ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
1
Institute for Storage ring facilities, Aarhus
• ASTRID is operating ~40 weeks/year, 24 hours/day, 7
days/week
• ~150 users annually, 50/25/25 % from abroad/Aarhus/DK
FUNDING for ASTRID2 37 MDKK (5 M€) 08/2009-02/2013:
•ASTRID modifications (mainly fast extr. kicker)
•Transfer beamline
•ASTRID2
•2T MPW
•Smaller SR beamline modifications/upgrades
10 MDKK for AMOLINE (incl. U-53)
Future (X-mas): Materials/iNANO/STM beamline
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
ASTRID2 with beamline layout
2
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
Present ASTRID injections
3 19-10-2007 18-10-2007 17-10-2007
Cu
rre
nt
[mA
]
220
200
180
160
140
120
100
80
60
40
20
0
Life
time
[ho
ur]
220
200
180
160
140
120
100
80
60
40
20
0
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
4
Beamlines at ASTRID
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
ASTRID2 schedule
37 MDKK (5M€) 08-2009/02-2013
•2010 normal ASTRID operation with SR
•2011 install ASTRID2
•2012 Commission ASTRID2 and first beamline
•2013 ASTRID2 operating in full including all beamlines
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
ASTRID2 with 4 ID’s
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
Parameter ASTRID2 ASTRID
Energy 580 MeV 580 MeV
Circumference 45.7 m 40.0 m
Current 200 mA 200 mA
Lifetime Top-up (~few hours) ~100 hours
Horizontal emittance ~10 nm 140 nm
H/V tunes 5.23/2.14 2.29/2.69
H/V Chromaticity -6.4/-11.2 -4.0/-7.1
Energy spread 0.24/0.45 keV 0.36 keV
Characteristic energy Dipole/MPW 0.43 ‰ 0.43 ‰
Characteristic wavelength 5.2/2.8 nm 3.5 nm
Straight sections (number and length) 4x3.0 m 12.0 m
ASTRID vs. ASTRID2
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
• DBA
• 6-fold symmetry
• Each period:
• 2 combined function dipole
magnets
(+ pole-face strips for qpole)
• 2 quadrupole families
• 2 sextupole families
• 4 H/2 V correctors
• 4 BPM’s
ASTRID2 lattice
9
QF3 QF3 QF2 QF2
SD SF SD
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
Girder/vacuum design
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
• Each dipole chamber has
› one 150 l/s ion pump with integrated TSP
› All interconnecting tubes (Ø38mm) are
NEG coated
• Insertion straights
› ID chambers are NEG coated
• Bake out: In-situ
› Dipole chambers: ~150°C
› Interconnecting tubes (NEG): ~200°C
› Heating: Thin (<0.5 mm) heating foil (Soleil)
› Isolation: Thin (~1 mm) ceramic “paper”
• Bake-out of first sector has ended today
ASTRID2 Vacuum
11
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
Dipole chamber with pole-face strips
12
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
ASTRID2 JAN-SEPT 2011
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
Insertion devices for ASTRID2
14
1. ASTRID U55, 0.56 T, 48 poles
2. New W116 mm period, 2 T, 14 poles
3. New U53, 1.06 T, 87 poles, ordered from
KYMA for AMO beamline
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
• ASTRID2 will be operated in top-up mode using ASTRID as a booster
Long cycle time of ASTRID, ~10 s
• 1 ¼ turn ASTRID extraction using the existing DC septum (12mm, 9°) and new
fast kicker (150 mm long, 132 gauss, <50 ns, flat-top jitter < ±0.02)
• Transfer beamline to take the beam below ASTRID2 through the girder injecting
into ASTRID2 from the inside.
• Beam is injected into ASTRID2 with a pulsed septum (15°)and 3 bumpers
(250 Gauss)
• ASTRID2 commissioned alternating with ASTRID operation and beamline
transfer → minimize dark period
ASTRID → ASTRID2
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
ASTRID
Extr. Kicker
septum
ASTRID2
bumper
septum
ASTRID2 injection
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
ASTRID 1¼ turn extraction
17
0 5 10 15 20 25 30 35 40-30
-20
-10
0
10
20
30
40
50
Position in ring [m]
Positio
n [
mm
]
Astrid 1¼ turn extraction
Bumpers on, Kicker on, 1 kick
Bumpers on, Kicker on, 2 kicks
Bumpers on, Kicker off
CK SS C C BL CBL BL BL
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
ASTRID extraction kicker
18
-2
0
2
4
6
8
10
12
-200 -150 -100 -50 0 50 100 150 200 250 300
Cu
rre
nt [
mA
]
Time (ns)
Extraction Beamline: Fast Current Transformer SignalBackground subtracted
50ns
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
Simulated ASTRID2 injection
19
-15 -10 -5 0 5 10 15 20-4
-3
-2
-1
0
1
2
3
4Horizontal phase space, dx=0.0013 df=0.0001 dp=0.0004
Position [mm]
Angle
[m
rad]
1
2
3
4
5
6
7
8
910
11
12
13
14
15
septum
septum
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
Diagnostics instruments
20
RF Cavity w. IonpumpValve
BPMStripline
DCCTViewer
Ionpump
Valve
BPM
BPM
SR camera
Bumper
Bumper
Bumper
Dual Stroke ViewerFCT (Fast Current Transformer)
StriplineBPM
Septum
SR camera
BPM
BPM
BPMBPM
BPM
BPM
BPM
BPM
BPMBPM
3.0 m
Standard suite of beam diagnostics
Since last, we chose LIBERA Electron BPM system (24),
which has been received.
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
ASTRID2 RF system
21
• 105 MHz (like ASTRID)
• Main ASTRID2 RF parameters
Synchrotron radiation power: ~1.4 kW (incl. IDs)
Harmonic: 16
RF voltage: 50-150 kV
Synchrotron frequency: 10-20 kHz
Cavity power: 0.8-7 kW
8 kW solid state amplifier has been ordered from TOMCO
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
ASTRID/ASTRID2 RF
• Old 105 MHz Cu-plated capacity-loaded
cavity with stubs operating since 20 years
• Several (outside) water leaks has been fixed!!
• 20 kW tetrode transm. (tube changed once)
• For ASTRID2 and ASTRID, 2 ebeam welded
cavities are procured together with MAXLAB
from RI.
• Delivery of first cavity February 2012.
• Intend to procure Landau cavity together with
MAXLAB
(Thank you Åke and others)
22
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
ASTRID/2 105 MHz Cu cavity
23
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
MAXLAB Landau cavity
24
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
LLRF
25
PreAmp
+40 dB, 10 W
FM transmitter
+36 dB, 10 kW
Splitter
Master oscillator 104.95 MHz
Rohde&Schwartz SMY01 or DDS
CombinerPhase
shifter
Atten-
nuator
-5 –
-55 dB
-180 –
+180
optional
Fast feedback loop
Diag
RF
sp
litt
er
DM
Diag
Realtime computer (running LabVIEW RealTime) with
FPGA controlled IO (NI PCIe-7852) for fast regulation and a Multifunction card for slower IO
adcM
Ole
vel
dacφ
dac
A
MOMO
adcC
avQ
adcC
avI
adcF
PW
Q
adcF
PW
I
dac
Plu
nger
adcR
PW
(fa
st)
Attenuator/
gain
-35 –
+20 dBm
Phase
shifter
-180 –
+180
adcD
riveP
wr
adcP
reA
mp
Inp
ut
adcB
eam
Curr
ent
Diag
adcS
par
e(f
ast)
Mic
Tri
gger
Ram
pT
rigger
Diag
Home-built digitally controlled analogue system. PC running
LabVIEW Real-Time with a commercial FPGA.
Operated at ASTRID since one year.
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
Missing/late items/nearest future
26
Installation, cabling and mechanical mounting ongoing.
RF solid state amplifier (TOMCO) (late Jan. 12)
RF cavity (February)
BPM blocks Coorstek Advanced Materials (Saint-Gobain)
ordered Dec. 2010. 11 out of 26 received (1 leaks)!
First commissioning in February 2012 (?)
TATION pRÆSEN
20 DECEMBER, 2008
AARHUS
UNIVERSITET
THANK YOU FOR YOUR ATTENTION
SØREN PAPE MØLLER
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
1E+11
1E+12
1E+13
1E+14
1E+15
1E+16
1E+17
0.001 0.01 0.1 1 10
Ph
/s*m
m^
2*m
rad
^2
*0.1
BW
Photon Energy (keV)
Brilliance
Undulator, ASTRID2
Undulator
2T 12 pol wiggler, ASTRID2
Bend, ASTRID1
Bend ASTRID2
ASTRID-ASTRID2 comparison
TATION pRÆSEN
20 DECEMBER, 2008
AARHUS
UNIVERSITET
ESLS XIX
23rd & 24th november
Søren Pape Møller
Welcome & ASTRID2
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
Aarhus University, Denmark
• ~40.000 students
• ~11.000 staff (~6.500 academic,
~4.500 tech/adm.)
• Budget 800 M€
• Established in 1928
• 2nd largest university in Denmark
• Has all the standard academic areas
• Merging with
Aarhus School of Business and
Engineering College of Aarhus
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
Department of Physics and Astronomy
31
• ~100 students/year
• ~100 staff (~50 academic, ~50 tech/adm.)
• Established in 1933 (for teaching medical students)
• Part of Faculty of Science and Technology (from 1954)
• Main research areas
› Atomic, molecular and optical (AMO) physics
› Condensed matter physics and nanophysics, surface
physics, statistical physics and biophysics
› Subatomic physics
› Astrophysics and cosmology
ASTRID
Søren Pape Møller
22-24 Nov 2011
AARHUS
UNIVERSITET
Institute for Storage Ring Facilities (ISA)
32
• ~10 staff +
• Operate and develop the
synchrotron ASTRID and
ASTRID2
• Other accelerator projects:
ELISA (electrostatic storage
ring for ions)
several other small
electrostatic accelerators and
storage rings
• Involvement in:
DANFYSIK projects
PT
ESS