Scheme boundary
Proposed alignment
Existing survey/OS information
Tactile / corduroy paving construction - Refer to
Footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
0.5m cycle segregation island
Proposed Footways and Paved Areas - Refer to
Footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
Proposed Cycleway - Refer to footways and Paved Areas
drawings B2309009-JAC-1100-DR-1101 to 1105
Shared footway - Refer to footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
Visirail as shown on drawings - Refer to Pedestrian guardrail
drawing B2309009-JAC-0400-DR-0402 and as per BCC SD
HW/4.02
Existing / Proposed Lighting column - Refer to Street
Lighting drawings B2309009-JAC-1300-DR-1301 to 1305
Proposed Traffic Sign and pole - Refer to Traffic Sign
drawings B2309009-JAC-1200-DR-1211 to 1215
Traffic Bollard - Refer to Traffic Sign
drawings B2309009-JAC-1200-DR-1211 to 1215
Existing relocated information board
Existing Edgbaston Road fingerboard sign to be relocated
Proposed bus shelter -Specification to be agreed
with TfWM
Proposed Road Markings - Refer to Road Markings
drawings B2309009-JAC-1200-DR-1201 to 1205
Proposed Traffic Signal - Refer to Traffic Signal drawings
B2309009-JAC-1200-DR-1221 to 1224
Proposed Earthworks and verge
Proposed bin - Broxap Derby Standard Liter Bin - BX45
2550-S (or similar approved) with pyramid top fixed to
permanent position with fixing kit. Colour - Powder coated
RAL 9005 with gold band.
Proposed mini feeder pillar
Earthworks Slope Gradient 1: x
Revision Cloud
x
1
Drawing status
Drawing number
Scale
Client no.
Jacobs No.
Drawing title
DO NOT SCALE
Rev
Project
Client
G
N
W
I
A
R
D
T
U
A
O
A
D
C
P:\B
2309009 - P
ersho
re
R
d- P
rio
ry R
d Jct D
etailed
D
esig
n\0
08 C
AD
D\000
0 G
ene
ral A
rrangem
ent\B
230
900
9-JA
C-00
00-D
R-0
00
1 (S
he
et 1
o
f 5
) R
02
.d
wg
- 3
0/09
/2
02
0 1
5:5
8:5
5 - S
HE
ET
0
1 - G
rice
D
Apprv'dPurpose of revision
Rev Rev. Date Drawn CheckdRev'd
© Copyright 2020 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs.
Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of
copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject
to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or
responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
PERSHORE ROAD - PRIORY ROAD
JUNCTION DETAILED DESIGN
GENERAL ARRANGEMENT
SHEET 1 OF 5
SUITABLE FOR APPROVAL
1:250 @ A1
B2309009
B2309009-JAC-0000-DR-0001 R02
7th Floor, 2 Colmore Square, 38 Colmore Circus
Queensway, Birmingham, B4 6BN
Tel:+44(0)121 237 4000 www.jacobs.com
REPRODUCED FROM ORDNANCE SURVEY MAPS WITH PERMISSION
FROM THE CONTROLLER OF HM STATIONERY OFFICE. CROWN
COPYRIGHT RESERVED. LICENCE No. 0100031673 2018.
C
O
N
T
I
N
U
E
D
O
N
S
H
E
E
T
2
S
H
E
E
T
0
1
S
H
E
E
T
0
2
SHEET 03
SHEET 04
SHEET 05
R02 30/09/20
CONCRETE BOLLARD REMOVED, SHARED HATCH AND
KEY UPDATED, BOUNDARY ALTERED, TIE IN DEFINED
DG MPMP AL
R01 27/05/20 AMENDMENTS MADE DG TSTS AL
R00 20/03/20 SUITABLE FOR APPROVAL BV TS DM AL
3.0m
3.0m
1.9m
2.0m
4.3m
3.0m
Odell Place traffic island extended
Tie into A38 BCR scheme
Tie into A38 BCR scheme
Existing substation
Notes:
1) Drawing to be printed in colour to enable correct viewing of symbols.
2) Do not scale.
3) This drawing to be read in conjunction with all other relevant contract
drawings and documents.
4) The Contractor shall verify the presence and location of all services
before undertaking any work in any area of the site by carrying out a full
non-intrusive survey of the entire site before commencing the works.
5) For cross sections refer to cross section drawings
B2309009-JAC-0000-DR-0041 to 0044 and
B2309009-JAC-0000-DR-0051 to 0065
Location Plan - Sheet 1
10m0m 15m5m5m
Scale 1:250
All site activities shall be carried out in accordance with the Contractor's Construction
Phase Plan and Safe Work Method Statements/Risk Assessments. In addition to the
hazards/risks normally associated with the type of work detailed on this drawing, note
the following:
WORK CAN ONLY BE CARRIED OUT BY SUITABLY TRAINED AND BRIEFED
PERSONNEL.
CONSTRUCTION
1) Working in proximity to live traffic and construction plant.
2) All existing services should be located on site as required by the contractor prior to any construction
works being undertaken.
3) Ensure adequate liaison is undertaken with residents and businesses within the site extents to
ensure safe access / egress arrangements are communicated.
4) Vibration from works operations should be avoided in the vicinity of buildings and utilities.
5) Any works to be undertaken at night should have adequate lighting available, and regulations
regarding noise must be followed.
6) Contact with carcinogenic tar based material.
7) Dust inhalation, noise and excessive vibration.
8) High temperatures from asphalt laying process resulting in burns and fume inhalation.
SAFETY, HEALTH AND ENVIRONMENTAL (SHE) INFORMATION
7.7m
Ducting and feeder pillar to new bus
shelter to be installed by contractor
ST
S
E
0
2
1
1
3
.
1
1
2
P
e
r
s
h
o
r
e
R
o
a
d
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
STST
STST
STST
ST
STST
STST
STST
ST
ST
ST
ST
ST
ST
FH
GAS
GASGAS
GAS
GAS
TP
TP
TV
TV
M
S
0
1
1
1
2
.
8
2
8
S
E
0
11
1
2
.
7
1
9
S
E
0
3
1
1
1
.
8
5
9
S
E
0
A
1
1
2
.
2
0
1
S
E
0
21
1
3
.
1
1
2
1
1
3
.
0
1
1
3
.
0
1
1
5
.
0
1
1
4
.
0
1
1
4
.
0
1
1
4
.
0
1
1
3
.
0
1
1
3
.
0
P
r
i
o
r
y
R
o
a
d
P
e
r
s
h
o
r
e
R
o
a
d
P
e
r
s
h
o
r
e
R
o
a
d
E
d
g
b
a
s
t
o
n
R
o
a
d
Extents of trees to be removed,
see Site Clearance drawing
B2309009-JAC-0200-DR-0202
R
a
m
p
E
x
t
e
n
t
s
Existing TRO marking to
be refreshed on new
kerbline
Bus lay-by adjusted to
suit new channel line
Tie in to existing shared
use footway
Key:
Scheme boundary
Proposed alignment
Existing survey/OS information
Tactile / corduroy paving construction - Refer to
Footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
0.5m cycle segregation island
Proposed Footways and Paved Areas - Refer to
Footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
Proposed Cycleway - Refer to footways and Paved Areas
drawings B2309009-JAC-1100-DR-1101 to 1105
Shared footway - Refer to footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
Visirail as shown on drawings - Refer to Pedestrian guardrail
drawing B2309009-JAC-0400-DR-0402 and as per BCC SD
HW/4.02
Existing / Proposed Lighting column - Refer to Street
Lighting drawings B2309009-JAC-1300-DR-1301 to 1305
Proposed Traffic Sign and pole - Refer to Traffic Sign
drawings B2309009-JAC-1200-DR-1211 to 1215
Traffic Bollard - Refer to Traffic Sign
drawings B2309009-JAC-1200-DR-1211 to 1215
Relocated information board
Existing Edgbaston Road fingerboard sign to be relocated
Proposed bus shelter -Specification to be agreed with
TfWM
Proposed Road Markings - Refer to Road Markings
drawings B2309009-JAC-1200-DR-1201 to 1205
Proposed Traffic Signal - Refer to Traffic Signal drawings
B2309009-JAC-1200-DR-1221 to 1224
Proposed Earthworks and verge
Proposed bin - Broxap Derby Standard Liter Bin - BX45
2550-S (or similar approved) with pyramid top fixed to
permanent position with fixing kit. Colour - Powder coated
RAL 9005 with gold band.
Proposed mini feeder pillar
Earthworks Slope Gradient 1: x
Revision Cloud
x
1
Key:
Scheme boundary
Proposed alignment
Existing survey/OS information
Tactile / corduroy paving construction - Refer to
Footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
0.5m cycle segregation island
Proposed Footways and Paved Areas - Refer to
Footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
Proposed Cycleway - Refer to footways and Paved Areas
drawings B2309009-JAC-1100-DR-1101 to 1105
Shared footway - Refer to footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
Visirail as shown on drawings - Refer to Pedestrian guardrail
drawing B2309009-JAC-0400-DR-0402 and as per BCC SD
HW/4.02
Existing / Proposed Lighting column - Refer to Street
Lighting drawings B2309009-JAC-1300-DR-1301 to 1305
Proposed Traffic Sign and pole - Refer to Traffic Sign
drawings B2309009-JAC-1200-DR-1211 to 1215
Traffic Bollard - Refer to Traffic Sign
drawings B2309009-JAC-1200-DR-1211 to 1215
Relocated information board
Existing Edgbaston Road fingerboard sign to be relocated
Proposed bus shelter -Specification to be agreed with
TfWM
Proposed Road Markings - Refer to Road Markings
drawings B2309009-JAC-1200-DR-1201 to 1205
Proposed Traffic Signal - Refer to Traffic Signal drawings
B2309009-JAC-1200-DR-1221 to 1224
Proposed Earthworks and verge
Proposed bin - Broxap Derby Standard Liter Bin - BX45
2550-S (or similar approved) with pyramid top fixed to
permanent position with fixing kit. Colour - Powder coated
RAL 9005 with gold band.
Proposed mini feeder pillar
Earthworks Slope Gradient 1: x
Revision Cloud
x
1
Drawing status
Drawing number
Scale
Client no.
Jacobs No.
Drawing title
DO NOT SCALE
Rev
Project
Client
G
N
W
I
A
R
D
T
U
A
O
A
D
C
P:\B
2309009 - P
ersho
re
R
d- P
rio
ry R
d Jct D
etailed
D
esig
n\0
08 C
AD
D\000
0 G
ene
ral A
rrangem
ent\B
230
900
9-JA
C-00
00-D
R-0
00
2 (S
he
et 2
o
f 5
) R
02
.d
wg
- 3
0/09
/2
02
0 16
:1
4:21
- S
HE
ET
0
2 - G
rice
D
Apprv'dPurpose of revision
Rev Rev. Date Drawn CheckdRev'd
© Copyright 2020 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs.
Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of
copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject
to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or
responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
C
O
N
T
I
N
U
E
D
O
N
S
H
E
E
T
1
C
O
N
T
I
N
U
E
D
O
N
S
H
E
E
T
3
PERSHORE ROAD - PRIORY ROAD
JUNCTION DETAILED DESIGN
GENERAL ARRANGEMENT
SHEET 2 OF 5
SUITABLE FOR APPROVAL
1:250 @ A1
B2309009
B2309009-JAC-0000-DR-0002 R02
7th Floor, 2 Colmore Square, 38 Colmore Circus
Queensway, Birmingham, B4 6BN
Tel:+44(0)121 237 4000 www.jacobs.com
REPRODUCED FROM ORDNANCE SURVEY MAPS WITH PERMISSION
FROM THE CONTROLLER OF HM STATIONERY OFFICE. CROWN
COPYRIGHT RESERVED. LICENCE No. 0100031673 2018.
S
H
E
E
T
0
1
S
H
E
E
T
0
2
SHEET 03
SHEET 04
SHEET 05
R02 30/09/20
SHARED HATCH AND KEY UPDATED & TIE IN
DEFINED, FEEDER PILLAR REMOVED
DG MPMP AL
R01 27/05/20 AMENDMENTS MADE DG TSTS AL
R00 20/03/20 SUITABLE FOR APPROVAL BV TS MS AL
C
O
N
T
I
N
U
E
D
O
N
I
N
S
E
T
A
INSET A
Scale 1:500
Location Plan - Sheet 2
10m0m 15m5m5m
Scale 1:250
All site activities shall be carried out in accordance with the Contractor's Construction
Phase Plan and Safe Work Method Statements/Risk Assessments. In addition to the
hazards/risks normally associated with the type of work detailed on this drawing, note
the following:
WORK CAN ONLY BE CARRIED OUT BY SUITABLY TRAINED AND BRIEFED
PERSONNEL.
CONSTRUCTION
1) Working in proximity to live traffic and construction plant.
2) All existing services should be located on site as required by the contractor prior to any construction
works being undertaken.
3) Ensure adequate liaison is undertaken with residents and businesses within the site extents to
ensure safe access / egress arrangements are communicated.
4) Vibration from works operations should be avoided in the vicinity of buildings and utilities.
5) Any works to be undertaken at night should have adequate lighting available, and regulations
regarding noise must be followed.
6) Contact with carcinogenic tar based material.
7) Dust inhalation, noise and excessive vibration.
8) High temperatures from asphalt laying process resulting in burns and fume inhalation.
SAFETY, HEALTH AND ENVIRONMENTAL (SHE) INFORMATION
Notes:
1) Drawing to be printed in colour to enable correct viewing of symbols.
2) Do not scale.
3) This drawing to be read in conjunction with all other relevant contract
drawings and documents.
4) The Contractor shall verify the presence and location of all services
before undertaking any work in any area of the site by carrying out a full
non-intrusive survey of the entire site before commencing the works.
5) For cross sections refer to cross section drawings
B2309009-JAC-0000-DR-0041 to 0044 and
B2309009-JAC-0000-DR-0051 to 0065.
3
1
3
1
TL
TLTL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
RS
BS
GAS
GAS
GAS
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
Existing shared
area to remain
Proposed cycleway at
carriageway level
Existing kerbline to remain
Existing uncontrolled
crossing to remain
Proposed toucan crossing
Existing crossing to be
retained
R
a
m
p
E
x
te
n
ts
Ramp Extents
E
Key:
Scheme boundary
Proposed alignment
Existing survey/OS information
Tactile / corduroy paving construction - Refer to
Footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
0.5m cycle segregation island
Proposed Footways and Paved Areas - Refer to
Footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
Proposed Cycleway - Refer to footways and Paved Areas
drawings B2309009-JAC-1100-DR-1101 to 1105
Shared footway - Refer to footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
Visirail as shown on drawings - Refer to Pedestrian guardrail
drawing B2309009-JAC-0400-DR-0402 and as per BCC SD
HW/4.02
Existing / Proposed Lighting column - Refer to Street
Lighting drawings B2309009-JAC-1300-DR-1301 to 1305
Proposed Traffic Sign and pole - Refer to Traffic Sign
drawings B2309009-JAC-1200-DR-1211 to 1215
Traffic Bollard - Refer to Traffic Sign
drawings B2309009-JAC-1200-DR-1211 to 1215
Relocated information board
Existing Edgbaston Road fingerboard sign to be relocated
Proposed bus shelter -Specification to be agreed with
TfWM
Proposed Road Markings - Refer to Road Markings
drawings B2309009-JAC-1200-DR-1201 to 1205
Proposed Traffic Signal - Refer to Traffic Signal drawings
B2309009-JAC-1200-DR-1221 to 1224
Proposed Earthworks and verge
Proposed bin - Broxap Derby Standard Liter Bin - BX45
2550-S (or similar approved) with pyramid top fixed to
permanent position with fixing kit. Colour - Powder coated
RAL 9005 with gold band.
Proposed mini feeder pillar
Earthworks Slope Gradient 1: x
Revision Cloud
x
1
CO
NT
IN
UE
D O
N S
HE
ET
2
CO
NT
IN
UE
D O
N S
HE
ET
4
PERSHORE ROAD - PRIORY ROAD
JUNCTION DETAILED DESIGN
GENERAL ARRANGEMENT
SHEET 3 OF 5
SUITABLE FOR APPROVAL
1:250 @ A1
B2309009
B2309009-JAC-0000-DR-0003 R02
7th Floor, 2 Colmore Square, 38 Colmore Circus
Queensway, Birmingham, B4 6BN
Tel:+44(0)121 237 4000 www.jacobs.com
REPRODUCED FROM ORDNANCE SURVEY MAPS WITH PERMISSION
FROM THE CONTROLLER OF HM STATIONERY OFFICE. CROWN
COPYRIGHT RESERVED. LICENCE No. 0100031673 2018.
S
H
E
E
T
0
1
S
H
E
E
T
0
2
SHEET 03
SHEET 04
SHEET 05
Drawing status
Drawing number
Scale
Client no.
Jacobs No.
Drawing title
DO NOT SCALE
Rev
Project
Client
G
N
W
I
A
R
D
T
U
A
O
A
D
C
P:\B
2309009 - P
ersho
re
R
d- P
rio
ry R
d Jct D
etailed
D
esig
n\0
08 C
AD
D\000
0 G
ene
ral A
rrangem
ent\B
230
900
9-JA
C-00
00-D
R-0
00
3 (S
he
et 3
o
f 5
) R
02
.d
wg
- 3
0/09
/2
02
0 15
:5
3:07
- S
HE
ET
0
3 - G
rice
D
Apprv'dPurpose of revision
Rev Rev. Date Drawn CheckdRev'd
© Copyright 2020 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs.
Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of
copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject
to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or
responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
Location Plan - Sheet 3
10m0m 15m5m5m
Scale 1:250
2.5m
12.4m
15.0m
6.3m
2.5m
3.0m
6.7m
6.2m
All site activities shall be carried out in accordance with the Contractor's Construction
Phase Plan and Safe Work Method Statements/Risk Assessments. In addition to the
hazards/risks normally associated with the type of work detailed on this drawing, note
the following:
WORK CAN ONLY BE CARRIED OUT BY SUITABLY TRAINED AND BRIEFED
PERSONNEL.
CONSTRUCTION
1) Working in proximity to live traffic and construction plant.
2) All existing services should be located on site as required by the contractor prior to any construction
works being undertaken.
3) Ensure adequate liaison is undertaken with residents and businesses within the site extents to
ensure safe access / egress arrangements are communicated.
4) Vibration from works operations should be avoided in the vicinity of buildings and utilities.
5) Any works to be undertaken at night should have adequate lighting available, and regulations
regarding noise must be followed.
6) Contact with carcinogenic tar based material.
7) Dust inhalation, noise and excessive vibration.
8) High temperatures from asphalt laying process resulting in burns and fume inhalation.
SAFETY, HEALTH AND ENVIRONMENTAL (SHE) INFORMATION
6.60m
Notes:
1) Drawing to be printed in colour to enable correct viewing of symbols.
2) Do not scale.
3) This drawing to be read in conjunction with all other relevant contract
drawings and documents.
4) The Contractor shall verify the presence and location of all services
before undertaking any work in any area of the site by carrying out a full
non-intrusive survey of the entire site before commencing the works.
5) For cross sections refer to cross section drawings
B2309009-JAC-0000-DR-0041 to 0044 and
B2309009-JAC-0000-DR-0051 to 0065
R02 30/09/20 KEY UPDATED DG MPMP AL
R01 27/05/20 AMENDMENTS MADE DG TSTS AL
R00 20/03/20 SUITABLE FOR APPROVAL BV TS DM AL
FH
SVSV
SV
SV
SV
SV
WO
GAS
Existing bus
stop post/flag to
remain
Proposed cycleway at
carriageway level on
existing
Existing bridge trief kerbs and
footway to remain
Edgbasto
n R
oad
Queen's R
ide
R
i
v
e
r
R
e
a
2.0m
2.0m
3.0m
Ramp
Extents
Key:
Scheme boundary
Proposed alignment
Existing survey/OS information
Tactile / corduroy paving construction - Refer to
Footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
0.5m cycle segregation island
Proposed Footways and Paved Areas - Refer to
Footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
Proposed Cycleway - Refer to footways and Paved Areas
drawings B2309009-JAC-1100-DR-1101 to 1105
Shared footway - Refer to footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
Visirail as shown on drawings - Refer to Pedestrian guardrail
drawing B2309009-JAC-0400-DR-0402 and as per BCC SD
HW/4.02
Existing / Proposed Lighting column - Refer to Street
Lighting drawings B2309009-JAC-1300-DR-1301 to 1305
Proposed Traffic Sign and pole - Refer to Traffic Sign
drawings B2309009-JAC-1200-DR-1211 to 1215
Traffic Bollard - Refer to Traffic Sign
drawings B2309009-JAC-1200-DR-1211 to 1215
Relocated information board
Existing Edgbaston Road fingerboard sign to be relocated
Proposed bus shelter -Specification to be agreed with
TfWM
Proposed Road Markings - Refer to Road Markings
drawings B2309009-JAC-1200-DR-1201 to 1205
Proposed Traffic Signal - Refer to Traffic Signal drawings
B2309009-JAC-1200-DR-1221 to 1224
Proposed Earthworks and verge
Proposed bin - Broxap Derby Standard Liter Bin - BX45
2550-S (or similar approved) with pyramid top fixed to
permanent position with fixing kit. Colour - Powder coated
RAL 9005 with gold band.
Proposed mini feeder pillar
Earthworks Slope Gradient 1: x
Revision Cloud
x
1
CO
NT
IN
UE
D O
N S
HE
ET
3
CO
NT
IN
UE
D O
N S
HE
ET
5
PERSHORE ROAD - PRIORY ROAD
JUNCTION DETAILED DESIGN
GENERAL ARRANGEMENT
SHEET 4 OF 5
SUITABLE FOR APPROVAL
1:250 @ A1
B2309009
B2309009-JAC-0000-DR-0004R02
7th Floor, 2 Colmore Square, 38 Colmore Circus
Queensway, Birmingham, B4 6BN
Tel:+44(0)121 237 4000 www.jacobs.com
REPRODUCED FROM ORDNANCE SURVEY MAPS WITH PERMISSION
FROM THE CONTROLLER OF HM STATIONERY OFFICE. CROWN
COPYRIGHT RESERVED. LICENCE No. 0100031673 2018.
S
H
E
E
T
0
1
S
H
E
E
T
0
2
SHEET 03
SHEET 04
SHEET 05
Drawing status
Drawing number
Scale
Client no.
Jacobs No.
Drawing title
DO NOT SCALE
Rev
Project
Client
G
N
W
I
A
R
D
T
U
A
O
A
D
C
P:\B
2309009
- P
ersh
ore R
d- P
riory R
d Jct D
etailed
D
esign\008 C
AD
D\000
0 G
en
eral A
rrangem
ent\B
230
900
9-JA
C-0
00
0-D
R-0
00
4 (S
he
et 4
o
f 5
) R
02
.d
wg
- 3
0/09
/2
02
0 1
5:5
3:4
5 - S
HE
ET
0
4 - G
rice
D
Apprv'dPurpose of revision
Rev Rev. Date Drawn CheckdRev'd
© Copyright 2020 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs.
Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of
copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject
to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or
responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
Location Plan - Sheet 4
10m0m 15m5m5m
Scale 1:250
All site activities shall be carried out in accordance with the Contractor's Construction
Phase Plan and Safe Work Method Statements/Risk Assessments. In addition to the
hazards/risks normally associated with the type of work detailed on this drawing, note
the following:
WORK CAN ONLY BE CARRIED OUT BY SUITABLY TRAINED AND BRIEFED
PERSONNEL.
CONSTRUCTION
1) Working in proximity to live traffic and construction plant.
2) All existing services should be located on site as required by the contractor prior to any construction
works being undertaken.
3) Ensure adequate liaison is undertaken with residents and businesses within the site extents to
ensure safe access / egress arrangements are communicated.
4) Vibration from works operations should be avoided in the vicinity of buildings and utilities.
5) Any works to be undertaken at night should have adequate lighting available, and regulations
regarding noise must be followed.
6) Contact with carcinogenic tar based material.
7) Dust inhalation, noise and excessive vibration.
8) High temperatures from asphalt laying process resulting in burns and fume inhalation.
SAFETY, HEALTH AND ENVIRONMENTAL (SHE) INFORMATION
Notes:
1) Drawing to be printed in colour to enable correct viewing of symbols.
2) Do not scale.
3) This drawing to be read in conjunction with all other relevant contract
drawings and documents.
4) The Contractor shall verify the presence and location of all services
before undertaking any work in any area of the site by carrying out a full
non-intrusive survey of the entire site before commencing the works.
5) For cross sections refer to cross section drawings
B2309009-JAC-0000-DR-0041 to 0044 and
B2309009-JAC-0000-DR-0051 to 0065
R02 30/09/20 KEY UPDATED DG MPMP AL
R01 27/05/20 AMENDMENTS MADE DG TSTS AL
R00 20/03/20 SUITABLE FOR APPROVAL BV TS DM AL
FH
Ramp Extents
E
d
g
b
a
s
to
n
R
o
a
d
C
a
n
n
o
n
H
ill
R
o
a
d
C
a
n
n
o
n
H
ill P
a
rk
Existing toucan
crossing to be
shortened
Existing kerbline to
remain
Proposed cycleway at
carriageway level on
existing westbound
lane
Visirails
Existing street name
plate
E
d
g
b
a
s
t
o
n
R
o
a
d
Existing bus shelter to
remain
Existing bus shelter to
remain
Key:
Scheme boundary
Proposed alignment
Existing survey/OS information
Tactile / corduroy paving construction - Refer to
Footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
0.5m cycle segregation island
Proposed Footways and Paved Areas - Refer to
Footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
Proposed Cycleway - Refer to footways and Paved Areas
drawings B2309009-JAC-1100-DR-1101 to 1105
Shared footway - Refer to footways and Paved Areas drawings
B2309009-JAC-1100-DR-1101 to 1105
Visirail as shown on drawings - Refer to Pedestrian guardrail
drawing B2309009-JAC-0400-DR-0402 and as per BCC SD
HW/4.02
Existing / Proposed Lighting column - Refer to Street
Lighting drawings B2309009-JAC-1300-DR-1301 to 1305
Proposed Traffic Sign and pole - Refer to Traffic Sign
drawings B2309009-JAC-1200-DR-1211 to 1215
Traffic Bollard - Refer to Traffic Sign
drawings B2309009-JAC-1200-DR-1211 to 1215
Relocated information board
Existing Edgbaston Road fingerboard sign to be relocated
Proposed bus shelter -Specification to be agreed with
TfWM
Proposed Road Markings - Refer to Road Markings
drawings B2309009-JAC-1200-DR-1201 to 1205
Proposed Traffic Signal - Refer to Traffic Signal drawings
B2309009-JAC-1200-DR-1221 to 1224
Proposed Earthworks and verge
Proposed bin - Broxap Derby Standard Liter Bin - BX45
2550-S (or similar approved) with pyramid top fixed to
permanent position with fixing kit. Colour - Powder coated
RAL 9005 with gold band.
Proposed mini feeder pillar
Earthworks Slope Gradient 1: x
Revision Cloud
x
1
PERSHORE ROAD - PRIORY ROAD
JUNCTION DETAILED DESIGN
GENERAL ARRANGEMENT
SHEET 5 OF 5
SUITABLE FOR APPROVAL
1:250 @ A1
B2309026
B2309009-JAC-0000-DR-0005 R02
7th Floor, 2 Colmore Square, 38 Colmore Circus
Queensway, Birmingham, B4 6BN
Tel:+44(0)121 237 4000 www.jacobs.com
S
H
E
E
T
0
1
S
H
E
E
T
0
2
SHEET 03
SHEET 04
SHEET 05
Drawing status
Drawing number
Scale
Client no.
Jacobs No.
Drawing title
DO NOT SCALE
Rev
Project
Client
G
N
W
I
A
R
D
T
U
A
O
A
D
C
P:\B
2309009 - P
ersho
re
R
d- P
rio
ry R
d Jct D
etailed
D
esig
n\0
08 C
AD
D\000
0 G
ene
ral A
rrangem
ent\B
230
900
9-JA
C-00
00-D
R-0
00
5 (S
he
et 5
o
f 5
) R
02
.d
wg
- 3
0/09
/2
02
0 1
6:1
9:0
6 - S
HE
ET
0
5 - G
rice
D
Apprv'dPurpose of revision
Rev Rev. Date Drawn CheckdRev'd
© Copyright 2020 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs.
Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of
copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject
to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or
responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
CO
NT
IN
UE
D O
N S
HE
ET
4
REPRODUCED FROM ORDNANCE SURVEY MAPS WITH PERMISSION
FROM THE CONTROLLER OF HM STATIONERY OFFICE. CROWN
COPYRIGHT RESERVED. LICENCE No. 0100031673 2018.
CO
NT
IN
UE
D O
N IN
SE
T B
CO
NT
IN
UE
D A
BO
VE
INSET B
3.0m
Location Plan - Sheet 5
10m0m 15m5m5m
Scale 1:250
All site activities shall be carried out in accordance with the Contractor's Construction
Phase Plan and Safe Work Method Statements/Risk Assessments. In addition to the
hazards/risks normally associated with the type of work detailed on this drawing, note
the following:
WORK CAN ONLY BE CARRIED OUT BY SUITABLY TRAINED AND BRIEFED
PERSONNEL.
CONSTRUCTION
1) Working in proximity to live traffic and construction plant.
2) All existing services should be located on site as required by the contractor prior to any construction
works being undertaken.
3) Ensure adequate liaison is undertaken with residents and businesses within the site extents to
ensure safe access / egress arrangements are communicated.
4) Vibration from works operations should be avoided in the vicinity of buildings and utilities.
5) Any works to be undertaken at night should have adequate lighting available, and regulations
regarding noise must be followed.
6) Contact with carcinogenic tar based material.
7) Dust inhalation, noise and excessive vibration.
8) High temperatures from asphalt laying process resulting in burns and fume inhalation.
SAFETY, HEALTH AND ENVIRONMENTAL (SHE) INFORMATION
Notes:
1) Drawing to be printed in colour to enable correct viewing of symbols.
2) Do not scale.
3) This drawing to be read in conjunction with all other relevant contract
drawings and documents.
4) The Contractor shall verify the presence and location of all services
before undertaking any work in any area of the site by carrying out a full
non-intrusive survey of the entire site before commencing the works.
5) For cross sections refer to cross section drawings
B2309009-JAC-0000-DR-0041 to 0044 and
B2309009-JAC-0000-DR-0051 to 0065
R02 30/09/20
SHARED HATCH AND KEY UPDATED, HAZARD
PAVING ADDED TO END OF SCHEME, ROAD PLATE
LEADER ADDED
DG MPMP AL
R01 27/05/20 AMENDMENTS MADE DG TSTS AL
R00 20/03/20 SUITABLE FOR APPROVAL BV TS DM AL