arch3170 2014 fall madams prince wright hp 2
Post on 08-Apr-2016
216 Views
Preview:
DESCRIPTION
TRANSCRIPT
Site Plan: Elevated Planmaverick mills, east boston
Site Plan: Ground Level
Site Plan: Fifth Level Plan
N
Scale: 1’ = 1/64”
Scale: 1’ = 1/64”
Scale: 1’ = 1/64”
N
N
Site Section: One Scale: 1’ = 1/32”
Site Section: Two
Transect: Condition One
Commerical: Commerical strip Residential: Commericial Strip
Residential: Alley
Transect: Condition Two Transect: Condition Three
Scale: 1’ = 1/48”
Commerical
Roof garden
Outdoor seating (private)
Outdoor seating (public)
Second floor commerical
Residential
Node
Horizontal Circulation (residential)
Alley (service for commerical)
First floor commerical
Outdoor seating (private)
Roof garden
Parking (residential)
Apartments
Courtyard
Roof garden
Outdoor seating (private)
Alley (residential parking)
Courtyard
Circulation
Greenhouse / Harvesting
Classrooms
Auditorium
Storage Rooms
1
2
3
4
1
1
2
3 3 3 3
4
Salt Marsh Aster
Sea Lavender
Salt Grass
Marsh Orach
Saltmeadow Hay
Node: Elevated Plan Scale: 1’ = 1/32”
Node: Section
Water Drainage System (piping) Example Residential Block
Perspective: Commercial Strip Perspective: Marsh / Node
Scale: 1’ = 1/32”
Node: Axonometric and Circulation of Marsh Platform
Node: Ground Floor Plan Scale: 1’ = 1/32”
Vertical circulation
Horizontal circulationWater from surrounding blocks
Water from site and roof gardens
Water from marsh to Chelsea River
N N
bennington street
T - blue line
interstate
highway
EAST BOSTON’S
NETWORK
zones
traveling towards residential
belle isle marsh reservationconstitution beach park
wood island bay edge parktemple ohabei shalom cemetery
noyes playground
east boston greenwaypiers park
porzio parkmassport harborwalk park
east boston memorial park
boston logan international airport
traveling towards airport
traveling towards parks
LAND MOSAICS
SOFTSCAPE
%
%
7
26 28 29 28 32 40 40 37 16 65 30 0
74 72 71
41 45 86
59 55 1472 68 60 60 63 84 45 70 100
12 15 17 29 25 28 29 28 2626 25 28 28 28 30 34 27 30 35 30 20 25 24 24 24 24 10 19 47 51 50 28 22 33 45 60 43 70 70 70 70 70 84 87 30 22 66 60 50 61 74 80 0 0 0 0 0 0
93 88 85 83 71 75 72 71 72 7474 75 72 72 72 70 66 73 70 65 70 80 75 76 76 76 76 90 81 53 49 50 72 78 67 55 40 57 30 30 30 30 30 16 13 70 78 34 40 50 39 26 20 100 100 100 100 100 100
softscape: 30%
hardscape: 70%
softscape: 30%
hardscape: 70%
33%
67%
softscape: 45%
hardscape: 55%
HARDSCAPE
SOFTSCAPE
%
%HARDSCAPE
hardscape softscape
-2 ~ -4 feet
0 ~ -2 feet
-4 feet
-2 ~ -4 feet
0 ~ -2 feet
-4 feet
hardscape/softscapeflooding
topographyflooding
The central focus and objective of the site is to connect one regional network and one local network through the site, while helping maintain flooding in the surrounding areas.
The district plan achieves this by creating five roads that split the site into three commerical strips across the site. A marsh is placed in the central spine of the site to maintain flooding.
Residential program is split by commercial blocks, which create the commerical strips that bridge over the marsh. The marsh bleeds out of the spine where the institutional strip is located to create an intersection between the ecological node and the archi-tectural node.
The marsh is one of the fundamental designs for the success of the design; it helps maintain flooding, and also splits the site in two parts (North and South), which the commerical strips stitch togeth-er.
Taxonomy / Framework
top related