AES Operates the Largest Fleet of Battery‐Based Energy Storage on the Power Grid
Contains Forward Looking Statements
AES Proprietary and Confidential
Credit: GE
KilrootNorthern Ireland
Alamitos US‐CA
Tait, US‐OH
Laurel Mountain US‐WV
Northern Ireland Project #2
AngamosChile Cochrane
Chile
Operations: 116 MWConstruction: 50 MWLate Stage Development: 218 MW
IPLUS‐IN
Philippines Project
Texas Project
Dominican Republic Project
AdvancionTMApplications Center US‐PA
Warrior Run,US-MD
Zeeland, Netherland
s
Los Andes,Chile
4
Initial project leading to over 100MW of energy storage in Chile
• Edison Award 2012 24 MW Los Andes ResourceAtacama, Chile
• Primary & secondary reserves• Contingency management
Impact: Avoided load shedding and
emergency curtailment Increased energy production &
reduced cost Increased system security Inertia‐like performance
Energy Storage Supplying Critical Spinning ReservesAES Proprietary and Confidential
5
Serving PJM Interconnection – world’s largest power market
98 MW Laurel Mountain Wind Farmwith 64 MW Storage Resource
West Virginia, USA
Adding System Reliability with WindAES Proprietary and Confidential
6
AES Advancion Array Providing 20MW of flexibility to Netherlands Market
20 MW Zeeland ResourceVlissingen, Netherlands
• Primary Control Reserve for integrated market (DE, NL, CH, AU)
Impact: Reduce total reserve cost Fast, accurate reserves Increased system flexibility Opportunity to explore fast
resource benefits Scalable
Storage Serving TenneT and Integrated Reserve MarketAES Proprietary and Confidential
7
Project Description:• 2x50 MW advanced battery array• Provides local capacity reliability• 4 hour duration• 24x7 power resource• No emission or water• Tolling PPA
100 MW Interconnection (rendered)200 MW of flexibility (discharge + charge)
AES Advancion Selected by SCE in Competitive RFP and Awarded a 20 Year PPA Contract AES Proprietary and Confidential
8
Project Description:• 2x50 MW advanced battery array• Provides local capacity reliability• 4 hour duration• 24x7 power resource• No emission or water• Tolling PPA
100 MW Interconnection (rendered)200 MW of flexibility (discharge + charge)
AES Energy Storage Offering to CaliforniaAES Proprietary and Confidential