Ahrom Project co. Industrial Plants Engineering & Construction
Introduction
One
One of the national leaders in metallurgy
industry, Ahrom Project co., was established
in 1993 by a group of professionals and
experts dedicated to providing the customers
with comprehensive technical and executive
services. The firm tends to be actively
involved in representing engineering
industrial consultancy, design, construction,
industrial erection and commissioning of
machineries and equipments as well as
industrial plants and factories.
Now having especialist experts and also
various experiences in desgin industrial
plants, design and construction of steel
structures, design and construction of
industrial foundations, design and
construction of industrial machineries and
equipments, installation and commissioning
production-line and machineries and
commissioning industrial plants as a turn key
projects, prepare us the way to meet all the
requirements and demands in all cement,
foundry and petroleum related projects.
Scope of Services
Consultancy
Commercial
Installation &
Commissioning
Construction
Design
1. Consultancy, Design and Engineering Department
Consultancy Services
In New Factories & Industrial Plants
In Installing & Commissioning
In Improving Industrial Plant’s Performance
Engineering Services
In Providing Feasibility Studies
In Designing Plant’s Layout
In Designing Industrial Machineries
In Designing Industrial Structures & Foundation
In Supervising & Managing Industrial Projects
In Process, Electricity & Automation, Mechanical and Civil Engineering Fields
Commercial Services
In Technical & Know-How Sciences Transferring
In Procuring Industrial Machineries &
Equipments
In Marketing For Raw Materials & Products
2. Construction and Montage Department
Counstructing and montage of machineries and equipments is another main activity of
our company.
In order to approach this scope, Ahrom Project co. equipped with a construction and
montage workshop with especial machines and tools including tower and mobile
cranes, forklifts, engine lathe and milling machine, rolling machine, radial drill
machines, plasma-cutting machines, all types of welding machines, grinding machines
and also independent design office and Quality control center. This facility enabale us
to meet all requirements and demands in industrial plants as well as projects.
Steel Structures & Storages & Reactors
Material Handling Equipments
Belt Conveyor & Feeder
Apron Conveyor
Screw Conveyor & Feeder
Bucket Elevator
Vibrator Conveyor & Shakeout
Pneumatic Conveyor
Industrial Machines & Equipments
Special Machines & Equipments
3. Installation & Commissening Department
Having valuable experiences as well as qulified experts, prepare the way for executing
industrial projects, including following areas:
Executing foundation & steel structures for industrial plants
Dismantelling industrial equipments & machineries throughout the world
Installing & commissioning of industrial plants as well as industrial machineries
Executing of mechanical & electrical installation for product lines and industrial
machineries
Executing piping systems for projects of transmitting petroleum, water and gas
Installing the equipments for civil & industrial projects
Tracktorsazi Oroomiye
Oroomiye Project opration site
2003 Project opration time
1. Design New factory layout
2. Design and procurement foundation plants and supervision on
3. Installation and commissioning Künkel Wagner line
Project activities
explanation
Irankhodro Takestan
Takesten Project opration site
2003-2005 Project opration time
1. Overhaul , installation and commissioning of full automatic
Fritz Hanzberg line
2. Overhaul , installation and commissioning of full automatic
Heinrich Wagner Sinto line
3. installation and commissioning of Casting Cooler system ,
cylinder production line 4. installation and commissioning of Shot Blast system , cylinder
production line 5. installation and commissioning of Decoring system , cylinder
production line
Project activities
explanation
Irankhodro Takestan
Majin Steel Industry
Semnan Project opration site
2006-2009 Project opration time
1. Design production site layout
2. Design and procurement foundation plants and ironic structures
3. Design , produce and installation all machines and equipments
of sand plant
4. Overhaul , installation and commissioning of full automatic
H.F.M 2040 line
5. Overhaul , installation and commissioning of dust collector
system
Project activities
explanation
Azarang Poolad Industry
Eshtehard Project opration site
2007-2009 Project opration time
1. Design factory layout and production sites
2. Design and procurement foundation plants and ironic structures
3. Design , produce and installation all machines and equipments of
sand plant
4. Installation and commissioning Künkel Wagner line
Project activities
explanation
Hamoon Nayze Industry
Kashan Project opration site
2007-2009 Project opration time
1. Installation and commissioning all of piping line
2. Installation and commissioning of Bitumen Coating Machine
3. Installation and commissioning of Zinc Spray machine
4. Installation and commissioning of Hydrostatic test machine
5. Installation and commissioning of 36 metres Aniling Oven
6. Installation and commissioning of 30 tons Holder Oven
Project activities
explanation
Completed Projects
Row Employer Term of contract Year of
Execution
1
Maleabel Saipa Design layout of the Hotbox-Core making machine
1990
Design the grinding & completion unit 1999
2 Butan Industrial co. Execution of LNG-Cylinder production line with capacity of 500000 cylinder of year
1991
3 Steel rolling mill co. Design, Construction and Installation of 3 dust collecting system for steel-melting furnace
1993
4
Servigaz co. Codifying the technical certificate of LNG-Cylinder valves
1992-1999
Construction of LNG-pressure vessels with capacity from 500 to 10000 gallon
Executing the maintenance – line unit for LNG cylinder with capacity of 200000 per year
5 CHODAN NASHKAN
FOUNDRY PLANT
Design, construction, Installation of new foundry plant consist of melting shop , moulding line & sand plant (7.500 ton/year casting parts )
1993
6 PARS METAL
FOUNDRY Co.
Design of 60 ton/hr B.M.D mixer 1993
Design & manufacturing of 45000 m3/hr dust collection system for induction furnaces & melting shop
1994
Manufacturing & installation of Disamatic AMC unit 1995
7 Butan Industrial co. Dismanteling old production-line, design new layout and
installation and commissioning new product-line for 11 kg cylinder
8 ATMOSPHERE
FOUNDRY PLANT
Installation of new Künkel Wagner automatic moulding line ( 120 m/hr)
1995
Installation & commissioning of 33 sets of walzing machineries for pipe fittings ( Rhein Böllen & Fiemat )
1997
Commissioning of Loi malleable iron furnace 1998
Commissioning & start of & production of foundry plant with 2 sets Disa line, 120 ton/hr Webac sand plant, 3 sets of 8 ton A.B.B. induction furnaces, 2 sets of BMD shot blasts, & complete utilities apparatus for plant
2004
9 SIMGOON VALVE
PRODUCTION Co.
Design of bronze melting shop, scrap yard & charging system Design of dust collection system for bronze melting shop
1994
Design, man. & installation of charging plant & dust collection system for 3 sets of induction furnaces
1996
Installation & commissioning of 3 sets of second hand bronze induction melting furnaces (3 ton/hr)
1998
Installation & commissioning of 3 sets of second hand bronze induction melting furnaces (3 ton/hr)
1998
10 IRAN KANSAR SAND
PLANT Co.
Design, manufacturing & erection f 2 sets of Sand plant filter machineries
1997
design & manufacturing of Sand dryer & classifier plant 1997
manufacturing of Crane wheel Gear Ø 2.8 m 1998
11 Teraktorsazi Tabriz Supervising for construction, installation and 1999
commissioning a cold box core making machine
12
IRAN KHODRO
FOUNDRY
FACTORY
Design, engineering, construction & Installation of
complete second hand Disa line with 60 ton/hr sand plant
& 6 ton Junker auto pouring induction furnace
2000
Design, construction, installation and commissioning 5 bag
filter with capacity of 45000 m³/hr 2003
13 ARDESTAN
FOUNDRY Co.
Design & engineering of foundry plant for 5.000 ton/year
casting parts ( Co2 moulding method ) 1999
Installation & commissioning of 3 sets second hand
induction melting furnaces
(6 ton Ajax- 8 ton B.B.C. – 3 ton B.B.C)
2001
14
IRAN CASTING
INDUSTRIES Co.
(I.C.I)
Foundation construction, Installation & commissioning of
1 set of 4.5 tons Junker second hand auto pouring furnace
for K.W.Moulding line.
Design & Installation of 1 set of 10 tons monorail crane for
melt transport for pouring furnace
2002
15 MEHVAR KHODRO
L.K.W AXLE CO.
Design, manufacturing & erection of: 2000 Front & back Axel montage complete line
Echlin Gears heat treatment & washing line 2001
20 & 25 tons Hydraulic presses (10 pcs.) 2002
Front & back Axel testing machineries (3 pcs.) 2002
Gear & Axel parts heat treatment furnaces (2pcs.) 2003
Axel special oil refinery machines (2 pcs.) 2004
Radial plasma cutting machines (2 pcs.) 2004
Linear plasma cutting machines (2 pcs.) 2004
16 ARAK MACHINE
MANUFACTURING manufacturing of Annealing furnace for Auto Glass 1999
17
RING KHODRO
PARS
Co.
Design of foundry plant’s layout
2001 Supervising for installation foundry machines
Design and sketch foundation drawing for moulding line, furnace and sand plant
Design of sand plant and sketch all workshop drawings
18
RASHA FOUNDRY
EXPANSION
PROJECT
Design, engineering, of foundry general plant
2003
Design and execution of foundation for moulding line and sand plant
Installation & commissioning of Second hand BMD moulding line ( 90 m/hr ),
Installation & commissioning of +GF+ sand plant 60 ton/hr
19
ORUMIEH
FOUNDRY
EXPANSION
PROJECT
Design of general plan for complete foundry project
2002
Design of Künkel Wagner 180 mould/hr moulding line (layout and foundation )
Design of sand plant ( 120 ton/hr) consist of : layout, foundation, steel structure, machineries & apparatus, electrical & control drawings
Melting shop, scrape yard & charging system design & engineering (layout & foundation drawings.)
Construction of complete sand plant
2003 Installation & commissioning of 180 mould/hr, Künkel Wagner Moulding line, & complete fettling shop for expansion project
20
MIRAB WATER
VALVES
FOUNDRIES
Design & engineering of foundry plant for 3.000 ton/year butterfly valves parts ( Co2 moulding method )
2001
Engineering, foundation, construction, Installation & commissioning of 1 set 10 ton/hr Co2 sand regeneration plant
2005
21 CHODAN PARS
FOUNDRY Co.
Design layout of B.M.D moulding line and sand plant
2004
Design and sketch foundation drawings for moulding line and sand plant
Design and sketch workshop drawing for WEBAC sand plant
Constructing of 3 screw conveyor and aerator
22
IRAN KHODRO
FOUNDRY
INDUSTRIES,
Takestan
Overhaul, installation and commissioning of Hansberg mouldign line
2004 Overhaul, installation and commissioning of Orthos-Eirich sand plant (for Hansberg)
Overhaul, installation and commissioning of H.W.S moulding line
2005 Overhaul, installation and commissioning of Orthos-Eirich sand plant (for H.W.S)
Overhaul, installation and commissioning of 2 pouring furnaces A.B.B
2004 Installation and commissioning of Jöst casting cooler (for Hansberg)
Installation and commissioning of Jöst casting cooler (for H.W.S) 2005 Installation of Sider Progetti sand conveying system
Installation and commissioning of Pangborn shot blast 2005
Installation and commissioning of F&K de-coring machine
23 MAGINE STEEL Co.
35 Tons Sand Plant Design & manufacturing
2006
Foundry Plant Consultant & Engineering
Sand Plant Design, Engineering & Construction & Commissioning
Overhaul, installation and commissioning H.F.M moulding line
24 CHESHME SAR Co.
Design and sketch layout and foundation drawings for mouldign line and sand plant
2006 Overhaul, installation and commissioning Disamatic moulding line and sand plant
25 FOULAD Consultant & Engineering of Foundry Plant 2006
PASARGAD Co. Dismantling of Sand Plant & moulding line
26 AZARANG POULAD
Co.
Design, engineering, manufacturing & installation of cast iron foundry plant consist of Künkel Wagner moulding line & Eirich sand plant.
2006
27
IRANKHODRO
FOUNDRY
FACTORY
Design & Manufacturing of : 3 sets of screw conveyor 6 sets of Double Pendulum flap damper 1 set of vibrating conveyor 1 set of Magnet. Pneumatic Conveyor for sand plant Installation and startup of rotary table shot blast
2007
28 SHIBEH VALVE Co. Design , engineering , construction and installation of de-dusting plant (6 cyclone + 6 Radial fans + Ducting fan)
2007
29 GOHAR RAVESH Co. feasibility study of new foundry plant (15,000 tons/year )
2007
30 TOLIDAT ALYAZI
NOVIN Co.
Design and construction of ventilation and de-dusting system for different production lines.
2007
31 HAMOON NAYZE
Co.
Erection & Startup of complete pipe production line consist of : 4 pcs of 5 ton induction melting furnace 1 pcs of 30 ton induction Holding Furnace 1 pcs of Hydrostatic test machine 1 pcs of automatic pipe purring line 1 set of Core making machine 1 set of Annealing furnace
2007
32 LULE & MACHINE
SAZI Co.
Erection & startup of machineries consist of : George fisher (+GF+) moulding line Orthos Project automatic sand plant 1 set of Φ1200 pipes transport clamp Hottinger pipe core preparation plant 4 sets of melt transport ladles.
2007
33
IRANKHODRO
FOUNDRY
FACTORY
Overhaul, installation and commissioning of shot blast machine and structures
2008
Overhaul, installation and commissioning of twin grinding machine
Overhaul, installation and commissioning of conveyor system
Overhaul, installation and commissioning of leakage-test machine for cylinder blocks
Overhaul, installation and commissioning of washing and lacking machine for cylinders
New Projects
Year of
execution Term of contract Customer Ref
2008
Design foundation and layout KÜNKEL WAGNER molding line and EIRICH sand plant AZARANG POULAD
Co. 1
Design, construction, installation and commissioning KÜNKEL WAGNER molding line and EIRICH sand plant
2009
Design foundation and layout KÜNKEL WAGNER molding line and JEMCO sand plant
ARDESTAN CASTING
INDUSTRY 2
Installation and commissioning KÜNKEL WAGNER molding line and JEMCO sand plant
2009 Installation and commissioning full automatic (AGM) D.E.E.P. molding line
CHESHME SAR Co. 3
2009 Executing of new foundry plant with capacity of 8000 ton/year (Turn Key)
FOOLAD
GRINSELSELE CO. 4
2009
Design and construction of machineries:
Shake out (6 meters)
Apron conveyor
Vibrating conveyor
SANAYE CHODAN
ESFAHAN CO. 5 Design and sketch moulding line and sand plant’s layout,
foundation and steel structure workshop drawings
Supervising for installation and commissioning H.W.S moulding line and Orthos-Eirich sand plant
2010 Design and construction Cold-Box core making machine type: H16-HV-K
Faraz Aluminum 6
2010 Design, construction, installation and commissioning sand plant and its equipments
Rouineh kari Zanjan 7
Address : 2nd Floor, No. 74, Golab Blvd., Janah Highway, Tehran, Iran
Tel : (+98-21) 44287072
Fax: (+98-21) 44286800
Website : www.ahromproject.com
Email : info@ahromproject.com
top related