__________________________________________________________________________ Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09 Assessment of Irrigation Potential Created in AIBP funded Irrigation Projects in India using Cartosat Satellite data SONE MODERNIZATION PROJECT BIHAR STATE Submitted to National Remote Sensing Centre Indian Space Research organization Dept. of Space, Govt. of India Balanagar, Hyderabad-625 By Jharkhand Space Application Center Department of Information Technology Government of Jharkhand, Ranchi-834004, Jharkhand April 2009

Upload: others

Post on 10-Feb-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Assessment of Irrigation Potential Created in AIBP funded Irrigation Projects in India using Cartosat Satellite data

SONE MODERNIZATION PROJECT BIHAR STATE

Submitted to

National Remote Sensing Centre

Indian Space Research organization Dept. of Space, Govt. of India Balanagar, Hyderabad-625

By

Jharkhand Space Application Center Department of Information Technology

Government of Jharkhand, Ranchi-834004, Jharkhand

April 2009

Page 2: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

i

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Mr. Vinod Kumar V. H. Project Scientist

PPPrrrooojjjeeecccttt TTTeeeaaammm

Dr. A. T. Jeyaseelan Director

Jharkhand Space Application Center Department of Information Technology

Government of Jharkhand Ranchi, Jharkhand-834004

Dr. Vivek Kumar Singh Project Scientist

Page 3: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

ii

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

DOCUMENT CONTROL SHEET

1. Security Classification Unrestricted 2. Distribution Central Water Commission 3. Report / Document

version (a) Issue no. 1

(b) Revision & Date:

0

4. Report /Document Type

Technical Report

5. Document Control Number

JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

6. Title Assessment of Irrigation Potential Created in AIBP funded Irrigation Projects in India using Cartosat Satellite Data: Western Kosi Main Canal, Bihar State

7. Particulars of Collation

Pages 100

Figures 5

Tables 3

References 0

8. Author(s) *Vinod Kumar V.H., JSAC (Study Team Leader) *Dr. Vivek Kumar Singh, JSAC (Study Team Member) *Dr. A. T. Jeyaseelan, Director JSAC, Project Coordinator, JSAC *M. Shanker, NRSC, Project Coordinator, NRSC

9. Affiliation of author(s) *Jharkhand Space Applications Center, Ranchi WRD, RS & GIS AA, NRSC

10. Scrutiny mechanism

Compiled by/ Controlled by JSAC/NRSC

Reviewed By Director, JSAC HWRD and GD (WR&OG)

Approved By DD – RS & GIS AA, NRSC

11. Sponsor(s) Name and Address

Central Water Commission, New Delhi Govt. of India

12. Date of Project Initiation

11.11.2008

13. Date of Publication 15.04.2009 14. Abstract (with Keywords)

This report deals with project work which includes satellite data used, methodology adopted and results & discussion and conclusions for assessment of Irrigation potential in Western Kosi Main Canal, Bihar State.

Page 4: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

iii

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

ACKNOWLEDGMENT

The National Remote Sensing Centre (NRSC) acknowledges with great appreciation for the initiative taken by the Planning Commission and Ministry of Water Resources (MoWR), Government of India in entrusting the present study on “Assessment of Irrigation Potential Created in 53 AIBP funded Irrigation Projects in India using Cartosat Satellite Data”. In this context, we acknowledge with great satisfaction Dr. Kirit Parikh, Member (Water and Power), Planning Commission, Govt. of India for taking keen interest in application of satellite remote sensing technology in scientific investigation, planning and development of water resources in the country. His dynamic initiative and continued encouragement has helped in fruitful completion of this study. The project team also acknowledges the inspiring guidance and support received from Mrs. Gauri Chatterji, Secretary to the Government of India, Ministry of Water Resources (MoWR) and Shri. B.S.Ahuja, Chairman and the former Member, WP&P, Central Water Commission. We also place on record our sincere thanks to Shri. S.K. Sinha, CE(PMO) and all Directors(PMO), CWC New Delhi for their painstaking efforts in initiating the Project . We also place on record our sincere thanks to all former CE’s(PMO), CWC, New Delhi for their kind support for conceptualizing this project. We also thank Shri. C. Agrawal, the former Director (Remote Sensing), CWC for his kind support for conceptualizing this project. Dr. G. Madhavan Nair, Chairman, Indian Space Research Organisation (ISRO) and the Secretary, Department of Space, under whose inspiring leadership the remote sensing programme in the country is carried out, has provided valuable guidance in executing this study. The project team is grateful to Dr. V. Jayaraman, Director NRSC and Dr.P.S.Roy, Deputy Director (RS&GIS Applications Area) in NRSC for providing inspiring guidance, necessary support and encouragement during the course of the study. We sincerely thank Principal Secretary, Information Technology, Government of Jharkhand for inspiring guidance and support The project team would like to thank Shri. Dhirendra Kumar Singh, Chief Engineer, Planning and Monitoring, Water Resource Department, Government of Bihar Shri. Jagdish Ram, Chief Engineer, Sone Canal Project (Aurangabad), Sri. S. N. Das Chief Engineer, Sone Canal Project (Patna), Chief Engineer, Sone Canal Project (Dehri-On-Sone) for their help and cooperation during field data collection and ground truth verification. Thanks are also due to Executive Engineers, Assistant Engineers and Junior Engineers who were associated during the field visits for Sone Canal Project. We also thank Shri. G. Behera, Group Director, WR&OG, NRSC and Dr. A.T.Jeyaseelan, Director, JSAC, Ranchi for their guidance and support in completing the project. We also sincerely place on record the co-operation extended by all the colleagues of Water Resources Division in NRSC and Jharkhand Space Application Center, Ranchi for the successful completion of the project.

Page 5: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

iv

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Executive Summary The present study has been conducted with an aim of assessing irrigation potential created in AIBP (Accelerated Irrigation Benefit Program) funded irrigation projects through mapping of irrigation infrastructure using Cartosat (2.5 m resolution) satellite data. This report deals with results of satellite data analysis of Sone Modernisation Project.

Freshly acquired (within a specified time window) Cartosat satellite data of 2.5m resolution (Ortho corrected Pan Data) procured from NDC (NRSC Data Centre) was checked for the quality, consistency and adequacy. The original satellite data in Geo-tiff format was converted into ERDAS Imagine image format to carry out further image analysis. Individual scenes were mosaiced to create satellite database in respect of AIBP component of study area. Then, identification and mapping of existing irrigation network with Main canal/Branch canal/Distributaries/Lateral & Sub-lateral was done from the satellite image on computer screen using ERDAS Imagine image processing /ArcGIS software through onscreen digitization by displaying the image at 1:4,000 to 1:2,000 scales. In addition to the canal network, the associated irrigation and drainage structures were also identified and inventoried. The digital map base for the study area with rivers/streams, roads/rail, and villages, etc. using high resolution data is prepared and used further for preparing map outputs. Thus, the inventory of information in terms of number of canals (main canals / branch canals / distributaries / minors (laterals) / subminors (sub-laterals) etc.), their chainages and respective lengths were computed for AIBP component area of Upper Penganga project. In addition to this, the status of canals was also assessed in terms of completed or incompleted or pending based on the satellite data inventory information. Then, the above inventory was compared vis a vis the proposed network (field obtained) and the irrigation potential was assessed along with balance Irrigation Potential (IP) to be created as on April/May, 2007.

The satellite data assessed irrigation potential is compared with the field reported irrigation potential estimates and the balance irrigation potential thus assessed at distributary level / branch / main canal and project level is presented in the study.

Page 6: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

v

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

The inventory and mapping of canal network using cartosat data was done for entire sone canal modernization project. The canal lengths and their off-take chainges from parent canals derived from satellite data were found to be comparable with proposed field reported statistics except in the case of few minors in the case of low level canals which are slightly short in length. There were few minors that are pending particularly under Gara choubey branch canal which could be due to pending modernization work. However, under high level canals, many canals are either pending or significantly short in length compared to the proposed. Also different cross-drainage structures like syphons, other cross drainage structures such as H.P.Cs etc and others were found to be completed on low level and high level canals. The irrigation potential was assessed using the irrigation infrastructure derived from the satellite data. The field data on canal wise IP created was not provided by project offices. Hence, for many canals under both low level and high level canals, I.P created could not be assessed based on satellite derived infrastructure due to non-availability of canal wise I.P proposed. In spite of repeated efforts, complete field data from project offices was not provided. The total proposed I.P under low level and high level canals provided by field offices was only 8,24,140 ha against U.I.P of 9,00,000 ha. Therefore, I.P created was assessed only for 8,24,140 ha. The Irrigation Potential created in the Sone canal modernization project based on Cartosat data analysis is assessed as 6,04,300 ha. as against the proposed Irrigation Potential of 8,24,140 ha. only. The satellite assessed I.P of 6,04,300 ha is distributed under Eastern Sone high level, Eastern sone low level , Western Sone high level, Western sone low level canals is 33,645 ha, 1,02,814 ha, 20,257 ha and 4,47,296 ha respectively. Hence, the total I.P created under son modernization project . For many canals, I.P created could not be estimated even though infrastructure data is available (both field and satellite derived) for want of detailed proposed I.P data.

Page 7: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

vi

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

CONTENTS

Page No. Project Team i Document Control Sheet ii Acknowledgment iii Executive Summary iv Contents vi List of Tables vii List of Figures vii Abbreviations viii 1.0 Introduction 1

1.1 Background 1 1.2 Study Objective 2 2.0 Study Area 3 2.1 Upper Penganga Project 3 2.2 AIBP Components 5 3.0 Data Used 6

3.1 Satellite Data Used 6 3.2 Ancillary Data Used 10

4.0 Satellite Data Analysis 10 4.1 Methodology 10

4.2 Assessment of Irrigation Infrastructure 12 4.3 Assessment of Irrigation Potential 12 5.0 Results and Conclusion 14 5.1 Irrigation Infrastructure 14 5.2 Irrigation Potential 37

Annexure I Salient Features of the Sone Modernisation Project 74 Annexure II Profile of the Sone Modernisation Project through 76

Satellite images and Ground photographs

Glossary of Terminology 78

Page 8: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

vii

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

List of Tables S.No Particulars Page

No Table.1 Satellite data used in the study

6

Table.2 Comparison of field reported and satellite derived offtake chainges and lengths of canal network

15

Table.3 Comparison of field reported and satellite derived Irrigation potential of canal network

38

List of Figures S.No Particulars Page

No Figure.1 Location map of study area

5

Figure.2 Satellite data coverage over the Sone Modernisation Project

9

Figure.3 Cartosat-1 Satellite Image of Sone Modernisation Project and its environs

9

Figure.4 Flowchart of Methodology followed in the study

11

Figure. 5. Map showing satellite derived irrigation infrastructure and irrigation potential of Sone Modernisation Project, Bihar State

73

Plate.1 Map showing satellite derived irrigation infrastructure and irrigation potential of Sone Modernisation Project, Bihar State (A0 size)

Page 9: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

viii

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Abbreviations AIBP Accelerated Irrigation Benefit Program CCA Cultivable Command Area CDs Cross Drainage Structures Ch Chainage CWC Central Water Commission DOL Direct OutLet Dy. Distributary GCA Gross Command Area GCP Ground Control Point GPS Global Positioning System Ha Hectare HPC Humed Pipe Culvert ICA Irrigable Command Area IP Irrigation Potential ILBC Isapur Left Bank Canal IRBC Isapur Right Bank Canal JSAC Jharkhand Space Applications Center Mr. Minor NDC NRSC Data Centre NRSC National Remote Sensing Centre MDRB Major District Road Bridge ODR Other District Road OT Outlet Terminal SMr SubMinor Tail Dy. Tail Distributary VRB Villlage Road Bridge

Page 10: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

1

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

1.0 Introduction Accelerated Irrigation Benefit Program (AIBP) launched by Government of India during 1996-97 aims at speeding up the implementation of on-going irrigation / multi-purpose water resources projects. The projects in which substantial progress has been made and which are beyond the resource capability of the respective State Governments and the projects which are in advanced stage of construction and could yield irrigation benefits in the next few agricultural seasons have been taken up under this program. AIBP was aimed at twin benefits of accelerating the ongoing irrigation projects & realization of bulk benefits from completed irrigation projects. A comprehensive physical and financial monitoring of the projects covered under the AIBP is periodically done by the Central Water Commission with the help of its regional offices situated all over the country. The recent advent of high resolution remote sensing satellites providing information over relatively small areas with greater details has opened new era of remote sensing applications. The meter to sub-meter pixel resolution dramatically improved the feature identification. High resolution satellite imagery can provide a rapid, high quality data source for capturing the topographic details more accurately and with less geometric distortion. There is immense potential for use of high resolution satellite data for inventory of Irrigation Infrastructure (canal network, conveyance & distribution system), assessment of progress of Irrigation works, closer visualisation of spatial irrigation utilisation patterns, assessing the impact of irrigation developmental programmes on the performance of irrigation command and to address the performance at Water User Associations level in the participatory irrigation management approach. With the advancement of Remote Sensing Satellites with high resolution sensors and the spatial information generation techniques, CWC / Planning commission is keen in utilising these technologies for regular monitoring of AIBP funded projects to assess the Irrigation Potential Creation in these projects. 1.1 Background Realising the potential of high resolution satellite data, Dr. Kirit Parikh, Member(Water & Power), Planning Commission. Government of India evinced keen interest to know the scope of using Satellite Remote Sensing

Page 11: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

2

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

technique for monitoring the progress made and potential created through AIBP. Two pilot studies covering Upper Krishna Project in Karnataka and Teesta barrage project in West Bengal at the request of Planning Commission, Govt. of India were carried out successfully using Ikonos and Quickbird satellite data during 2005. The results of both the assessments were satisfactory and compared well with ground realities which were verified and reported by CWC field officers and State Governments. The pilot study results along with the application potential of the cost effective Indian Cartosat-1 satellite data were also presented to Dr Montek Singh Ahluwalia, Deputy Chairman, Planning Commission, Govt. of India during May 2006. Subsequently, Planning Commission had discussions with NRSA on the implications of satellite data resolution, cost and time frame for taking up all AIBP funded irrigation projects in the country especially using Cartosat-1 satellite data. In view of the importance and utility of results arising out of satellite data based pilot study, it was decided to take up the project on a National scale covering all AIBP Projects with an estimated irrigation potential of 10 Million ha spread across different States in India. Accordingly, Ministry of Water Resources, Govt. of India vide letter No.31/17/2006-Project dated 8th November 2006 desired NRSA to work out modalities for Irrigation Potential assessment under AIBP funded irrigation projects using cartosat-1 data covering about 5.45 Mha spread across 53 projects in 18 States in India. Hence, the NRSA has prepared the present project proposal on “Assessment of Irrigation Potential Created in AIBP funded Irrigation Projects in India using Cartosat-1 Satellite Data“.

1.2 Study Objective

Assessment of irrigation potential created up to March / April 2007 using Cartosat-1 / Cartosat 2 high resolution satellite data through identification and mapping of the existing irrigation network in the selected irrigation projects covered under AIBP. Specific objectives are:

• Inventory and Mapping of Irrigation Infrastructure consisting of canal network, cross drainage and other related irrigation structures

Page 12: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

3

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

• Assessment of Irrigation Potential (I.P) created as on March / April 2007

• Identification of gap / critical areas in I.P creation

The present report deals with Cartosat satellite data based Irrigation Potential assessment in Sone Modernisation Project, Bihar State. 2.0 Study Area 2.1 Sone Modernisation Project

Sone is an inter state river originating from Amarkantak plateau in the state of Chattishgarh. After flowing through a distance of 839 km, draining an area of 71,259 sq km in Chattishgarh, Up, Jharkhand and Bihar, the river joins Ganga, about 32km upstream. The Sone Canal Project in Bihar comprising of an anicut at Dehri-on-Sone and Western and eastern canal systems was completed in the year 1873-74. The project then created an irrigation potential of 364 th. Ha. Subsequently improvements and changes were carried out in the canal system. A barrage on river Sone at Indrapuri, 8 km upstream of the existing Dehri-on-Sone anicut, was constructed in 1968. Two link canals, one on either side of the barrage, viz Western Link and eastern Link Canals were constructed to connect the old Sone canal System with the barrage. Remodeling of the old Canal system (now called the Sone low level canals) was also carried out. Two High level canals one each off taking from the Eastern and western Link canals were constructed later in 1974 to provide irrigation to higher areas. The Sone Canal Project which was originally conceived for irrigating rabi (wheat crop) subsequently started irrigating kharif (paddy crop) as well. In the meantime new technique of agriculture backed by improved quality of fertilizers and high yielding variety of crops started to be grown, resulting in greater demand for water. Accordingly, the canal system was made to run with capacities higher than those for which they were designed. This resulted in enormous stress to the century old canal system. Consequently, the overall efficiency of the system became low and the crop yield decreased. To achieve improvement in the overall irrigation efficiency, modernization of canal system was thought of. This was also expected to increase the crop yield and extend the ultimate Irrigation Potential to 9,00,000 ha.

Page 13: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

4

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

The modernization of canal is related to (a) Sone Low Level canals which in turn consists of Western Low Canal system covering Bhojpur, Buxar, Rohtas and Kaimur districts and the Eastern Low Level Canal system covering Aurangabad, Gaya, Arwal and Patna Districts and (b) Sone high level canals. As such the modernization of canals include 13 nos. of canals comprising of 9 canals on the western side and 4 canals on the eastern side, listed below: WESTERN CANAL SYSTEM:

a) Western Link Canal 10.45 km b) Main Western Canal 32.50 km c) Ara Canal (Without escape channel) 84.50 km

(With escape channel) 93.00 km

d) Dumraon Branch Canal 64.87 km e) Behia Canal 49.60 km f) Buxar Canal (Without escape channel) 70.00 km

(With escape channel) 72.00 km

g) Chausa Branch Canal 62.675 km h) Gara Choubey Branch Canal 61.20 km i) Western High Level Canal

EASTERN CANAL SYSTEM:

a) Eastern Link Canal 10.45 km b) Main Eastern Canal 11.00 km c) Patna Canal 129.50 km d) Eastern High Level Canal

The geographical extent of the project is between 830 27’ E – 850 05’ E longitude and 240 40’ N – 240 53’ N latitude. Salient features of the project are given in Annexure-I. Figure -1 shows the location map of study area.

Page 14: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

5

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Figure-1. Location map of Study area

2.2 AIBP Components The project was included under AIBP assistance during 1998-99. under modernization, the following are the main works proposed are as follows: 1. Construction of additional Head Regulators at Indrapuri to induce more

discharge in to the system 2. Strengthening/repair of canal banks 3. Resectioning of the canal to carry design discharge 4. Renovation and reconstruction of canal structures 5. Construction of new canal structures

In the CWC work order No.3/121/2007-RS/63-70 dated 28.02.2007, It was mentioned that UIP of the Sone Modernisation Project project as 9,00,00 ha, irrigation Potential created before AIBP as 5,85,420 ha and target for AIBP as 3,14,580 ha. However the details of AIBP target potential were not provided by field authorities, inspite of repeated enquiries with them. Hence, the satellite study was carried out for entire project covering 9,00,000 ha of UIP.

Page 15: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

6

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

3.0 Data Used

3.1 Satellite Data Used Table-1 shows the satellite data used in the study. Cartosat-1 (IRS-P5) PAN sensor data was used which has a spatial resolution of 2.5 m and 10 bit radiometric resolution. Figure-2 shows the satellite data coverage over the study area. Each scene is ortho corrected (7.5’X7.5’) product and the entire study area was covered by 29 scenes. Figure-3 shows the mosaic of satellite image covering the study area.

Table-1 Satellite data used in the study

S.No. Satellite Sensor Date of Pass Path-Row 1. CARTOSAT-1 PAN 17th June 2007 562/281 2. CARTOSAT-1 PAN 13th February 2008 562/282 3. CARTOSAT-1 PAN 13th February 2008 562/282 4. CARTOSAT-1 PAN 17th June 2007

12th April 2007 562/280 523/280

5. CARTOSAT-1 PAN 17th June 2007 12th April 2007

562/280 563/581

6. CARTOSAT-1 PAN 17th June 2007 12th April 2007

562/281 563/281

7. CARTOSAT-1 PAN 12th April 2007 563/282 8. CARTOSAT-1 PAN 11th January 2008 563/282 9. CARTOSAT-1 PAN 12th April 2007 563/280 10. CARTOSAT-1 PAN 12th April 2007 563/281 11. CARTOSAT-1 PAN 12th April 2007 563/281 12. CARTOSAT-1 PAN 12th April 2007

26th May 2007 563/282 564/282

13. CARTOSAT-1 PAN 12th April 2007 15th May 2007

563/282 564/282

14. CARTOSAT-1 PAN 12th April 2007 26th May 2007

563/279 563/279

15. CARTOSAT-1 PAN 12th April 2007 26th May 2007

563/280 564/280

16. CARTOSAT-1 PAN 12th April 2007 26th May 2007

563/281 564/280

17. CARTOSAT-1 PAN 26th May 2007 564/281 18. CARTOSAT-1 PAN 26th May 2007 564/282 19. CARTOSAT-1 PAN 15th May 2007 564/282 20. CARTOSAT-1 PAN 26th May 2007 564/279

Page 16: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

7

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

21. CARTOSAT-1 PAN 26th May 2007 564/280 22. CARTOSAT-1 PAN 04th May 2007

26th May 2007 565/281 564/281

23. CARTOSAT-1 PAN 04th May 2007 26th May 2007

565/281 564/281

24. CARTOSAT-1 PAN 04th May 2007 26th May 2007

565/281 564/281

25. CARTOSAT-1 PAN 04th May 2007 565/282 26. CARTOSAT-1 PAN 04th May 2007 565/283 27. CARTOSAT-1 PAN 04th May 2007

26th May 2007 565/279 564/279

28. CARTOSAT-1 PAN 04th May 2007 565/280 29. CARTOSAT-1 PAN 04th May 2007 565/281 30. CARTOSAT-1 PAN 04th May 2007 565/281 31. CARTOSAT-1 PAN 04th May 2007 565/281 32. CARTOSAT-1 PAN 23rd April 2007

04th May 2007 566/282 565/282

33. CARTOSAT-1 PAN 23rd April 2007 04th May 2007

566/283 565/283

34. CARTOSAT-1 PAN 23rd April 2007 04th May 2007

566/279 565/279

35. CARTOSAT-1 PAN 23rd April 2007 04th May 2007

566/280 565/280

36. CARTOSAT-1 PAN 23rd April 2007 04th May 2007

566/281 565/281

37. CARTOSAT-1 PAN 23rd April 2007 566/281 38. CARTOSAT-1 PAN 23rd April 2007 566/282 39. CARTOSAT-1 PAN 23rd April 2007 566/282 40. CARTOSAT-1 PAN 23rd April 2007 566/282 41. CARTOSAT-1 PAN 23rd April 2007 566/279 42. CARTOSAT-1 PAN 23rd April 2007 566/280 43. CARTOSAT-1 PAN 23rd April 2007 566/281 44. CARTOSAT-1 PAN 23rd April 2007

28th November 2007 566/281 567/281

45. CARTOSAT-1 PAN 23rd April 2007 28th November 2007

566/282 567/282

46. CARTOSAT-1 PAN 28th November 2007 567/282 47. CARTOSAT-1 PAN 31st December 2007 567/283 48. CARTOSAT-1 PAN 28th November 2007 567/280 49. CARTOSAT-1 PAN 28th November 2007 567/280 50. CARTOSAT-1 PAN 28th November 2007 567/280 51. CARTOSAT-1 PAN 28th November 2007 567/281 52. CARTOSAT-1 PAN 28th November 2007 567/282

Page 17: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

8

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

53. CARTOSAT-1 PAN 17th November 2007 31st December 2007

568/282 567/282

54. CARTOSAT-1 PAN 11th October 2008 568/283 55. CARTOSAT-1 PAN 31st December 2007 567/279 56. CARTOSAT-1 PAN 17th November 2007

28th November 2007 568/280 567/280

57. CARTOSAT-1 PAN 17th November 2007 31st December 2007

568/281 567/281

58. CARTOSAT-1 PAN 17th November 2007 568/281 59. CARTOSAT-1 PAN 17th November 2007 568/281 60. CARTOSAT-1 PAN 17th November 2007 568/282 61. CARTOSAT-1 PAN 17th November 2007 568/279 62. CARTOSAT-1 PAN 17th November 2007 568/279 63. CARTOSAT-1 PAN 17th November 2007 568/280 64. CARTOSAT-1 PAN 21st March 2007

17th November 2007 569/281 568/281

65. CARTOSAT-1 PAN 21st March 2007 17th November 2007

569/281 568/281

66. CARTOSAT-1 PAN 21st March 2007 17th November 2007

569/281 568/281

67. CARTOSAT-1 PAN 24th April 2008 21st March 2007

568/282 569/282

68. CARTOSAT-1 PAN 21st March 2007 17th November 2007

569/279 568/279

69. CARTOSAT-1 PAN 21st March 2007 569/279 70. CARTOSAT-1 PAN 21st March 2007 569/280 71. CARTOSAT-1 PAN 21st March 2007 569/281 72. CARTOSAT-1 PAN 21st March 2007 569/281 73. CARTOSAT-1 PAN 21st March 2007 569/282 74. CARTOSAT-1 PAN 10th March 2007

21st March 2007 570/282 569/282

75. CARTOSAT-1 PAN 21st March 2007 569/279 76. CARTOSAT-1 PAN 21st March 2007 569/280 77. CARTOSAT-1 PAN 10th March 2007

21st March 2007 570/280 569/280

78. CARTOSAT-1 PAN 10th March 2007 570/280

Page 18: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

9

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Figure-2.Satellite data coverage over the Sone Modernisation Porject

Figure-3. Cartosat-1 Satellite Image of Sone Modernisation Project and its environs

Page 19: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

10

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

3.2 Ancillary Data Used In addition to the satellite data, the following ancillary data was used to understand the study area, preparing base details of the study area and for comparative assessment of the satellite based results • Index map of the Project area. • Index map showing distributaries. • Tree diagrams showing chainages and lengths of canal networks (Main

canal, branch canals, distributaries, minors and sub-minors). • Statements showing chainage, length, ICA, IP proposed and IP created

for canals and water cources under each distributary.

4.0 Satellite Data Analysis The detailed methodology used for assessment of irrigation potential creation in an irrigation project through the satellite data based irrigation infrastructure inventory is given below. The overview of methodology followed in the study is shown in the flow chart (Figure-4). 4.1 Methodology

The basic approach for the assessment of irrigation potential creation in a project is through identification and mapping of irrigation canal network and providing the status (w.r.t. the completion / incompletion / pending) of the entire conveyance and distribution system, various irrigation & drainage structures, etc.

Project command area maps and relevant ground/field information was used for precise boundary delineation of AIBP component of the study area. This area mask was then used for Cartosat satellite data acquisition planning and procurement. The individual ortho corrected Cartosat pan scenes were mosaiced to create AIBP Component area satellite database. This database was used to inventory irrigation infrastructure.

Page 20: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

11

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Figure-4. Flowchart of Methodology followed in the study

Acquisition planning for high resolution Cartosat-1

satellite data

Field data on Proposed Irrigation canal network and other infrastructure

(Line / Tree diagram)

Interpretation / Analysis of Cartosat data

Procurement of Cartosat data

Pre-processing of Cartosat data

(Rectification & Mosaicking)

Irrigation Project command index maps (Showing spatial extent of

AIBP component)

Generation of Existing Canal network and other

infrastructure layers

Assessment of percentage

Physical progress

Identification of critical gap areas for I.P creation

Assessment of Irrigation

Potential created

Assessment of Irrigation Potential created and its status

GPS survey for collection of GCPs

Preparation of project area mask

Image Interpretation key

Generation of Maps and study report • Irrigation Infrastructure • IP created • Gap areas

Page 21: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

12

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

4.2 Assessment of Irrigation Infrastructure Identification and mapping of existing irrigation canal network with Main canal/Branch canal/Distributaries/Minors & Sub-minors (for AIBP component area) was done from the satellite image through onscreen digitisation using ERDAS IMAGINE image processing software and ArcGIS software by displaying the image at 1:4,000 to 1:2,000 scales. The above inventory and mapping of canal network was done for AIBP component area in the project. In addition to the canal network, irrigation and other structures including cross drainage structures viz. aqueducts, super passages, syphons, H.P. drains, road/cart/foot bridges etc. were identified and marked on to the digital database. The above irrigation infrastructure was identified and mapped using the image interpretation key. Thus, the inventory of information in terms of number of canals (main canals/branch canals/distributaries/minors/sub-minors etc.), their offtake chainages and respective lengths was made. In addition to this, the status of canals was also assessed in terms of completed or incompleted or pending based on satellite data inventory information. Then, random ground checks were made for verification and confirmation of image interpretation details. 4.3 Assessment of Irrigation Potential Based on the above satellite based inventory of canals and structures information and their status, the Irrigation Potential (IP) created in the study area was assessed as given below:

• The distributary wise satellite derived canal network is inspected in a

hierarchical sequence for hydraulic flow continuity or discontinuity, anomalies in terms of length and absence of a particular canal altogether (Minor / Sub-minor etc), if any. This information is compared with proposed canal network information supplied by project authorities (Revenue Survey project maps, T-diagrams and Statements showing canal chainages, CCAs, Irrigation intensities and IP created).

• If the distributary wise satellite derived canal network is found

comparable and there are no Cross-Drainage (CD) and other irrigation structures pending / under construction indicating hydraulic flow continuity, then that distributary Irrigation Potential (IP) is considered

Page 22: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

13

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

as completed. The IP created is taken as proposed Irrigation Potential (estimated based on ICA and irrigation intensity) of the distributary.

• If the distributary wise satellite derived canal network is found with

hydraulic flow discontinuities either due to incomplete canal stretches or due to incomplete structures, then that distributary Irrigation Potential (IP) is considered as incomplete. Then the IP created under that distributary is assessed by aggregating the IP of various canals up to that point (from the off take point of distributary/minor/sub-minor) including Direct Pipe Outlets(DPO’s) on distributaries.

• If the distributary wise satellite derived canal network is found with

anamolies in terms of length (like shortening) either due to pending work or terrain conditions, then that distributary Irrigation Potential is considered as incomplete. Then the IP created under that distributary is assessed by aggregating the IP of various canals up to that point (from the off take point of distributary/ minor/sub-minor) including Direct Pipe Outlets (DPO’s) on distributaries.

• The balance Irrigation Potential (IP) is assessed as the difference

between proposed IP and IP created under each distributary.

• Though balance Irrigation Potential (IP) is assessed as above, the canal network completed beyond the points of hydraulic discontinuity and canal length anomalies were also mapped and reported.

The satellite data assessed irrigation potential using the above methodology is compared with the field reported irrigation potential estimates and the balance Irrigation Potential thus assessed at Distributary level, Branch Canal and Project level is reported and discussed in the following sections.

Page 23: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

14

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

5.0 Results and Conclusion 5.1 Irrigation Infrastructure

The inventory and mapping of canal network using cartosat data was done for entire sone canal modernization project. The details of the satellite derived existing canal network are shown in Table-2. The proposed canal lengths and off-take chainages from the parent canals provided by the project officials and that derived from satellite data were shown in the above table. The statistics were provided up to the level of minors. The canal lengths and their off-take chainges from parent canals derived from satellite data were found to be comparable with proposed field reported statistics except in the case of few minors in the case of low level canals which are slightly short in length. There were few minors that are pending particularly under Gara choubey branch canal which could be due to pending modernization work. However, under high level canals, many canals are either pending or significantly short in length compared to the proposed. Also different cross-drainage structures like syphons, other cross drainage structures such as H.P.Cs etc and others were found to be completed on low level and high level canals.

Page 24: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

15

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Table.2 Comparison of field reported and satellite derived offtake chainges and lengths of canal network

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

SONE MODERNISATION PROJECT EASETRN LINK CANAL - 10.19 - 10.37 Completed EASTERN SON HIGH LEVEL CANAL 7.20 83.09 6.62 84.42 Completed JAGATUR MINOR 4.08 3.71 4.10 3.68 Completed DEURY - - 0.33 0.48 Completed*

MADHPUR MINOR - 2.66 1.48 2.56 Completed

GORAHA MINOR 3.71 2.66 3.68 3.05 Completed

SUDAMPUR MINOR 3.71 1.85 3.68 1.65 Completed

TETARIA - - 6.30 1.61 Completed* SARANGA M.R 8.03 2.59 - - Pending GOPALPUR M.R 11.24 2.78 11.88 2.27 Completed RAMPUR 0.00 0.00 13.70 1.66 Completed

MATHUA SUB DISTRIBUTARY 15.80 6.28 15.80 6.08 Completed

JAMHORE MINOR - 4.26 0.93 4.07 Completed

MAHTHU MINOR - 0.93 - - Pending

OBRA MINOR 18.17 4.88 18.02 4.82 Completed KARMA MINOR 0.00 1.79 18.51 1.86 Completed PIRAUTA MINOR 22.49 3.40 22.09 3.34 Completed

CHAPRA SUB DISTRIBUTARY 22.55 0.00 22.11 7.93 Completed

DEURIYA MINOR - - 3.11 1.29 Completed*

SURKHI SUB DISTRIBUTARY - 6.18 5.52 7.90 Completed

KADIAHI MINOR - - - - Pending

Page 25: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

16

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

SURKI MINOR - - - - Pending

SOHRAIYA MINOR 0.00 2.47 5.52 2.46 Completed

BEL SUB DISTRIBUTARY 0.00 2.47 22.11 5.54 Completed

PHESAR MINOR 23.24 3.55 22.85 4.28 Completed

SIMRA SUB DISTRIBUTARY 24.03 13.22 23.47 13.12 Completed

MIRJAPUR MINOR 1.54 3.34 1.54 3.55 Completed

DOSMA MINOR 8.19 5.56 8.10 4.79 Completed KHAIRA - - 0.66 2.59 Completed* JHIKATIYA - - 0.66 2.28 Completed* BESENI MINOR 9.95 3.40 9.90 3.25 Completed

DHANDHWAR MINOR - - - - Pending

SIMRA MINOR 9.98 2.63 13.12 3.09 Completed

MAJKHAR MINOR - 1.24 - 2.16 Completed

JAMALPUR MINOR - 1.24 - - Pending

GOSIA MINOR - 3.49 32.90 4.55 Completed

SONBRSA DISTRIBUTARY 33.48 - 32.90 16.14 Completed*

RUKHUA MINOR 0.26 4.88 0.27 5.56 Completed

RAMPUR SUB DISTRIBUTARY 23.48 6.78 - - Pending

BARAHI DISTRIBUTARY - 0.86 3.11 1.55 Completed

SAIRA MNOR - - - - Pending

ABDULPUR MINOR 4.91 5.71 7.76 2.84 Shot In Length

PANCHAHARA MINOR - 1.94 1.18 2.41 Completed

ETAR MINOR - 4.63 - - Pending

Page 26: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

17

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

BANS MINOR 7.95 5.25 10.74 3.62 Shot In Length PAUTHU MINOR - 2.63 1.40 4.09 Completed SABDAR MINOR - 1.48 - - Pending

BHARTIPUR H.C 14.95 - - - Pending

ITWA MINOR - - - - Pending JAKHIM MINOR 42.29 0.69 40.40 1.95 Completed KUTKUR MINOR 44.21 2.74 44.22 2.74 Completed

BHITAPIA MINOR 0.09 1.73 0.14 3.54 Completed

BIHTA MINOR 46.65 2.44 46.41 2.35 Completed LATTA MINOR 48.47 3.66 48.27 5.07 Completed

JUJHARPUR SUB DISTRIBUTARY 53.05 6.55 52.67 8.72 Completed

CHAPUK MINOR 0.62 2.01 0.59 5.07 Completed

HASANPUR MINOR 53.75 1.70 52.67 1.89 Completed

DULARCHAK SUB DISTRIBUTARY 57.93 7.62 57.80 8.65 Completed

SAHPUR 0.37 3.68 0.39 6.55 Completed SINGHARI 3.18 2.78 3.13 2.87 Completed MAGAIN - 2.16 - - Pending LOHARI 6.92 1.85 - - Pending MIRPUR MINOR 58.54 6.40 - - Pending

DAMODERPUR MINOR 61.58 2.74 60.13 3.28 Completed

BHAGATIPUR SUB DISTRIBUTARY 63.99 19.27 63.66 20.91 Completed

MOHAMMADPUR MINOR - - - - Pending

LODIPUR SUB DISTRIBUTARY 2.44 11.58 2.49 11.66 Completed

Page 27: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

18

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

TULSHIBIGHA MINOR - 11.43 - - Pending

GORKATI MINOR - - - - Pending

SALEMPUR MINOR 5.73 2.63 6.03 2.61 Completed

AMARPUR MINOR 5.73 3.66 6.03 3.67 Completed

BAIJALPUR MINOR 9.08 5.10 - - Pending

USAS MINOR 10.19 3.05 - - Pending

BHLAOAR MINOR 11.99 5.12 11.89 4.81 Completed

KASSTURIPUR MINOR 19.53 3.21 - - Pending

Adjustment for DO'S and Data Gaps -

MOHUDINPUR MINOR 68.14 3.73 - - Pending

LIMRA MINOR 0.45 4.20 - - Pending

DHARAMPUR SUB DISTRIBUTARY 70.73 15.85 70.61 16.48 Completed

BITHARA MINOR 9.13 3.40 - - Pending

RAMBIGHA SUB DISTRIBUTARY 72.86 7.00 72.59 9.50 Completed

RATNI DISTRIBUTARY 78.06 11.12 76.71 11.04 Completed

ALIPUR MINOR - - - - Pending MAU MINOR - 0.98 0.97 3.40 Completed

BENIPUR SUB DISTRIBUTARY 5.49 9.88 5.43 5.75 Pending

NASIRNA MINOR - 5.41 - - Pending

SACHAI MINOR - - - - Pending MIRPUR MINOR - - - - Pending

Page 28: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

19

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

Adjustment for DO'S and Data Gaps -

FARIDPUR DISTRIBUTARY

82.29 25.33 88.79 2.79

2.79+Gap+2.44+Gap+0.20+Gap+7.89+Gap+0.59+

Gap+12.08 BARA MINOR 1.14 2.59 - - Pending

RAMPUR MINOR 4.70 3.54 - - Pending

GOPALPUR MINOR 9.27 5.72 - - Pending

BISUNPUR MINOR 13.28 6.18 - - Pending

BIZLIPUR MINOR 11.43 5.33 - - Pending

UCHITA MINOR 18.26 3.62 - - Pending

MIRZAPUR MINOR 21.50 5.37 - - Pending

NARAYANPUR DISTRIBUTARY

83.09 25.95 89.42 17.19

No Offtake+3.86+Gap+0.38+Gap+0.37+Gap+2.12+Gap+0.17+Gap+2.36+Gap+1.18+Gap+0.51+Gap+0.30+Gap+1.49+Gap+7.65+Gap+0.

32+Gap+3.69

MAKHOOMPUR SUB DISTRIBUTARY - - - - Pending

NEWARI SUB DISTRIBUTARY 11.71 12.97 - - Pending

SALEMPUR MINOR 12.51 12.36 - - Pending

Total of Minors and other from 0 to 24 km -

Total of Minors -

Page 29: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

20

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

and other from 44.21 to 72.86 km

Total of Minors and other from 78.06 to 83.09 km -

Adjustment for DO'S and Data Gaps -

KARAMDIH MINOR 8.19 4.79 5.95 4.78 Completed MAWNER SUB DISTRIBUTARY 10.19 13.27 9.80 12.68 Shot In Length BHALUA MINOR 4.54 1.70 - - Pending ENGLISH MINOR 5.96 2.01 6.02 1.65 Shot In Length CHURA MINOR 6.12 2.41 - - Pending KATHAHA MINOR 7.54 2.78 8.04 1.53 Shot In Length

DHANAUTI MINOR 7.94 1.30 - - Pending

DHURIA MINOR 9.53 2.32 9.66 1.91 Shot In Length PATNA MAIN CANAL 10.19 124.80 - 125.00 Completed M.E. CANAL 6.01 5.00 - 5.00 Completed

MANORA DISTRIBUTARY 3.98 21.00 9.98 14.42 Shot In Length

SURPLUS -

TELDIHA DISTRIBUTARY 9.35 5.25 9.52 4.80 Shot In Length

R.P.C.-A 10.65 8.70 10.70 6.50 Shot In Length

CHANDA DISTRIBUTARY 16.00 18.00 16.06 14.79 Shot In Length

TEJPURA (Feeder) 16.00 5.00 18.55 2.66 Shot In Length

TUTURAKH DISTRIBUTARY 18.30 12.80 18.55 13.33 Completed

R.P.C.-B 0.10 2.25 0.10 2.50 Completed

MALI DISTRIBUTARY 23.00 41.60 18.55 41.70 Completed

DEVHARA SUB DISTRIBUTARY 18.40 9.80 18.44 6.25 Shot In Length

Page 30: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

21

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

BHARATLINE SUB DISTRIBUTARY 22.30 6.00 22.86 4.49 Shot In Length

ANCHA (Feeder) 23.00 7.40 22.20 6.90 Shot In Length

KOCHAHASA DISTRIBUTARY 31.33 35.20 31.70 33.00 Shot In Length

R.P.C.-C 31.40 9.60 33.32 5.08 Shot In Length

AMRA DISTRIBUTARY 38.35 20.80 39.09 20.94 Completed

MOCHMMADPUR DISTRIBUTARY 1.75 10.00 1.79 4.76 Shot In Length

SAIDPUR DISTRIBUTARY 6.75 16.00 6.88 12.98 Shot In Length

IMAMAGANJ 41.20 22.40 40.82 23.36 Completed R.P.C.-D 42.00 6.40 41.47 6.30 Completed L.P.C. 44.30 4.80 48.00 9.57 Completed R.P.C.-E 48.30 9.60 48.00 9.57 Completed R.P.C.-I 57.60 8.42 57.60 6.46 Shot In Length

RAMPUR CHAURAM 1.00 5.20 1.16 4.10 Shot In Length

Adjustment for DO'S and Data Gaps -

AIYARA 61.20 9.82 61.20 10.00 Completed MURKA 65.92 27.94 66.00 28.74 Completed NAGWAN 3.34 9.70 3.00 10.00 Completed

Adjustment for DO'S and Data Gaps -

R.P.C.-II 67.61 9.18 68.20 9.29 Completed PALIGANJ 72.00 26.45 73.96 26.76 Completed CHANDHOS 10.45 7.19 10.51 7.30 Completed BHARATPURA 17.15 5.37 17.24 5.29 Completed

Page 31: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

22

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

Adjustment for DO'S and Data Gaps -

R.P.C.III 77.22 8.80 77.66 8.00 Completed DORWAN 85.44 7.20 85.63 7.36 Completed R.P.C.-IV 85.44 6.40 86.60 6.20 Completed JITAN CHAPRA 85.09 2.00 86.30 2.90 Completed DHANA-PAREV 86.08 2.40 85.26 2.00 Shot In Length MANER 86.40 36.80 86.60 37.67 Completed JAWARPUR 6.10 8.00 2.70 6.80 Shot In Length REWA 97.76 14.85 98.46 14.59 Completed ADAMPUR 97.76 12.75 97.60 10.95 Shot In Length R.P.C.-V 98.23 6.00 98.00 5.74 Shot In Length TANRAILLA 4.64 4.40 5.09 4.75 Completed KHAJURI-I 108.80 4.80 108.46 4.21 Shot In Length KHAJURI-II 108.80 4.00 108.46 4.15 Completed MAJHAULI 109.22 14.40 108.86 12.77 Shot In Length MAHGUPUR 3.20 6.40 2.80 6.60 Completed FATEHPUR 109.22 19.20 108.86 18.84 Shot In Length KURKURI 3.20 12.80 2.46 14.73 Completed DARIYAPUR 6.00 6.40 15.54 10.52 Completed

Adjustment for DO'S and Data Gaps -

AKOPUR (FEEDER) 117.60 0.91 118.80 1.17 Completed

DANAPUR 120.00 6.40 119.67 7.08 Completed PATNA 121.60 6.40 120.58 7.80 Completed R.P.C.-VI 124.80 3.20 124.00 3.49 Completed

Adjustment for DO'S and Data Gaps -

Page 32: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

23

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

WESTERN PARALEL LINK CANAL - 10.45 - 10.52 Completed WESTERN SONA HIGH LEVEL CANAL 8.60 80.42 8.60 79.63 Completed PAHLEJA MINOR 3.64 2.92 3.67 2.92 Completed

GANGAULI SUB DISTRIBURARY 3.78 5.06 3.85 5.19 Completed

KHANDA MINOR 8.38 2.43 8.48 2.16 Shot In Length MORE MINOR 11.00 3.65 11.17 1.29 Shot In Length KHURNU MINOR 13.47 4.87 - - Pending GIGNA MINOR 14.60 3.04 - - Pending AKASHI MINOR 16.76 1.52 16.51 2.00 Completed

GAMHARIA MINOR 19.69 2.50 - - Pending

UCHITPUR SEMRA MINOR 21.52 4.57 21.53 3.38 Shot In Length

MURADABAD MINOR 22.74 1.86 22.76 0.61 Shot In Length

BEDA MINOR 24.23 0.91 23.26 1.93 Completed RAUJA MINOR 24.23 3.96 23.26 1.93 Shot In Length

MALBAR SUB DISTRIBUTARY 26.46 12.39 25.50 12.12 Completed

GIRDHARIA MINOR 6.05 4.46 6.04 4.46 Completed

SARAIYA MINOR 12.39 4.57 12.12 1.52 0.71+Gap+0.81

SHAKAS NINOR 26.57 2.92 - - Pending JANJRA MINOR 27.28 3.96 27.84 2.05 Shot In Length MALAON MINOR 28.78 1.52 - - Pending

DHANPURWA MINOR 28.84 4.57 - - Pending

KHAIRI MINOR 32.33 0.90 - - Pending

MORKAP SUB DISTRIBUTARY 33.53 3.96 32.67 4.00 Completed

MADAINY MINOR 3.96 3.96 4.00 1.00 Shot In Length

Page 33: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

24

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

NAD MINOR 34.69 3.04 - - Pending BADDI MINOR 38.35 4.42 - - Pending

BASANTPUR SUB DISTRIBUTARY 38.49 8.53 37.69 8.76 Completed

SIKRAUR MINOR 2.28 2.56 - - Pending

PITAMBARPUR MINOR 8.53 2.80 - - Pending

KENAR MINOR 40.87 3.47 40.73 1.35 Shot In Length DIHI MINOR 41.76 2.74 - - Pending BHAPSI MINOR 44.69 3.04 - - Pending

HARNAGRA SUB DISTRIBUTARY 47.74 6.09 46.47 6.19 Completed

BARTALI MINOR 1.98 2.43 2.09 1.11 Shot In Length

DIGHAT MINOR 1.98 4.57 - - Pending

PIYAKALA MINOR 4.57 3.96 - - Pending

MAHESHI MINOR 3.17 3.65 - - Pending

DUMRI MINOR 4.26 1.98 - - Pending BIJARHI MINOR 6.09 4.26 - - Pending

KUDRA DISTRIBUTARY 51.31 27.43 50.35 18.72 Shot In Length

GOLUDIA MINOR 14.46 2.13 - - Pending

PUSAULI SUB DISTRIBUTARY 17.83 6.09 - - Pending

NEORAS MINOR-I 0.06 3.04 - - Pending KARMA MINOR 2.43 5.79 - - Pending

NATHOPUR MINOR 3.73 3.65 - - Pending

DIHRA M.R 17.83 5.18 - - Pending OINA M.R 17.98 5.18 - - Pending

NEORAS MINOR-II 19.54 3.65 - - Pending

Page 34: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

25

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

HALWANTA MINOR 20.12 4.87 - - Pending

KEORHI MINOR 21.72 3.35 - - Pending

DEORARH MINOR 22.25 2.74 - - Pending

ASARWALIA MINOR-I 22.56 2.13 - - Pending

JARUAN MINOR 23.01 1.82 - - Pending

NIMIA MINOR 24.02 1.52 - - Pending

MOHANIA SUB DIST. 24.02 6.40 - - Pending

ASARWALIA MINOR-II 0.00 2.79 - - Pending

NASEJ MINOR 0.00 1.52 - - Pending TENGRAHI 24.62 1.52 - - Pending TELARI MINOR 52.13 10.06 - - Pending

BAGHI-KURARI LINK CANAL 54.29 4.20 - - Pending

KURARI MINOR 54.87 5.79 - - Pending

ALIPUR SUB DISTRIBUTARY 56.18 7.42 55.24 7.67 Completed

BASANTPUR MINOR 0.90 0.62 - - Pending

JALALPUR MINOR 1.89 4.41 - - Pending

BANOLY MINOR 1.89 2.00 - - Pending

THILOI MINOR 3.16 4.25 - - Pending

DARWAN MINOR 6.70 4.25 - - Pending

RAMPUR MINOR 7.43 5.36 - - Pending

DIA MINOR 7.43 1.82 - - Pending

KAJAHAR MINOR 7.43 5.18 - - Pending

BARAKA GAON 56.18 - - - Pending

Page 35: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

26

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

MINOR

KARAUNDA 59.87 17.00 58.60 12.80 Shot In Length

CHAMARION MINOR 2.72 4.80 - 2.35 No Offtake+2.35

CHITARY MINOR 4.87 0.85 - - Pending

KARAUNDI MINOR 4.87 3.04 - - Pending

TARAHANI MINOR 8.32 4.34 8.26 1.24 Shot In Length

KAWAI SUB DISTRIBUTARY 8.32 9.29 8.26 9.42 Completed

SONARA MINOR 60.97 6.56 61.05 3.30 Shot In Length KARMA 63.55 17.07 62.64 19.33 Completed

KHAJURA MINOR 0.70 3.95 - - Pending

RUDRAWAR MINOR 3.96 1.91 - - Pending

SHIVPUR MINOR 5.79 5.79 - - Pending

SHIKRA MINOR 8.35 5.18 8.59 2.46 Shot In Length

MADHAVPUR MINOR 10.14 4.26 10.22 3.01 Shot In Length

BAHUWAN MINOR 11.61 0.93 11.72 0.60 Shot In Length

DIHRA MINOR 14.63 9.00 12.15 7.66 Shot In Length

BHESHLOT MINOR 14.63 2.25 13.69 1.08 Shot In Length

MACHAW MINOR 17.07 1.52 17.16 1.10 Shot In Length

KASER 73.17 23.75 72.08 22.75 Shot In Length

DULLAHPUR MINOR 1.30 4.25 0.46 1.19 Shot In Length

PIHRA MINOR 1.55 4.50 1.55 1.82 Shot In Length

PARMAIPUR MINOR 3.96 4.00 3.98 1.46 Shot In Length

BALLIPUR 7.62 2.10 6.91 0.77 Shot In Length

Page 36: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

27

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

MINOR

SIKTI MINOR 15.24 1.52 20.02 1.18 Shot In Length

RATWAR MINOR 20.30 5.20 22.50 4.79 Shot In Length

BASHI MINOR 23.75 5.20 22.75 4.79 Shot In Length BETARI 80.42 22.60 79.63 23.09 Completed BETRI MINOR 1.80 5.70 0.48 5.57 Completed NATI MINOR 4.95 1.79 4.96 1.70 Completed

SAREWA MINOR 7.04 2.12 7.04 2.77 Completed

JAGARIA MINOR 7.04 1.81 7.04 1.73 Completed

SADERA MINOR 13.79 1.81 13.87 1.26 Shot In Length

KOHIRA LINK CANAL 80.42 7.19 79.63 7.08 Completed

W.S.H.L.C and its Distributaries from 0 to 56.18 -

W.S.H.L.C and its Distributaries from 56.18 to 80.42 -

WESTERN MAIN CANAL 10.45 32.50 10.52 33.16 Completed

ARA MAIN CANAL 7.20 84.50 6.66 85.27 Completed

RAJPUR DISTRIBUTARY 2.52 19.20 2.75 19.08 Completed

BISENI SUB DISTRIBUTARY 4.10 10.00 4.80 10.47 Completed

New Canal 6.13 6.00 6.24 5.55 Completed

MAUNA DISTRIBUTARY 8.50 11.73 8.55 11.76 Completed

NASRIGANJ DISTRIBUTARY 8.50 7.24 8.55 7.02 Completed

DUMRAON BRANCH 16.00 64.88 16.12 64.61 Completed

Page 37: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

28

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

CANAL

JESHRI DISTRIBUTARY 6.91 13.20 6.98 12.56 Shot In Length

NINGAGHOSHIA MINOR 12.12 6.90 12.68 5.93 Shot In Length

KARATH DISTRIBUTARY 15.20 15.74 15.33 15.68 Completed

ITIMAH SUB DISTRIBUTARY 9.81 5.40 9.76 5.57 Completed

Adjustment for DO'S and Data Gaps -

LAHTHAN DISTRIBUTARY 20.40 26.40 20.45 26.65 Completed

JAMORHT SUB DISTRIBUTARY 3.22 10.25 3.14 10.44 Completed

BARAULI SUB DISTRIBUTARY & MINOR 11.40 3.40 - - Pending

DHANPURA SUB DISTRIBUTARY & MINOR 3.06 4.55 - - Pending

Adjustment for DO'S and Data Gaps -

Adjustment for DO'S and Data Gaps -

KESATH-I DISTRIBUTARY 20.40 9.75 20.45 10.46 Completed

MAHUARY DISTRIBUTARY 28.70 6.50 28.15 5.85 Shot In Length

KESATH-II DISTRIBUTARY 28.00 7.80 28.24 6.05 Shot In Length

BARIA DISTRIBUTARY 29.33 6.40 28.40 6.19 Shot In Length

WAINA DISTRIBUTARY 34.15 11.49 33.88 11.45 Completed

KESATH-III 34.85 11.00 33.49 13.09 Completed

Page 38: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

29

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

DISTRIBUTARY

KESATH-IV DISTRIBUTARY 45.34 7.20 45.45 7.32 Completed

SIKARIA DISTRIBUTARY 45.80 22.93 45.35 22.50 Completed

BAGAIN SUB DISTRIBUTARY 4.74 11.08 4.84 11.24 Completed

SALASLA MINOR 6.14 5.74 6.21 4.42 Shot In Length

Adjustment for DO'S and Data Gaps -

BARAON SUB DISTRIBUTARY 45.90 7.20 46.37 7.42 Completed

RAGHUNATHPUR DISTRIBUTARY 49.21 15.20 49.18 14.96 Shot In Length

CHAUGAIN SUB DISTRIBUTARY 3.60 7.00 3.77 6.64 Completed

Adjustment for DO'S and Data Gaps -

ARIAON DISTRIBUTARY 54.93 9.60 55.21 9.83 Completed

Adjustment for DO'S and Data Gaps -

KAITHY DISTRIBUTARY 17.78 18.10 17.65 17.40 Shot In Length

SAKALA DISTRIBUTARY 17.60 25.50 17.65 24.71 Shot In Length

DEW DISTRIBUTARY 2.00 11.00 2.28 11.97 Completed

Adjustment -

AMOUNA DISTRIBUTARY 28.30 11.25 28.49 7.69 4.74+Gap+2.95

DANWAR MINOR 32.60 5.30 0.00 0.00 Pending

BIHIA BRANCH CANAL 33.77 49.60 33.84 50.44 Completed

Page 39: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

30

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

c KURMURY DISTRIBUTARY 6.97 28.00 7.02 28.09 Completed

GAHARUA DISTRIBUTARY 8.10 4.91 8.17 4.86 Completed

SIKROUL DISTRIBUTARY 11.80 8.80 11.81 8.85 Completed

KATEYA DISTYRIBUTARY 18.26 34.40 18.37 34.65 Completed

GARHANI SUBDISTRIBUTARY 2.80 18.40 2.78 18.50 Completed

BARAON MINOR 5.60 5.00 2.78 4.97 Completed

KAKILA SUB DISTRIBUTARY 6.85 6.50 6.98 6.45 Completed

BALIGAON MINOR 12.90 5.00 12.35 4.11 Shot In Length

NARAYANPUR SUB DISTRIBUTARY 18.69 7.18 17.29 7.21 Completed

GYANPUR SUB DISTRIBUTARY 25.00 6.40 23.43 6.34 Completed

KATEYA FACTORY MINOR 27.50 5.58 26.23 5.55 Completed

Adjustment for DO'S and Data Gaps -

TAR DISTRIBUTARY 23.20 12.00 23.74 12.13 Completed

KESARI DISTRIBUTARY 28.21 8.00 28.52 8.39 Completed

HETAMPUR DISTRIBUTARY 35.20 14.40 35.26 14.22 Completed

CHAKWAT 11.25 4.00 11.03 3.10 Shot In Length

Total of R.P.C and Direct Outlets -

PANWARI 41.60 8.12 41.69 9.23 Completed

KOIFWAR DISTRIBUTARY 43.80 46.64 43.88 47.11 Completed

Page 40: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

31

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

EKWARI SUB DISTRIBUTARY 8.27 8.25 8.30 8.47 Completed

AFZALPUR SUB DISTRIBUTARY 7.47 5.00 8.47 5.20 Completed

MARASPUR MINOR 3.18 3.90 3.22 3.60 Completed

Adjustment for DO'S and Data Gaps -

BANSI DIHRA MINOR 16.00 4.00 16.34 4.14 Completed

BAGHI MINOR 19.46 3.19 19.42 3.64 Completed

KORI SUBDISTRIBUTARY 25.50 10.04 25.49 9.19 Completed

Adjustment for DO'S and Data Gaps Completed*

DILIA NARAYANPUR DISTRIBUTARY 49.50 20.68 49.55 20.74 Completed

PAWAR DISTRIBUTARY 18.20 12.49 13.29 12.48 Completed

Adjustment -

JAITPUR DISTRIBUTARY 57.56 21.64 57.63 23.28 Completed

L.P.C 68.73 5.74 68.78 5.77 Completed

BELAUR DISTRIBUTARY 68.74 12.57 68.78 12.65 Completed

BICHHIAON DISTRIBUTARY 1.57 9.68 1.48 9.64 Completed

KUSREY MINOR - - 7.61 3.06 Completed*

SURPLUS -

ASHNI DISTRIBUTARY 74.00 10.60 74.47 10.33 Completed

CHAURAI DISTRIBUTARY 4.35 4.58 4.31 4.51 Completed

Page 41: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

32

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

Adjustment for DO'S and Data Gaps Completed*

SARTHUA L.C 74.60 1.83 74.47 1.74 Completed

DHANUPRA DISTRIBUTARY 78.50 11.72 78.62 11.46 Shot In Length

BHUSAULA MINOR 1.39 7.80 1.36 6.40 Shot In Length

HASANPURA MINOR 5.10 1.33 5.52 1.33 Completed

Adjustment for DO'S and Data Gaps -

CHANDWA DISTRIBUTARY 78.69 7.67 78.62 7.51 Completed

Total of R.P.C, L.P.C and others from 17.5 to 64 km -

SALAYA DIST. 10.60 5.20 9.82 5.20 Completed SIYAWAK DIST. 16.00 14.63 15.72 14.33 Completed BARAICHA M.R 5.45 3.55 6.00 4.01 Completed

BUXAR BRANCH CANAL 18.00 70.20 18.27 70.33 Completed

CHAUSA BRANCH CANAL 2.05 62.68 2.00 63.67 Completed

KOCHAS DISTRIBUTARY 5.68 30.30 5.74 30.40 Completed

INDAUR DISTRIBUTARY 12.28 16.10 12.36 16.20 Completed

MURARCHAK DISTRIBUTARY 17.16 10.40 17.26 10.63 Completed

NEW BHANPUR DISTRIBUTARY 21.00 8.40 21.27 8.25 Shot In Length

BHANPUR P.C. 28.00 4.25 27.12 4.32 Completed

KHIRI DISTRIBUTARY 29.69 21.00 29.48 22.00 Completed

Page 42: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

33

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

UNWAS DISTRIBUTARY 32.44 18.50 32.60 18.39 Shot In Length

ATRAUNA DISTRIBUTARY 35.73 19.20 35.89 18.87 Completed

SISRAH 6.80 6.80 7.25 6.85 Completed

Adjustment for DO'S and Data Gaps -

HATHUA DISTRIBUTARY 41.82 18.50 42.02 15.74 Shot In Length

SONPA 46.50 8.00 46.78 14.45 Completed NAGPUR - 3.50 4.29 4.70 Completed RAMPUR - 13.00 5.34 8.43 Shot In Length BIRPUR - 0.00 6.83 2.82 Completed SURPLUS -

Total of Minor and w/c from 0 to 62.675 -

PANDARIA DISTRIBUTARY 7.75 6.50 7.60 6.70 Completed

LALGANJ DISTRIBUTARY 7.98 4.00 8.71 3.61 Shot In Length

BHOJPUR DISTRIBUTARY 9.45 51.06 - - Pending

BASAULI 4.35 5.76 4.41 5.65 Shot In Length

SANJHAULI SUB DISTRIBUTARY 10.50 7.90 10.66 7.90 Completed

NARAYANPUR CHANNEL 27.20 4.15 - - Pending

Adjustment for DO'S and Data Gaps -

BHANAS DISTRIBUTARY 14.40 11.87 14.16 11.93 Completed

SARANA 19.60 15.25 19.40 12.88 Shot In Length NADWAN 4.60 1.75 4.38 1.31 Shot In Length

Page 43: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

34

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

SATH DISTRIBUTARY 26.16 28.80 26.35 29.80 Completed

GARAHIA DISTRIBUTARY 6.79 16.60 6.83 15.70 Shot In Length

CHAMELA DISTRIBUTARY 8.00 10.46 8.04 10.46 Completed

AMARPUR DISTRIBUTARY 13.60 8.00 13.79 7.92 Completed

BASANTPUR DISTRIBUTARY 20.00 6.40 21.18 6.33 Completed

SIKRAUL DISTRIBUTARY 45.99 21.40 46.51 21.77 Completed

NENUA DISTRIBUTARY 11.00 8.00 10.64 8.09 Completed

BASAULY 46.00 11.20 46.51 10.84 Shot In Length SIKRAUL L.P.C 46.00 4.80 46.51 3.50 Shot In Length BASUDHAR 53.00 5.78 53.77 5.68 Completed ITARIH 59.60 4.80 59.94 4.80 Completed MAHDAH 59.60 12.20 60.07 12.68 Completed MUKUNDPUR 1.20 6.74 1.16 6.20 Shot In Length

Total of Minors, P.C. and Direct Outlets -

BARAON DISTRIBUTARY 22.00 9.25 21.88 10.34 Completed

BHANPUR DISTRIBUTARY 9.25 4.30 9.55 4.39 Completed

BALTHARY DISTRIBUTARY 26.00 26.50 25.68 26.09 Completed

RASULPUR DISTRIBUTARY 28.50 21.50 27.60 22.76 Completed

GARA CHOUBEY BRANCH CANAL 30.00 61.00 29.74 56.38 Shot In Length

NEW SONEBARSA DISTRIBUTARY 4.30 11.30 4.01 10.97 Shot In Length

PARHUTY DISTRIBUTARY 8.70 21.36 8.86 21.40 Completed

Page 44: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

35

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

KARGAHAR DISTRIBUTARY 12.40 38.20 12.53 38.36 Completed

SALTHUA DISTRIBUTARY 9.93 19.52 10.23 19.30 Shot In Length

DUM-DUMA SUB DISTYRIBUTARY 23.83 8.00 24.20 8.09 Completed

PAKIYAWA MINOR 36.50 2.00 - - Pending

Adjustment for DO'S and Data Gaps -

GOGAHRA DISTRIBUTARY 14.40 7.52 14.54 7.22 Shot In Length

LOKNATHPUR DISTRIBUTARY 15.50 9.40 15.33 9.77 Completed

RAGHUNATHPUR DISTRIBUTARY 20.00 12.95 20.18 12.86 Completed

KATHRAIN DISTRIBUTARY 24.99 8.00 23.73 8.01 Completed

NEW DANGRI DISTRIBUTARY 31.50 8.54 30.29 8.98 Completed

NEW BAHUPUR DISTRIBUTARY 40.00 8.96 41.46 7.74 Shot In Length

SABDULLAHPUR DISTYRIBUTARY 45.40 17.00 - - Pending

SIZUA DISTRIBUTARY 46.00 8.00 - - Pending

NEW GORSARA DISTRIBUTARY 46.85 6.80 52.34 6.80 Completed

BANWARICHAK DISTRIBUTARY 3.16 4.17 - - Pending

BAGADIH DISTRIBUTARY 4.00 2.50 - - Pending

KATHRINE DISTRIBUTARY 25.00 7.80 - - Pending

PANJRAO DISTRIBUTARY 56.30 6.72 - - Pending

Page 45: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

36

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal

Proposed Satellite Derived

Remarks Off take

Chainage of Canal

(km)

Length of

Canal (km)

Off take Chainage of Canal

(km)

Length of

Canal (km)

TIRA TIRAITHA 57.40 2.70 - - Pending MAHARTHA 57.40 4.40 - - Pending

Total of Minors and w/c from 0 to 57.54 -

KHURMABAD DIST. 31.00 16.00 30.84 17.53 Completed

Page 46: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

37

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

5.2 Irrigation Potential The irrigation potential was assessed using the irrigation infrastructure derived from the satellite data. The details of proposed irrigation potential and satellite based irrigation potential created in the project are given in Table-3. The field data on canal wise IP created was not provided by project offices. The parent /offtake canals which were derived from satellite data and their lengths are comparable to the proposed without any pending cross-drainage/irrigation structures, they were assessed to have created the proposed irrigation potential fully. However, for many canals under both low level and high level canals, I.P created could not be assessed based on satellite derived infrastructure due to non-availability of canal wise I.P proposed. In spite of repeated efforts, complete field data from project offices was not provided. The total proposed I.P under low level and high level canals provided by field offices was only 8,24,140 ha against U.I.P of 9,00,000 ha. Therefore, I.P created was assessed only for 8,24,140 ha. The Irrigation Potential created in the Sone canal modernization project based on Cartosat data analysis is assessed as 6,04,300 ha. as against the proposed Irrigation Potential of 8,24,140 ha. only. The satellite assessed I.P of 6,04,300 ha is distributed under Eastern Sone high level, Eastern son low level , Western Sone high level, Western son low level canals is 33,645 ha, 1,02,814 ha, 20,257 ha and 4,47,296 ha respectively. Hence, the total I.P created under son modernization project . For many canals, I.P created could not be estimated even though infrastructure data is available (both field and satellite derived) for want of detailed proposed I.P data. Figure-5 shows the map of satellite derived irrigation infrastructure and irrigation potential created in Sone canal modernization project as described earlier. An ‘A0 size’ map showing canal network derived from satellite data together with the spatial distribution of irrigation potential created was prepared (including the base details of roads, drains and villages) and provided along with this report (Plate-1).

Page 47: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

38

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Table.3 Comparison of field reported and satellite derived Irrigation potential of canal network

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

SONE MODERNISATION PROJECT 645675.96 824139.68 604300.59

EASETRN LINK CANAL 190109.62 229780.72 - 136747.57

Balance IP could not

be assessed

due to non availability

of Field data

EASTERN SON HIGH LEVEL CANAL 73845.62 73845.62 - 33645.37

Balance IP could not

be assessed

due to non availability

of Field data

JAGATUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DEURY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MADHPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

GORAHA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SUDAMPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

TETARIA 0.00 0.00 - IP Could Not be

Field Data on IP Not

Page 48: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

39

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

Assessed Available

SARANGA M.R 0.00 0.00 - 0.00

Field Data on IP Not Available

GOPALPUR M.R 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

RAMPUR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MATHUA SUB DISTRIBUTARY 1710.00 1710.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

JAMHORE MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MAHTHU MINOR 0.00 0.00 - 0.00 Pending

DO 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

OBRA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KARMA MINOR 372.00 372.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

PIRAUTA MINOR 550.00 550.00 - 550.00 Completed

CHAPRA SUB DISTRIBUTARY 4536.00 4536.00 - 4536.00 Completed

DEURIYA MINOR 267.00 267.00 - 267.00

Field Data on IP Not Available

Page 49: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

40

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

SURKHI SUB DISTRIBUTARY 1428.00 1428.00 - 1428.00

Field Data on IP Not Available

KADIAHI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SURKI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SOHRAIYA MINOR 356.00 356.00 - 356.00

Field Data on IP Not Available

BEL SUB DISTRIBUTARY 1285.00 1285.00 - 1285.00

Field Data on IP Not Available

PHESAR MINOR 664.00 664.00 - 664.00

Field Data on IP Not Available

DO 536.00 536.00 - 536.00 Completed

SIMRA SUB DISTRIBUTARY 4797.00 4797.00 - 4797.00 Completed

MIRJAPUR MINOR 1307.00 1307.00 - 1307.00 Completed

DOSMA MINOR 1192.00 1192.00 - 1192.00 Completed

KHAIRA 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

JHIKATIYA 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BESENI MINOR 340.00 340.00 - 340.00 Completed

SIMRA MINOR 454.00 454.00 - 454.00 Completed

MAJKHAR 340.00 340.00 - 340.00 Completed

Page 50: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

41

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

MINOR

DO 1164.00 1164.00 - 1164.00 Completed

JAMALPUR MINOR 434.00 434.00 - 0.00 Pending

GOSIA MINOR 1013.62 1013.62 - 1013.62 Completed

SONBRSA DISTRIBUTARY 6556.00 6556.00 - 3461.75 Completed

RUKHUA MINOR 646.15 646.15 - 646.15 Completed

RAMPUR SUB DISTRIBUTARY 1819.28 1819.28 - 0.00 Pending

BARAHI DISTRIBUTARY 641.37 641.37 - 0.00 Pending

DO 1177.91 1177.91 - 0.00 Pending

ABDULPUR MINOR 1155.82 1155.82 - 789.87 Completed

PANCHAHARA MINOR 428.33 428.33 - 428.33 Completed

DO 727.49 727.49 - 361.54 Completed ETAR MINOR 317.67 317.67 - 0.00 Pending BANS MINOR 1691.52 1691.52 - 1100.17 Completed

PAUTHU MINOR 560.34 560.34 - 560.34 Completed

SABDAR MINOR 348.73 348.73 - 0.00 Pending

DO 782.45 782.45 - 539.83 Pending

BHARTIPUR H.C 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DO 925.56 925.56 - 925.56 Completed

Page 51: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

42

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

JAKHIM MINOR 330.00 330.00 - 330.00 Pending

KUTKUR MINOR 1135.00 1135.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BHITAPIA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DO 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BIHTA MINOR 510.00 510.00 - 510.00 Completed

LATTA MINOR 1420.00 1420.00 - 1420.00 Completed

JUJHARPUR SUB DISTRIBUTARY 1800.00 1800.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

CHAPUK MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DO 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

HASANPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DULARCHAK SUB DISTRIBUTARY 2525.00 2525.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SAHPUR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SINGHARI 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Page 52: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

43

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

MAGAIN 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

LOHARI 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DO 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MIRPUR MINOR 700.00 700.00 - 0.00 Pending

DAMODERPUR MINOR 525.00 525.00 - 525.00 Completed

BHAGATIPUR SUB DISTRIBUTARY 3460.00 3460.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MOHAMMADPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

LODIPUR SUB DISTRIBUTARY 1800.00 1800.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

TULSHIBIGHA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

GORKATI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SALEMPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

AMARPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BAIJALPUR MINOR 0.00 0.00 -

IP Could Not be

Field Data on IP Not

Page 53: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

44

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

Assessed Available

USAS MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BHLAOAR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KASSTURIPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Adjustment for DO'S and Data Gaps 1660.00 1660.00 - 0.00 Pending

MOHUDINPUR MINOR 560.00 560.00 - 0.00 Pending

LIMRA MINOR 0.00 0.00 - 0.00 Pending

DHARAMPUR SUB DISTRIBUTARY 1600.00 1600.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BITHARA MINOR 0.00 0.00 - 0.00 Pending

RAMBIGHA SUB DISTRIBUTARY 1700.00 1700.00 - 1700.00 Completed

RATNI DISTRIBUTARY 2916.00 2916.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

ALIPUR MINOR 0.00 0.00 - 0.00 Pending

MAU MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BENIPUR 838.00 838.00 - 0.00 Pending

Page 54: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

45

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

SUB DISTRIBUTARY

NASIRNA MINOR 0.00 0.00 - 0.00 Pending

SACHAI MINOR 0.00 0.00 - 0.00 Pending

MIRPUR MINOR 0.00 0.00 - 0.00 Pending

Adjustment for DO'S and Data Gaps 2078.00 2078.00 - 0.00 Pending

FARIDPUR DISTRIBUTARY 5045.00 5045.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BARA MINOR 0.00 0.00 - 0.00 Pending

RAMPUR MINOR 0.00 0.00 - 0.00 Pending

GOPALPUR MINOR 0.00 0.00 - 0.00 Pending

BISUNPUR MINOR 0.00 0.00 - 0.00 Pending

BIZLIPUR MINOR 0.00 0.00 - 0.00 Pending

UCHITA MINOR 0.00 0.00 - 0.00 Pending

MIRZAPUR MINOR 0.00 0.00 - 0.00 Pending

NARAYANPUR DISTRIBUTARY 4650.00 4650.00 - 0.00 Pending

MAKHOOMPUR SUB DISTRIBUTARY 0.00 0.00 - 0.00 Pending

NEWARI SUB DISTRIBUTAR 0.00 0.00 - 0.00 Pending

Page 55: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

46

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

Y

SALEMPUR MINOR 0.00 0.00 - 0.00 Pending

Total of Minors and other from 0 to 24 km 10817.00 10817.00 - 10817.00 Completed

Total of Minors and other from 44.21 to 72.86 km 3860.00 3860.00 - 3860.00 Completed

Total of Minors and other from 78.06 to 83.09 km 125.00 125.00 - 125.00 Completed

Adjustment for DO'S and Data Gaps 10199.00 10199.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KARAMDIH MINOR 288.00 288.00 - 288.00 Completed

MAWNER SUB DISTRIBUTARY 2630.00 2630.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BHALUA MINOR 0.00 0.00 - 0.00 Pending

ENGLISH MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

CHURA MINOR 0.00 0.00 - 0.00 Pending

KATHAHA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DHANAUTI MINOR 0.00 0.00 - 0.00 Pending

Page 56: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

47

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

DHURIA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

PATNA MAIN CANAL 113346.00 153017.10 - 102814.20

Balance IP could not

be assessed

due to non availability

of Field data

M.E. CANAL 4000.00 5400.00 - 3414.02 Completed

MANORA DISTRIBUTARY 4695.00 6338.25 - 4352.27 Pending

SURPLUS 695.00 938.25 - 938.25 Completed

TELDIHA DISTRIBUTARY 2029.00 2739.15 - 2504.37 Completed

R.P.C.-A 1700.00 2295.00 - 1714.66 Completed

CHANDA DISTRIBUTARY 6465.00 8727.75 - 7171.30 Completed

TEJPURA (Feeder) 575.00 776.25 - 412.97 Completed

TUTURAKH DISTRIBUTARY 3835.00 5177.25 -

IP Could Not be

Assessed

Field Data on IP Not Available

R.P.C.-B 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MALI DISTRIBUTARY 13118.00 17709.30 - 997.86 Completed

DEVHARA SUB 1159.00 1564.65 - 997.86 Completed

Page 57: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

48

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

DISTRIBUTARY

BHARATLINE SUB DISTRIBUTARY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DO 11959.00 16144.65 -

IP Could Not be

Assessed

Field Data on IP Not Available

ANCHA (Feeder) 1265.00 1707.75 - 1592.36 Completed

KOCHAHASA DISTRIBUTARY 19904.00 26870.40 - 25191.00 Completed

R.P.C.-C 505.00 681.75 - 360.76 Completed

AMRA DISTRIBUTARY 7106.00 9593.10 -

IP Could Not be

Assessed

Field Data on IP Not Available

MOCHMMADPUR DISTRIBUTARY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SAIDPUR DISTRIBUTARY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DO 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

IMAMAGANJ 5671.00 7655.85 - 7655.85 Completed

R.P.C.-D 180.00 243.00 - 243.00 Completed L.P.C. 260.00 351.00 - 351.00 Completed R.P.C.-E 286.00 386.10 - 386.10 Completed R.P.C.-I 1100.00 1485.00 - 1159.40 Pending

RAMPUR CHAURAM 700.00 945.00 - 745.10 Pending

Page 58: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

49

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

DO 400.00 540.00 - 414.30 Pending AIYARA 1500.00 2025.00 - 2025.00 Completed MURKA 3400.00 4590.00 - 2025.00 Completed NAGWAN 900.00 1215.00 - 1215.00 Completed DO 2500.00 3375.00 - 3375.00 Completed R.P.C.-II 1100.00 1485.00 - 1485.00 Completed PALIGANJ 4000.00 5400.00 - 5400.00 Completed CHANDHOS 900.00 1215.00 - 1215.00 Completed

BHARATPURA 700.00 945.00 - 945.00 Completed

DO 2400.00 3240.00 - 3240.00 Completed R.P.C.III 1600.00 2160.00 - 2160.00 Completed DORWAN 1400.00 1890.00 - 1890.00 Completed R.P.C.-IV 1400.00 1890.00 - 1890.00 Completed

JITAN CHAPRA 227.00 306.45 - 306.45 Completed

DHANA-PAREV 200.00 270.00 - 225.00 Pending

MANER 6300.00 8505.00 - 8505.00 Completed

JAWARPUR 1400.00 1890.00 - 1606.50 Pending

REWA 2800.00 3780.00 - 3780.00 Completed ADAMPUR 1600.00 2160.00 - 1855.06 Pending

R.P.C.-V 1400.00 1890.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

TANRAILLA 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DO 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Page 59: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

50

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

KHAJURI-I 1000.00 1350.00 - 1184.06 Completed

KHAJURI-II 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MAJHAULI 2000.00 2700.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MAHGUPUR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DO 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

FATEHPUR 3200.00 4320.00 - 715.50 Pending

KURKURI 530.00 715.50 - 715.50 Pending

DARIYAPUR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Adjustment for DO'S and Data Gaps 2670.00 3604.50 -

IP Could Not be

Assessed

Field Data on IP Not Available

AKOPUR (FEEDER) - - -

IP Could Not be

Assessed Completed DANAPUR 1000.00 1350.00 - 1350.00 Completed PATNA 1000.00 1350.00 - 1350.00 Completed R.P.C.-VI 30.00 40.50 - 40.50 Completed

Adjustment for DO'S and Data Gaps 8790.00 11866.50 - 11866.50 Completed

Page 60: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

51

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

WESTERN PARALEL LINK CANAL 455566.34 594358.96 - 467553.02

Balance IP could not

be assessed

due to non availability

of Field data

WESTERN SONA HIGH LEVEL CANAL 59016.00 59016.00 - 20257.00

Balance IP could not

be assessed

due to non availability

of Field data

PAHLEJA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

GANGAULI SUB DISTRIBURARY 2052.00 2052.00 - 2052.00 Completed

KHANDA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MORE MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KHURNU MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

GIGNA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

AKASHI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Page 61: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

52

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

GAMHARIA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

UCHITPUR SEMRA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MURADABAD MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BEDA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

RAUJA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MALBAR SUB DISTRIBUTARY 2237.00 2237.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

GIRDHARIA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SARAIYA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SHAKAS NINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

JANJRA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MALAON MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DHANPURWA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KHAIRI MINOR 0.00 0.00 -

IP Could Not be

Field Data on IP Not

Page 62: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

53

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

Assessed Available

MORKAP SUB DISTRIBUTARY 967.00 967.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MADAINY MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

NAD MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BADDI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BASANTPUR SUB DISTRIBUTARY 2411.00 2411.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SIKRAUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

PITAMBARPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KENAR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DIHI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BHAPSI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

HARNAGRA SUB DISTRIBUTARY 2614.00 2614.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Page 63: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

54

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

BARTALI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DIGHAT MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

PIYAKALA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MAHESHI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DUMRI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BIJARHI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KUDRA DISTRIBUTARY 12230.00 12230.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

GOLUDIA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

PUSAULI SUB DISTRIBUTARY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

NEORAS MINOR-I 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KARMA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

NATHOPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DIHRA M.R 0.00 0.00 - IP Could Not be

Field Data on IP Not

Page 64: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

55

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

Assessed Available

OINA M.R 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

NEORAS MINOR-II 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

HALWANTA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KEORHI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DEORARH MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

ASARWALIA MINOR-I 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

JARUAN MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

NIMIA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MOHANIA SUB DIST. 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

ASARWALIA MINOR-II 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

NASEJ MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

TENGRAHI 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Page 65: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

56

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

TELARI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BAGHI-KURARI LINK CANAL 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KURARI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

ALIPUR SUB DISTRIBUTARY 3850.00 3850.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BASANTPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

JALALPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BANOLY MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

THILOI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DARWAN MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

RAMPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DIA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KAJAHAR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Page 66: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

57

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

BARAKA GAON MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KARAUNDA 5060.00 5060.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

CHAMARION MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

CHITARY MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KARAUNDI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

TARAHANI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KAWAI SUB DISTRIBUTARY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SONARA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KARMA 4840.00 4840.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KHAJURA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

RUDRAWAR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SHIVPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SHIKRA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Page 67: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

58

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

MADHAVPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BAHUWAN MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DIHRA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BHESHLOT MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MACHAW MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KASER 2900.00 2900.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DULLAHPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

PIHRA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

PARMAIPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BALLIPUR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SIKTI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

RATWAR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BASHI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Page 68: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

59

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

BETARI 1650.00 1650.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BETRI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

NATI MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SAREWA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

JAGARIA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SADERA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KOHIRA LINK CANAL 418.00 418.00 - 418.00 Completed

W.S.H.L.C and its Distributaries from 0 to 56.18 14266.00 14266.00 - 14266.00 Completed

W.S.H.L.C and its Distributaries from 56.18 to 80.42 3521.00 3521.00 - 3521.00 Completed

WESTERN MAIN CANAL 396550.34 535342.96 - 447296.02

Balance IP could not

be assessed

due to non availability

of Field

Page 69: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

60

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

data

ARA MAIN CANAL 208900.34 282015.46 - 271938.09

Balance IP could not

be assessed

due to non availability

of Field data

RAJPUR DISTRIBUTARY 4726.00 6380.10 - 6380.10 Completed

BISENI SUB DISTRIBUTARY 1001.00 1351.35 - 1351.35 Completed

DO 3725.00 5028.75 - 5028.75 Completed

MAUNA DISTRIBUTARY 3317.00 4477.95 - 4477.95 Completed

NASRIGANJ DISTRIBUTARY 1609.00 2172.15 - 2172.15 Completed

DUMRAON BRANCH CANAL 30586.00 41291.10 - 40439.95

Balance IP could not

be assessed

due to non availability

of Field data

JESHRI DISTRIBUTAR 1744.00 2354.40 - 2240.25 Pending

Page 70: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

61

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

Y

NINGAGHOSHIA MINOR 1000.00 1350.00 - 1160.22 Pending

KARATH DISTRIBUTARY 3351.00 4523.85 - 4523.85 Completed

ITIMAH SUB DISTRIBUTARY 583.00 787.05 - 787.05 Completed

DO 2768.00 3736.80 - 3736.80 Completed

LAHTHAN DISTRIBUTARY 8500.00 11475.00 - 11475.00 Completed

JAMORHT SUB DISTRIBUTARY 1417.00 1912.95 - 1912.95 Completed

BARAULI SUB DISTRIBUTARY & MINOR 911.00 1229.85 - 1229.85 Completed

DHANPURA SUB DISTRIBUTARY & MINOR 745.00 1005.75 - 1005.75 Completed

DO 166.00 224.10 - 224.10 Completed Do 6172.00 8332.20 - 8332.20 Completed

KESATH-I DISTRIBUTARY 1585.00 2139.75 - 2139.75 Completed

MAHUARY DISTRIBUTARY 1136.00 1533.60 - 1380.24 Pending

KESATH-II DISTRIBUTARY 640.00 864.00 - 670.15 Pending

BARIA DISTRIBUTARY 400.00 540.00 - 522.28 Pending

WAINA DISTRIBUTAR 1938.00 2616.30 - 2616.30 Completed

Page 71: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

62

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

Y

KESATH-III DISTRIBUTARY 1144.00 1544.40 - 1544.40 Completed

KESATH-IV DISTRIBUTARY 525.00 708.75 - 708.75 Completed

SIKARIA DISTRIBUTARY 2959.00 3994.65 - 3870.47 Pending

BAGAIN SUB DISTRIBUTARY 1275.00 1721.25 - 1721.25 Completed

SALASLA MINOR 400.00 540.00 - 415.82 Pending

DO 1284.00 1733.40 - 1733.40 Completed

BARAON SUB DISTRIBUTARY 919.00 1240.65 - 1240.65 Completed

RAGHUNATHPUR DISTRIBUTARY 3369.00 4548.15 - 4490.04 Pending

CHAUGAIN SUB DISTRIBUTARY 643.00 868.05 - 868.05 Completed

DO 2726.00 3680.10 - 3621.99 Pending

ARIAON DISTRIBUTARY 1376.00 1857.60 - 1857.60 Completed

KAITHY DISTRIBUTARY 3431.34 4632.31 - 4453.16 Pending

SAKALA DISTRIBUTARY 43600.00 58860.00 - 57107.59 Pending

DEW DISTRIBUTARY 1700.00 2295.00 - 2295.00 Completed

Page 72: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

63

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

DO 41900.00 56565.00 - 54812.59 Pending

AMOUNA DISTRIBUTARY 1319.00 1780.65 - 750.25 Pending

DANWAR MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BIHIA BRANCH CANAL 47551.00 64193.85 - 63005.79

Balance IP could not

be assessed

due to non availability

of Field data

c

KURMURY DISTRIBUTARY 600.00 810.00 - 810.00 Completed

GAHARUA DISTRIBUTARY 1180.00 1593.00 - 1593.00 Completed

SIKROUL DISTRIBUTARY 2500.00 3375.00 - 3375.00 Completed

KATEYA DISTYRIBUTARY 12792.00 17269.20 - 16081.14 Pending

GARHANI SUBDISTRIBUTARY 4559.00 6154.65 - 6154.65 Completed

BARAON MINOR 985.00 1329.75 - 1329.75 Completed

KAKILA SUB DISTRIBUTARY 968.00 1306.80 - 1306.80 Completed

BALIGAON MINOR 1150.80 1553.58 - 1277.04 Pending

NARAYANPUR SUB DISTRIBUTARY 2297.00 3100.95 - 3100.95 Completed

Page 73: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

64

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

GYANPUR SUB DISTRIBUTARY 2157.00 2911.95 - 2911.95 Completed

KATEYA FACTORY MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Adjustment for DO'S and Data Gaps 675.20 911.52 -

IP Could Not be

Assessed

Field Data on IP Not Available

TAR DISTRIBUTARY 1900.00 2565.00 - 2565.00 Completed

KESARI DISTRIBUTARY 1250.00 1687.50 - 1687.50 Completed

HETAMPUR DISTRIBUTARY 2927.00 3951.45 - 3951.45 Completed

CHAKWAT 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Total of R.P.C and Direct Outlets 24402.00 32942.70 - 32942.70 Completed

PANWARI 1652.00 2230.20 - 2230.20 Completed

KOIFWAR DISTRIBUTARY 7214.00 9738.90 - 9738.90 Completed

EKWARI SUB DISTRIBUTARY 1518.00 2049.30 - 2049.30 Completed

AFZALPUR SUB DISTRIBUTARY 569.00 768.15 - 768.15 Completed

MARASPUR MINOR 330.00 445.50 - 445.50 Completed

DO 619.00 835.65 - 835.65 Completed

BANSI DIHRA MINOR 150.00 202.50 - 202.50 Completed

Page 74: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

65

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

BAGHI MINOR 150.00 202.50 - 202.50 Completed

KORI SUBDISTRIBUTARY 1732.00 2338.20 - 2338.20 Completed

DO 3664.00 4946.40 - 4946.40 Completed

DILIA NARAYANPUR DISTRIBUTARY 5747.00 7758.45 - 7758.45 Completed

PAWAR DISTRIBUTARY 1652.00 2230.20 - 2230.20 Completed

Do 4095.00 5528.25 - 5528.25 Completed

JAITPUR DISTRIBUTARY 4676.00 6312.60 - 6312.60 Completed

L.P.C 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BELAUR DISTRIBUTARY 1665.00 2247.75 - 2247.75 Completed

BICHHIAON DISTRIBUTARY 2550.00 3442.50 - 3442.50 Completed

KUSREY MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SURPLUS 885.00 1194.75 - 1194.75 -

ASHNI DISTRIBUTARY 7450.00 10057.50 - 10057.50 Completed

CHAURAI DISTRIBUTARY 875.00 1181.25 - 1181.25 Completed

DO 6575.00 8876.25 - 8876.25 Completed

Page 75: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

66

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

SARTHUA L.C 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

DHANUPRA DISTRIBUTARY 4026.00 5435.10 - 358.89 Pending

BHUSAULA MINOR 324.00 437.40 - 358.89 Pending

HASANPURA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Adjustment for DO'S and Data Gaps 3702.00 4997.70 -

IP Could Not be

Assessed

Field Data on IP Not Available

CHANDWA DISTRIBUTARY 691.00 932.85 - 932.85 Completed

Total of R.P.C, L.P.C and others from 17.5 to 64 km 39640.00 53514.00 - 53514.00 Completed

SALAYA DIST. 1184.00 1598.40 - 1598.40 Completed

SIYAWAK DIST. 5958.00 8043.30 -

IP Could Not be

Assessed

Field Data on IP Not Available

BARAICHA M.R 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BUXAR BRANCH CANAL 118552.00 160045.20 - 104340.66

Balance IP could not

be assessed

due to non availability

of Field data

Page 76: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

67

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

CHAUSA BRANCH CANAL 50961.00 68797.35 - 64600.21

Balance IP could not

be assessed

due to non availability

of Field data

KOCHAS DISTRIBUTARY 623.00 841.05 - 841.05 Completed

INDAUR DISTRIBUTARY 4060.00 5481.00 - 5481.00 Completed

MURARCHAK DISTRIBUTARY 1723.00 2326.05 - 2326.05 Completed

NEW BHANPUR DISTRIBUTARY 1205.00 1626.75 - 1597.70 Pending

BHANPUR P.C. 604.00 815.40 - 815.40 Completed

KHIRI DISTRIBUTARY 5030.00 6790.50 - 6790.50 Completed

UNWAS DISTRIBUTARY 5027.00 6786.45 - 6746.10 Pending

ATRAUNA DISTRIBUTARY 5040.00 6804.00 - 6804.00 Completed

SISRAH 1524.00 2057.40 - 2057.40 Completed DO 3516.00 4746.60 - 4746.60 Completed

HATHUA DISTRIBUTARY 3520.00 4752.00 - 4043.05 Pending

SONPA 6240.00 8424.00 - 5005.21 Pending

Page 77: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

68

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

NAGPUR 1353.00 1826.55 - 1826.55 Completed RAMPUR 3631.00 4901.85 - 3178.66 Pending

BIRPUR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Adjustment for DO'S and Data Gaps 1256.00 1695.60 -

IP Could Not be

Assessed

Field Data on IP Not Available

Total of Minor and w/c from 0 to 62.675 17889.00 24150.15 - 24150.15 Completed

PANDARIA DISTRIBUTARY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

LALGANJ DISTRIBUTARY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BHOJPUR DISTRIBUTARY 11609.00 15672.15 - 0.00 Pending

BASAULI 0.00 0.00 - 0.00 Pending

SANJHAULI SUB DISTRIBUTARY 2195.57 2964.02 - 0.00 Pending

NARAYANPUR CHANNEL 473.94 639.82 - 0.00 Pending

Adjustment for DO'S and Data Gaps 8939.49 12068.31 - 0.00 Pending

BHANAS DISTRIBUTARY 2998.00 4047.30 - 4047.30 Completed

SARANA 3791.00 5117.85 -

IP Could Not be

Assessed

Field Data on IP Not Available

Page 78: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

69

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

NADWAN 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SATH DISTRIBUTARY 13785.00 18609.75 -

IP Could Not be

Assessed

Field Data on IP Not Available

GARAHIA DISTRIBUTARY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

CHAMELA DISTRIBUTARY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

AMARPUR DISTRIBUTARY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BASANTPUR DISTRIBUTARY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

SIKRAUL DISTRIBUTARY 5181.00 6994.35 -

IP Could Not be

Assessed

Field Data on IP Not Available

NENUA DISTRIBUTARY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BASAULY 2353.00 3176.55 - 3074.45 Pending

SIKRAUL L.P.C 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BASUDHAR 1129.00 1524.15 - 1524.15 Completed

ITARIH 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

MAHDAH 3712.00 5011.20 -

IP Could Not be

Assessed

Field Data on IP Not Available

MUKUNDPUR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Page 79: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

70

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

Total of Minors, P.C. and Direct Outlets 23033.00 31094.55 - 31094.55 Completed

BARAON DISTRIBUTARY 3972.00 5362.20 - 5362.20 Completed

BHANPUR DISTRIBUTARY 3972.00 5362.20 - 5362.20 Completed

BALTHARY DISTRIBUTARY 5472.00 7387.20 - 7387.20 Completed

RASULPUR DISTRIBUTARY 4284.00 5783.40 - 5783.40 Completed

GARA CHOUBEY BRANCH CANAL 43402.00 58592.70 - 44370.97

Balance IP could not

be assessed

due to non availability

of Field data

NEW SONEBARSA DISTRIBUTARY 1563.00 2110.05 - 2048.43 Pending

PARHUTY DISTRIBUTARY 3350.00 4522.50 - 4522.50 Completed

KARGAHAR DISTRIBUTARY 12713.00 17162.55 - 7896.79 Pending

SALTHUA DISTRIBUTARY 5104.00 6890.40 - 6812.74 Pending

Page 80: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

71

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

DUM-DUMA SUB DISTYRIBUTARY 803.00 1084.05 - 1084.05 Completed

PAKIYAWA MINOR 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

Adjustment for DO'S and Data Gaps 6806.00 9188.10 -

IP Could Not be

Assessed

Field Data on IP Not Available

GOGAHRA DISTRIBUTARY 1102.00 1487.70 - 1428.35 Pending

LOKNATHPUR DISTRIBUTARY 1727.00 2331.45 - 2331.45 Completed

RAGHUNATHPUR DISTRIBUTARY 1938.00 2616.30 - 2616.30 Completed

KATHRAIN DISTRIBUTARY 1727.00 2331.45 - 2331.45 Completed

NEW DANGRI DISTRIBUTARY 1632.00 2203.20 - 2203.20 Completed

NEW BAHUPUR DISTRIBUTARY 1720.00 2322.00 - 2005.58 Pending

SABDULLAHPUR DISTYRIBUTARY 0.00 0.00 - 0.00 Pending

SIZUA DISTRIBUTARY 0.00 0.00 - 0.00 Pending

Page 81: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

72

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Name of Canal CCA (ha) Irrigation Potential Proposed

(ha)

Irrigatioin Potential created as on March 2007 (ha)

Field Reported

(ha)

Satellite Derived

(ha) Remarks

NEW GORSARA DISTRIBUTARY 1429.00 1929.15 -

IP Could Not be

Assessed

Field Data on IP Not Available

BANWARICHAK DISTRIBUTARY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

BAGADIH DISTRIBUTARY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

KATHRINE DISTRIBUTARY 0.00 0.00 -

IP Could Not be

Assessed

Field Data on IP Not Available

PANJRAO DISTRIBUTARY 887.00 1197.45 - 0.00 Pending

TIRA TIRAITHA 0.00 0.00 - 0.00 Pending

MAHARTHA 0.00 0.00 - 0.00 Pending

Total of Minors and w/c from 0 to 57.54 13614.00 18378.90 - 16986.92 Pending

KHURMABAD DIST. 4826.00 6515.10 - 6515.10 Completed

Page 82: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

73

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Figure-5 Map showing satellite derived Irrigation Infrastructure and Irrigation Potential of Sone Modernisation Project, Bihar State.

Page 83: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

74

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Annexure I

Salient Features of the Sone Modernisation Project

I GENERAL State BIHAR Districts Benifited Rohtas, Bhojpur,

Kalmur, Buxar, Patna, Gaya, Arwal and Aurangabad

River SONE Nature of the Project ERM II Location Head Works Barrage at Indrapuri

(District, Rohtas) Latitude 240 48’ Longitude 840 07’ III Hydrology (a) Catchment Area at Barrage 68,916 sq km (b) Mean Annual Rainfall 1398mm (c) Net Utilization GW Potential 3136.30 M m3

(d) Present GW Utilisation 918.20 M m3

(e) Proposed additional GW Utilisation 714.20 M m3 (f) Post development Utilisation 1632.40 M m3 (g) Balance GW for future development 1503.90 M m3 IV Barrage data (a) Length 1410 m (b) Design flood discharge 41,300 cumecs (c) Maximum observed flood discharge 34,100 cumecs (d) Pond Level RL 108.38 m (e) Weir Crest level RL 104.00 m (f) River bed level RL 103.80 m (g) Under sluice crest level RL 103.40 m (h) Design HFL RL 109.60 m (i) Afflux 1.22 m V Canal System Western Canal system (a) Western Link Canal L=10.45 km Q=448.00 cumecs (b) Main Western Canal L=32.50 km Q=317.80 cumecs (c) Ara Canal L=84.50 km Q=160.22 cumecs (d) Dumraon Branch Canal L=64.87 km Q=34.88 cumecs

Page 84: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

75

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

(e) Behia Canal L=49.60 km Q=41.66 cumecs (f) Buxar Canal L=70.00 km Q=85.90 cumecs (g) Chausa Branch Canal L=62.50 km Q=23.60 cumecs (h) Gara Choubey Br. Canal L=61.20 km Q=39.76 cumecs Eastern Canal System (a) Eastern Link Canal L=10.86 km Q=133.34 cumecs (b) Main Eastern Canal L=11.00 km Q=99.23 cumecs (c) Patna Canal L=129.50 km Q=99.23 cumecs VI Command Area GCA (a) L.L. Canal system 7.04 lakh ha (b) H.L.canal System 1.84 lakh ha 8.88 lakh ha CCA (a) L.L. Canal System 5.60 lakh ha (b) H.L. Canal System 1.39 lakh ha 6.99 lakh ha Annual Irrigation (a) L.L. Canal System 7.61 lakh ha (b) H.L. Canal System 1.39 lakh ha 9.00 lakh ha VII Intensity of Irrigation (in

%)

For L.L. Canal System 135 % (a) Kharif 62.05 (b) Rabi 65.00 (c) Hot Weather 6.50 (d) Perennial 1.50 Total 135.00 For H.L. Canal System (a) Kharif 58.00 (b) Rabi 42.00 (c) Hot Weather NIL (d) Perennial NIL Total 100.00 IX Benefit Cost Ratio

(@ 10% of interest) 2.5:1.0

X Internal Rate of Return 24%

Page 85: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

76

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Annexure II

Profile of the Sone Modernisation project through Satellite images and Ground photographs

Page 86: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

77

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Page 87: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

78

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

GLOSSARY OF TERMINOLOGY Ancillary Data Secondary data pertaining to the study area, such as topographic, demographic, climatological, etc., Band A wavelength interval in the electromagnetic spectrum. For example, in Landsat images the bands designate specific wavelength intervals at which images are acquired. Branch canal is the primary artery of canal water delivery system of off takes from reservoir. Command Area represents the area irrigated or capable of being irrigated either by gravitational flow or by lift irrigation or by any other method and includes every such area by law in force in the State; also referred as ayacut. Cropping Pattern is determined according to relative acreage of various crops in the command. Cross Drainage structures are structures constructed across canals for passing the drain include super passage, Pipe culvert, depressed hume pipe culvert, aqueducts, Cultivable Command Area (CCA) is the portion of the Gross Cultivable Area, which is cultivable. Digital image is an image where the property being measured has been converted from a continuous range of analogue values to a range expressed by a finite number of integers, usually recorded as binary codes from 0 to 255, or as one byte. Digitization Process of converting an analog display into a digital display. Distributary is the tertiary artery of the canal water delivery system. It takes off from the main canal.

Page 88: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

79

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Field Channel is the tertiary irrigation unit which takes off from an outlet to deliver water to individual farm fields or a group of farm fields. Geometric Correction Image processing procedure that corrects spatial distortions in an image. Gross Command Area (GCA) is the total area, which can be irrigated in a project command. It includes the area covered by roads, culverts, settlements, uncultivable area etc. Ground Truth Jargon coined for data, information, and observations obtained on the surface or subsurface about features or classes, used to aid in interpretation of remotely sensed data. Image Pictorial representation of a scene recorded by a remote sensing system. Although image is a general term, it is commonly restricted to representations acquired by non-photographic methods. Intensity of Irrigation is the ratio of the actual area irrigated in a season to the total cultivable command area; expressed as %. Interpretation The process in which a person extracts information from an image. Irrigation infrastructure is the structures constructed in an irrigation project to create irrigation potential include canal network , head regulator, cross regulator, canal off-take structures, cross drainage structures, drop structures, roads, road bridges, cart bridges, and foot bridges, etc. Kharif is an important agricultural season and commences during June-July after the onset of southwest monsoon and ends during October-November. Main Canal is the principal artery of the distribution system.

Page 89: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

80

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Minor is fourth artery of the canal water delivery system. It takes off from the distributary and can be a ridge canal irrigating on both sides. It is also sometimes referred as lateral. Monitoring is the process of collecting information about the actual execution of planned tasks and factors, which might affect their execution; analyzing these in relation to the plan and exercising control so that the deviations from the plan are minimal. Mosaic Composite image made by piecing together individual images covering adjacent areas. Orbit is the path traced out by a satellite in space as it moves around the earth. Path-Row Index-System for locating satellite remotely sensed images. Pixel Picture element-In a digitized image, the area on the ground represented by each digital number. Sub Minor is fifth artery of the canal water delivery system. It takes off from the minor or Lateral and can be a ridge canal irrigating on both sides. It is also sometimes referred as sub-lateral. Raster format-A means of representing spatial data in the form of a grid of DN, each line of which can be used to modulate the lines of a video raster. Real Time Refers to images or data made available for inspection simultaneously with their acquisition. Registration Process of superposing two or more images or photographs so that equivalent geographic points coincide. Remote Sensing Collection and interpretation of information about an object without being in physical contact with the object.

Page 90: Assessment of Irrigation Potential Created in AIBP funded ...jsac.jharkhand.gov.in/Report_PDF/AIBP/AIBP_SONE_2009.pdfv Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09The inventory

__________________________________________________________________________

81

Project Report JSAC-DoIT-Goj-AIBP-April09-JSAC-TR02/09

Resolution Ability to separate closely spaced objects on an image or photograph. Resolution is commonly expressed as the most closely spaced line-pairs per unit distance that can be distinguished and also called as spatial resolution. Scale Ratio of distance on an image to the equivalent distance on the ground. Scene Area on the ground that is covered by an image or photograph. Sensor is device that receives electromagnetic radiation and converts it into a signal that can be recorded and displayed as either numerical data or an image.