alaska-3.5k (1)
Post on 24-Feb-2018
218 Views
Preview:
TRANSCRIPT
-
7/25/2019 Alaska-3.5k (1)
1/3
Trial Mix/Trial Batch Data Sheet (QCD-020)
Client Name AMC-TDM Date
Project Name Alaska Plant Rehabilitation Product 3500 psi at 28 days (PCD)
Address San Pedro Laguna Max. Aggregate 3/4"
Slump/ Flow Specified Wt .of Bucket, kg 2.90 Time Batched
Concrete Temp,C Vol. of Bucket, m3 0.007 Sample Time
Ambient Temp, C Wt. of Concrete, kg 17.44 Batch Method:
Air Content, % Unit Weight [kg/m3] 2,491 Sampled By:
Free Water of Sand Relative Yield,Ry 0.99 Cylinder Size & Qty
Free Water of M. Sand Load Size
Slump Loss Test
Slump (in)
Concrete Temp
Conducted By/Date: Witnessed By/Date:
Notes
74.06
Lee Ann P. Calara
QC Engineer/Holcim
Daratard P87 - - 0.000
Total (kg) 2,469 2,469 74.06
Mira P99 (L) 3.30 3.3 0.099
Adva 212L (L) 0.40 0.40 0.012
3/8 Aggregates (kg) 470 470 14.1
Water (kg) 150 150 4.5
G1 Aggregates (kg) - 0 -3/4 Aggregates (kg) 559 559 16.8
Fine Aggregates (kg) 773 773 23.2
Manufactured Sand (kg) 183 183 5.5
Fly ash (kg) 66.0 66.0 2.0
Slag (kg) 0.0 0.0 0.0
Raw MaterialsBatch Weight SSD
(kg/m3)
Batch Weight Adjusted
(kg /m3)
Trial Batch Weights
(kg)
Cement (kg) 264.0 264 7.9
Raw Materials
Initial()
0.0% 8pcs 4" x 8"
0.0% 0.03
6-8"
Project Details
November 9, 2015
Trial Mix Results
-
7/25/2019 Alaska-3.5k (1)
2/3
-
7/25/2019 Alaska-3.5k (1)
3/3