOGRAM(Down to the level of

XEN/equiv.)

Executive Engineer

(Operation)

Executive Engineer

(Efficiency)

Executive Engineer

(Shift) (Five Nos.)

Deputy Manager

(Operation)

Deputy Manager

Maintenance

Executive Engineer

(Boiler)

Executive Engineer

(Turbine)

Executive Engineer

(Generator)

Executive Engineer

(Auto-control)

Executive Engineer

(Electrical)

Executive Engineer

(Measuring)

Executive Engineer

(Civil)

Executive Engineer

(Workshop)

CHIEF ENGINEER

Manager (Operation) Manager (Maintenance)

Deputy Director (Admn.) Asstt. Chief Engineer

Deputy Director (Acc.)

Chief Chemist

At A Glance

Power Plant overview

Control Room

SUPERHEATER

BOILER DRUM

BOILER

LPHP IP

HARIPUR 230kv S/S

TURBINE

GENERATOR

REHEATER

LP 3LP 4FEED WATER PUMP

DEAERATOR

LP HEATERS CONDENSATE PUMP

CONDENSER

LP 1LP 2HP 5HP 6HP 7

HP HEATERS

SIMPLIFIED FLOW DIAGRAM5400C130kg/cm2

3340C28kg/cm2

5400C26kg/cm2

Economizer

15.75/230kvX-former

ENERGY CONVERSION

Main Components

• Boiler Specification : Manufacturer : TKZ, Russia.

Type : Ep 670-138-545G (Model:TGME-206/VSO)

Rated Steam Capacity : 670 t/h

Superheated Steam Temperature : 545oc

Pressure of Superheated Steam : 138 kgf/cm2

Fuel : Natural Gas

Reheated Steam temperature inlet/outlet : 334 / 545oc

Temperature of Feed Water : 246oc

MAJOR EQUIPMENT

CIRCULATING WATER PUMP

MAJOR EQUIPMENT

Manufacturer : Russia

Type : 96ДB-4.5/23TB3

Vertical, Mixed Flow, Single Stage.

Number of Pumps : Three

Delivery : 14290 m3/ h

Capacity : 1048 KW.

Head : 21.3m

Voltage : 6.6KV

Pumphouse

Turbine Specification : Manufacturer : LMZ, Russia.

Type : K-210-130-8

No. of Cylinder : Three

Nominal Power : 210MW

Rotor speed : 3000 rpm

Pressure of Live Steam : 130 kgf/cm2

Temperature of Live Steam : 540 0C

No. of Regenerative Extraction : 7

No. of Stages : 29

MAJOR EQUIPMENT

MAJOR EQUIPMENTGenerator Specification :

Manufacturer : ELEKTROTJAZMASH, UKRAINE

Type : TΓB-200MT3Capacity : 210MW (247MVA)

Generating Voltage : 15.75KVPower Factor : 0.85R.P.M. : 3000rpm (50Hz)Stator current : 9060 Ampere

Rotor Current: 1950 AmpereExcitation Voltage : 430 VPhase : Three

CWP Intake (Siphon)

CIRCULATING WATER SYSTEM

Discharge Channel

Single Line Diagram

125 MVA15.75 / 230 KV

Unit Transformer

Haripur 230 KV Substation

Unit Breaker

Siddhirganj 132 KV

Auxiliary 6.6 KV Bus

Diesel Generator

DC Power

Stand-by 6.6 KV Bus

0.4 KV Bus

25.01.2014

Schematic Diagram of a Nuclear Power Plant

Safety Guidelines

top related