ATN Subnetwork Implementation: VDL Mode 2/Controller Pilot Data Link Communications (CPDLC) Presentation ATN 3-4 by R. Oishi, ARINC ICAO Regional ATN Seminar 6-7 May 2002. Aviation Communications. Aeronautical Operational Control (AOC) Dispatcher - Pilot Communications - PowerPoint PPT Presentation

TRANSCRIPT

A1

ATN Subnetwork Implementation:ATN Subnetwork Implementation:VDL Mode 2/Controller Pilot Data Link VDL Mode 2/Controller Pilot Data Link

Communications (CPDLC)Communications (CPDLC)

Presentation ATN 3-4 by R. Oishi, ARINCICAO Regional ATN Seminar

6-7 May 2002

A2

Aviation Communications

Aeronautical Operational Control (AOC)• Dispatcher - Pilot Communications• Operational Information• Flight Information Services

Air Traffic Services (ATS)• Controller - Pilot Communications• Flight Information Services

A3

VDL Mode 2 Subnetwork

FMSor ATSU

VDLRadio

CMU

ATN Aircraft

FMSor ATSU

MU or CMU

VDLRadio

VDL Mode 2Subnetwork

GroundStation

AOC G/G Network

ATN G/G Network

ATNRouter

ATN ATCEnd System

ACARS Aircraft

Air/GroundRouter

AOCEnd System

MessageProcessor

ATN Messages

ACARS Messages

A4

VDL Mode 2 Ground Station Status

US• 40+ AOA stations operational

…and approaching 50+ stations quickly over 90 stations deployed by end of CY 2002

• 9 aircraft using AOA operationally and number of aircraft growing (revenue flights)

Europe• 3 AOA stations being installed to support Airbus

Toulouse is operational Lyon and Nice are installed; waiting for frequency

license

A5

ARINC VDL Coverage Available/Near-Term

A6

EUROCONTROL PETAL II

PETAL II in operational environment at Maastricht Upper Air Control Centre• With line ATC controllers • Revenue and non-revenue flights of American Airlines 767-

300ERs• Also conducted test flights with Qinetiq BAC1-11 in a test

sector configuration • Flight operations completed September 01

PETAL II was a Success• Demonstrated viability/suitability of CPDLC over

VDLM2/ATN• Worked out many technical and ops issues for CPDLC over

VDLM2/ATN in a trials environment• Basis for US-based CPDLC program and Link 2000+

A7

CPDLC Partnership

A

A8

FAA CPDLC Build 1

CPDLC Build 1 partners, in a consensus decision, replanned CPDLC Build 1• Technical validation and operational evaluation conducted• Operational service begins Sep 02 and lasts until Build 1A

(Dec 05)

ARINC has installed the US ATN/VDLM2 ground network • 4 stations in FL operational (MCO, RSW, GNV, MIA)• Provides partial coverage of the Miami ARTCC airspace to

support testing pre-operational testing • 5 additional stations (9 total) to be operational by Sep 02

FAA flight tests with Rockwell Collins• In the Miami ARTCC• Three successful flights on 22, 24 January 02

A9

CPDLC Build I Coverage Map

A10

Summary ARINC VDL Mode 2 and CPDLC

AOA and ATN capability using VDL Mode 2 is now available

Customers are using VDL Mode 2 operationally today

Coverage is being expanded as customer aircraft are equipped

CPDLC activities are proceeding• PETAL II was a success• CPDLC Build 1 is in flight tests