Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Assessment of Irrigation Potential Created in AIBP funded Irrigation Projects in India using Cartosat Satellite data
SONE MODERNIZATION PROJECT BIHAR STATE
Submitted to
National Remote Sensing Centre
Indian Space Research organization Dept. of Space, Govt. of India Balanagar, Hyderabad-625
By
Jharkhand Space Application Center Department of Information Technology
Government of Jharkhand, Ranchi-834004, Jharkhand
April 2009
__________________________________________________________________________
i
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Mr. Vinod Kumar V. H. Project Scientist
PPPrrrooojjjeeecccttt TTTeeeaaammm
Dr. A. T. Jeyaseelan Director
Jharkhand Space Application Center Department of Information Technology
Government of Jharkhand Ranchi, Jharkhand-834004
Dr. Vivek Kumar Singh Project Scientist
__________________________________________________________________________
ii
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
DOCUMENT CONTROL SHEET
1. Security Classification Unrestricted 2. Distribution Central Water Commission 3. Report / Document
version (a) Issue no. 1
(b) Revision & Date:
0
4. Report /Document Type
Technical Report
5. Document Control Number
JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
6. Title Assessment of Irrigation Potential Created in AIBP funded Irrigation Projects in India using Cartosat Satellite Data: Western Kosi Main Canal, Bihar State
7. Particulars of Collation
Pages 100
Figures 5
Tables 3
References 0
8. Author(s) *Vinod Kumar V.H., JSAC (Study Team Leader) *Dr. Vivek Kumar Singh, JSAC (Study Team Member) *Dr. A. T. Jeyaseelan, Director JSAC, Project Coordinator, JSAC *M. Shanker, NRSC, Project Coordinator, NRSC
9. Affiliation of author(s) *Jharkhand Space Applications Center, Ranchi WRD, RS & GIS AA, NRSC
10. Scrutiny mechanism
Compiled by/ Controlled by JSAC/NRSC
Reviewed By Director, JSAC HWRD and GD (WR&OG)
Approved By DD – RS & GIS AA, NRSC
11. Sponsor(s) Name and Address
Central Water Commission, New Delhi Govt. of India
12. Date of Project Initiation
11.11.2008
13. Date of Publication 15.04.2009 14. Abstract (with Keywords)
This report deals with project work which includes satellite data used, methodology adopted and results & discussion and conclusions for assessment of Irrigation potential in Western Kosi Main Canal, Bihar State.
__________________________________________________________________________
iii
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
ACKNOWLEDGMENT
The National Remote Sensing Centre (NRSC) acknowledges with great appreciation for the initiative taken by the Planning Commission and Ministry of Water Resources (MoWR), Government of India in entrusting the present study on “Assessment of Irrigation Potential Created in 53 AIBP funded Irrigation Projects in India using Cartosat Satellite Data”. In this context, we acknowledge with great satisfaction Dr. Kirit Parikh, Member (Water and Power), Planning Commission, Govt. of India for taking keen interest in application of satellite remote sensing technology in scientific investigation, planning and development of water resources in the country. His dynamic initiative and continued encouragement has helped in fruitful completion of this study. The project team also acknowledges the inspiring guidance and support received from Mrs. Gauri Chatterji, Secretary to the Government of India, Ministry of Water Resources (MoWR) and Shri. B.S.Ahuja, Chairman and the former Member, WP&P, Central Water Commission. We also place on record our sincere thanks to Shri. S.K. Sinha, CE(PMO) and all Directors(PMO), CWC New Delhi for their painstaking efforts in initiating the Project . We also place on record our sincere thanks to all former CE’s(PMO), CWC, New Delhi for their kind support for conceptualizing this project. We also thank Shri. C. Agrawal, the former Director (Remote Sensing), CWC for his kind support for conceptualizing this project. Dr. G. Madhavan Nair, Chairman, Indian Space Research Organisation (ISRO) and the Secretary, Department of Space, under whose inspiring leadership the remote sensing programme in the country is carried out, has provided valuable guidance in executing this study. The project team is grateful to Dr. V. Jayaraman, Director NRSC and Dr.P.S.Roy, Deputy Director (RS&GIS Applications Area) in NRSC for providing inspiring guidance, necessary support and encouragement during the course of the study. We sincerely thank Principal Secretary, Information Technology, Government of Jharkhand for inspiring guidance and support The project team would like to thank Shri. Dhirendra Kumar Singh, Chief Engineer, Planning and Monitoring, Water Resource Department, Government of Bihar Shri. Jagdish Ram, Chief Engineer, Sone Canal Project (Aurangabad), Sri. S. N. Das Chief Engineer, Sone Canal Project (Patna), Chief Engineer, Sone Canal Project (Dehri-On-Sone) for their help and cooperation during field data collection and ground truth verification. Thanks are also due to Executive Engineers, Assistant Engineers and Junior Engineers who were associated during the field visits for Sone Canal Project. We also thank Shri. G. Behera, Group Director, WR&OG, NRSC and Dr. A.T.Jeyaseelan, Director, JSAC, Ranchi for their guidance and support in completing the project. We also sincerely place on record the co-operation extended by all the colleagues of Water Resources Division in NRSC and Jharkhand Space Application Center, Ranchi for the successful completion of the project.
__________________________________________________________________________
iv
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Executive Summary The present study has been conducted with an aim of assessing irrigation potential created in AIBP (Accelerated Irrigation Benefit Program) funded irrigation projects through mapping of irrigation infrastructure using Cartosat (2.5 m resolution) satellite data. This report deals with results of satellite data analysis of Sone Modernisation Project.
Freshly acquired (within a specified time window) Cartosat satellite data of 2.5m resolution (Ortho corrected Pan Data) procured from NDC (NRSC Data Centre) was checked for the quality, consistency and adequacy. The original satellite data in Geo-tiff format was converted into ERDAS Imagine image format to carry out further image analysis. Individual scenes were mosaiced to create satellite database in respect of AIBP component of study area. Then, identification and mapping of existing irrigation network with Main canal/Branch canal/Distributaries/Lateral & Sub-lateral was done from the satellite image on computer screen using ERDAS Imagine image processing /ArcGIS software through onscreen digitization by displaying the image at 1:4,000 to 1:2,000 scales. In addition to the canal network, the associated irrigation and drainage structures were also identified and inventoried. The digital map base for the study area with rivers/streams, roads/rail, and villages, etc. using high resolution data is prepared and used further for preparing map outputs. Thus, the inventory of information in terms of number of canals (main canals / branch canals / distributaries / minors (laterals) / subminors (sub-laterals) etc.), their chainages and respective lengths were computed for AIBP component area of Upper Penganga project. In addition to this, the status of canals was also assessed in terms of completed or incompleted or pending based on the satellite data inventory information. Then, the above inventory was compared vis a vis the proposed network (field obtained) and the irrigation potential was assessed along with balance Irrigation Potential (IP) to be created as on April/May, 2007.
The satellite data assessed irrigation potential is compared with the field reported irrigation potential estimates and the balance irrigation potential thus assessed at distributary level / branch / main canal and project level is presented in the study.
__________________________________________________________________________
v
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
The inventory and mapping of canal network using cartosat data was done for entire sone canal modernization project. The canal lengths and their off-take chainges from parent canals derived from satellite data were found to be comparable with proposed field reported statistics except in the case of few minors in the case of low level canals which are slightly short in length. There were few minors that are pending particularly under Gara choubey branch canal which could be due to pending modernization work. However, under high level canals, many canals are either pending or significantly short in length compared to the proposed. Also different cross-drainage structures like syphons, other cross drainage structures such as H.P.Cs etc and others were found to be completed on low level and high level canals. The irrigation potential was assessed using the irrigation infrastructure derived from the satellite data. The field data on canal wise IP created was not provided by project offices. Hence, for many canals under both low level and high level canals, I.P created could not be assessed based on satellite derived infrastructure due to non-availability of canal wise I.P proposed. In spite of repeated efforts, complete field data from project offices was not provided. The total proposed I.P under low level and high level canals provided by field offices was only 8,24,140 ha against U.I.P of 9,00,000 ha. Therefore, I.P created was assessed only for 8,24,140 ha. The Irrigation Potential created in the Sone canal modernization project based on Cartosat data analysis is assessed as 6,04,300 ha. as against the proposed Irrigation Potential of 8,24,140 ha. only. The satellite assessed I.P of 6,04,300 ha is distributed under Eastern Sone high level, Eastern sone low level , Western Sone high level, Western sone low level canals is 33,645 ha, 1,02,814 ha, 20,257 ha and 4,47,296 ha respectively. Hence, the total I.P created under son modernization project . For many canals, I.P created could not be estimated even though infrastructure data is available (both field and satellite derived) for want of detailed proposed I.P data.
__________________________________________________________________________
vi
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
CONTENTS
Page No. Project Team i Document Control Sheet ii Acknowledgment iii Executive Summary iv Contents vi List of Tables vii List of Figures vii Abbreviations viii 1.0 Introduction 1
1.1 Background 1 1.2 Study Objective 2 2.0 Study Area 3 2.1 Upper Penganga Project 3 2.2 AIBP Components 5 3.0 Data Used 6
3.1 Satellite Data Used 6 3.2 Ancillary Data Used 10
4.0 Satellite Data Analysis 10 4.1 Methodology 10
4.2 Assessment of Irrigation Infrastructure 12 4.3 Assessment of Irrigation Potential 12 5.0 Results and Conclusion 14 5.1 Irrigation Infrastructure 14 5.2 Irrigation Potential 37
Annexure I Salient Features of the Sone Modernisation Project 74 Annexure II Profile of the Sone Modernisation Project through 76
Satellite images and Ground photographs
Glossary of Terminology 78
__________________________________________________________________________
vii
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
List of Tables S.No Particulars Page
No Table.1 Satellite data used in the study
6
Table.2 Comparison of field reported and satellite derived offtake chainges and lengths of canal network
15
Table.3 Comparison of field reported and satellite derived Irrigation potential of canal network
38
List of Figures S.No Particulars Page
No Figure.1 Location map of study area
5
Figure.2 Satellite data coverage over the Sone Modernisation Project
9
Figure.3 Cartosat-1 Satellite Image of Sone Modernisation Project and its environs
9
Figure.4 Flowchart of Methodology followed in the study
11
Figure. 5. Map showing satellite derived irrigation infrastructure and irrigation potential of Sone Modernisation Project, Bihar State
73
Plate.1 Map showing satellite derived irrigation infrastructure and irrigation potential of Sone Modernisation Project, Bihar State (A0 size)
__________________________________________________________________________
viii
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Abbreviations AIBP Accelerated Irrigation Benefit Program CCA Cultivable Command Area CDs Cross Drainage Structures Ch Chainage CWC Central Water Commission DOL Direct OutLet Dy. Distributary GCA Gross Command Area GCP Ground Control Point GPS Global Positioning System Ha Hectare HPC Humed Pipe Culvert ICA Irrigable Command Area IP Irrigation Potential ILBC Isapur Left Bank Canal IRBC Isapur Right Bank Canal JSAC Jharkhand Space Applications Center Mr. Minor NDC NRSC Data Centre NRSC National Remote Sensing Centre MDRB Major District Road Bridge ODR Other District Road OT Outlet Terminal SMr SubMinor Tail Dy. Tail Distributary VRB Villlage Road Bridge
__________________________________________________________________________
1
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
1.0 Introduction Accelerated Irrigation Benefit Program (AIBP) launched by Government of India during 1996-97 aims at speeding up the implementation of on-going irrigation / multi-purpose water resources projects. The projects in which substantial progress has been made and which are beyond the resource capability of the respective State Governments and the projects which are in advanced stage of construction and could yield irrigation benefits in the next few agricultural seasons have been taken up under this program. AIBP was aimed at twin benefits of accelerating the ongoing irrigation projects & realization of bulk benefits from completed irrigation projects. A comprehensive physical and financial monitoring of the projects covered under the AIBP is periodically done by the Central Water Commission with the help of its regional offices situated all over the country. The recent advent of high resolution remote sensing satellites providing information over relatively small areas with greater details has opened new era of remote sensing applications. The meter to sub-meter pixel resolution dramatically improved the feature identification. High resolution satellite imagery can provide a rapid, high quality data source for capturing the topographic details more accurately and with less geometric distortion. There is immense potential for use of high resolution satellite data for inventory of Irrigation Infrastructure (canal network, conveyance & distribution system), assessment of progress of Irrigation works, closer visualisation of spatial irrigation utilisation patterns, assessing the impact of irrigation developmental programmes on the performance of irrigation command and to address the performance at Water User Associations level in the participatory irrigation management approach. With the advancement of Remote Sensing Satellites with high resolution sensors and the spatial information generation techniques, CWC / Planning commission is keen in utilising these technologies for regular monitoring of AIBP funded projects to assess the Irrigation Potential Creation in these projects. 1.1 Background Realising the potential of high resolution satellite data, Dr. Kirit Parikh, Member(Water & Power), Planning Commission. Government of India evinced keen interest to know the scope of using Satellite Remote Sensing
__________________________________________________________________________
2
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
technique for monitoring the progress made and potential created through AIBP. Two pilot studies covering Upper Krishna Project in Karnataka and Teesta barrage project in West Bengal at the request of Planning Commission, Govt. of India were carried out successfully using Ikonos and Quickbird satellite data during 2005. The results of both the assessments were satisfactory and compared well with ground realities which were verified and reported by CWC field officers and State Governments. The pilot study results along with the application potential of the cost effective Indian Cartosat-1 satellite data were also presented to Dr Montek Singh Ahluwalia, Deputy Chairman, Planning Commission, Govt. of India during May 2006. Subsequently, Planning Commission had discussions with NRSA on the implications of satellite data resolution, cost and time frame for taking up all AIBP funded irrigation projects in the country especially using Cartosat-1 satellite data. In view of the importance and utility of results arising out of satellite data based pilot study, it was decided to take up the project on a National scale covering all AIBP Projects with an estimated irrigation potential of 10 Million ha spread across different States in India. Accordingly, Ministry of Water Resources, Govt. of India vide letter No.31/17/2006-Project dated 8th November 2006 desired NRSA to work out modalities for Irrigation Potential assessment under AIBP funded irrigation projects using cartosat-1 data covering about 5.45 Mha spread across 53 projects in 18 States in India. Hence, the NRSA has prepared the present project proposal on “Assessment of Irrigation Potential Created in AIBP funded Irrigation Projects in India using Cartosat-1 Satellite Data“.
1.2 Study Objective
Assessment of irrigation potential created up to March / April 2007 using Cartosat-1 / Cartosat 2 high resolution satellite data through identification and mapping of the existing irrigation network in the selected irrigation projects covered under AIBP. Specific objectives are:
• Inventory and Mapping of Irrigation Infrastructure consisting of canal network, cross drainage and other related irrigation structures
__________________________________________________________________________
3
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
• Assessment of Irrigation Potential (I.P) created as on March / April 2007
• Identification of gap / critical areas in I.P creation
The present report deals with Cartosat satellite data based Irrigation Potential assessment in Sone Modernisation Project, Bihar State. 2.0 Study Area 2.1 Sone Modernisation Project
Sone is an inter state river originating from Amarkantak plateau in the state of Chattishgarh. After flowing through a distance of 839 km, draining an area of 71,259 sq km in Chattishgarh, Up, Jharkhand and Bihar, the river joins Ganga, about 32km upstream. The Sone Canal Project in Bihar comprising of an anicut at Dehri-on-Sone and Western and eastern canal systems was completed in the year 1873-74. The project then created an irrigation potential of 364 th. Ha. Subsequently improvements and changes were carried out in the canal system. A barrage on river Sone at Indrapuri, 8 km upstream of the existing Dehri-on-Sone anicut, was constructed in 1968. Two link canals, one on either side of the barrage, viz Western Link and eastern Link Canals were constructed to connect the old Sone canal System with the barrage. Remodeling of the old Canal system (now called the Sone low level canals) was also carried out. Two High level canals one each off taking from the Eastern and western Link canals were constructed later in 1974 to provide irrigation to higher areas. The Sone Canal Project which was originally conceived for irrigating rabi (wheat crop) subsequently started irrigating kharif (paddy crop) as well. In the meantime new technique of agriculture backed by improved quality of fertilizers and high yielding variety of crops started to be grown, resulting in greater demand for water. Accordingly, the canal system was made to run with capacities higher than those for which they were designed. This resulted in enormous stress to the century old canal system. Consequently, the overall efficiency of the system became low and the crop yield decreased. To achieve improvement in the overall irrigation efficiency, modernization of canal system was thought of. This was also expected to increase the crop yield and extend the ultimate Irrigation Potential to 9,00,000 ha.
__________________________________________________________________________
4
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
The modernization of canal is related to (a) Sone Low Level canals which in turn consists of Western Low Canal system covering Bhojpur, Buxar, Rohtas and Kaimur districts and the Eastern Low Level Canal system covering Aurangabad, Gaya, Arwal and Patna Districts and (b) Sone high level canals. As such the modernization of canals include 13 nos. of canals comprising of 9 canals on the western side and 4 canals on the eastern side, listed below: WESTERN CANAL SYSTEM:
a) Western Link Canal 10.45 km b) Main Western Canal 32.50 km c) Ara Canal (Without escape channel) 84.50 km
(With escape channel) 93.00 km
d) Dumraon Branch Canal 64.87 km e) Behia Canal 49.60 km f) Buxar Canal (Without escape channel) 70.00 km
(With escape channel) 72.00 km
g) Chausa Branch Canal 62.675 km h) Gara Choubey Branch Canal 61.20 km i) Western High Level Canal
EASTERN CANAL SYSTEM:
a) Eastern Link Canal 10.45 km b) Main Eastern Canal 11.00 km c) Patna Canal 129.50 km d) Eastern High Level Canal
The geographical extent of the project is between 830 27’ E – 850 05’ E longitude and 240 40’ N – 240 53’ N latitude. Salient features of the project are given in Annexure-I. Figure -1 shows the location map of study area.
__________________________________________________________________________
5
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Figure-1. Location map of Study area
2.2 AIBP Components The project was included under AIBP assistance during 1998-99. under modernization, the following are the main works proposed are as follows: 1. Construction of additional Head Regulators at Indrapuri to induce more
discharge in to the system 2. Strengthening/repair of canal banks 3. Resectioning of the canal to carry design discharge 4. Renovation and reconstruction of canal structures 5. Construction of new canal structures
In the CWC work order No.3/121/2007-RS/63-70 dated 28.02.2007, It was mentioned that UIP of the Sone Modernisation Project project as 9,00,00 ha, irrigation Potential created before AIBP as 5,85,420 ha and target for AIBP as 3,14,580 ha. However the details of AIBP target potential were not provided by field authorities, inspite of repeated enquiries with them. Hence, the satellite study was carried out for entire project covering 9,00,000 ha of UIP.
__________________________________________________________________________
6
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
3.0 Data Used
3.1 Satellite Data Used Table-1 shows the satellite data used in the study. Cartosat-1 (IRS-P5) PAN sensor data was used which has a spatial resolution of 2.5 m and 10 bit radiometric resolution. Figure-2 shows the satellite data coverage over the study area. Each scene is ortho corrected (7.5’X7.5’) product and the entire study area was covered by 29 scenes. Figure-3 shows the mosaic of satellite image covering the study area.
Table-1 Satellite data used in the study
S.No. Satellite Sensor Date of Pass Path-Row 1. CARTOSAT-1 PAN 17th June 2007 562/281 2. CARTOSAT-1 PAN 13th February 2008 562/282 3. CARTOSAT-1 PAN 13th February 2008 562/282 4. CARTOSAT-1 PAN 17th June 2007
12th April 2007 562/280 523/280
5. CARTOSAT-1 PAN 17th June 2007 12th April 2007
562/280 563/581
6. CARTOSAT-1 PAN 17th June 2007 12th April 2007
562/281 563/281
7. CARTOSAT-1 PAN 12th April 2007 563/282 8. CARTOSAT-1 PAN 11th January 2008 563/282 9. CARTOSAT-1 PAN 12th April 2007 563/280 10. CARTOSAT-1 PAN 12th April 2007 563/281 11. CARTOSAT-1 PAN 12th April 2007 563/281 12. CARTOSAT-1 PAN 12th April 2007
26th May 2007 563/282 564/282
13. CARTOSAT-1 PAN 12th April 2007 15th May 2007
563/282 564/282
14. CARTOSAT-1 PAN 12th April 2007 26th May 2007
563/279 563/279
15. CARTOSAT-1 PAN 12th April 2007 26th May 2007
563/280 564/280
16. CARTOSAT-1 PAN 12th April 2007 26th May 2007
563/281 564/280
17. CARTOSAT-1 PAN 26th May 2007 564/281 18. CARTOSAT-1 PAN 26th May 2007 564/282 19. CARTOSAT-1 PAN 15th May 2007 564/282 20. CARTOSAT-1 PAN 26th May 2007 564/279
__________________________________________________________________________
7
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
21. CARTOSAT-1 PAN 26th May 2007 564/280 22. CARTOSAT-1 PAN 04th May 2007
26th May 2007 565/281 564/281
23. CARTOSAT-1 PAN 04th May 2007 26th May 2007
565/281 564/281
24. CARTOSAT-1 PAN 04th May 2007 26th May 2007
565/281 564/281
25. CARTOSAT-1 PAN 04th May 2007 565/282 26. CARTOSAT-1 PAN 04th May 2007 565/283 27. CARTOSAT-1 PAN 04th May 2007
26th May 2007 565/279 564/279
28. CARTOSAT-1 PAN 04th May 2007 565/280 29. CARTOSAT-1 PAN 04th May 2007 565/281 30. CARTOSAT-1 PAN 04th May 2007 565/281 31. CARTOSAT-1 PAN 04th May 2007 565/281 32. CARTOSAT-1 PAN 23rd April 2007
04th May 2007 566/282 565/282
33. CARTOSAT-1 PAN 23rd April 2007 04th May 2007
566/283 565/283
34. CARTOSAT-1 PAN 23rd April 2007 04th May 2007
566/279 565/279
35. CARTOSAT-1 PAN 23rd April 2007 04th May 2007
566/280 565/280
36. CARTOSAT-1 PAN 23rd April 2007 04th May 2007
566/281 565/281
37. CARTOSAT-1 PAN 23rd April 2007 566/281 38. CARTOSAT-1 PAN 23rd April 2007 566/282 39. CARTOSAT-1 PAN 23rd April 2007 566/282 40. CARTOSAT-1 PAN 23rd April 2007 566/282 41. CARTOSAT-1 PAN 23rd April 2007 566/279 42. CARTOSAT-1 PAN 23rd April 2007 566/280 43. CARTOSAT-1 PAN 23rd April 2007 566/281 44. CARTOSAT-1 PAN 23rd April 2007
28th November 2007 566/281 567/281
45. CARTOSAT-1 PAN 23rd April 2007 28th November 2007
566/282 567/282
46. CARTOSAT-1 PAN 28th November 2007 567/282 47. CARTOSAT-1 PAN 31st December 2007 567/283 48. CARTOSAT-1 PAN 28th November 2007 567/280 49. CARTOSAT-1 PAN 28th November 2007 567/280 50. CARTOSAT-1 PAN 28th November 2007 567/280 51. CARTOSAT-1 PAN 28th November 2007 567/281 52. CARTOSAT-1 PAN 28th November 2007 567/282
__________________________________________________________________________
8
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
53. CARTOSAT-1 PAN 17th November 2007 31st December 2007
568/282 567/282
54. CARTOSAT-1 PAN 11th October 2008 568/283 55. CARTOSAT-1 PAN 31st December 2007 567/279 56. CARTOSAT-1 PAN 17th November 2007
28th November 2007 568/280 567/280
57. CARTOSAT-1 PAN 17th November 2007 31st December 2007
568/281 567/281
58. CARTOSAT-1 PAN 17th November 2007 568/281 59. CARTOSAT-1 PAN 17th November 2007 568/281 60. CARTOSAT-1 PAN 17th November 2007 568/282 61. CARTOSAT-1 PAN 17th November 2007 568/279 62. CARTOSAT-1 PAN 17th November 2007 568/279 63. CARTOSAT-1 PAN 17th November 2007 568/280 64. CARTOSAT-1 PAN 21st March 2007
17th November 2007 569/281 568/281
65. CARTOSAT-1 PAN 21st March 2007 17th November 2007
569/281 568/281
66. CARTOSAT-1 PAN 21st March 2007 17th November 2007
569/281 568/281
67. CARTOSAT-1 PAN 24th April 2008 21st March 2007
568/282 569/282
68. CARTOSAT-1 PAN 21st March 2007 17th November 2007
569/279 568/279
69. CARTOSAT-1 PAN 21st March 2007 569/279 70. CARTOSAT-1 PAN 21st March 2007 569/280 71. CARTOSAT-1 PAN 21st March 2007 569/281 72. CARTOSAT-1 PAN 21st March 2007 569/281 73. CARTOSAT-1 PAN 21st March 2007 569/282 74. CARTOSAT-1 PAN 10th March 2007
21st March 2007 570/282 569/282
75. CARTOSAT-1 PAN 21st March 2007 569/279 76. CARTOSAT-1 PAN 21st March 2007 569/280 77. CARTOSAT-1 PAN 10th March 2007
21st March 2007 570/280 569/280
78. CARTOSAT-1 PAN 10th March 2007 570/280
__________________________________________________________________________
9
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Figure-2.Satellite data coverage over the Sone Modernisation Porject
Figure-3. Cartosat-1 Satellite Image of Sone Modernisation Project and its environs
__________________________________________________________________________
10
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
3.2 Ancillary Data Used In addition to the satellite data, the following ancillary data was used to understand the study area, preparing base details of the study area and for comparative assessment of the satellite based results • Index map of the Project area. • Index map showing distributaries. • Tree diagrams showing chainages and lengths of canal networks (Main
canal, branch canals, distributaries, minors and sub-minors). • Statements showing chainage, length, ICA, IP proposed and IP created
for canals and water cources under each distributary.
4.0 Satellite Data Analysis The detailed methodology used for assessment of irrigation potential creation in an irrigation project through the satellite data based irrigation infrastructure inventory is given below. The overview of methodology followed in the study is shown in the flow chart (Figure-4). 4.1 Methodology
The basic approach for the assessment of irrigation potential creation in a project is through identification and mapping of irrigation canal network and providing the status (w.r.t. the completion / incompletion / pending) of the entire conveyance and distribution system, various irrigation & drainage structures, etc.
Project command area maps and relevant ground/field information was used for precise boundary delineation of AIBP component of the study area. This area mask was then used for Cartosat satellite data acquisition planning and procurement. The individual ortho corrected Cartosat pan scenes were mosaiced to create AIBP Component area satellite database. This database was used to inventory irrigation infrastructure.
__________________________________________________________________________
11
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Figure-4. Flowchart of Methodology followed in the study
Acquisition planning for high resolution Cartosat-1
satellite data
Field data on Proposed Irrigation canal network and other infrastructure
(Line / Tree diagram)
Interpretation / Analysis of Cartosat data
Procurement of Cartosat data
Pre-processing of Cartosat data
(Rectification & Mosaicking)
Irrigation Project command index maps (Showing spatial extent of
AIBP component)
Generation of Existing Canal network and other
infrastructure layers
Assessment of percentage
Physical progress
Identification of critical gap areas for I.P creation
Assessment of Irrigation
Potential created
Assessment of Irrigation Potential created and its status
GPS survey for collection of GCPs
Preparation of project area mask
Image Interpretation key
Generation of Maps and study report • Irrigation Infrastructure • IP created • Gap areas
__________________________________________________________________________
12
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
4.2 Assessment of Irrigation Infrastructure Identification and mapping of existing irrigation canal network with Main canal/Branch canal/Distributaries/Minors & Sub-minors (for AIBP component area) was done from the satellite image through onscreen digitisation using ERDAS IMAGINE image processing software and ArcGIS software by displaying the image at 1:4,000 to 1:2,000 scales. The above inventory and mapping of canal network was done for AIBP component area in the project. In addition to the canal network, irrigation and other structures including cross drainage structures viz. aqueducts, super passages, syphons, H.P. drains, road/cart/foot bridges etc. were identified and marked on to the digital database. The above irrigation infrastructure was identified and mapped using the image interpretation key. Thus, the inventory of information in terms of number of canals (main canals/branch canals/distributaries/minors/sub-minors etc.), their offtake chainages and respective lengths was made. In addition to this, the status of canals was also assessed in terms of completed or incompleted or pending based on satellite data inventory information. Then, random ground checks were made for verification and confirmation of image interpretation details. 4.3 Assessment of Irrigation Potential Based on the above satellite based inventory of canals and structures information and their status, the Irrigation Potential (IP) created in the study area was assessed as given below:
• The distributary wise satellite derived canal network is inspected in a
hierarchical sequence for hydraulic flow continuity or discontinuity, anomalies in terms of length and absence of a particular canal altogether (Minor / Sub-minor etc), if any. This information is compared with proposed canal network information supplied by project authorities (Revenue Survey project maps, T-diagrams and Statements showing canal chainages, CCAs, Irrigation intensities and IP created).
• If the distributary wise satellite derived canal network is found
comparable and there are no Cross-Drainage (CD) and other irrigation structures pending / under construction indicating hydraulic flow continuity, then that distributary Irrigation Potential (IP) is considered
__________________________________________________________________________
13
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
as completed. The IP created is taken as proposed Irrigation Potential (estimated based on ICA and irrigation intensity) of the distributary.
• If the distributary wise satellite derived canal network is found with
hydraulic flow discontinuities either due to incomplete canal stretches or due to incomplete structures, then that distributary Irrigation Potential (IP) is considered as incomplete. Then the IP created under that distributary is assessed by aggregating the IP of various canals up to that point (from the off take point of distributary/minor/sub-minor) including Direct Pipe Outlets(DPO’s) on distributaries.
• If the distributary wise satellite derived canal network is found with
anamolies in terms of length (like shortening) either due to pending work or terrain conditions, then that distributary Irrigation Potential is considered as incomplete. Then the IP created under that distributary is assessed by aggregating the IP of various canals up to that point (from the off take point of distributary/ minor/sub-minor) including Direct Pipe Outlets (DPO’s) on distributaries.
• The balance Irrigation Potential (IP) is assessed as the difference
between proposed IP and IP created under each distributary.
• Though balance Irrigation Potential (IP) is assessed as above, the canal network completed beyond the points of hydraulic discontinuity and canal length anomalies were also mapped and reported.
The satellite data assessed irrigation potential using the above methodology is compared with the field reported irrigation potential estimates and the balance Irrigation Potential thus assessed at Distributary level, Branch Canal and Project level is reported and discussed in the following sections.
__________________________________________________________________________
14
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
5.0 Results and Conclusion 5.1 Irrigation Infrastructure
The inventory and mapping of canal network using cartosat data was done for entire sone canal modernization project. The details of the satellite derived existing canal network are shown in Table-2. The proposed canal lengths and off-take chainages from the parent canals provided by the project officials and that derived from satellite data were shown in the above table. The statistics were provided up to the level of minors. The canal lengths and their off-take chainges from parent canals derived from satellite data were found to be comparable with proposed field reported statistics except in the case of few minors in the case of low level canals which are slightly short in length. There were few minors that are pending particularly under Gara choubey branch canal which could be due to pending modernization work. However, under high level canals, many canals are either pending or significantly short in length compared to the proposed. Also different cross-drainage structures like syphons, other cross drainage structures such as H.P.Cs etc and others were found to be completed on low level and high level canals.
__________________________________________________________________________
15
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Table.2 Comparison of field reported and satellite derived offtake chainges and lengths of canal network
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
SONE MODERNISATION PROJECT EASETRN LINK CANAL - 10.19 - 10.37 Completed EASTERN SON HIGH LEVEL CANAL 7.20 83.09 6.62 84.42 Completed JAGATUR MINOR 4.08 3.71 4.10 3.68 Completed DEURY - - 0.33 0.48 Completed*
MADHPUR MINOR - 2.66 1.48 2.56 Completed
GORAHA MINOR 3.71 2.66 3.68 3.05 Completed
SUDAMPUR MINOR 3.71 1.85 3.68 1.65 Completed
TETARIA - - 6.30 1.61 Completed* SARANGA M.R 8.03 2.59 - - Pending GOPALPUR M.R 11.24 2.78 11.88 2.27 Completed RAMPUR 0.00 0.00 13.70 1.66 Completed
MATHUA SUB DISTRIBUTARY 15.80 6.28 15.80 6.08 Completed
JAMHORE MINOR - 4.26 0.93 4.07 Completed
MAHTHU MINOR - 0.93 - - Pending
OBRA MINOR 18.17 4.88 18.02 4.82 Completed KARMA MINOR 0.00 1.79 18.51 1.86 Completed PIRAUTA MINOR 22.49 3.40 22.09 3.34 Completed
CHAPRA SUB DISTRIBUTARY 22.55 0.00 22.11 7.93 Completed
DEURIYA MINOR - - 3.11 1.29 Completed*
SURKHI SUB DISTRIBUTARY - 6.18 5.52 7.90 Completed
KADIAHI MINOR - - - - Pending
__________________________________________________________________________
16
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
SURKI MINOR - - - - Pending
SOHRAIYA MINOR 0.00 2.47 5.52 2.46 Completed
BEL SUB DISTRIBUTARY 0.00 2.47 22.11 5.54 Completed
PHESAR MINOR 23.24 3.55 22.85 4.28 Completed
SIMRA SUB DISTRIBUTARY 24.03 13.22 23.47 13.12 Completed
MIRJAPUR MINOR 1.54 3.34 1.54 3.55 Completed
DOSMA MINOR 8.19 5.56 8.10 4.79 Completed KHAIRA - - 0.66 2.59 Completed* JHIKATIYA - - 0.66 2.28 Completed* BESENI MINOR 9.95 3.40 9.90 3.25 Completed
DHANDHWAR MINOR - - - - Pending
SIMRA MINOR 9.98 2.63 13.12 3.09 Completed
MAJKHAR MINOR - 1.24 - 2.16 Completed
JAMALPUR MINOR - 1.24 - - Pending
GOSIA MINOR - 3.49 32.90 4.55 Completed
SONBRSA DISTRIBUTARY 33.48 - 32.90 16.14 Completed*
RUKHUA MINOR 0.26 4.88 0.27 5.56 Completed
RAMPUR SUB DISTRIBUTARY 23.48 6.78 - - Pending
BARAHI DISTRIBUTARY - 0.86 3.11 1.55 Completed
SAIRA MNOR - - - - Pending
ABDULPUR MINOR 4.91 5.71 7.76 2.84 Shot In Length
PANCHAHARA MINOR - 1.94 1.18 2.41 Completed
ETAR MINOR - 4.63 - - Pending
__________________________________________________________________________
17
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
BANS MINOR 7.95 5.25 10.74 3.62 Shot In Length PAUTHU MINOR - 2.63 1.40 4.09 Completed SABDAR MINOR - 1.48 - - Pending
BHARTIPUR H.C 14.95 - - - Pending
ITWA MINOR - - - - Pending JAKHIM MINOR 42.29 0.69 40.40 1.95 Completed KUTKUR MINOR 44.21 2.74 44.22 2.74 Completed
BHITAPIA MINOR 0.09 1.73 0.14 3.54 Completed
BIHTA MINOR 46.65 2.44 46.41 2.35 Completed LATTA MINOR 48.47 3.66 48.27 5.07 Completed
JUJHARPUR SUB DISTRIBUTARY 53.05 6.55 52.67 8.72 Completed
CHAPUK MINOR 0.62 2.01 0.59 5.07 Completed
HASANPUR MINOR 53.75 1.70 52.67 1.89 Completed
DULARCHAK SUB DISTRIBUTARY 57.93 7.62 57.80 8.65 Completed
SAHPUR 0.37 3.68 0.39 6.55 Completed SINGHARI 3.18 2.78 3.13 2.87 Completed MAGAIN - 2.16 - - Pending LOHARI 6.92 1.85 - - Pending MIRPUR MINOR 58.54 6.40 - - Pending
DAMODERPUR MINOR 61.58 2.74 60.13 3.28 Completed
BHAGATIPUR SUB DISTRIBUTARY 63.99 19.27 63.66 20.91 Completed
MOHAMMADPUR MINOR - - - - Pending
LODIPUR SUB DISTRIBUTARY 2.44 11.58 2.49 11.66 Completed
__________________________________________________________________________
18
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
TULSHIBIGHA MINOR - 11.43 - - Pending
GORKATI MINOR - - - - Pending
SALEMPUR MINOR 5.73 2.63 6.03 2.61 Completed
AMARPUR MINOR 5.73 3.66 6.03 3.67 Completed
BAIJALPUR MINOR 9.08 5.10 - - Pending
USAS MINOR 10.19 3.05 - - Pending
BHLAOAR MINOR 11.99 5.12 11.89 4.81 Completed
KASSTURIPUR MINOR 19.53 3.21 - - Pending
Adjustment for DO'S and Data Gaps -
MOHUDINPUR MINOR 68.14 3.73 - - Pending
LIMRA MINOR 0.45 4.20 - - Pending
DHARAMPUR SUB DISTRIBUTARY 70.73 15.85 70.61 16.48 Completed
BITHARA MINOR 9.13 3.40 - - Pending
RAMBIGHA SUB DISTRIBUTARY 72.86 7.00 72.59 9.50 Completed
RATNI DISTRIBUTARY 78.06 11.12 76.71 11.04 Completed
ALIPUR MINOR - - - - Pending MAU MINOR - 0.98 0.97 3.40 Completed
BENIPUR SUB DISTRIBUTARY 5.49 9.88 5.43 5.75 Pending
NASIRNA MINOR - 5.41 - - Pending
SACHAI MINOR - - - - Pending MIRPUR MINOR - - - - Pending
__________________________________________________________________________
19
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
Adjustment for DO'S and Data Gaps -
FARIDPUR DISTRIBUTARY
82.29 25.33 88.79 2.79
2.79+Gap+2.44+Gap+0.20+Gap+7.89+Gap+0.59+
Gap+12.08 BARA MINOR 1.14 2.59 - - Pending
RAMPUR MINOR 4.70 3.54 - - Pending
GOPALPUR MINOR 9.27 5.72 - - Pending
BISUNPUR MINOR 13.28 6.18 - - Pending
BIZLIPUR MINOR 11.43 5.33 - - Pending
UCHITA MINOR 18.26 3.62 - - Pending
MIRZAPUR MINOR 21.50 5.37 - - Pending
NARAYANPUR DISTRIBUTARY
83.09 25.95 89.42 17.19
No Offtake+3.86+Gap+0.38+Gap+0.37+Gap+2.12+Gap+0.17+Gap+2.36+Gap+1.18+Gap+0.51+Gap+0.30+Gap+1.49+Gap+7.65+Gap+0.
32+Gap+3.69
MAKHOOMPUR SUB DISTRIBUTARY - - - - Pending
NEWARI SUB DISTRIBUTARY 11.71 12.97 - - Pending
SALEMPUR MINOR 12.51 12.36 - - Pending
Total of Minors and other from 0 to 24 km -
Total of Minors -
__________________________________________________________________________
20
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
and other from 44.21 to 72.86 km
Total of Minors and other from 78.06 to 83.09 km -
Adjustment for DO'S and Data Gaps -
KARAMDIH MINOR 8.19 4.79 5.95 4.78 Completed MAWNER SUB DISTRIBUTARY 10.19 13.27 9.80 12.68 Shot In Length BHALUA MINOR 4.54 1.70 - - Pending ENGLISH MINOR 5.96 2.01 6.02 1.65 Shot In Length CHURA MINOR 6.12 2.41 - - Pending KATHAHA MINOR 7.54 2.78 8.04 1.53 Shot In Length
DHANAUTI MINOR 7.94 1.30 - - Pending
DHURIA MINOR 9.53 2.32 9.66 1.91 Shot In Length PATNA MAIN CANAL 10.19 124.80 - 125.00 Completed M.E. CANAL 6.01 5.00 - 5.00 Completed
MANORA DISTRIBUTARY 3.98 21.00 9.98 14.42 Shot In Length
SURPLUS -
TELDIHA DISTRIBUTARY 9.35 5.25 9.52 4.80 Shot In Length
R.P.C.-A 10.65 8.70 10.70 6.50 Shot In Length
CHANDA DISTRIBUTARY 16.00 18.00 16.06 14.79 Shot In Length
TEJPURA (Feeder) 16.00 5.00 18.55 2.66 Shot In Length
TUTURAKH DISTRIBUTARY 18.30 12.80 18.55 13.33 Completed
R.P.C.-B 0.10 2.25 0.10 2.50 Completed
MALI DISTRIBUTARY 23.00 41.60 18.55 41.70 Completed
DEVHARA SUB DISTRIBUTARY 18.40 9.80 18.44 6.25 Shot In Length
__________________________________________________________________________
21
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
BHARATLINE SUB DISTRIBUTARY 22.30 6.00 22.86 4.49 Shot In Length
ANCHA (Feeder) 23.00 7.40 22.20 6.90 Shot In Length
KOCHAHASA DISTRIBUTARY 31.33 35.20 31.70 33.00 Shot In Length
R.P.C.-C 31.40 9.60 33.32 5.08 Shot In Length
AMRA DISTRIBUTARY 38.35 20.80 39.09 20.94 Completed
MOCHMMADPUR DISTRIBUTARY 1.75 10.00 1.79 4.76 Shot In Length
SAIDPUR DISTRIBUTARY 6.75 16.00 6.88 12.98 Shot In Length
IMAMAGANJ 41.20 22.40 40.82 23.36 Completed R.P.C.-D 42.00 6.40 41.47 6.30 Completed L.P.C. 44.30 4.80 48.00 9.57 Completed R.P.C.-E 48.30 9.60 48.00 9.57 Completed R.P.C.-I 57.60 8.42 57.60 6.46 Shot In Length
RAMPUR CHAURAM 1.00 5.20 1.16 4.10 Shot In Length
Adjustment for DO'S and Data Gaps -
AIYARA 61.20 9.82 61.20 10.00 Completed MURKA 65.92 27.94 66.00 28.74 Completed NAGWAN 3.34 9.70 3.00 10.00 Completed
Adjustment for DO'S and Data Gaps -
R.P.C.-II 67.61 9.18 68.20 9.29 Completed PALIGANJ 72.00 26.45 73.96 26.76 Completed CHANDHOS 10.45 7.19 10.51 7.30 Completed BHARATPURA 17.15 5.37 17.24 5.29 Completed
__________________________________________________________________________
22
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
Adjustment for DO'S and Data Gaps -
R.P.C.III 77.22 8.80 77.66 8.00 Completed DORWAN 85.44 7.20 85.63 7.36 Completed R.P.C.-IV 85.44 6.40 86.60 6.20 Completed JITAN CHAPRA 85.09 2.00 86.30 2.90 Completed DHANA-PAREV 86.08 2.40 85.26 2.00 Shot In Length MANER 86.40 36.80 86.60 37.67 Completed JAWARPUR 6.10 8.00 2.70 6.80 Shot In Length REWA 97.76 14.85 98.46 14.59 Completed ADAMPUR 97.76 12.75 97.60 10.95 Shot In Length R.P.C.-V 98.23 6.00 98.00 5.74 Shot In Length TANRAILLA 4.64 4.40 5.09 4.75 Completed KHAJURI-I 108.80 4.80 108.46 4.21 Shot In Length KHAJURI-II 108.80 4.00 108.46 4.15 Completed MAJHAULI 109.22 14.40 108.86 12.77 Shot In Length MAHGUPUR 3.20 6.40 2.80 6.60 Completed FATEHPUR 109.22 19.20 108.86 18.84 Shot In Length KURKURI 3.20 12.80 2.46 14.73 Completed DARIYAPUR 6.00 6.40 15.54 10.52 Completed
Adjustment for DO'S and Data Gaps -
AKOPUR (FEEDER) 117.60 0.91 118.80 1.17 Completed
DANAPUR 120.00 6.40 119.67 7.08 Completed PATNA 121.60 6.40 120.58 7.80 Completed R.P.C.-VI 124.80 3.20 124.00 3.49 Completed
Adjustment for DO'S and Data Gaps -
__________________________________________________________________________
23
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
WESTERN PARALEL LINK CANAL - 10.45 - 10.52 Completed WESTERN SONA HIGH LEVEL CANAL 8.60 80.42 8.60 79.63 Completed PAHLEJA MINOR 3.64 2.92 3.67 2.92 Completed
GANGAULI SUB DISTRIBURARY 3.78 5.06 3.85 5.19 Completed
KHANDA MINOR 8.38 2.43 8.48 2.16 Shot In Length MORE MINOR 11.00 3.65 11.17 1.29 Shot In Length KHURNU MINOR 13.47 4.87 - - Pending GIGNA MINOR 14.60 3.04 - - Pending AKASHI MINOR 16.76 1.52 16.51 2.00 Completed
GAMHARIA MINOR 19.69 2.50 - - Pending
UCHITPUR SEMRA MINOR 21.52 4.57 21.53 3.38 Shot In Length
MURADABAD MINOR 22.74 1.86 22.76 0.61 Shot In Length
BEDA MINOR 24.23 0.91 23.26 1.93 Completed RAUJA MINOR 24.23 3.96 23.26 1.93 Shot In Length
MALBAR SUB DISTRIBUTARY 26.46 12.39 25.50 12.12 Completed
GIRDHARIA MINOR 6.05 4.46 6.04 4.46 Completed
SARAIYA MINOR 12.39 4.57 12.12 1.52 0.71+Gap+0.81
SHAKAS NINOR 26.57 2.92 - - Pending JANJRA MINOR 27.28 3.96 27.84 2.05 Shot In Length MALAON MINOR 28.78 1.52 - - Pending
DHANPURWA MINOR 28.84 4.57 - - Pending
KHAIRI MINOR 32.33 0.90 - - Pending
MORKAP SUB DISTRIBUTARY 33.53 3.96 32.67 4.00 Completed
MADAINY MINOR 3.96 3.96 4.00 1.00 Shot In Length
__________________________________________________________________________
24
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
NAD MINOR 34.69 3.04 - - Pending BADDI MINOR 38.35 4.42 - - Pending
BASANTPUR SUB DISTRIBUTARY 38.49 8.53 37.69 8.76 Completed
SIKRAUR MINOR 2.28 2.56 - - Pending
PITAMBARPUR MINOR 8.53 2.80 - - Pending
KENAR MINOR 40.87 3.47 40.73 1.35 Shot In Length DIHI MINOR 41.76 2.74 - - Pending BHAPSI MINOR 44.69 3.04 - - Pending
HARNAGRA SUB DISTRIBUTARY 47.74 6.09 46.47 6.19 Completed
BARTALI MINOR 1.98 2.43 2.09 1.11 Shot In Length
DIGHAT MINOR 1.98 4.57 - - Pending
PIYAKALA MINOR 4.57 3.96 - - Pending
MAHESHI MINOR 3.17 3.65 - - Pending
DUMRI MINOR 4.26 1.98 - - Pending BIJARHI MINOR 6.09 4.26 - - Pending
KUDRA DISTRIBUTARY 51.31 27.43 50.35 18.72 Shot In Length
GOLUDIA MINOR 14.46 2.13 - - Pending
PUSAULI SUB DISTRIBUTARY 17.83 6.09 - - Pending
NEORAS MINOR-I 0.06 3.04 - - Pending KARMA MINOR 2.43 5.79 - - Pending
NATHOPUR MINOR 3.73 3.65 - - Pending
DIHRA M.R 17.83 5.18 - - Pending OINA M.R 17.98 5.18 - - Pending
NEORAS MINOR-II 19.54 3.65 - - Pending
__________________________________________________________________________
25
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
HALWANTA MINOR 20.12 4.87 - - Pending
KEORHI MINOR 21.72 3.35 - - Pending
DEORARH MINOR 22.25 2.74 - - Pending
ASARWALIA MINOR-I 22.56 2.13 - - Pending
JARUAN MINOR 23.01 1.82 - - Pending
NIMIA MINOR 24.02 1.52 - - Pending
MOHANIA SUB DIST. 24.02 6.40 - - Pending
ASARWALIA MINOR-II 0.00 2.79 - - Pending
NASEJ MINOR 0.00 1.52 - - Pending TENGRAHI 24.62 1.52 - - Pending TELARI MINOR 52.13 10.06 - - Pending
BAGHI-KURARI LINK CANAL 54.29 4.20 - - Pending
KURARI MINOR 54.87 5.79 - - Pending
ALIPUR SUB DISTRIBUTARY 56.18 7.42 55.24 7.67 Completed
BASANTPUR MINOR 0.90 0.62 - - Pending
JALALPUR MINOR 1.89 4.41 - - Pending
BANOLY MINOR 1.89 2.00 - - Pending
THILOI MINOR 3.16 4.25 - - Pending
DARWAN MINOR 6.70 4.25 - - Pending
RAMPUR MINOR 7.43 5.36 - - Pending
DIA MINOR 7.43 1.82 - - Pending
KAJAHAR MINOR 7.43 5.18 - - Pending
BARAKA GAON 56.18 - - - Pending
__________________________________________________________________________
26
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
MINOR
KARAUNDA 59.87 17.00 58.60 12.80 Shot In Length
CHAMARION MINOR 2.72 4.80 - 2.35 No Offtake+2.35
CHITARY MINOR 4.87 0.85 - - Pending
KARAUNDI MINOR 4.87 3.04 - - Pending
TARAHANI MINOR 8.32 4.34 8.26 1.24 Shot In Length
KAWAI SUB DISTRIBUTARY 8.32 9.29 8.26 9.42 Completed
SONARA MINOR 60.97 6.56 61.05 3.30 Shot In Length KARMA 63.55 17.07 62.64 19.33 Completed
KHAJURA MINOR 0.70 3.95 - - Pending
RUDRAWAR MINOR 3.96 1.91 - - Pending
SHIVPUR MINOR 5.79 5.79 - - Pending
SHIKRA MINOR 8.35 5.18 8.59 2.46 Shot In Length
MADHAVPUR MINOR 10.14 4.26 10.22 3.01 Shot In Length
BAHUWAN MINOR 11.61 0.93 11.72 0.60 Shot In Length
DIHRA MINOR 14.63 9.00 12.15 7.66 Shot In Length
BHESHLOT MINOR 14.63 2.25 13.69 1.08 Shot In Length
MACHAW MINOR 17.07 1.52 17.16 1.10 Shot In Length
KASER 73.17 23.75 72.08 22.75 Shot In Length
DULLAHPUR MINOR 1.30 4.25 0.46 1.19 Shot In Length
PIHRA MINOR 1.55 4.50 1.55 1.82 Shot In Length
PARMAIPUR MINOR 3.96 4.00 3.98 1.46 Shot In Length
BALLIPUR 7.62 2.10 6.91 0.77 Shot In Length
__________________________________________________________________________
27
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
MINOR
SIKTI MINOR 15.24 1.52 20.02 1.18 Shot In Length
RATWAR MINOR 20.30 5.20 22.50 4.79 Shot In Length
BASHI MINOR 23.75 5.20 22.75 4.79 Shot In Length BETARI 80.42 22.60 79.63 23.09 Completed BETRI MINOR 1.80 5.70 0.48 5.57 Completed NATI MINOR 4.95 1.79 4.96 1.70 Completed
SAREWA MINOR 7.04 2.12 7.04 2.77 Completed
JAGARIA MINOR 7.04 1.81 7.04 1.73 Completed
SADERA MINOR 13.79 1.81 13.87 1.26 Shot In Length
KOHIRA LINK CANAL 80.42 7.19 79.63 7.08 Completed
W.S.H.L.C and its Distributaries from 0 to 56.18 -
W.S.H.L.C and its Distributaries from 56.18 to 80.42 -
WESTERN MAIN CANAL 10.45 32.50 10.52 33.16 Completed
ARA MAIN CANAL 7.20 84.50 6.66 85.27 Completed
RAJPUR DISTRIBUTARY 2.52 19.20 2.75 19.08 Completed
BISENI SUB DISTRIBUTARY 4.10 10.00 4.80 10.47 Completed
New Canal 6.13 6.00 6.24 5.55 Completed
MAUNA DISTRIBUTARY 8.50 11.73 8.55 11.76 Completed
NASRIGANJ DISTRIBUTARY 8.50 7.24 8.55 7.02 Completed
DUMRAON BRANCH 16.00 64.88 16.12 64.61 Completed
__________________________________________________________________________
28
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
CANAL
JESHRI DISTRIBUTARY 6.91 13.20 6.98 12.56 Shot In Length
NINGAGHOSHIA MINOR 12.12 6.90 12.68 5.93 Shot In Length
KARATH DISTRIBUTARY 15.20 15.74 15.33 15.68 Completed
ITIMAH SUB DISTRIBUTARY 9.81 5.40 9.76 5.57 Completed
Adjustment for DO'S and Data Gaps -
LAHTHAN DISTRIBUTARY 20.40 26.40 20.45 26.65 Completed
JAMORHT SUB DISTRIBUTARY 3.22 10.25 3.14 10.44 Completed
BARAULI SUB DISTRIBUTARY & MINOR 11.40 3.40 - - Pending
DHANPURA SUB DISTRIBUTARY & MINOR 3.06 4.55 - - Pending
Adjustment for DO'S and Data Gaps -
Adjustment for DO'S and Data Gaps -
KESATH-I DISTRIBUTARY 20.40 9.75 20.45 10.46 Completed
MAHUARY DISTRIBUTARY 28.70 6.50 28.15 5.85 Shot In Length
KESATH-II DISTRIBUTARY 28.00 7.80 28.24 6.05 Shot In Length
BARIA DISTRIBUTARY 29.33 6.40 28.40 6.19 Shot In Length
WAINA DISTRIBUTARY 34.15 11.49 33.88 11.45 Completed
KESATH-III 34.85 11.00 33.49 13.09 Completed
__________________________________________________________________________
29
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
DISTRIBUTARY
KESATH-IV DISTRIBUTARY 45.34 7.20 45.45 7.32 Completed
SIKARIA DISTRIBUTARY 45.80 22.93 45.35 22.50 Completed
BAGAIN SUB DISTRIBUTARY 4.74 11.08 4.84 11.24 Completed
SALASLA MINOR 6.14 5.74 6.21 4.42 Shot In Length
Adjustment for DO'S and Data Gaps -
BARAON SUB DISTRIBUTARY 45.90 7.20 46.37 7.42 Completed
RAGHUNATHPUR DISTRIBUTARY 49.21 15.20 49.18 14.96 Shot In Length
CHAUGAIN SUB DISTRIBUTARY 3.60 7.00 3.77 6.64 Completed
Adjustment for DO'S and Data Gaps -
ARIAON DISTRIBUTARY 54.93 9.60 55.21 9.83 Completed
Adjustment for DO'S and Data Gaps -
KAITHY DISTRIBUTARY 17.78 18.10 17.65 17.40 Shot In Length
SAKALA DISTRIBUTARY 17.60 25.50 17.65 24.71 Shot In Length
DEW DISTRIBUTARY 2.00 11.00 2.28 11.97 Completed
Adjustment -
AMOUNA DISTRIBUTARY 28.30 11.25 28.49 7.69 4.74+Gap+2.95
DANWAR MINOR 32.60 5.30 0.00 0.00 Pending
BIHIA BRANCH CANAL 33.77 49.60 33.84 50.44 Completed
__________________________________________________________________________
30
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
c KURMURY DISTRIBUTARY 6.97 28.00 7.02 28.09 Completed
GAHARUA DISTRIBUTARY 8.10 4.91 8.17 4.86 Completed
SIKROUL DISTRIBUTARY 11.80 8.80 11.81 8.85 Completed
KATEYA DISTYRIBUTARY 18.26 34.40 18.37 34.65 Completed
GARHANI SUBDISTRIBUTARY 2.80 18.40 2.78 18.50 Completed
BARAON MINOR 5.60 5.00 2.78 4.97 Completed
KAKILA SUB DISTRIBUTARY 6.85 6.50 6.98 6.45 Completed
BALIGAON MINOR 12.90 5.00 12.35 4.11 Shot In Length
NARAYANPUR SUB DISTRIBUTARY 18.69 7.18 17.29 7.21 Completed
GYANPUR SUB DISTRIBUTARY 25.00 6.40 23.43 6.34 Completed
KATEYA FACTORY MINOR 27.50 5.58 26.23 5.55 Completed
Adjustment for DO'S and Data Gaps -
TAR DISTRIBUTARY 23.20 12.00 23.74 12.13 Completed
KESARI DISTRIBUTARY 28.21 8.00 28.52 8.39 Completed
HETAMPUR DISTRIBUTARY 35.20 14.40 35.26 14.22 Completed
CHAKWAT 11.25 4.00 11.03 3.10 Shot In Length
Total of R.P.C and Direct Outlets -
PANWARI 41.60 8.12 41.69 9.23 Completed
KOIFWAR DISTRIBUTARY 43.80 46.64 43.88 47.11 Completed
__________________________________________________________________________
31
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
EKWARI SUB DISTRIBUTARY 8.27 8.25 8.30 8.47 Completed
AFZALPUR SUB DISTRIBUTARY 7.47 5.00 8.47 5.20 Completed
MARASPUR MINOR 3.18 3.90 3.22 3.60 Completed
Adjustment for DO'S and Data Gaps -
BANSI DIHRA MINOR 16.00 4.00 16.34 4.14 Completed
BAGHI MINOR 19.46 3.19 19.42 3.64 Completed
KORI SUBDISTRIBUTARY 25.50 10.04 25.49 9.19 Completed
Adjustment for DO'S and Data Gaps Completed*
DILIA NARAYANPUR DISTRIBUTARY 49.50 20.68 49.55 20.74 Completed
PAWAR DISTRIBUTARY 18.20 12.49 13.29 12.48 Completed
Adjustment -
JAITPUR DISTRIBUTARY 57.56 21.64 57.63 23.28 Completed
L.P.C 68.73 5.74 68.78 5.77 Completed
BELAUR DISTRIBUTARY 68.74 12.57 68.78 12.65 Completed
BICHHIAON DISTRIBUTARY 1.57 9.68 1.48 9.64 Completed
KUSREY MINOR - - 7.61 3.06 Completed*
SURPLUS -
ASHNI DISTRIBUTARY 74.00 10.60 74.47 10.33 Completed
CHAURAI DISTRIBUTARY 4.35 4.58 4.31 4.51 Completed
__________________________________________________________________________
32
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
Adjustment for DO'S and Data Gaps Completed*
SARTHUA L.C 74.60 1.83 74.47 1.74 Completed
DHANUPRA DISTRIBUTARY 78.50 11.72 78.62 11.46 Shot In Length
BHUSAULA MINOR 1.39 7.80 1.36 6.40 Shot In Length
HASANPURA MINOR 5.10 1.33 5.52 1.33 Completed
Adjustment for DO'S and Data Gaps -
CHANDWA DISTRIBUTARY 78.69 7.67 78.62 7.51 Completed
Total of R.P.C, L.P.C and others from 17.5 to 64 km -
SALAYA DIST. 10.60 5.20 9.82 5.20 Completed SIYAWAK DIST. 16.00 14.63 15.72 14.33 Completed BARAICHA M.R 5.45 3.55 6.00 4.01 Completed
BUXAR BRANCH CANAL 18.00 70.20 18.27 70.33 Completed
CHAUSA BRANCH CANAL 2.05 62.68 2.00 63.67 Completed
KOCHAS DISTRIBUTARY 5.68 30.30 5.74 30.40 Completed
INDAUR DISTRIBUTARY 12.28 16.10 12.36 16.20 Completed
MURARCHAK DISTRIBUTARY 17.16 10.40 17.26 10.63 Completed
NEW BHANPUR DISTRIBUTARY 21.00 8.40 21.27 8.25 Shot In Length
BHANPUR P.C. 28.00 4.25 27.12 4.32 Completed
KHIRI DISTRIBUTARY 29.69 21.00 29.48 22.00 Completed
__________________________________________________________________________
33
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
UNWAS DISTRIBUTARY 32.44 18.50 32.60 18.39 Shot In Length
ATRAUNA DISTRIBUTARY 35.73 19.20 35.89 18.87 Completed
SISRAH 6.80 6.80 7.25 6.85 Completed
Adjustment for DO'S and Data Gaps -
HATHUA DISTRIBUTARY 41.82 18.50 42.02 15.74 Shot In Length
SONPA 46.50 8.00 46.78 14.45 Completed NAGPUR - 3.50 4.29 4.70 Completed RAMPUR - 13.00 5.34 8.43 Shot In Length BIRPUR - 0.00 6.83 2.82 Completed SURPLUS -
Total of Minor and w/c from 0 to 62.675 -
PANDARIA DISTRIBUTARY 7.75 6.50 7.60 6.70 Completed
LALGANJ DISTRIBUTARY 7.98 4.00 8.71 3.61 Shot In Length
BHOJPUR DISTRIBUTARY 9.45 51.06 - - Pending
BASAULI 4.35 5.76 4.41 5.65 Shot In Length
SANJHAULI SUB DISTRIBUTARY 10.50 7.90 10.66 7.90 Completed
NARAYANPUR CHANNEL 27.20 4.15 - - Pending
Adjustment for DO'S and Data Gaps -
BHANAS DISTRIBUTARY 14.40 11.87 14.16 11.93 Completed
SARANA 19.60 15.25 19.40 12.88 Shot In Length NADWAN 4.60 1.75 4.38 1.31 Shot In Length
__________________________________________________________________________
34
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
SATH DISTRIBUTARY 26.16 28.80 26.35 29.80 Completed
GARAHIA DISTRIBUTARY 6.79 16.60 6.83 15.70 Shot In Length
CHAMELA DISTRIBUTARY 8.00 10.46 8.04 10.46 Completed
AMARPUR DISTRIBUTARY 13.60 8.00 13.79 7.92 Completed
BASANTPUR DISTRIBUTARY 20.00 6.40 21.18 6.33 Completed
SIKRAUL DISTRIBUTARY 45.99 21.40 46.51 21.77 Completed
NENUA DISTRIBUTARY 11.00 8.00 10.64 8.09 Completed
BASAULY 46.00 11.20 46.51 10.84 Shot In Length SIKRAUL L.P.C 46.00 4.80 46.51 3.50 Shot In Length BASUDHAR 53.00 5.78 53.77 5.68 Completed ITARIH 59.60 4.80 59.94 4.80 Completed MAHDAH 59.60 12.20 60.07 12.68 Completed MUKUNDPUR 1.20 6.74 1.16 6.20 Shot In Length
Total of Minors, P.C. and Direct Outlets -
BARAON DISTRIBUTARY 22.00 9.25 21.88 10.34 Completed
BHANPUR DISTRIBUTARY 9.25 4.30 9.55 4.39 Completed
BALTHARY DISTRIBUTARY 26.00 26.50 25.68 26.09 Completed
RASULPUR DISTRIBUTARY 28.50 21.50 27.60 22.76 Completed
GARA CHOUBEY BRANCH CANAL 30.00 61.00 29.74 56.38 Shot In Length
NEW SONEBARSA DISTRIBUTARY 4.30 11.30 4.01 10.97 Shot In Length
PARHUTY DISTRIBUTARY 8.70 21.36 8.86 21.40 Completed
__________________________________________________________________________
35
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
KARGAHAR DISTRIBUTARY 12.40 38.20 12.53 38.36 Completed
SALTHUA DISTRIBUTARY 9.93 19.52 10.23 19.30 Shot In Length
DUM-DUMA SUB DISTYRIBUTARY 23.83 8.00 24.20 8.09 Completed
PAKIYAWA MINOR 36.50 2.00 - - Pending
Adjustment for DO'S and Data Gaps -
GOGAHRA DISTRIBUTARY 14.40 7.52 14.54 7.22 Shot In Length
LOKNATHPUR DISTRIBUTARY 15.50 9.40 15.33 9.77 Completed
RAGHUNATHPUR DISTRIBUTARY 20.00 12.95 20.18 12.86 Completed
KATHRAIN DISTRIBUTARY 24.99 8.00 23.73 8.01 Completed
NEW DANGRI DISTRIBUTARY 31.50 8.54 30.29 8.98 Completed
NEW BAHUPUR DISTRIBUTARY 40.00 8.96 41.46 7.74 Shot In Length
SABDULLAHPUR DISTYRIBUTARY 45.40 17.00 - - Pending
SIZUA DISTRIBUTARY 46.00 8.00 - - Pending
NEW GORSARA DISTRIBUTARY 46.85 6.80 52.34 6.80 Completed
BANWARICHAK DISTRIBUTARY 3.16 4.17 - - Pending
BAGADIH DISTRIBUTARY 4.00 2.50 - - Pending
KATHRINE DISTRIBUTARY 25.00 7.80 - - Pending
PANJRAO DISTRIBUTARY 56.30 6.72 - - Pending
__________________________________________________________________________
36
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal
Proposed Satellite Derived
Remarks Off take
Chainage of Canal
(km)
Length of
Canal (km)
Off take Chainage of Canal
(km)
Length of
Canal (km)
TIRA TIRAITHA 57.40 2.70 - - Pending MAHARTHA 57.40 4.40 - - Pending
Total of Minors and w/c from 0 to 57.54 -
KHURMABAD DIST. 31.00 16.00 30.84 17.53 Completed
__________________________________________________________________________
37
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
5.2 Irrigation Potential The irrigation potential was assessed using the irrigation infrastructure derived from the satellite data. The details of proposed irrigation potential and satellite based irrigation potential created in the project are given in Table-3. The field data on canal wise IP created was not provided by project offices. The parent /offtake canals which were derived from satellite data and their lengths are comparable to the proposed without any pending cross-drainage/irrigation structures, they were assessed to have created the proposed irrigation potential fully. However, for many canals under both low level and high level canals, I.P created could not be assessed based on satellite derived infrastructure due to non-availability of canal wise I.P proposed. In spite of repeated efforts, complete field data from project offices was not provided. The total proposed I.P under low level and high level canals provided by field offices was only 8,24,140 ha against U.I.P of 9,00,000 ha. Therefore, I.P created was assessed only for 8,24,140 ha. The Irrigation Potential created in the Sone canal modernization project based on Cartosat data analysis is assessed as 6,04,300 ha. as against the proposed Irrigation Potential of 8,24,140 ha. only. The satellite assessed I.P of 6,04,300 ha is distributed under Eastern Sone high level, Eastern son low level , Western Sone high level, Western son low level canals is 33,645 ha, 1,02,814 ha, 20,257 ha and 4,47,296 ha respectively. Hence, the total I.P created under son modernization project . For many canals, I.P created could not be estimated even though infrastructure data is available (both field and satellite derived) for want of detailed proposed I.P data. Figure-5 shows the map of satellite derived irrigation infrastructure and irrigation potential created in Sone canal modernization project as described earlier. An ‘A0 size’ map showing canal network derived from satellite data together with the spatial distribution of irrigation potential created was prepared (including the base details of roads, drains and villages) and provided along with this report (Plate-1).
__________________________________________________________________________
38
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Table.3 Comparison of field reported and satellite derived Irrigation potential of canal network
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
SONE MODERNISATION PROJECT 645675.96 824139.68 604300.59
EASETRN LINK CANAL 190109.62 229780.72 - 136747.57
Balance IP could not
be assessed
due to non availability
of Field data
EASTERN SON HIGH LEVEL CANAL 73845.62 73845.62 - 33645.37
Balance IP could not
be assessed
due to non availability
of Field data
JAGATUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DEURY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MADHPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
GORAHA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SUDAMPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
TETARIA 0.00 0.00 - IP Could Not be
Field Data on IP Not
__________________________________________________________________________
39
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
Assessed Available
SARANGA M.R 0.00 0.00 - 0.00
Field Data on IP Not Available
GOPALPUR M.R 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
RAMPUR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MATHUA SUB DISTRIBUTARY 1710.00 1710.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
JAMHORE MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MAHTHU MINOR 0.00 0.00 - 0.00 Pending
DO 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
OBRA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KARMA MINOR 372.00 372.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
PIRAUTA MINOR 550.00 550.00 - 550.00 Completed
CHAPRA SUB DISTRIBUTARY 4536.00 4536.00 - 4536.00 Completed
DEURIYA MINOR 267.00 267.00 - 267.00
Field Data on IP Not Available
__________________________________________________________________________
40
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
SURKHI SUB DISTRIBUTARY 1428.00 1428.00 - 1428.00
Field Data on IP Not Available
KADIAHI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SURKI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SOHRAIYA MINOR 356.00 356.00 - 356.00
Field Data on IP Not Available
BEL SUB DISTRIBUTARY 1285.00 1285.00 - 1285.00
Field Data on IP Not Available
PHESAR MINOR 664.00 664.00 - 664.00
Field Data on IP Not Available
DO 536.00 536.00 - 536.00 Completed
SIMRA SUB DISTRIBUTARY 4797.00 4797.00 - 4797.00 Completed
MIRJAPUR MINOR 1307.00 1307.00 - 1307.00 Completed
DOSMA MINOR 1192.00 1192.00 - 1192.00 Completed
KHAIRA 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
JHIKATIYA 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BESENI MINOR 340.00 340.00 - 340.00 Completed
SIMRA MINOR 454.00 454.00 - 454.00 Completed
MAJKHAR 340.00 340.00 - 340.00 Completed
__________________________________________________________________________
41
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
MINOR
DO 1164.00 1164.00 - 1164.00 Completed
JAMALPUR MINOR 434.00 434.00 - 0.00 Pending
GOSIA MINOR 1013.62 1013.62 - 1013.62 Completed
SONBRSA DISTRIBUTARY 6556.00 6556.00 - 3461.75 Completed
RUKHUA MINOR 646.15 646.15 - 646.15 Completed
RAMPUR SUB DISTRIBUTARY 1819.28 1819.28 - 0.00 Pending
BARAHI DISTRIBUTARY 641.37 641.37 - 0.00 Pending
DO 1177.91 1177.91 - 0.00 Pending
ABDULPUR MINOR 1155.82 1155.82 - 789.87 Completed
PANCHAHARA MINOR 428.33 428.33 - 428.33 Completed
DO 727.49 727.49 - 361.54 Completed ETAR MINOR 317.67 317.67 - 0.00 Pending BANS MINOR 1691.52 1691.52 - 1100.17 Completed
PAUTHU MINOR 560.34 560.34 - 560.34 Completed
SABDAR MINOR 348.73 348.73 - 0.00 Pending
DO 782.45 782.45 - 539.83 Pending
BHARTIPUR H.C 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DO 925.56 925.56 - 925.56 Completed
__________________________________________________________________________
42
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
JAKHIM MINOR 330.00 330.00 - 330.00 Pending
KUTKUR MINOR 1135.00 1135.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BHITAPIA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DO 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BIHTA MINOR 510.00 510.00 - 510.00 Completed
LATTA MINOR 1420.00 1420.00 - 1420.00 Completed
JUJHARPUR SUB DISTRIBUTARY 1800.00 1800.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
CHAPUK MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DO 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
HASANPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DULARCHAK SUB DISTRIBUTARY 2525.00 2525.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SAHPUR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SINGHARI 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
__________________________________________________________________________
43
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
MAGAIN 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
LOHARI 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DO 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MIRPUR MINOR 700.00 700.00 - 0.00 Pending
DAMODERPUR MINOR 525.00 525.00 - 525.00 Completed
BHAGATIPUR SUB DISTRIBUTARY 3460.00 3460.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MOHAMMADPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
LODIPUR SUB DISTRIBUTARY 1800.00 1800.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
TULSHIBIGHA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
GORKATI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SALEMPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
AMARPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BAIJALPUR MINOR 0.00 0.00 -
IP Could Not be
Field Data on IP Not
__________________________________________________________________________
44
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
Assessed Available
USAS MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BHLAOAR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KASSTURIPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
Adjustment for DO'S and Data Gaps 1660.00 1660.00 - 0.00 Pending
MOHUDINPUR MINOR 560.00 560.00 - 0.00 Pending
LIMRA MINOR 0.00 0.00 - 0.00 Pending
DHARAMPUR SUB DISTRIBUTARY 1600.00 1600.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BITHARA MINOR 0.00 0.00 - 0.00 Pending
RAMBIGHA SUB DISTRIBUTARY 1700.00 1700.00 - 1700.00 Completed
RATNI DISTRIBUTARY 2916.00 2916.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
ALIPUR MINOR 0.00 0.00 - 0.00 Pending
MAU MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BENIPUR 838.00 838.00 - 0.00 Pending
__________________________________________________________________________
45
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
SUB DISTRIBUTARY
NASIRNA MINOR 0.00 0.00 - 0.00 Pending
SACHAI MINOR 0.00 0.00 - 0.00 Pending
MIRPUR MINOR 0.00 0.00 - 0.00 Pending
Adjustment for DO'S and Data Gaps 2078.00 2078.00 - 0.00 Pending
FARIDPUR DISTRIBUTARY 5045.00 5045.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BARA MINOR 0.00 0.00 - 0.00 Pending
RAMPUR MINOR 0.00 0.00 - 0.00 Pending
GOPALPUR MINOR 0.00 0.00 - 0.00 Pending
BISUNPUR MINOR 0.00 0.00 - 0.00 Pending
BIZLIPUR MINOR 0.00 0.00 - 0.00 Pending
UCHITA MINOR 0.00 0.00 - 0.00 Pending
MIRZAPUR MINOR 0.00 0.00 - 0.00 Pending
NARAYANPUR DISTRIBUTARY 4650.00 4650.00 - 0.00 Pending
MAKHOOMPUR SUB DISTRIBUTARY 0.00 0.00 - 0.00 Pending
NEWARI SUB DISTRIBUTAR 0.00 0.00 - 0.00 Pending
__________________________________________________________________________
46
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
Y
SALEMPUR MINOR 0.00 0.00 - 0.00 Pending
Total of Minors and other from 0 to 24 km 10817.00 10817.00 - 10817.00 Completed
Total of Minors and other from 44.21 to 72.86 km 3860.00 3860.00 - 3860.00 Completed
Total of Minors and other from 78.06 to 83.09 km 125.00 125.00 - 125.00 Completed
Adjustment for DO'S and Data Gaps 10199.00 10199.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KARAMDIH MINOR 288.00 288.00 - 288.00 Completed
MAWNER SUB DISTRIBUTARY 2630.00 2630.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BHALUA MINOR 0.00 0.00 - 0.00 Pending
ENGLISH MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
CHURA MINOR 0.00 0.00 - 0.00 Pending
KATHAHA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DHANAUTI MINOR 0.00 0.00 - 0.00 Pending
__________________________________________________________________________
47
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
DHURIA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
PATNA MAIN CANAL 113346.00 153017.10 - 102814.20
Balance IP could not
be assessed
due to non availability
of Field data
M.E. CANAL 4000.00 5400.00 - 3414.02 Completed
MANORA DISTRIBUTARY 4695.00 6338.25 - 4352.27 Pending
SURPLUS 695.00 938.25 - 938.25 Completed
TELDIHA DISTRIBUTARY 2029.00 2739.15 - 2504.37 Completed
R.P.C.-A 1700.00 2295.00 - 1714.66 Completed
CHANDA DISTRIBUTARY 6465.00 8727.75 - 7171.30 Completed
TEJPURA (Feeder) 575.00 776.25 - 412.97 Completed
TUTURAKH DISTRIBUTARY 3835.00 5177.25 -
IP Could Not be
Assessed
Field Data on IP Not Available
R.P.C.-B 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MALI DISTRIBUTARY 13118.00 17709.30 - 997.86 Completed
DEVHARA SUB 1159.00 1564.65 - 997.86 Completed
__________________________________________________________________________
48
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
DISTRIBUTARY
BHARATLINE SUB DISTRIBUTARY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DO 11959.00 16144.65 -
IP Could Not be
Assessed
Field Data on IP Not Available
ANCHA (Feeder) 1265.00 1707.75 - 1592.36 Completed
KOCHAHASA DISTRIBUTARY 19904.00 26870.40 - 25191.00 Completed
R.P.C.-C 505.00 681.75 - 360.76 Completed
AMRA DISTRIBUTARY 7106.00 9593.10 -
IP Could Not be
Assessed
Field Data on IP Not Available
MOCHMMADPUR DISTRIBUTARY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SAIDPUR DISTRIBUTARY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DO 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
IMAMAGANJ 5671.00 7655.85 - 7655.85 Completed
R.P.C.-D 180.00 243.00 - 243.00 Completed L.P.C. 260.00 351.00 - 351.00 Completed R.P.C.-E 286.00 386.10 - 386.10 Completed R.P.C.-I 1100.00 1485.00 - 1159.40 Pending
RAMPUR CHAURAM 700.00 945.00 - 745.10 Pending
__________________________________________________________________________
49
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
DO 400.00 540.00 - 414.30 Pending AIYARA 1500.00 2025.00 - 2025.00 Completed MURKA 3400.00 4590.00 - 2025.00 Completed NAGWAN 900.00 1215.00 - 1215.00 Completed DO 2500.00 3375.00 - 3375.00 Completed R.P.C.-II 1100.00 1485.00 - 1485.00 Completed PALIGANJ 4000.00 5400.00 - 5400.00 Completed CHANDHOS 900.00 1215.00 - 1215.00 Completed
BHARATPURA 700.00 945.00 - 945.00 Completed
DO 2400.00 3240.00 - 3240.00 Completed R.P.C.III 1600.00 2160.00 - 2160.00 Completed DORWAN 1400.00 1890.00 - 1890.00 Completed R.P.C.-IV 1400.00 1890.00 - 1890.00 Completed
JITAN CHAPRA 227.00 306.45 - 306.45 Completed
DHANA-PAREV 200.00 270.00 - 225.00 Pending
MANER 6300.00 8505.00 - 8505.00 Completed
JAWARPUR 1400.00 1890.00 - 1606.50 Pending
REWA 2800.00 3780.00 - 3780.00 Completed ADAMPUR 1600.00 2160.00 - 1855.06 Pending
R.P.C.-V 1400.00 1890.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
TANRAILLA 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DO 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
__________________________________________________________________________
50
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
KHAJURI-I 1000.00 1350.00 - 1184.06 Completed
KHAJURI-II 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MAJHAULI 2000.00 2700.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MAHGUPUR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DO 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
FATEHPUR 3200.00 4320.00 - 715.50 Pending
KURKURI 530.00 715.50 - 715.50 Pending
DARIYAPUR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
Adjustment for DO'S and Data Gaps 2670.00 3604.50 -
IP Could Not be
Assessed
Field Data on IP Not Available
AKOPUR (FEEDER) - - -
IP Could Not be
Assessed Completed DANAPUR 1000.00 1350.00 - 1350.00 Completed PATNA 1000.00 1350.00 - 1350.00 Completed R.P.C.-VI 30.00 40.50 - 40.50 Completed
Adjustment for DO'S and Data Gaps 8790.00 11866.50 - 11866.50 Completed
__________________________________________________________________________
51
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
WESTERN PARALEL LINK CANAL 455566.34 594358.96 - 467553.02
Balance IP could not
be assessed
due to non availability
of Field data
WESTERN SONA HIGH LEVEL CANAL 59016.00 59016.00 - 20257.00
Balance IP could not
be assessed
due to non availability
of Field data
PAHLEJA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
GANGAULI SUB DISTRIBURARY 2052.00 2052.00 - 2052.00 Completed
KHANDA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MORE MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KHURNU MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
GIGNA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
AKASHI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
__________________________________________________________________________
52
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
GAMHARIA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
UCHITPUR SEMRA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MURADABAD MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BEDA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
RAUJA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MALBAR SUB DISTRIBUTARY 2237.00 2237.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
GIRDHARIA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SARAIYA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SHAKAS NINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
JANJRA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MALAON MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DHANPURWA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KHAIRI MINOR 0.00 0.00 -
IP Could Not be
Field Data on IP Not
__________________________________________________________________________
53
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
Assessed Available
MORKAP SUB DISTRIBUTARY 967.00 967.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MADAINY MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
NAD MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BADDI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BASANTPUR SUB DISTRIBUTARY 2411.00 2411.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SIKRAUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
PITAMBARPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KENAR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DIHI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BHAPSI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
HARNAGRA SUB DISTRIBUTARY 2614.00 2614.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
__________________________________________________________________________
54
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
BARTALI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DIGHAT MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
PIYAKALA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MAHESHI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DUMRI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BIJARHI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KUDRA DISTRIBUTARY 12230.00 12230.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
GOLUDIA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
PUSAULI SUB DISTRIBUTARY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
NEORAS MINOR-I 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KARMA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
NATHOPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DIHRA M.R 0.00 0.00 - IP Could Not be
Field Data on IP Not
__________________________________________________________________________
55
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
Assessed Available
OINA M.R 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
NEORAS MINOR-II 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
HALWANTA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KEORHI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DEORARH MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
ASARWALIA MINOR-I 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
JARUAN MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
NIMIA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MOHANIA SUB DIST. 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
ASARWALIA MINOR-II 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
NASEJ MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
TENGRAHI 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
__________________________________________________________________________
56
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
TELARI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BAGHI-KURARI LINK CANAL 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KURARI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
ALIPUR SUB DISTRIBUTARY 3850.00 3850.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BASANTPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
JALALPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BANOLY MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
THILOI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DARWAN MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
RAMPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DIA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KAJAHAR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
__________________________________________________________________________
57
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
BARAKA GAON MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KARAUNDA 5060.00 5060.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
CHAMARION MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
CHITARY MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KARAUNDI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
TARAHANI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KAWAI SUB DISTRIBUTARY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SONARA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KARMA 4840.00 4840.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KHAJURA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
RUDRAWAR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SHIVPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SHIKRA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
__________________________________________________________________________
58
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
MADHAVPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BAHUWAN MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DIHRA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BHESHLOT MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MACHAW MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KASER 2900.00 2900.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DULLAHPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
PIHRA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
PARMAIPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BALLIPUR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SIKTI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
RATWAR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BASHI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
__________________________________________________________________________
59
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
BETARI 1650.00 1650.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BETRI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
NATI MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SAREWA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
JAGARIA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SADERA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KOHIRA LINK CANAL 418.00 418.00 - 418.00 Completed
W.S.H.L.C and its Distributaries from 0 to 56.18 14266.00 14266.00 - 14266.00 Completed
W.S.H.L.C and its Distributaries from 56.18 to 80.42 3521.00 3521.00 - 3521.00 Completed
WESTERN MAIN CANAL 396550.34 535342.96 - 447296.02
Balance IP could not
be assessed
due to non availability
of Field
__________________________________________________________________________
60
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
data
ARA MAIN CANAL 208900.34 282015.46 - 271938.09
Balance IP could not
be assessed
due to non availability
of Field data
RAJPUR DISTRIBUTARY 4726.00 6380.10 - 6380.10 Completed
BISENI SUB DISTRIBUTARY 1001.00 1351.35 - 1351.35 Completed
DO 3725.00 5028.75 - 5028.75 Completed
MAUNA DISTRIBUTARY 3317.00 4477.95 - 4477.95 Completed
NASRIGANJ DISTRIBUTARY 1609.00 2172.15 - 2172.15 Completed
DUMRAON BRANCH CANAL 30586.00 41291.10 - 40439.95
Balance IP could not
be assessed
due to non availability
of Field data
JESHRI DISTRIBUTAR 1744.00 2354.40 - 2240.25 Pending
__________________________________________________________________________
61
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
Y
NINGAGHOSHIA MINOR 1000.00 1350.00 - 1160.22 Pending
KARATH DISTRIBUTARY 3351.00 4523.85 - 4523.85 Completed
ITIMAH SUB DISTRIBUTARY 583.00 787.05 - 787.05 Completed
DO 2768.00 3736.80 - 3736.80 Completed
LAHTHAN DISTRIBUTARY 8500.00 11475.00 - 11475.00 Completed
JAMORHT SUB DISTRIBUTARY 1417.00 1912.95 - 1912.95 Completed
BARAULI SUB DISTRIBUTARY & MINOR 911.00 1229.85 - 1229.85 Completed
DHANPURA SUB DISTRIBUTARY & MINOR 745.00 1005.75 - 1005.75 Completed
DO 166.00 224.10 - 224.10 Completed Do 6172.00 8332.20 - 8332.20 Completed
KESATH-I DISTRIBUTARY 1585.00 2139.75 - 2139.75 Completed
MAHUARY DISTRIBUTARY 1136.00 1533.60 - 1380.24 Pending
KESATH-II DISTRIBUTARY 640.00 864.00 - 670.15 Pending
BARIA DISTRIBUTARY 400.00 540.00 - 522.28 Pending
WAINA DISTRIBUTAR 1938.00 2616.30 - 2616.30 Completed
__________________________________________________________________________
62
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
Y
KESATH-III DISTRIBUTARY 1144.00 1544.40 - 1544.40 Completed
KESATH-IV DISTRIBUTARY 525.00 708.75 - 708.75 Completed
SIKARIA DISTRIBUTARY 2959.00 3994.65 - 3870.47 Pending
BAGAIN SUB DISTRIBUTARY 1275.00 1721.25 - 1721.25 Completed
SALASLA MINOR 400.00 540.00 - 415.82 Pending
DO 1284.00 1733.40 - 1733.40 Completed
BARAON SUB DISTRIBUTARY 919.00 1240.65 - 1240.65 Completed
RAGHUNATHPUR DISTRIBUTARY 3369.00 4548.15 - 4490.04 Pending
CHAUGAIN SUB DISTRIBUTARY 643.00 868.05 - 868.05 Completed
DO 2726.00 3680.10 - 3621.99 Pending
ARIAON DISTRIBUTARY 1376.00 1857.60 - 1857.60 Completed
KAITHY DISTRIBUTARY 3431.34 4632.31 - 4453.16 Pending
SAKALA DISTRIBUTARY 43600.00 58860.00 - 57107.59 Pending
DEW DISTRIBUTARY 1700.00 2295.00 - 2295.00 Completed
__________________________________________________________________________
63
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
DO 41900.00 56565.00 - 54812.59 Pending
AMOUNA DISTRIBUTARY 1319.00 1780.65 - 750.25 Pending
DANWAR MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BIHIA BRANCH CANAL 47551.00 64193.85 - 63005.79
Balance IP could not
be assessed
due to non availability
of Field data
c
KURMURY DISTRIBUTARY 600.00 810.00 - 810.00 Completed
GAHARUA DISTRIBUTARY 1180.00 1593.00 - 1593.00 Completed
SIKROUL DISTRIBUTARY 2500.00 3375.00 - 3375.00 Completed
KATEYA DISTYRIBUTARY 12792.00 17269.20 - 16081.14 Pending
GARHANI SUBDISTRIBUTARY 4559.00 6154.65 - 6154.65 Completed
BARAON MINOR 985.00 1329.75 - 1329.75 Completed
KAKILA SUB DISTRIBUTARY 968.00 1306.80 - 1306.80 Completed
BALIGAON MINOR 1150.80 1553.58 - 1277.04 Pending
NARAYANPUR SUB DISTRIBUTARY 2297.00 3100.95 - 3100.95 Completed
__________________________________________________________________________
64
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
GYANPUR SUB DISTRIBUTARY 2157.00 2911.95 - 2911.95 Completed
KATEYA FACTORY MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
Adjustment for DO'S and Data Gaps 675.20 911.52 -
IP Could Not be
Assessed
Field Data on IP Not Available
TAR DISTRIBUTARY 1900.00 2565.00 - 2565.00 Completed
KESARI DISTRIBUTARY 1250.00 1687.50 - 1687.50 Completed
HETAMPUR DISTRIBUTARY 2927.00 3951.45 - 3951.45 Completed
CHAKWAT 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
Total of R.P.C and Direct Outlets 24402.00 32942.70 - 32942.70 Completed
PANWARI 1652.00 2230.20 - 2230.20 Completed
KOIFWAR DISTRIBUTARY 7214.00 9738.90 - 9738.90 Completed
EKWARI SUB DISTRIBUTARY 1518.00 2049.30 - 2049.30 Completed
AFZALPUR SUB DISTRIBUTARY 569.00 768.15 - 768.15 Completed
MARASPUR MINOR 330.00 445.50 - 445.50 Completed
DO 619.00 835.65 - 835.65 Completed
BANSI DIHRA MINOR 150.00 202.50 - 202.50 Completed
__________________________________________________________________________
65
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
BAGHI MINOR 150.00 202.50 - 202.50 Completed
KORI SUBDISTRIBUTARY 1732.00 2338.20 - 2338.20 Completed
DO 3664.00 4946.40 - 4946.40 Completed
DILIA NARAYANPUR DISTRIBUTARY 5747.00 7758.45 - 7758.45 Completed
PAWAR DISTRIBUTARY 1652.00 2230.20 - 2230.20 Completed
Do 4095.00 5528.25 - 5528.25 Completed
JAITPUR DISTRIBUTARY 4676.00 6312.60 - 6312.60 Completed
L.P.C 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BELAUR DISTRIBUTARY 1665.00 2247.75 - 2247.75 Completed
BICHHIAON DISTRIBUTARY 2550.00 3442.50 - 3442.50 Completed
KUSREY MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SURPLUS 885.00 1194.75 - 1194.75 -
ASHNI DISTRIBUTARY 7450.00 10057.50 - 10057.50 Completed
CHAURAI DISTRIBUTARY 875.00 1181.25 - 1181.25 Completed
DO 6575.00 8876.25 - 8876.25 Completed
__________________________________________________________________________
66
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
SARTHUA L.C 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
DHANUPRA DISTRIBUTARY 4026.00 5435.10 - 358.89 Pending
BHUSAULA MINOR 324.00 437.40 - 358.89 Pending
HASANPURA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
Adjustment for DO'S and Data Gaps 3702.00 4997.70 -
IP Could Not be
Assessed
Field Data on IP Not Available
CHANDWA DISTRIBUTARY 691.00 932.85 - 932.85 Completed
Total of R.P.C, L.P.C and others from 17.5 to 64 km 39640.00 53514.00 - 53514.00 Completed
SALAYA DIST. 1184.00 1598.40 - 1598.40 Completed
SIYAWAK DIST. 5958.00 8043.30 -
IP Could Not be
Assessed
Field Data on IP Not Available
BARAICHA M.R 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BUXAR BRANCH CANAL 118552.00 160045.20 - 104340.66
Balance IP could not
be assessed
due to non availability
of Field data
__________________________________________________________________________
67
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
CHAUSA BRANCH CANAL 50961.00 68797.35 - 64600.21
Balance IP could not
be assessed
due to non availability
of Field data
KOCHAS DISTRIBUTARY 623.00 841.05 - 841.05 Completed
INDAUR DISTRIBUTARY 4060.00 5481.00 - 5481.00 Completed
MURARCHAK DISTRIBUTARY 1723.00 2326.05 - 2326.05 Completed
NEW BHANPUR DISTRIBUTARY 1205.00 1626.75 - 1597.70 Pending
BHANPUR P.C. 604.00 815.40 - 815.40 Completed
KHIRI DISTRIBUTARY 5030.00 6790.50 - 6790.50 Completed
UNWAS DISTRIBUTARY 5027.00 6786.45 - 6746.10 Pending
ATRAUNA DISTRIBUTARY 5040.00 6804.00 - 6804.00 Completed
SISRAH 1524.00 2057.40 - 2057.40 Completed DO 3516.00 4746.60 - 4746.60 Completed
HATHUA DISTRIBUTARY 3520.00 4752.00 - 4043.05 Pending
SONPA 6240.00 8424.00 - 5005.21 Pending
__________________________________________________________________________
68
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
NAGPUR 1353.00 1826.55 - 1826.55 Completed RAMPUR 3631.00 4901.85 - 3178.66 Pending
BIRPUR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
Adjustment for DO'S and Data Gaps 1256.00 1695.60 -
IP Could Not be
Assessed
Field Data on IP Not Available
Total of Minor and w/c from 0 to 62.675 17889.00 24150.15 - 24150.15 Completed
PANDARIA DISTRIBUTARY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
LALGANJ DISTRIBUTARY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BHOJPUR DISTRIBUTARY 11609.00 15672.15 - 0.00 Pending
BASAULI 0.00 0.00 - 0.00 Pending
SANJHAULI SUB DISTRIBUTARY 2195.57 2964.02 - 0.00 Pending
NARAYANPUR CHANNEL 473.94 639.82 - 0.00 Pending
Adjustment for DO'S and Data Gaps 8939.49 12068.31 - 0.00 Pending
BHANAS DISTRIBUTARY 2998.00 4047.30 - 4047.30 Completed
SARANA 3791.00 5117.85 -
IP Could Not be
Assessed
Field Data on IP Not Available
__________________________________________________________________________
69
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
NADWAN 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SATH DISTRIBUTARY 13785.00 18609.75 -
IP Could Not be
Assessed
Field Data on IP Not Available
GARAHIA DISTRIBUTARY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
CHAMELA DISTRIBUTARY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
AMARPUR DISTRIBUTARY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BASANTPUR DISTRIBUTARY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
SIKRAUL DISTRIBUTARY 5181.00 6994.35 -
IP Could Not be
Assessed
Field Data on IP Not Available
NENUA DISTRIBUTARY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BASAULY 2353.00 3176.55 - 3074.45 Pending
SIKRAUL L.P.C 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BASUDHAR 1129.00 1524.15 - 1524.15 Completed
ITARIH 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
MAHDAH 3712.00 5011.20 -
IP Could Not be
Assessed
Field Data on IP Not Available
MUKUNDPUR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
__________________________________________________________________________
70
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
Total of Minors, P.C. and Direct Outlets 23033.00 31094.55 - 31094.55 Completed
BARAON DISTRIBUTARY 3972.00 5362.20 - 5362.20 Completed
BHANPUR DISTRIBUTARY 3972.00 5362.20 - 5362.20 Completed
BALTHARY DISTRIBUTARY 5472.00 7387.20 - 7387.20 Completed
RASULPUR DISTRIBUTARY 4284.00 5783.40 - 5783.40 Completed
GARA CHOUBEY BRANCH CANAL 43402.00 58592.70 - 44370.97
Balance IP could not
be assessed
due to non availability
of Field data
NEW SONEBARSA DISTRIBUTARY 1563.00 2110.05 - 2048.43 Pending
PARHUTY DISTRIBUTARY 3350.00 4522.50 - 4522.50 Completed
KARGAHAR DISTRIBUTARY 12713.00 17162.55 - 7896.79 Pending
SALTHUA DISTRIBUTARY 5104.00 6890.40 - 6812.74 Pending
__________________________________________________________________________
71
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
DUM-DUMA SUB DISTYRIBUTARY 803.00 1084.05 - 1084.05 Completed
PAKIYAWA MINOR 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
Adjustment for DO'S and Data Gaps 6806.00 9188.10 -
IP Could Not be
Assessed
Field Data on IP Not Available
GOGAHRA DISTRIBUTARY 1102.00 1487.70 - 1428.35 Pending
LOKNATHPUR DISTRIBUTARY 1727.00 2331.45 - 2331.45 Completed
RAGHUNATHPUR DISTRIBUTARY 1938.00 2616.30 - 2616.30 Completed
KATHRAIN DISTRIBUTARY 1727.00 2331.45 - 2331.45 Completed
NEW DANGRI DISTRIBUTARY 1632.00 2203.20 - 2203.20 Completed
NEW BAHUPUR DISTRIBUTARY 1720.00 2322.00 - 2005.58 Pending
SABDULLAHPUR DISTYRIBUTARY 0.00 0.00 - 0.00 Pending
SIZUA DISTRIBUTARY 0.00 0.00 - 0.00 Pending
__________________________________________________________________________
72
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Name of Canal CCA (ha) Irrigation Potential Proposed
(ha)
Irrigatioin Potential created as on March 2007 (ha)
Field Reported
(ha)
Satellite Derived
(ha) Remarks
NEW GORSARA DISTRIBUTARY 1429.00 1929.15 -
IP Could Not be
Assessed
Field Data on IP Not Available
BANWARICHAK DISTRIBUTARY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
BAGADIH DISTRIBUTARY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
KATHRINE DISTRIBUTARY 0.00 0.00 -
IP Could Not be
Assessed
Field Data on IP Not Available
PANJRAO DISTRIBUTARY 887.00 1197.45 - 0.00 Pending
TIRA TIRAITHA 0.00 0.00 - 0.00 Pending
MAHARTHA 0.00 0.00 - 0.00 Pending
Total of Minors and w/c from 0 to 57.54 13614.00 18378.90 - 16986.92 Pending
KHURMABAD DIST. 4826.00 6515.10 - 6515.10 Completed
__________________________________________________________________________
73
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Figure-5 Map showing satellite derived Irrigation Infrastructure and Irrigation Potential of Sone Modernisation Project, Bihar State.
__________________________________________________________________________
74
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Annexure I
Salient Features of the Sone Modernisation Project
I GENERAL State BIHAR Districts Benifited Rohtas, Bhojpur,
Kalmur, Buxar, Patna, Gaya, Arwal and Aurangabad
River SONE Nature of the Project ERM II Location Head Works Barrage at Indrapuri
(District, Rohtas) Latitude 240 48’ Longitude 840 07’ III Hydrology (a) Catchment Area at Barrage 68,916 sq km (b) Mean Annual Rainfall 1398mm (c) Net Utilization GW Potential 3136.30 M m3
(d) Present GW Utilisation 918.20 M m3
(e) Proposed additional GW Utilisation 714.20 M m3 (f) Post development Utilisation 1632.40 M m3 (g) Balance GW for future development 1503.90 M m3 IV Barrage data (a) Length 1410 m (b) Design flood discharge 41,300 cumecs (c) Maximum observed flood discharge 34,100 cumecs (d) Pond Level RL 108.38 m (e) Weir Crest level RL 104.00 m (f) River bed level RL 103.80 m (g) Under sluice crest level RL 103.40 m (h) Design HFL RL 109.60 m (i) Afflux 1.22 m V Canal System Western Canal system (a) Western Link Canal L=10.45 km Q=448.00 cumecs (b) Main Western Canal L=32.50 km Q=317.80 cumecs (c) Ara Canal L=84.50 km Q=160.22 cumecs (d) Dumraon Branch Canal L=64.87 km Q=34.88 cumecs
__________________________________________________________________________
75
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
(e) Behia Canal L=49.60 km Q=41.66 cumecs (f) Buxar Canal L=70.00 km Q=85.90 cumecs (g) Chausa Branch Canal L=62.50 km Q=23.60 cumecs (h) Gara Choubey Br. Canal L=61.20 km Q=39.76 cumecs Eastern Canal System (a) Eastern Link Canal L=10.86 km Q=133.34 cumecs (b) Main Eastern Canal L=11.00 km Q=99.23 cumecs (c) Patna Canal L=129.50 km Q=99.23 cumecs VI Command Area GCA (a) L.L. Canal system 7.04 lakh ha (b) H.L.canal System 1.84 lakh ha 8.88 lakh ha CCA (a) L.L. Canal System 5.60 lakh ha (b) H.L. Canal System 1.39 lakh ha 6.99 lakh ha Annual Irrigation (a) L.L. Canal System 7.61 lakh ha (b) H.L. Canal System 1.39 lakh ha 9.00 lakh ha VII Intensity of Irrigation (in
%)
For L.L. Canal System 135 % (a) Kharif 62.05 (b) Rabi 65.00 (c) Hot Weather 6.50 (d) Perennial 1.50 Total 135.00 For H.L. Canal System (a) Kharif 58.00 (b) Rabi 42.00 (c) Hot Weather NIL (d) Perennial NIL Total 100.00 IX Benefit Cost Ratio
(@ 10% of interest) 2.5:1.0
X Internal Rate of Return 24%
__________________________________________________________________________
76
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Annexure II
Profile of the Sone Modernisation project through Satellite images and Ground photographs
__________________________________________________________________________
77
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
__________________________________________________________________________
78
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
GLOSSARY OF TERMINOLOGY Ancillary Data Secondary data pertaining to the study area, such as topographic, demographic, climatological, etc., Band A wavelength interval in the electromagnetic spectrum. For example, in Landsat images the bands designate specific wavelength intervals at which images are acquired. Branch canal is the primary artery of canal water delivery system of off takes from reservoir. Command Area represents the area irrigated or capable of being irrigated either by gravitational flow or by lift irrigation or by any other method and includes every such area by law in force in the State; also referred as ayacut. Cropping Pattern is determined according to relative acreage of various crops in the command. Cross Drainage structures are structures constructed across canals for passing the drain include super passage, Pipe culvert, depressed hume pipe culvert, aqueducts, Cultivable Command Area (CCA) is the portion of the Gross Cultivable Area, which is cultivable. Digital image is an image where the property being measured has been converted from a continuous range of analogue values to a range expressed by a finite number of integers, usually recorded as binary codes from 0 to 255, or as one byte. Digitization Process of converting an analog display into a digital display. Distributary is the tertiary artery of the canal water delivery system. It takes off from the main canal.
__________________________________________________________________________
79
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Field Channel is the tertiary irrigation unit which takes off from an outlet to deliver water to individual farm fields or a group of farm fields. Geometric Correction Image processing procedure that corrects spatial distortions in an image. Gross Command Area (GCA) is the total area, which can be irrigated in a project command. It includes the area covered by roads, culverts, settlements, uncultivable area etc. Ground Truth Jargon coined for data, information, and observations obtained on the surface or subsurface about features or classes, used to aid in interpretation of remotely sensed data. Image Pictorial representation of a scene recorded by a remote sensing system. Although image is a general term, it is commonly restricted to representations acquired by non-photographic methods. Intensity of Irrigation is the ratio of the actual area irrigated in a season to the total cultivable command area; expressed as %. Interpretation The process in which a person extracts information from an image. Irrigation infrastructure is the structures constructed in an irrigation project to create irrigation potential include canal network , head regulator, cross regulator, canal off-take structures, cross drainage structures, drop structures, roads, road bridges, cart bridges, and foot bridges, etc. Kharif is an important agricultural season and commences during June-July after the onset of southwest monsoon and ends during October-November. Main Canal is the principal artery of the distribution system.
__________________________________________________________________________
80
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Minor is fourth artery of the canal water delivery system. It takes off from the distributary and can be a ridge canal irrigating on both sides. It is also sometimes referred as lateral. Monitoring is the process of collecting information about the actual execution of planned tasks and factors, which might affect their execution; analyzing these in relation to the plan and exercising control so that the deviations from the plan are minimal. Mosaic Composite image made by piecing together individual images covering adjacent areas. Orbit is the path traced out by a satellite in space as it moves around the earth. Path-Row Index-System for locating satellite remotely sensed images. Pixel Picture element-In a digitized image, the area on the ground represented by each digital number. Sub Minor is fifth artery of the canal water delivery system. It takes off from the minor or Lateral and can be a ridge canal irrigating on both sides. It is also sometimes referred as sub-lateral. Raster format-A means of representing spatial data in the form of a grid of DN, each line of which can be used to modulate the lines of a video raster. Real Time Refers to images or data made available for inspection simultaneously with their acquisition. Registration Process of superposing two or more images or photographs so that equivalent geographic points coincide. Remote Sensing Collection and interpretation of information about an object without being in physical contact with the object.
__________________________________________________________________________
81
Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09
Resolution Ability to separate closely spaced objects on an image or photograph. Resolution is commonly expressed as the most closely spaced line-pairs per unit distance that can be distinguished and also called as spatial resolution. Scale Ratio of distance on an image to the equivalent distance on the ground. Scene Area on the ground that is covered by an image or photograph. Sensor is device that receives electromagnetic radiation and converts it into a signal that can be recorded and displayed as either numerical data or an image.