Attachment 5.1Scheduled Meeting of Council9 September 2020Page 1
Page 2 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 2
Page 3 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 3
Page 4 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 4
Lawyers and Planning Consultants
ABN 53 692 008 486
Tel: 0448 793 795
Email: admin@belllegalplanning.com.au
Post: PO Box 129, Kilmore VIC 3764
Application for planning permit
Use of land for a café – 3-9 Back Eildon Road, Thornton 1
APPLICATION FOR PLANNING PERMIT
Use of land for a café - 3-9 Back Eildon Road, Thornton
Figure 1 – Existing buildings located on the Subject Land, formerly the Thornton State School.
Introduction
A planning permit is sought for the use of land for a café at 3-9 Back Eildon Road, Thornton (Subject
Land). The Subject Land is located in the Murrindindi Shire and is governed by the Murrindindi
Planning Scheme (Scheme).
Site description
The Subject Land is located in the township of Thornton and is the site of the former Thornton State
School No 1371. The Subject Land consists of two parcels more particularly described as lot 1 on
TP431776S (3 Back Eildon Road) and lot 1 on TP962705E (9 Back Eildon Road) and is located to the
north-west of the Goulburn Valley Highway and Back Eildon Road intersection.
Please refer to the attached certificates of title volume 4749 folio 755 and volume 12168 folio 427.
Lot 1 on TP431776S has an area of approximately 3721 m². It is an L-shaped allotment with a
14.5 metre frontage to the Back Eildon Road. Lot 1 on TP962705E is a rectangular allotment and has
an area of approximately 4049 m². This allotment has a 100 metre frontage (approximately) to the
Back Eildon Road.
Page 5 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 5
Bell Legal & Planning admin@belllegalplanning.com.au 0448 793 795
Application for planning permit
Use of land for a café – 3-9 Back Eildon Road, Thornton 2
The two lots combined contain the former school building, two smaller wooden sheds, a steel shed
and the school toilet block. The Subject Land contains mostly exotic species of trees and a few
native trees predominantly around the perimeter of the Subject Land and in the south-eastern
corner, with a significant large native tree located in the south-western corner of the land and a
significant mature oak located centrally on the southern boundary. The northern section of the
Subject Land contains an open grassed area, formerly the school’s football field and cricket pitch,
and a bituminised court located closer to the buildings which currently contains faded line-markings
for various ball sports played by the school children.
The buildings are located reasonably centrally on the Subject Land. The Subject Land has an existing
access towards the north-eastern corner with a sealed driveway leading towards the sealed court
area. There is an existing sealed carparking area located on the road reserve at the frontage of the
Subject Land, with sufficient area for seven parallel spaces. See Figure 2 below showing the Subject
Land and Figure 3 showing the location of the Subject Land within the broader Thornton township.
Figure 2 – Subject Land.
Page 6 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 6
Bell Legal & Planning admin@belllegalplanning.com.au 0448 793 795
Application for planning permit
Use of land for a café – 3-9 Back Eildon Road, Thornton 3
Figure 3 – Location of Subject Land to the north-west of the main crossroads in Thornton.
The immediate surrounding parcels of land are used for residential purposes and generally contain
dwellings with ancillary outbuildings. To the south of the main intersection lies the small
commercial area of Thornton, which includes a butcher shop, take-away food store, general store
and Rubicon Hotel. The Thornton Caravan Park is to the north-east of the intersection.
The Subject Land is in the Township Zone and is subject to the Floodway Overlay (FO) and Heritage
Overlay (HO). An Area of Aboriginal Cultural Heritage Sensitivity exists over the northern section of
the Subject Land. The land immediately surrounding the Subject Land is a mixture of Township
Zone and Farming Zone with the exception of the Goulburn River which is in the Public Conservation
and Resource Zone and the Goulburn Valley Highway which is in Road Zone Category 1. The FO also
applies to the surrounding land. Refer to the zoning map in Figure 4, the overlay maps in Figures 5
and 6 and the map showing the area of aboriginal cultural heritage sensitivity in Figure 7.
Page 7 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 7
Bell Legal & Planning admin@belllegalplanning.com.au 0448 793 795
Application for planning permit
Use of land for a café – 3-9 Back Eildon Road, Thornton 4
Figure 4 – Map showing the zoning of the Subject Land and surrounds.
Figure 5 – Floodway Overlay.
Page 8 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 8
Bell Legal & Planning admin@belllegalplanning.com.au 0448 793 795
Application for planning permit
Use of land for a café – 3-9 Back Eildon Road, Thornton 5
Figure 6 – Heritage Overlay.
Figure 7 – Area of aboriginal cultural heritage sensitivity.
In accordance with the Aboriginal Heritage Regulations 2018 particular uses of land require a
cultural heritage management plan where the use is considered a high impact activity and the
activity area includes an area of cultural heritage sensitivity. As the current proposal is for the use of
Page 9 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 9
Bell Legal & Planning admin@belllegalplanning.com.au 0448 793 795
Application for planning permit
Use of land for a café – 3-9 Back Eildon Road, Thornton 6
the land for a café and does not require any significant ground disturbance, we have been advised
that a cultural heritage management plan is not required for the proposal.
Proposal
The proposal is for the use of the Subject Land for a café. The café will be located in the main school
building on the Subject Land and an additional food preparation area will be located in the existing
steel shed on the site.
The café building consists of an entry way leading into two large rooms providing tables and chairs
for sit-down customers. The café also includes a small kitchen and preparation area, and a servery in
the larger of the dining rooms. A larger food preparation area will be located in a separate building,
which will be partitioned into two rooms to also provide a small office area for the running of the
café.
The café will include both sit-down and takeaway food, with a focus on providing breakfast and
lunch, as well as morning and afternoon teas and hot drinks for patrons.
The seating capacity of the café is 36 patrons, divided between the two large dining rooms. We note
that these numbers are presently restricted in accordance with government guidelines due to
COVID-19.
The proposed operating hours for the café are 6:30 am to 5:30pm, 7 days a week. The early opening
time is to serve the needs of tradespeople and other workers moving through the area in the early
hours, as well as locals and tourists alike.
The Subject Land currently has 7 existing parallel car spaces on the road reserve at the frontage of
the land with direct access through a pedestrian gate to the café building. The area of the café and
the food preparation area requires 6 car spaces in accordance with clause 52.06 of the Scheme.
Although this requirement is met with the existing spaces on the road reserve, an additional 5 car
spaces are proposed to be provided on site, one of which will be an accessible parking space. These
proposed car spaces will be accessed via the existing driveway access from Back Eildon Road and
along a sealed driveway.
The former school toilet block will be updated and includes sufficient toilet facilities for staff and
patrons. The toilet building includes two toilets and two wash basins for females, one toilet, one
urinal and two wash basins for males, one unisex accessible toilet and washbasin, and an additional
toilet and washbasin for staff. A new wastewater treatment system will be installed due to the old
system being removed sometime after the school closed in 2013. A Land Capability Assessment has
been prepared for the site which demonstrates that the land is suitable for sustainable on-site
effluent disposal.
No external alterations are proposed to the café building, other than fresh paint, replacing broken
glass in the windows due to vandals after the school closed, and other routine maintenance and
repairs. Internally, the two former classrooms will remain essentially the same, and alterations to
the northern part of the building will include the fit-out and installation of the kitchen and food
preparation areas.
Page 10 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 10
Bell Legal & Planning admin@belllegalplanning.com.au 0448 793 795
Application for planning permit
Use of land for a café – 3-9 Back Eildon Road, Thornton 7
Please refer to the attached:
- Existing site plan (TP-01);
- Proposed site plan (TP-02);
- Floor plan of the café building (TP-03);
- Floor plan of the food preparation area and toilet building (TP-04);
- Proposed parking plan (TP-05); and
- Land Capability Assessment prepared by Paul Williams & Associates Pty Ltd, Report No.
A200505, June 2020.
Please note no permanent signage is proposed for the café at this stage. A local laws application for
an A-frame sign will be made if required.
Permit Triggers
The following planning permit trigger applies to this application:
• Clause 32.05 Township Zone – a permit is required to use the land for a retail premises.
The proposed café falls within the definition of a “food and drink premises” which is defined in
clause 73.03 of the Scheme as:
Land used to prepare and sell food and drink for immediate consumption on, or off, the
premises.
A food and drink premises is included in the broader land use term of “retail premises”. In the
Township Zone a retail premises is a section 2 use.
Zoning
Clause 32.05 Township Zone
The purpose of the Township Zone (TZ) is:
• To implement the Municipal Planning Strategy and the Planning Policy Framework.
• To provide for residential development and a range of commercial, industrial and other uses
in small towns.
• To encourage development that respects the neighbourhood character of the area.
• To allow educational, recreational, religious, community and a limited range of other non-
residential uses to serve local community needs in appropriate locations.
The proposed café is consistent with the purpose of the TZ. The café is located within an existing
building on the Subject Land and provides an opportunity to bring life back into the old school
buildings. The café is located reasonably centrally to the Thornton township and will not only
service the local community but the extensive tourism trade with traffic coming through Thornton to
access Lake Eildon. The Thornton Caravan Park is also located within short walking distance to the
café providing another option for visitors to the area. The Subject Land provides sufficient area for
carparking, both at the frontage of the land and with additional spaces proposed on site and as such,
will not have a detrimental impact on the neighbouring residential properties.
Page 11 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 11
Bell Legal & Planning admin@belllegalplanning.com.au 0448 793 795
Application for planning permit
Use of land for a café – 3-9 Back Eildon Road, Thornton 8
Decision guidelines
Clause 32.05-13 Decision guidelines - a response to the relevant guidelines is provided as follows:
Guideline Response
The protection and enhancement of the character of the town and surrounding area including the retention of vegetation.
The café will be located in the existing former school building on the site. The character of the town will be further enhanced with the proposed café breathing life back into the former school site. No vegetation is required to be removed for the proposed use.
The availability and provision of utility services, including sewerage, water, drainage, electricity, gas and telecommunications.
A new effluent disposal system is proposed for the Subject Land and the site has access to reticulated water and electricity.
In the absence of reticulated sewerage, the capability of the lot to treat and retain all wastewater in accordance with the State Environment Protection Policy (Waters of Victoria) under the Environment Protection Act 1970.
The Subject Land is suitable for sustainable onsite effluent disposal. Please refer to the attached Land Capability Assessment prepared by Paul Williams and Associates Pty Ltd.
The design, height, setback and appearance of the proposed buildings and works including provision for solar access.
No new buildings are proposed.
Provision of car and bicycle parking and loading bay facilities and landscaping.
Provision for car parking has been made on the Subject Land as well as utilising the existing car spaces at the frontage of the Subject Land. The Subject Land contains existing substantial landscaping and no further landscaping is proposed at this stage.
The effect that existing uses on adjoining or nearby land may have on the proposed use.
The uses of the land that adjoins the Subject Land is predominantly residential and these uses are unlikely to have a detrimental impact on the proposed use.
The scale and intensity of the use and development.
The proposed café is not considered an intensive use of the Subject Land and the café building sits well back from any adjoining residential buildings.
The safety, efficiency and amenity effects of traffic to be generated by the proposal.
The scale of the proposed use is unlikely to have any significant impact on traffic. The Back Eildon Road carries a significant volume of traffic through to Eildon. The proposed parking on site will allow cars to enter and exit the Subject Land in a forwards direction, and the
Page 12 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 12
Bell Legal & Planning admin@belllegalplanning.com.au 0448 793 795
Application for planning permit
Use of land for a café – 3-9 Back Eildon Road, Thornton 9
provision of parking at the frontage of the Subject Land provides the ability for vehicles towing caravans or boats to pull off the road and park safely.
Overlays
Clause 43.01 Heritage Overlay
The purpose of the Heritage Overlay is:
• To implement the Municipal Planning Strategy and the Planning Policy Framework.
• To conserve and enhance heritage places of natural or cultural significance.
• To conserve and enhance those elements which contribute to the significance of heritage
places.
• To ensure that development does not adversely affect the significance of heritage places.
• To conserve specified heritage places by allowing a use that would otherwise be prohibited if
this will demonstrably assist with the conservation of the significance of the heritage place.
The HO applies to the whole of the Subject Land and is listed in the schedule to the HO as HO90 as
follows:
The Murrindindi Shire Stage 2 Heritage Study 2006 identified the Subject Land as having significant
heritage value and as a result was included in the Heritage Overlay through Amendment C43 (Part 1)
gazetted on 4 December 2014. The Thornton Primary School is of local historic, social and aesthetic
significance to the Shire. The school was originally opened in 1870 as a one-roomed schoolhouse.
This building was replaced in 1902 and it is this building that is still on the Subject Land. A larger
school room was added to the school in 1923 and it is these two rooms that will house the proposed
café. The historical significance of the school is that it is one of the earliest schools that was still in
use as a school up until its closure in 2013.
For the current proposal, no external works are proposed to the school building, other than
maintenance and repairs. Internally the building will be renovated with new finishes and fittings and
the creation of the kitchen and food preparation area.
Accordingly, the requirements of the Heritage Overlay are not triggered for this application and as
advised by Council, no heritage report is required for the proposed café.
Page 13 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 13
Bell Legal & Planning admin@belllegalplanning.com.au 0448 793 795
Application for planning permit
Use of land for a café – 3-9 Back Eildon Road, Thornton 10
Clause 44.03 Floodway Overlay
The purpose of the FO includes:
• To implement the Municipal Planning Strategy and the Planning Policy Framework.
• To identify waterways, major floodpaths, drainage depressions and high hazard areas which
have the greatest risk and frequency of being affected by flooding.
• To ensure that any development maintains the free passage and temporary storage of
floodwater, minimises flood damage and is compatible with flood hazard, local drainage
conditions and the minimisation of soil erosion, sedimentation and silting.
• To ensure that development maintains or improves river and wetland health, waterway
protection and flood plain health.
As no new buildings are required for the proposed café, the requirements of the Floodway Overlay
are not triggered.
Particular provisions
Clause 52.06 Car parking
Purpose
• To ensure that car parking is provided in accordance with the Municipal Planning Strategy
and the Planning Policy Framework.
• To ensure the provision of an appropriate number of car parking spaces having regard to the
demand likely to be generated, the activities on the land and the nature of the locality.
• To support sustainable transport alternatives to the motor car.
• To promote the efficient use of car parking spaces through the consolidation of car parking
facilities.
• To ensure that car parking does not adversely affect the amenity of the locality.
• To ensure that the design and location of car parking is of a high standard, creates a safe
environment for users and enables easy and efficient use.
The Subject Land currently has provision for 7 car spaces at the frontage of the land in the road
reserve. An additional 5 car spaces are proposed on the Subject Land, one of which will be an
accessible car space. Table 1 of clause 52.06-5 sets out the car parking requirements that apply to
uses listed in the table. The required number of car spaces for a food and drink premises is 4 spaces
to each 100 square metres of leasable floor area:
Page 14 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 14
Bell Legal & Planning admin@belllegalplanning.com.au 0448 793 795
Application for planning permit
Use of land for a café – 3-9 Back Eildon Road, Thornton 11
The total leasable floor area for the proposed use is 164 square metres, comprised of 114 square
metres in the main café building and 52 square metres in the food preparation building. The
number of car spaces required for the proposal, therefore, is 6 car spaces. With 5 new car spaces
proposed on the Subject Land and the 7 parallel spaces on the road reserve, this requirement is
satisfied.
Municipal Planning Strategy
The relevant sections of the Municipal Planning Strategy are addressed as follows:
Clause 02.03 Strategic directions
Settlement
The established townships and settlements offer a significant opportunity to expand in locations
with infrastructure and leisure facilities, where natural environment is protected and where a high
level of community safety is facilitated.
Smaller townships in the municipality offer alternative lifestyle choices for residents. Council seeks
to develop its established townships and settlements by supporting each township as the focus for
residential and commercial needs and as the community and service hub for its surrounding area.
Built environment and heritage
The municipality has a diverse and colourful history and includes many sites and structures of
heritage significance. Heritage forms an essential part of the municipality’s town and rural
character. Recognition and protection of significant heritage is important for the cultural integrity
and character of the community.
The heritage value of the former Thornton State School has been protected through the application
of the Heritage Overlay. Specifically, the main school building and a small shelter shed have been
considered as significant features of the site, as well as a mature oak tree which was planted on
Arbour Day in 1923.
Planning Policy Framework
The relevant sections of the Planning Policy Framework are addressed as follows:
Clause11 Settlement
This clause identifies that Planning is to anticipate and respond to the needs of existing and future
communities through provision of zoned and services land for housing, employment, recreation and
open space, commercial and community facilities and infrastructure.
The zoning of the Thornton township provides for residential development as well as commercial
and other uses in this smaller town. The proposed café is close to the centre of town and will
provide an additional point of interest for visitors coming to Thornton or travelling through on their
way to Lake Eildon.
Page 15 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 15
Bell Legal & Planning admin@belllegalplanning.com.au 0448 793 795
Application for planning permit
Use of land for a café – 3-9 Back Eildon Road, Thornton 12
Clause 13.03-1S Floodplain management
This clause identifies the necessity to protect the natural flood carrying capacity of rivers, streams
and floodways, to protect the flood storage function of floodplains and waterways, and to protect
floodplain areas of environmental significance or of importance to river health. This clause includes
the following strategies:
• Identify land affected by flooding in planning schemes.
• Avoid intensifying the impact of flooding through inappropriately located use and
development.
The proposed use of the Subject Land is utilising existing buildings and as such, there will be no
impact on the movement of floodwater across the Subject Land.
Clause 15.03-1L Heritage Conservation
This clause identifies the importance of retaining significant heritage plans where appropriate and
encouraging new development that maintains and enhances the setting of heritage places and the
visual relationship between heritage places and the view from the public realm.
Alternative uses of heritage buildings are allowed where the original use of a heritage building is no
longer viable.
General Provisions
Clause 65 Decision Guidelines
Clause 65.01 Approval of an application or plan
Guideline Assessment
The matters set out in s60 of the Planning and Environment Act 1987.
The proposed cafe is consistent with the objectives of the Scheme and satisfies the Scheme’s requirements.
The Municipal Planning Strategy and the Planning Policy Framework.
The MPS and PPF have been addressed above.
The purpose of the zone, overlay or other provision.
The proposed café is consistent with the purposes of the TZ, HO and FO.
Any matter required to be considered in the zone, overlay or other provisions.
All matters have been considered and the proposed cafe satisfies the requirements of the zone and overlays and other provisions.
The orderly planning of the area. The proposed café is situated in an existing building on the Subject Land, which is located close to the centre of Thornton. With car parking available at the frontage of the land as well as on-site the proposed café supports the orderly planning of the area.
The effect on the amenity of the area. The proposal will not have a detrimental effect on the amenity of the area.
The proximity of the land to any public land. The Goulburn River is located to the north of the Subject Land and will not be impacted by
Page 16 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 16
Bell Legal & Planning admin@belllegalplanning.com.au 0448 793 795
Application for planning permit
Use of land for a café – 3-9 Back Eildon Road, Thornton 13
the proposed café.
Factors likely to cause or contribute to land degradation, salinity or reduce water quality.
Unsatisfactory effluent disposal is a factor that may contribute to a reduction in water quality. This has been addressed by the appropriate siting of a new effluent disposal system on the Subject Land.
Whether the proposed development is designed to maintain or improve the quality of stormwater within and exiting the site.
Not applicable
The extent and character of native vegetation and the likelihood of its destruction.
No native vegetation is required to be removed for the proposed café.
Whether native vegetation is to be or can be protected, planted or allowed to regenerate.
Not applicable.
The degree of flood, erosion or fire hazard associated with the location of the land and the use, development or management of the land so as to minimise any such hazard.
No new development is proposed for the cafe.
The adequacy of loading and unloading facilities and any associated amenity, traffic flow and road safety impacts.
The Subject Land has adequate room available for the unloading of supplies and for the provision of parking on site. The proposed café will have a negligible impact on traffic flow through the area.
Conclusion
The proposed use of the Subject Land for a cafe is consistent with the purpose and objectives of the
Scheme, namely the Municipal Planning Strategy and Planning Policy Framework, and the purpose
and requirements of the zone, overlays and particular provisions. We therefore respectfully request
that a planning permit for the use of the Subject Land for a café is issued at your earliest
convenience.
_______________________________
Angelina Bell Principal Solicitor Bell Legal & Planning 2 July 2020
Page 17 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 17
DATE: DRAWING NO:
SCALE:
NORTH: REVISION:
TP-02ABN 40 193 714 048ARBV registration No. 16171
Dion KeechArchitect
REV DESCRIPTION DATEa: 14 Kendall St, Prestonp: 0419 449 309
e: dionkeech@gmail.com
ABN 40 193 714 048ARBV registration No. 16171
THORNTON PRIMARY SCHOOLPROJECT:
SITE PLAN - PROPOSEDDRAWING TITLE:
FOR:
HEDGER CONSTRUCTIONS
1:500 @ A3B13/08/20A Preliminary issue 11/6/20
B Staff parking added 13/8/20
Site Plan - ProposedScale: 1:500
B A C K E I L D O N R O A D
No.1322 Goulburn Valley H'way
19°05'10" 114.02
109°
05'1
0"
67.9
8
289°
05'1
0 2
9.47
290°
38'1
0"
38.5
2
199°05'10" 115.07
ironshed
woodshed
No.1 Back Eildon Rd.
No.1388 Goulburn Valley H'way
Cafe
Shelter
Cafe prep.
Toilets
Bus shelter
Shed 1
Court
On site public parking
Existing parking bay
On site staff parking
11200
4 eq.
4900
drive
way
1 2 3 4
Page 18 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 18
kitchen
total floor area114m2
7400
4900
6750 1820
6200 4100
Cafe PlanScale: 1:100
Servery
Seating area 1(capacity 16)
Entry
1275
0
10700
9020
Shelter
Entry
Seating area 2(capacity 20
OutsideSeating area
accessible ramp
Entry(level platform)
Take awaywaiting zone
Court
to toi
lets/
cafe
prep
.
Existing weatehrboard school house renovated with new internal finishes, walls and equipment
DATE: DRAWING NO:
SCALE:
NORTH: REVISION:
TP-03ABN 40 193 714 048ARBV registration No. 16171
Dion KeechArchitect
REV DESCRIPTION DATEa: 14 Kendall St, Prestonp: 0419 449 309
e: dionkeech@gmail.com
ABN 40 193 714 048ARBV registration No. 16171
THORNTON PS CAFEPROJECT:
CAFE PLANDRAWING TITLE:
FOR:
HEDGER CONSTRUCTIONS
1:100 @ A3
A First issue 19/5/20
A17/06/20
Page 19 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 19
DATE: DRAWING NO:
SCALE:
NORTH: REVISION:
TP-02ABN 40 193 714 048ARBV registration No. 16171
Dion KeechArchitect
REV DESCRIPTION DATEa: 14 Kendall St, Prestonp: 0419 449 309
e: dionkeech@gmail.com
ABN 40 193 714 048ARBV registration No. 16171
THORNTON PRIMARY SCHOOLPROJECT:
SITE PLAN - PROPOSEDDRAWING TITLE:
FOR:
HEDGER CONSTRUCTIONS
1:500 @ A3A11/06/20
Site Plan - ProposedScale: 1:500
B A C K E I L D O N R O A D
No.1322 Goulburn Valley H'way
19°05'10" 114.02
109°
05'1
0"
67.9
8
289°
05'1
0 2
9.47
290°
38'1
0"
38.5
2
199°05'10" 115.07
ironshed
woodshed
No.1 Back Eildon Rd.
No.1388 Goulburn Valley H'way
Cafe
Shelter
Cafe prep.
Toilets
Bus shelter
Shed
Court
On site parking
Existing parking bay
Page 20 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 20
DATE: DRAWING NO:
SCALE:
NORTH: REVISION:
TP-05ABN 40 193 714 048ARBV registration No. 16171
Dion KeechArchitect
REV DESCRIPTION DATEa: 14 Kendall St, Prestonp: 0419 449 309
e: dionkeech@gmail.com
ABN 40 193 714 048ARBV registration No. 16171
THORNTON PSPROJECT:
DRAWING TITLE:
FOR:
HEDGER CONSTRUCTIONS APLAN - CAR PARKING 1:250 @ A3
2/06/20
Plan - Car parkingScale: 1:250
B A C K E I L D O N R O A D
2800
5400
6400
2400 2400 28002800 2800
4 3 2 1
tree #1 Elm
Fence
Fenc
e
Court
existing roadalignment
Bus shelter
Cafe
Oval
Existing gate
Existing crossover
gate
s
existing parallel bays (currently unmarked)
existing pedestrian entry
76
5
tree #26Kurrajong
54321
6700
typical
2300
Page 21 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 21
HEDGER CONSTRUCTIONS
LAND CAPABILITY ASSESSMENT FOR
ON-SITE WASTEWATER MANAGEMENT AT
3-9 BACK EILDON ROAD, THORNTON
REPORT No. A200505 JUNE 2020
By
Paul Williams, B.App.Sc.
Paul Williams & Associates Pty Ltd CONSULTANTS IN THE EARTH SCIENCES
IMPORTANT NOTE
The land capability assessment report consists of this cover sheet, two
written sections, three drawings and four appendices.
The report elements are not to be read or interpreted in isolation.
Copyright - Paul Williams & Associates Pty Ltd. Any reproduction must be in full.
Page 22 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 22
(i)
TABLE OF CONTENTS
(ii) Assessor’s Qualifications & Insurance
(iii) Executive Summary
SECTION 1 SITE INVESTIGATION
1.1 INTRODUCTION 1
1.2 INVESTIGATION METHOD 1
1.3 CAPABILITY ASSESSMENT
1.3.1 Land-Soil Unit A
2
2
1.3.1.1
1.3.1.2
1.3.1.3
1.3.1.4
1.3.1.5
1.3.1.6
1.3.1.7
1.3.1.8
1.3.1.9
1.3.1.10
1.3.1.11
1.3.1.12
Climate
Slope and Aspect
Vegetation and Land Use
Slope Stability
Subsurface Profile
Soil Permeability
Basement Rock Permeability
Colloid Stability
AS1547:2012 Soil Classification
Surface Drainage
Groundwater
Nutrient Attenuation
2
2
2
2
2
2
3
3
3
3
3
4
1.4 RISK MANAGEMENT & MITIGATION 4
1.4.1
1.4.2
1.4.3
1.4.4
1.4.5
1.4.6
1.4.7
1.4.8
1.4.9
1.4.10
1.4.11
1.4.12
1.4.12.1
1.4.12.2
1.4.12.3
1.4.12.4
1.4.13
Water Usage
Secondary Treatment
Block Size
Management Plan
Sizing of Treatment System
Load Balancing
Zoned Dosing
Pressure Compensated Subsurface Disposal
Oversized Effluent Areas
Reserve Areas
Buffer Distances
System Failure
Mechanical Breakdown
Accidents
Operational Breakdown
Maintenance Breakdown
Risk Summary
4
4
4
4
4
5
5
5
5
5
5
6
6
6
6
6
6
Page 23 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 23
SECTION 2 RECOMMENDATIONS
2.1 APPLICATION 8
2.2 SUBSURFACE IRRIGATION 8
2.2.1
2.2.2
2.2.2.1
2.2.2.2
2.2.2.3
2.2.2.4
2.2.2.5
2.2.2.6
2.2.3
2.2.3.1
2.2.3.2
2.2.3.3
2.2.3.4
2.2.4
2.2.5
2.2.5.1
2.2.5.2
2.2.6
2.2.7
2.2.8
2.2.9
Disposal Strategy
Effluent
Effluent Quality
Effluent Quantity
Load Balancing
BOD Reduction
Triple Stage Grease Trap
Existing Infrastructure
Application Rates and Irrigation Areas
Hydraulic Loading
Nutrient Loading
Design Loading
Irrigation Area
General Requirements
Subsurface Distribution System
Ground Preparation and Excavation
Pump System and Pipe works
Sequential Zoned Irrigation
Inspections and Monitoring
Soil Renovation
AWTS/Sand filter
8
8
8
8
9
9
9
9
9
9
9
9
9
9
9
9
10
10
10
10
10
2.3 RESERVE AREA 11
2.4 SITE DRAINAGE 11
2.5 BUFFER DISTANCES 11
2.6 SUMMARY OF RECOMMENDATIONS 11
DRAWING 1
DRAWING 2
DRAWING 3
APPENDIX A
Results of Permeability Testing
Soil profile Photographs
APPENDIX B
Water Balance and Rainfall data
APPENDIX C
Land Capability Rating Tables
APPENDIX D
Management Plan
Page 24 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 24
(ii)
ASSESSOR’S ACADEMIC & PROFESSIONAL QUALIFICATIONS
Paul Williams is the Director and principal earth scientist at Paul Williams & Associates Pty Ltd.
He has a Bachelors Degree in Applied Science (Geology and Land Use) (awarded in 1978) and has since
specialised in vadose zone hydrology, soil science and engineering geology.
He is a member of the Foundation and Footings Society (Vic) Inc. and is a Registered Building
Practitioner (EC1486)
All fieldwork and analyses are undertaken by, or directly supervised by Paul Williams.
ASSESSOR’S PROFESSIONAL INDEMNITY INSURANCE
Policy Number: NPP-13384
Period of Cover: 14/2/2020 – 14/2/2021
Geographical Coverage: Worldwide (excluding U.S.A.)
Retro-active Date: Unlimited
Limit of Indemnity: $4,000,000
Underwriting Company: Certain Underwriters at Lloyd’s
Page 25 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 25
(iii)
EXECUTIVE SUMMARY
The proposed development at 3-9 Back Eildon Road, Thornton, is suitable for sustainable on-site
effluent disposal.
The allotment of 0.7771 hectares is in the Township zone and is not located in a Special Water Supply
Catchment.
It is proposed to operate a 30-table café and 8-accomodation cabins, as shown in Drawing 2
The site is not sewered. For design purposes, mains water (equivalent) is assumed.
Table 1
Description of Development
Parameter Site specific element
SPI Number 1\TP431776 and 1\TP962705 (to be consolidated)
Property Address 3-9 Back Eildon Road, Thornton
Owner/lessee c/- Hedger Constructions
Contact
Locality Thornton
Zoning and Overlays Township
Area 0.7771 hectares.
Usable Lot Area At least double LAA requirement (i.e. 1440m2+).
Soil Texture Type 4 (loam) over Type 4/5 (light clay/clay loam).
Soil Depth 1.4m+.
Soil Structure Well structured.
Soil Constraints Requires amelioration.
Permeability 0.05 to 0.6m/day after renovation.
Slope 0.5% to 1%
Distance to Surface Waters 130m (minimum) to Goulburn River.
Distance to water bore 100m+ to bore.
Water Supply Mains equivalent (assumed for design purposes).
Wastewater Load Up to 1,320 litres (load balanced) and 3,300 (peak).
Availability of Sewer Not available
Our field testing which included soil profile logging and sampling, permeability testing, a differential
level survey (by others), laboratory testing and subsequent reporting including water and nutrient
balance modelling and risk assessment has revealed that on-site effluent disposal is rational and
sustainable.
The assessment has been made in the context of prioritising public and environmental health with a
design compromise between rational wastewater reuse and sustainable wastewater disposal.
Effluent shall be treated to at least the 20/30 standard and distributed by subsurface irrigation utilising
the processes of evapotranspiration and deep seepage.
The irrigation area has been determined for the mean wet year and satisfies the requirements of SEPPs
(Waters of Victoria) in that the effluent irrigation system cannot have any detrimental impact on the
beneficial use of surface waters or groundwater.
For the proposed developments the site is not limited by area.
With regard to density of development and cumulative risk the assessment has considered risk
associated with subsurface flows and surface flows.
In regard to subsurface flows, it is clear that provided the on-site system is adequately designed,
constructed, operated and maintained the risk to surface and ground waters is negligible. Once the
effluent is placed underground, the extraordinary long travel times via ground water to surface waters
ensures adequate nutrient attenuation.
Page 26 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 26
In regard to surface flows, it is clear that provided the on-site system is adequately designed,
constructed, operated and maintained, the risk to surface and ground waters is no greater than for a
sewered development.
The results of the land capability assessment and risk analysis indicate that primary effluent and trench
systems are not appropriate for this site.
Where risk is defined as the product of consequences and frequency, the risk can be reduced to
negligible levels if effluent is treated to a secondary level and disposed via pressure compensated
subsurface irrigation, as described in Section 2 of the land capability assessment.
Onsite disposal/recycling requires AWTS or sand filter with pressure compensated subsurface irrigation
and load balancing facility.
The LCA recommends a conservative, scientifically based, well founded wastewater management
system with inherent multiple barriers of safety.
Cumulative risk from the development is extremely low. The risk of serious or irreversible damage is
extremely low.
All requirements of SEPP (Waters of Victoria) can be met.
Page 27 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 27
Paul Williams & Associates Pty. Ltd. ABN 80 006 412 862
CONSULTANTS IN THE EARTH SCIENCES
P. O. Box 277, Sunbury, Victoria, 3429
2 Argyle Place, Sunbury, Victoria, 3429
Telephone: 03 9744 6426
Mobile: 0418 171 796
Email: paul@rockdr.com.au
LAND CAPABILITY ASSESSMENT LAND USE MAPPING TERRAIN MODELLING GEOLOGY SOIL SCIENCE HYDROGEOLOGY HYDROLOGY LAND-SOIL RISK ASSESSMENT
A200505 – JUNE 2020
LAND CAPABILITY ASSESSMENT FOR
ON-SITE WASTEWATER MANAGEMENT AT
3-9 BACK EILDON ROAD, THORNTON
SECTION 1. SITE INVESTIGATION
1.1 INTRODUCTION
On instruction from the land owner, an investigation was undertaken to assess land capability for on-site effluent
disposal at 3-9 Back Eildon Road, Thornton.
The allotment of 0.7771 hectares is in the Township zone and is not located in a Special Water Supply Catchment.
It is proposed to operate a 30-table café and 8-accomodation cabins, as shown in Drawing 2
The site is not sewered. For design purposes, mains water (equivalent) is assumed.
The assessment has been made in the context of prioritising public and environmental health with a design
compromise between rational wastewater reuse and sustainable wastewater disposal.
1.2 INVESTIGATION METHOD
The site investigation was carried out in accordance with SEPPs (Waters of Victoria) and related documents. This
report is in accordance with current SEPPs (Waters of Victoria), Code of Practice - Onsite Wastewater Management,
E.P.A. Publication 891.4, July 2016 and Approaches for Risk Analysis of Development with On-site Wastewater Disposal
in Open, Potable Water Catchments, Dr Robert Edis, April 2014 (as adapted for non-potable catchments). Guidance
has been sought from AS/NZS 1547:2012, Guidelines for Wastewater Irrigation, E.P.A. Publication 168, April 1991,
Wastewater Subsurface Drip Distribution, Tennessee Valley Authority, March, 2004, AS 2223, AS 1726, AS 1289,
AS 2870 and Australian Laboratory Handbook of Soil and Water Chemical Methods.
Our capability assessment involved the mapping of unique land-soil unit(s) which were defined in terms of significant
attributes including; climate, slope, aspect, vegetation, soil profile characteristics (including colloid stability, soil
reaction trend and electrical conductivity), depth to rock, proximity to surface waters and escarpments, transient soil
moisture characteristics and hydraulic conductivity.
Exploratory boreholes were push-tube sampled and hand augered. The soil profile was logged and representative soil
samples were taken for laboratory testing.
Water and nutrient balance analyses were based on the mean wet year rainfall for Lake Eildon and mean evaporation
data for Lake Eildon and were undertaken in accordance with Guidelines for Wastewater Irrigation, E.P.A. Publication
168, April 1991 (Part), AS/NZS 1547:2012 and in-house methods.
The results of the water and nutrient balance analyses are given in Appendix B, to this report.
The results of the investigation and in situ and laboratory testing are given in Section 1.3, below, and in Appendix A, to
this report.
Page 28 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 28
Paul Williams & Associates Pty Ltd
2
1.3 CAPABILITY ASSESSMENT
We have used the attributes determined by the investigation to define one (1) land-soil unit, as follows:-
1.3.1 Land-Soil Unit A. This land-soil unit consists of very gently sloping terrain, as shown in Drawing 2 and Figure 1.
1.3.1.1 Climate. The general area receives a mean annual rainfall of 852mm and a mean annual evaporation of
1157mm. Mean evaporation matches or exceeds the mean rainfall in October through April.
Rainfall and evaporation data are presented in Appendix B, to this report.
1.3.1.2 Slope and Aspect. The ground surface (proposed land application area) slopes to the north-west at 0.5% to
1%, as shown in Drawing 2.
The unit is exposed to the prevailing winds and is subject to partial shade from nearby trees.
1.3.1.3 Vegetation and Land Use. The unit is vegetated with dense lawn grasses, as shown in Figure 1.
1.3.1.4. Slope Stability. For the encountered subsurface conditions, slope degree and geometry and for the proposed
range of hydraulic loadings, the stability of the ground slopes within the disposal areas are unlikely to be
compromised.
1.3.1.5 Subsurface Profile. The unit is underlain by alluvial materials of Quaternary Age.
The general subsurface profile consists of:-
• A topsoil (A1-horizon) layer of grey-brown, moist to wet, medium dense sandy silt (loam), with a soil reaction trend
of 6.3 to 6.7 pH and electrical conductivity of 0.11 dS/m, containing a root mat and rootzone, to a depth of 0.2m,
overlying,
• An alluvial soil (AL1-horizon) layer of grey-brown, moist to wet, medium dense clayey silt (clay loam) containing
some fine sand, with a soil reaction trend of 6.9 to 7.1 pH, electrical conductivity of 0.10 dS/m and free swella of
5%, with clay content increasing with depth, to a depth of 0.5m, overlying,
• An alluvial soil (AL2-horizon) layer of orange-grey-brown and light orange-grey-brown, moist to wet, moderately
well-structured silty clay and clayey silt of low plasticity (light clay), with a soil reaction trend of 6.9 to 7.4 pH,
electrical conductivity of 0.10 dS/m and free swell of zero, containing inter-beds, lenses and layers of clayey sand
and clayey-silty sand, to a depth of at least 1.5m.
1.3.1.6 Soil Permeability. The in-situ permeability tests were attempted on 4th June 2020
The occurrence of transient and seasonally occurring free water in the soil materials prevented the acquisition of
sufficient hydraulic data for determination of the geometric mean of saturated hydraulic conductivity.
Note: The relatively high soil moisture content at the time of testing was due to residual seepage from the topsoil into
the test holes and high moisture content from recent heavy and persistent rainfalls.
This transient high soil moisture impacts on the test method only and does not reflect in any way on the suitability of
the site for the sustainable onsite attenuation of waste water – see AS/NZS1547:2012, Appendix G.
A conservative estimate of permeability has been deduced as follows (see Code 3.6.1):-
Profile analysis in accordance with AS/NZS 1547:2012 and our laboratory analyses shows the clay and clayey materials
to be moderately well-drained.
These materials are the limiting layer, controlling vertical permeability.
a After Holtz (measures swell potential of fraction passing 450-micron sieve)
Page 29 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 29
Paul Williams & Associates Pty Ltd
3
Constant head permeameter testing from similar formations has realised AL-horizon hydraulic conductivity ranging
from 0.05 to 0.60m/day.
For the limiting moderately well-structured B-horizon clayey soils, we have adopted an estimated saturated hydraulic
conductivity of 0.05m/day.
Peak deep seepage is conservatively estimated at 4.5mm/day.
1.3.1.7 Basement Permeability. From the literature and from examination of profiles and soil character in the vicinity,
the hydraulic conductivity of the underlying sediments would be in excess of 0.1m/day (adopt 3m/day for buffer
design).
1.3.1.8 Colloid Stability. The results of the Emerson Crumb Tests, Dispersion Index tests and observations of any
discolouration of water in the boreholes indicate that all encountered materials are non-dispersive.
The Emerson Class was 5 while the Dispersion Index was zero for all soil horizons.
The residual soils show a low slaking potential and have a low shrink-swell potential.
The electrical conductivity was determined for all horizons using a 1:5 soil/water extract and converted to EC
(saturation extract).
The determined electrical conductivity (ECse) ranged from 0.10 dS/m to 0.11 dS/m.
Soil reaction trend ranged from 6.5 pH to 7.2 pH which is within a tolerable range.
Assuming design, construction, operation and maintenance of the on-site effluent systems are in accordance with the
recommendations contained in this report, we can conclude that there is a low salting potential.
1.3.1.9 AS1547:2012 Soil Classification. In accordance with AS/NZS1547:2012 the alluvial clayey materials can be
classified as Type 4/5 soils.
After allocating proportional vertical and lateral flows and allowing for the potential for perched water mounding and
after the application of ameliorants, we have adopted a daily peak water balance seepage rateb of 4.7mm for 20/30
standard effluent.
1.3.1.10 Surface Drainage. Site surface drainage (proposed land application areas) is to the north-west, as shown in
Drawings 1 and 2. The nearest surface water (Goulburn River) is at least 130m distant, as shown in Drawings 1 and 2.
The effluent areas cannot impact on any surface waters (see Section 2.5, below).
1.3.1.11 Groundwater. No ground water was encountered in the boreholes.
Subsurface flow direction will generally reflect natural surface flow direction (i.e. a north-westerly direction), as shown
in Drawing 2.
There are no groundwater bores within a significant distance.
The Victorian groundwater data base indicates groundwater is between 1.5 and 5 metres of the surface.
Regionally the groundwater is contained in sand and gravel alluvium and is of high yield and high quality (less than
500mg/litre TDS) with beneficial use including domestic.
b The peak water balance seepage loss rate is based on being <10% of the measured/estimated hydraulic conductivity (of the limiting horizon) plus
a lateral flow component, effluent type and the effects of soil characteristics including profile thickness (flow paths and storage), shrink-swell,
dispersivity, soil reaction trend and assumes renovation.
Page 30 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 30
Paul Williams & Associates Pty Ltd
4
1.3.1.12 Nutrient Attenuation. Clayey soils (as found on this site) can fix large amounts of phosphorous. Phosphate-
rich effluent seeping through these soils will lose most of the phosphorous within a few metres.
The limiting nutrient for this site is nitrogen. No phosphorous balance is required.
Nitrogen, contained in organic compounds and ammonia, forms nitrate-N and small amounts of nitrite-N when
processed in an aerated treatment plant. Several processes affect nitrogen levels within soil after irrigation. Alternate
periods of wetting and drying with the presence of organic matter promote reduction to nitrogen gas (denitrification).
Plant roots absorb nitrates at varying rates depending on the plant species (see Appendix B), however nitrate is highly
mobile, readily leached, and can enter groundwater via deep seepage and surface waters via overland flow and near-
surface lateral flow.
Based on the water and nutrient balance (see Appendix B), and assuming 30mg/litre N in the effluent (general case)
and 20mg/litre P, a denitrification rate of 20%, with N uptake of 220 kg/ha/year for the an appropriate grass cover
equivalent to a rye/clover mix) and sequential zoned dosing of the irrigation area, a conservative estimate can be
made of the nitrogen content in the deep seepage and lateral flow.
For the general case, and without considering further expected denitrification below the root zone and in the
groundwater (reported to be in the vicinity of 80%), denitrification in the lateral flow (external to the irrigation areas
but within the curtilage of the allotment) and plant uptake in the lateral flow, the irrigation area would need to be
530m2 for 1,320 litres/day of effluent for complete attenuation.
The hydraulic component of the water and nutrient balance have shown that an irrigation area of 720m2 would be
required to limit surface rainwater flows to episodic rain events.
For the development and to satisfactorily attenuate nitrogen on-site and to accommodate the design hydraulic
loading, the application rate should not exceed 1.8mm/day.
1.4 RISK MANAGEMENT & MITIGATION
SEPP (Waters of Victoria) requires that the proposal be assessed on a risk-weighted basis and cumulative effectsc be
considered.
A multiple risk-reduction approach is used in assessing this development, with components listed below:
1.4.1 Water Usage. With respect to daily effluent production, the system is overdesigned. Current best practice allows
for a (maximum) daily design effluent flow of 1,320 litres (7-day trading for the café and load balanced to include an
accommodation patronage of 40% annually). Design usage estimates are as per Code of Practice - Onsite Wastewater
Management, E.P.A. Publication 891.4, July 2016.
1.4.2 Secondary Treatment. The LCA recommends AWTS and sand filters. These systems generate a much higher
quality of effluent than septic systems.
1.4.3 Block Size. Many under-performing effluent fields are placed on blocks where area is limited. Limited area can
lead to inadequately sized or inappropriately placed effluent fields and a lack of options should the daily effluent
volumes increase. In the subject site, size is at constraining factor.
1.4.4 Management Plan. Historically, inadequate maintenance has played a major part in the failure of onsite effluent
disposal systems. There is a management plan within the LCA (see Appendix C). This plan gives guidance on the
implementation of mandatory operation, maintenance and inspection procedures.
1.4.5 Sizing of Treatment Systems. No specific proprietary treatment plant is recommended, however treatment
plants or sand filters must have current JAS/ANZ accreditation, which match effluent volumes with plant capacity.
c We would contend that there can be no significant cumulative effect if the provisions of SEPP (Waters of Victoria) are met (i.e. all wastes
contained onsite).
Page 31 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 31
Paul Williams & Associates Pty Ltd
5
1.4.6 Load Balancing. Surge flows are likely and the systems may become overwhelmed for a period. This potential
problem can be eliminated by installing a plant with a load balancing facility (or equivalent function) which enables
short-term storage and sustainable flows to the distribution area over extended time. The load balancing facility also
provides temporary storage should the plant fail or if there is a power outage.
1.4.7 Zoned Dosing. The LCA stipulates that the effluent area is (automatically) irrigated sequentially by zones or time
to promote the creation of transient aerobic and anaerobic soil conditions.
The effluent field is sized conservatively for nitrogen attenuation, using pasture grass (rye/clover eq mix), which has a
nitrogen uptake of 220 kg/ha/year. Zoned dosing will increase the efficiency of the field for removing nitrogen from
the soil.
Undersized effluent fields are at risk of becoming anaerobic for long periods, with the risk of microbial build-up. This
leads to secretion of microbial polysaccharides, which coat soil particles and restrict the ability of the soil to adsorb
nutrients and attenuate pathogens. Polysaccharides can also coat the interior of pipes and block drainage holes if
drainage is slow due to the field being overloaded with effluent. This can lead to effluent surcharge from the ends of
the drainage pipes, forming preferential flow paths through overlying soil and draining overland to nearby surface
waters.
The alternating aerobic and anaerobic conditions created by zoned dosing prevent the build-up of microbial
polysaccharides, and ensures efficient renovation of effluent.
1.4.8 Pressure Compensated Subsurface Disposal. Conservatively sized irrigation areas with pressure compensated
subsurface disposal and zoned dosing deliver effluent directly into the soil. Under saturated conditions, water flow is
downwards in the direction of maximum hydraulic gradient. For a surface flow containing effluent to occur, the
effluent would have to rise, against gravity, through at least 150mm of soil. Under unsaturated conditions, water flow
is multi-directional due to capillary forces and matrix suction. The atmosphere provides a capillary break with capillary
forces and matrix suction reducing to zero at the air/soil interface. Gravitational forces outweigh the capillary forces
and matrix suction long before the surface is reached. Hence, any surface flow from the effluent area cannot contain
any effluent, regardless of the intensity and duration of rain events. Surface flow can only ever consist of rainfall in
excess of soil storage capacity and hydraulic conductivity.
Except for the instance of a broken/damaged drip line or distribution line, surface flow cannot contain any effluent.
Note: For a pressure compensated distribution network to function properly, lines must be placed parallel to contours
and/or horizontal for even effluent distribution.
1.4.9 Effluent Areas. Design effluent areas are oversized. They have been designed for a deep seepage less than 10%
of hydraulic conductivity.
1.4.10 Reserve Areas. Although reserve areas are not required for subsurface irrigation (Code of Practice, 2016), there
is sufficient area available for extension of the irrigation area. The reserve area is a spare effluent field, which is left
undeveloped, but can be commissioned in the case of increase in daily effluent production due to contingencies
through the chain of ownership.
1.4.11 Buffer Distances. Buffer distances are set out in the Code of Practice to allow for attenuation of pathogens and
nutrients, should an overland effluent surcharge occur.
The time taken for groundwater to reach the nearest potable surface waters can be estimated by using the Darcy
equation (which states that velocity is the product of the hydraulic conductivity and the hydraulic gradient). From the
literature, the regional gradient is about 0.005.
Flow times can be estimated for groundwater to flow the 130m (minimum) to the nearest surface waters at this site.
For a conservative basement hydraulic conductivity of 3m/dayd with a hydraulic gradient of 0.005, the time taken for
groundwater to flow a distance of 130m is over 20 years.
d This is a conservatively high figure to demonstrate maximum possible flow rates. A conservatively low figure was used for calculation of effluent
application rates (see recommendations) to demonstrate irrigation sustainability.
Page 32 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 32
Paul Williams & Associates Pty Ltd
6
For a (rare) surface effluent discharge on a 0.5% slope and for the prevailing soil hydraulic characteristics, the
estimated maximum travel distance of the surface effluent discharge before reabsorption is less than 1me.
The design buffer distances comply the requirements of the Code of Practice.
1.4.12 System Failure. A properly designed and constructed onsite effluent system consisting of the treatment plant
and the irrigation area can suffer degrees of failure.
Failure can take the form of mechanical (plant), accidental (toilet blockages, damaged irrigation lines, high BOD
influent), operational (power outage, overloading) and maintenance (failure to check filters, failure to participate in
maintenance programme).
1.4.12.1 Mechanical Breakdown. Mechanical plant breakdown typically involves compressor and pump malfunction
causing no aeration and high-water levels, respectively. Both of these situations are alarmed (both audible and visual).
The proposed plants will benefit from a service contract providing 24-hour repair cycles. If the alarms were ignored (or
malfunctioned) and the establishment continued to produce waste until the load balancing tank and plant capacities
were exceeded (at least 5 days), a mixture of septic and raw effluent would back up to the interior of the toilet area
and/or surcharge through the plant hatches. It is difficult to imagine how this outcome could be allowed to manifest.
In addition, a plant malfunction with the occupants absent could not cause an effluent surcharge because no influent
would be produced during this period.
1.4.12.2 Accidents. Toilet blockages and accidentally damaged irrigation lines could allow localised surface surcharge
of treated effluent. This is why minimum buffers to surface waters have been maintained. High BOD influent (e.g.
dairy or orange juice) can realise a lesser quality than 20/30 standard for some weeks. Provided the high BOD influent
is not continuous, the soils will continue to satisfactorily renovate the effluent.
1.4.12.3 Operational Breakdown. Operational failures including power outages and transient hydraulic overloading
are accommodated by the load balancing facility, as described in Section 1.4.6, above.
1.4.12.4 Maintenance Breakdown. Maintenance breakdowns such as failure to clean line filters can lead to expensive
pump repairs and in extreme cases leakage (of 20/30 standard effluent) from the outlet pipe. This leakage would
occur in proximity to the facility and would be noticed and acted on.
Refusal to participate in the management programme would be acted on by the responsible authority within one
maintenance cycle.
AWTS and pumped systems have mechanical components which can malfunction and will age. The management plan
including the maintenance and monitoring programmes are essential to ensure safe onsite effluent disposal.
1.4.13 Risk Summary. With regard to density of development and cumulative risk the assessment has considered risk
associated with subsurface flows and surface flows.
In regard to subsurface flows, it is clear that provided the on-site system is adequately designed, constructed,
operated and maintained (see items 1.4.1 through 1.4.12.4), the risk to surface and ground waters is negligible. Once
the effluent is placed underground, the extraordinary long travel times via ground water to surface waters ensures
adequate nutrient attenuation.
In regard to surface flows, it is clear that provided the on-site system is adequately designed, constructed, operated
and maintained (see items 1.4.1 through 1.4.12.4), the risk to surface and ground waters is no greater than for a
sewered development. Indeed, it could be considered that the risk is less than for a sewered development because
there can be no mains failure (because there is no mains).
The LCA recommends a conservative, scientifically based, well founded wastewater management system with
inherent multiple barriers of safety. Cumulative risk from the development is also extremely low. The risk of serious or
irreversible damage is extremely low.
All requirements of SEPP (Waters of Victoria) have been met.
e Source: Approaches for Risk Analysis of Development with On-site Wastewater Disposal in Open, Potable Water Catchments (Dr Robert Edis April
2014).
Page 33 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 33
Figure 1: Land-soil unit A (proposed land application area) viewed from north to south.
Page 34 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 34
Paul Williams & Associates Pty Ltd
8
SECTION 2. RECOMMENDATIONS
2.1 APPLICATION
The following recommendations are based on the results of our assessment, and are made in accordance with SEPPs
(Waters of Victoria), the Code of Practice - Onsite Wastewater Management, E.P.A. Publication 891.4, July 2016,
AS 1726, and AS/NZS 1547:2012.
They are based on the mean saturated hydraulic conductivity of the limiting clayey materials and are designed to
demonstrate the viability of on-site effluent disposal for café and accommodation units and a design daily effluent
production of up to 1,320 litres and are considered to be conservative.
2.2 SUBSURFACE IRRIGATION
2.2.1 General. Based on the results of the water balance analysis and considering the prevailing surficial and
subsurface conditions including soil profile thicknessf and slope and on condition that adequate site drainage is
provided (as described in Section 2.4, below), on-site irrigation systems are appropriate for effluent disposal for land-
soil unit A.
2.2.2 Effluent. Effluent will be generated from a café and accommodation units and will include black and grey water
(all wastes).
2.2.2.1 Effluent Quality. Effluent shall be treated by AWTS or sand filter to a standard that meets or exceeds the
water quality requirements of the 20/30 standard for BOD/SS.
2.2.2.2 Effluent Quantity. The daily effluent volume is a function of patronage, trading days and type of business. It is
proposed to have a 30-seat café with four 2-bedroom cabins and four 1-bedroom cabins.
As there is no water usage or patronage data, we are required to estimate conservative values from the Code.
For a cafe, a daily wastewater allowance of 10 litres/person and 10 grams BOD/person is required.
Allowing for a daily average of three covers per seat, the peak load is 900 litres and 900 grams BOD.
Allowing for seasonal fluctuations (eq 40% annually), the design daily load is 360 litres and 360 grams BOD.
For the accommodation cabins (assuming external laundry), a daily wastewater allowance of 100 litres/person and 80
grams BOD/person is required.
Allowing for four persons/2-bedroom cabin and two persons/1-bedroom cabin, the daily peak load is 2,400 litres and
1,920 grams BOD.
Allowing for 40% annual occupancy, the design daily load is 960 litres and 770 grams BOD.
The combined daily peak load is 3,300 litres and 2,820 grams BOD (900 + 2,400 and 900 + 1,920).
The combined daily design load is 1,320 litres and 1,130 grams BOD (40% of 3,300) and (40% of 2,820)
All effluent volumes have been calculated from Code of Practice - Onsite Wastewater Management, E.P.A. Publication
891.4, July 2016, Table 4 and assumes mains water (equivalent), out-sourced laundry and WELS-rated water-reduction
fixtures and fittings – minimum 4 Stars for dual-flush toilets, aerator taps, flow/pressure control valves and minimum
3 Stars for all appliances and external laundry.
For estimating grease trap volume, we have adopted a peak daily flow of 900 litres (7-day trading week).
f Minimum 1400mm required for evapotranspiration-absorption trenches.
Page 35 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 35
Paul Williams & Associates Pty Ltd
9
2.2.2.3 Load Balancing. Transient hydraulic loads in excess of the expected daily peak load will occur (e.g. transient
increases in patronage). In addition, and in the case of power outages and/or mechanical breakdown, the load
balancing tank can act as a temporary storage.
The effluent treatment system must be fitted with a load balancing facility to allow transient high hydraulic loads to
be retained and distributed to the land application area during periods of low load.
The load-balancing tank size is a function of 2 times (approximately) maximum daily peak flow plus ballast if requiredg.
Hence, we recommend that the load-balancing tank be at least 7,000 litres without ballast or 10,000 litres with ballast.
2.2.2.4 BOD Reduction. The effluent treatment system will be required to process up to 1,130 grams BOD/day (load-
balanced). The effluent stream will pass through kitchen degreasing practices, triple stage grease trap, load-balancing
tank and sand filter/AWTS.
Typically, BOD reduction would be a minimum of 60% through the grease trap and 30% in the balance tank (assuming
3,000 litre ballast) prior to the sand filter/AWTS. Hence, the sand filter/AWTS will typically need to treat about 320
grams BOD.
For non-ballasted tanks, the BOD prior to the sand filter/AWTS would be about 450 grams.
To satisfactorily reduce BOD, we recommend that the effluent stream pass through a triple interceptor grease trap
and a 10,000 litre (including ballast) load-balance tank.
2.2.2.5 Triple Stage Grease Trap. The triple stage grease trap needs to be sized in proportion to peak hourly waste
flow. Hence, for a peak daily waste flow of 900 litres and a wash cycle of 3 to 4 hours the grease trap would need to be
at least 250 to 300 litres capacity, allow 500 litres.
2.2.3 Application Rates and Irrigation Areas. An irrigation area and application rate has been determined from the
results of the water and nutrient balance analyses and AS/NZS 1547:2012, Appendix M.
2.2.3.1 Hydraulic Loading. To satisfy the requirement for no surface discharge in the mean wet year, effluent shall be
applied at an application rate not exceeding 1.8mm/day.
2.2.3.2 Nutrient Loading. The requirements of SEPPs (Waters of Victoria) would be satisfied with effluent applied at
an application rate not exceeding 2.5mm/day.
2.2.3.3 Design Loading. To satisfy the requirement for no surface discharge in the mean wet year and on-site
attenuation of nutrients, the effluent shall be applied at a rate not exceeding 1.8mm/day.
2.2.3.4 Irrigation Area. To satisfy the requirement for no surface discharge in the mean wet year and on-site
attenuation of nutrients, the effluent shall be applied to an area of 720m2.
2.2.4 General Requirements. For subsurface irrigation, it is assumed that the design, construction, operation and
maintenance are carried out in accordance with AS/NZS1547:2012 and a “system specific” JAS/ANZ accreditation, as
appropriate.
The irrigation area is to be a dedicated area. To prevent pedestrian, stock and vehicular movements over the area, the
effluent area shall be “fenced”.
2.2.5 Subsurface Distribution System. A distribution network design similar to that shown in AS/NZS1547:2012, Figure
M1 is appropriate.
2.2.5.1 Ground Preparation and Excavations. Preparation of the ground is to include the redistribution of topsoil to
form a free draining, smooth surface. Pipe excavations shall only be undertaken in drier periods when soil moisture
contents are relatively low and when heavy rainfall and storms are not normally expected (see also, Section 2.2.8,
below).
g Ballast would nominally be 1/3 required capacity (i.e. 6,600 litres). Engineering alternatives (e.g. basal rim) can preclude the ballast requirement.
Page 36 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 36
Paul Williams & Associates Pty Ltd
10
The concrete cricket pitch is to be removed and the subgrade lightly ripped and prepared as per Section 2.2.8, below.
2.2.5.2 Pump System and Pipe works. Uniform delivery pressure of the effluent throughout the distribution system is
essential. Percolation or drip rates shall not vary by more than 10% from the design rate over the whole of the system
(i.e. pressure compensated).
The distribution pipes shall be placed coincident with slope contours. The dripper system is to provide an effective
even distribution of effluent over the whole of the design area. Line spacing shall be no closer than 1000mm.
2.2.6 Sequential Zoned Irrigation. The efficiency of irrigation effluent disposal systems can be highly variable. We
recommend that as part of the daily irrigation process, the effluent area be irrigated sequentially by zones or time to
promote the creation of transient aerobic and anaerobic soil conditions.
The inspection regime described in Section 2.2.7, below, is to be strictly adhered to.
2.2.7 Inspections and Monitoring. We recommend that the mandatory testing and reporting as described in the Code
of Practice - Onsite Wastewater Management, E.P.A. Publication 891.4, July 2016, include an annual (post spring)
report on the functioning and integrity of the distribution system and on the functioning and integrity of the cut-off
drains and outfall areas.
It is expected that the frequency of inspections and monitoring will intensify as systems age.
We recommend that the daily waste flow is metered and recorded against patronage.
2.2.8 Soil Renovation. To improve the subsoil permeability and to maintain stable soil peds, the exchangeable Calcium
needs to be increased.
To achieve a suitable cation balance, gypsum needs to be added to the soil.
Application rates are related to water (irrigation and mean rainfall) available to dissolve or distribute to depth the
required ameliorants.
In this instance, where irrigation water is expected to be constant, available water is sourced from mean rainfall plus
irrigation.
A suitable amelioration technique is to initially broadcast gypsum over the regraded irrigation area at a rate of
0.25kg/m2. After smoothing of the surface, the irrigation network can be constructed.
After two months, broadcast gypsum over the irrigation area at a rate of 0.25kg/m2.
Gypsum must be fine-ground, agricultural quality.
Gypsum should be broadcast over the land application area at a rate of 0.25kg/m2 every 3 years.
2.2.9 AWTS and Sand Filter. It is assumed that the design, construction, operation and maintenance of all treatment
elements are carried out in accordance with AS/NZS1547:2012 and a current JAS-ANZ accreditation.
The AWTS or sand filter are to be sized to successfully treat a daily hydraulic load of 1,320 litres and a nutrient load of
either 370 grams BOD or 450 grams BOD for ballasted load balance tanks and non-ballasted load balance tanks,
respectively.
The sand filter shall have a minimum plan area of 27m2 with the sand media complying to the Code Appendix G. The
sand media must have less than 5% fines, effective size (D10) between 0.25 and 0.60mm and uniformity coefficient
(D60/D10) less than 4mm.
Note: All AWTS/sand filter inlets, hatches and access ports must be contructed above the 1%AEP flood levels, a shown
in Drawing 2.
Page 37 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 37
Paul Williams & Associates Pty Ltd
11
2.3 RESERVE AREA
The expected design life of fifteen years may vary due to construction and maintenance vagaries and possible effluent
volume increases through the chain of ownership.
There is sufficient available area on the allotment for extension of the effluent area.
2.4 SITE DRAINAGE.
Our recommendations for on-site effluent disposal have allowed for incident rainfall only and are conditional on the
installation of a shallow cut-off drain, which shall be placed upslope of the disposal area.
Care shall be taken to ensure that the intercepted and diverted surface waters are discharged well away and down
slope of the disposal field.
Locations of the cut-off drains and a drain detail are shown in Drawings 2 and 3.
The owner shall also ensure that any upslope site works do not divert and/or concentrate surface water flows onto
the disposal area.
2.5 BUFFER DISTANCES
The water balance analysis has shown that potential surface (rain water) flows from the effluent area would be
restricted to episodic events.
The estimated hydraulic properties of the upper soil materials and hydraulic gradient have been used to evaluate (via
Darcy’s Law) the buffer distances with respect to subsurface flows.
Our analysis and evaluation have shown that the default setback distances given in Code of Practice - Onsite
Wastewater Management, E.P.A. Publication 891.4, July 2016, Table 5 and Approaches for Risk Analysis of
Development with On-site Wastewater Disposal in Open, Potable Water Catchments, Dr Robert Edis, April 2014 are
conservative and can be applied without amendment.
For a building located downslope of an effluent field, your engineer shall evaluate the integrity of building foundations
with respect to the assigned buffer distance.
2.6 SUMMARY OF RECOMMENDATIONS
Our capability assessment has shown that at least one rational and sustainable on-site effluent disposal method
(20/30 standard subsurface irrigation) is appropriate for the proposed development, subject to specific design criteria,
described above.
A management plan is presented in Appendix D, to this report.
Paul R. WILLIAMS B.App.Sc.
PRINCIPAL HYDROGEOLOGIST
Building Practitioner No. EC-1486
Page 38 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 38
Paul Williams & Associates Pty Ltd
SUBJECT SITE
Page 39 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 39
SEWER PIT?
TAP
GRATED PIT
GARDEN BED
ELM
ELM
ELM
ELM
ELM
(ht = 23m)
(ht = 23m)
(ht = 23m)
(ht = 23m)
(ht = 23m)
(ht = 22m)
OAK
OAK(ht = 22m)
(ht = 8m)
EVERGREEN
(ht = 16m)
(ht = 16m)
(ht = 26m)
(ht = 14m)
DECIDUOUS
CONIFER
(ht = 18m)
(ht = 10m)MAPLE
MAPLE(ht = 12m)
(ht = 24m)
LIQUIDAMBAR
DECIDUOUS
(ht = 12m)
(ht = 12m)ASH
ASH(ht = 12m)
CITRUS(ht = 4m)
CALISTEMON(ht = 5m)
(ht = 8m)
(ht = 6m)
BANKSIA
BANKSIA
EVERGREEN
EVERGREEN
(ht = 6m)
(ht = 6m)
ELMS
(ht = 10m)
(ht = 23m)ELM
EVERGREEN(ht = 8m)
(ht = 14m)
EVERGREEN
ELM
(ht = 11m)
(ht = 11m)
(ht = 11m)
(ht = 11m)
ELM
ELM
ELM
SILKY OAK(ht = 17m)
(ht = 15m)
EVERGREEN
PAPER BARK
(ht = 5m)
(ht = 8m)
SILKY OAK
IRON SHED
PO
ST &
WIR
E
G.I.
GATE
G.I.
GRASS
CORRUGATED IRON
IRON
PALINGS
SAIL POSTS
GRAZING
CLUMP OF BIRCHES AND EUCALYPTS
(up to 16m high)
PIT
TO
SPO
RU
MS
(up to
5m
hig
h)
ASH(ht = 6m)
HO
LE
BITUMEN DRIVEWAY No.11
CONCRETE
GRASSED AREA
ELM(ht = 14m)
GAT
E
BITUMEN
BIT
UM
EN
DR
IVEW
AY
EDGE OF BITUMEN
BITUMEN
CONCRETE
GRASSED AREA
BU
SS
HE
LTE
R
CO
NC
RET
E
METERBOX
PLAYGROUND
BITUMEN PATHWAY
TIM
BE
R T
OIL
ET
CO
NC
RE
TE
CONCRETE PATH
WEEPING CHERRY(ht = 4m)
OLD FRAME
ED
GE
OF B
ITU
ME
N
CO
NC
RE
TE
PATH
ROW OF SHRUBS
POST & WIRE
PO
ST &
WIR
E
WO
VEN
WIR
E
PO
ST &
WIR
E
114.0
2
67.98
29.47
38.52
NO
T F
EN
CED
115.0
7
POWER HEAD
221
200.2
201.2
CE
NTE
R L
INE
BIT
UM
EN
RO
AD
TIMBER SHED
CO
NC
RETE
PATH
U/GELECTRICITY
COVERED AREA
CONCRETE UNDER
TIMBER SHED
TIM
BER
SH
ED
CO
NC
RE
TE
BIT
UM
EN
WOODSHED
POST & WIRE
HIG
H W
OV
EN
WIR
E
BIT
UM
EN
SID
EENTRY
PIT
B.B.Q.
COVERED
POST & WIRE
POST & WIRE
CONCRETE
CORRUGATED IRON
ELECTRICITY TO No.1
CO
NC
RE
TE
KE
RB
& C
HA
NN
EL
BA
CK
OF C
ON
CR
ET
E K
ER
B
CROSSING
ED
GE O
F
BIT
UM
EN
ED
GE O
F B
ITU
ME
N
EUCALYPT
AR
RP
OX. 1.5
m D
EE
P
GRASS AND SCATTERED TREES
S/W PROPERTY INLET
S/W PIT
SEWER MANHOLE
ELECT. PIT
ELEC. POLE
PEG
WATER VALVE
WATER HYDRANT
SEWER VENT / I.S.
TELSTRA PIT
TREE
STREET SIGN
T.B.M.
GAS METER
WATER METER
W
S. SILLH. HEAD
WINDOWHABITABLE ROOM
SHRUBS
Level 1, 325 Camberw ell Road, CAMBERWELL. 3124.
ph: 9813 2222 fax: 9813 2244
aujard@bigpond.net.au
SURVEY REF: 19445 JZ DATE: 12/05/2020
Report Number: A200505
Drawing Number: 2
Drawn: P.R.W.
Date: June 2020
Scale: 1:1,000
Contour Interval: 0.2m
HEDGER CONSTRUCTIONS
3 & 9 BACK EILDON ROAD, THORNTON
LOCATION OF PROPOSED DEVELOPMENT SHOWING FLOOD LEVELS
100m HERITAGE BUFFERTO GOULBURN RIVER
SUFFICIENT AREA EXISTS FORDUPLICATION OF EFFLUENTIRRIGATION AREA DUE TOCONTINGENCIES THROUGHTHE CHAIN OF OWNERSHIP
Paul Williams & Associates Pty Ltd
720m2 PRIMARYIRRIGATION AREA
BH1
BH3
FEATURE SURVEY SUPPLIED BY RODNEY AUJARD & ASSOCIATES
BH2
INSTALL FENCE
INSTALL CUT-OFF DRAIN(SEE DRAWING 3)
Page 40 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 40
Report Number: SPEC 014
Drawing Number: 3
Drawn: P.R.W.
Date: June 2020
Scale: 1:10 (Approximately)
Contour Interval: N/A
HEDGER CONSTRUCTIONS
DUPLEX/GRADATIONAL SOIL PROFILES
CUT-OFF DRAIN DETAIL FOR 20/30 STANDARD EFFLUENT IRRIGATION FIELDS
NOTE: DRAWING NOT TO BE USED FOR SET-OUT PURPOSES
Paul Williams & Associates Pty Ltd
SILTY (LOAM) TOPSOIL
Clayey SILT SUBSOIL(DESIGN Ksat)
SOCKET DEPTHAT LEAST 100MM
PROPRIETARY SLOTTED PIPE
GRANULAR FILTERMATERIAL
SURFACE REGRADED BY CUTTING TO FACILITATECOLLECTION OF SURFACE FLOWS - DEGREE OFCUT SLOPE LIMITED BY REQUIREMENTS FOR SAFE& EFFICIENT MOWING/MAINTENANCE
NOTES:1. DRAIN TO BE DESIGNED, CONSTRUCTED & MAINTAINED TO ENSURE THAT NO SURFACE & PERCHED
GROUNDWATER FLOWS ENTER THE IRRIGATION AREA.2. DRAIN TO BE LOCATED ON ALL UPSLOPE SIDES OF IRRIGATION AREA (NO CLOSER THAN 1m FROM NEAREST
SUBSURFACE DISTRIBUTION LINE).3. DRAIN TO HAVE UNSPECIFIED FALL.4. MINIMUM SOCKET DEPTH OF 100mm INTO CLAY SUBSOIL (WHERE ENCOUNTERED) OR AT LEAST 300mm DEEP.5. DRAIN CROSS SECTIONAL AREA RELATED TO DESIGN FLOWS AS DETERMINED BY A SUITABLY QUALIFIED
AND EXPERIENCED ENGINEER.6. OFF-SITE DRAIN OUTFALL TO LEGAL POINT OF DISCHARGE SUBJECT TO LOCAL AUTHORITY REQUIREMENTS.7. ON-SITE DRAIN OUTFALL TO INCLUDE APPROPRIATE ENERGY DISSIPATION TO AVOID EROSION.8. ALL DRAINS AND OUTFALL AREAS SUBJECT TO POST-SPRING INSPECTION.
EFFLUENT AREA
(Ksat >> DESIGN Ksat)
1
1
EFFLUENT AREA
1 METRE SETBACK TONEAREST DRIP LINE
CUT-OFF DRAIN LOCATION(NOT TO SCALE)
NOTE: CUT-OFF DRAIN LOCATIONIS SCHEMATIC ONLY. FINAL LOCATIONTO BE DETERMINED BYDESIGN ENGINEER AS PARTOF SITE DRAINAGE DESIGN.
Page 41 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 41
APPENDICES
Page 42 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 42
APPENDIX A2
TYPICAL SOIL PROFILE
Borehole BH1
Borehole BH2
Borehole BH3
Page 43 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 43
Page 44 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 44
APPENDIX B
PART 2
RAINFALL DATA
Page 45 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 45
APPENDIX C
LAND CAPABILITY ASSESSMENT TABLE
(Non-potable catchments) LAND LAND CAPABILITY RISK RATING AMELIORATIVE MEASURE
FEATURE LOW MEDIUM HIGH LIMITING & RISK REDUCTION
Available land for LAA Exceeds LAA and
duplicate LAA
requirements
Meets LAA and
duplicate LAA
requirements
Meets LAA and
partial duplicate LAA
requirements
Insufficient LAA area Limiting for trenches & beds: Insufficient area available.
Non-limiting for subsurface irrigation: Full reserve area available
Aspect North, north-east
and north-west
East, west, south-
east, south-west
South South, full shade North and north-westerly aspect.
Exposure Full sun and/or high
wind or minimal
shading
Dappled light
(partial shade)
Limited light, little
wind to heavily
shaded all day
Perpetual shade Partial shade.
Slope Form Convex or divergent
side slopes
Straight sided slopes Concave or
convergent side
slopes
Locally depressed Regrade finished LAA surface by smoothing and redistribution of topsoil.
Slope gradient:
Trenches and beds <5% 5% to 10% 10% to 15% >15% 0.5%: Non-limiting for trenches.
Subsurface irrigation <10% 10% to 30% 30% to 40% >40% 0.5%: Non-limiting for irrigation.
Site drainage:
runoff/run-on
LAA backs onto crest
or ridge
Moderate likelihood High likelihood Cut-off drain not
possible
Regrade land application area to be free draining.
Landslip8 Potential Potential Potential Existing Unremarkable
Erosion potential Low Moderate High No practical
amelioration
If undisturbed. Well vegetated soils (all runoff to be dispersed without concentrating
flows).
Flood/inundation Never <1%AEP <5% to 1%AEP >5% AEP All inlets and access ports to be above 1% AEP flood levels – see Drawing 2.
Distance to surface waters
(m)
Buffer distance
complies with Code
requirements
Buffer distance does
not comply with
Code requirements
Reduced buffer
distance not
acceptable
LAA located at least 130m from watercourse Goulburn River).
Distance to groundwater
bores (m)
No bores on site or
within a significant
distance
Buffer distances
comply with Code
Buffer distances do
not comply with
Code
No suitable
treatment method
No bores within a significant distance.
Vegetation Plentiful/healthy
vegetation
Moderate vegetation Sparse or no
vegetation
Propagation not
possible
Existing vegetation is suitable for land application area.
Depth to water table
(potentiometric)
(m)
>2 2 to 1.5 <1.5 Surface Water 1.5 to 5m.
Depth to water table
(seasonal perched)
(m)
>1.5 <0.5 0.5 to 1.5 Surface Perching probable.
(Regrade LAA to shed excess rainfall)
Rainfall9
(9th decile) (mm)
<500 500-750 750-1000 >1000 Non-limiting for trench systems.
Non-limiting for subsurface irrigation - Design by water balance.
Pan evaporation (mean)
(mm)
1250 to 1500 1000 to 1250 750 to 1000 <750 Design by water balance.
SOIL PROFILE
CHARACTERISTICS
Structure High or moderately
structured
Weakly structured Structureless,
massive or hardpan
Improve and maintain structure by gypsum application.
Fill materials Nil or mapped good
quality topsoil
Mapped variable
depth and quality
materials
Variable quality
and/or uncontrolled
filling
Uncontrolled poor
quality/unsuitable
filling
No significant fill encountered.
Thickness: (m)
Trenches and beds >1.4 <1.4 <1.2 Non-limiting for trench systems.
Subsurface irrigation 1.5+ 1.0 to 1.5 0.75 to 1.0 <0.75 Non-limiting for irrigation systems.
Permeability10
(limiting horizon) (m/day)
0.15-0.3 0.03-0.15
0.3-0.6
0.01-0.03
0.6-3.0
>3.0
<0.03
After renovation; design by water balance
Permeability11
(buffer evaluation) (m/day)
<0.3 0.3-3
3 to 5 >5.0
Evaluate flow times via Darcy’s Law
(assume 3m/day for alluvial sands and gravels)
Stoniness (%) <10 10 to 20 >20 Unremarkable
Emerson number 4, 5, 6, 8 7 2, 3 1 Non-dispersive.
Dispersion Index 0 1-8 8-15 >15 Non-dispersive.
Reaction trend (pH) 5.5 to 8 4.5 to 5.5 <4.5>8 Apply lime to raise pH.
E.C. (dS/m) <0.8 0.8 to 2 2-4 >4.0 Non-limiting for trench systems.
Non-limiting for irrigation.
Exchangeable Na (%) <5 5 to 10 10-15 >15 Less than 5% by deduction. (Non-limiting for trenches)
Exchangeable Mg (%) 12-15 15 to 25 25-35 35+ Less than 25% by deduction. (Non-limiting for trenches)
Exchangeable Ca (%) 65-70 40-65 20-40 <20 Greater than 40% by deduction. (Non-limiting for trenches)
Adjusted CEC 15+ 10 to 15 5 to 10 <5 15+: By deduction.
Free swell (%) <30 30-80 80-120 >120 Low-swelling clay fraction.
There are limiting factors for primary effluent trench systems (rainfall and available area).
There are no limiting factors for secondary effluent subsurface irrigation.
8 Landslip assessment based on proposed hydraulic loading, slope, profile characteristics and past and present land use.
9 Mean monthly rainfalls used in water balance analyses.
10 Saturated hydraulic conductivity from insitu testing and data base.
11 Saturated hydraulic conductivity estimated from AS/NZS1547:2012 and data base.
Page 46 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 46
APPENDIX D
MANAGEMENT PLAN
Page 47 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 47
Paul Williams & Associates Pty. Ltd. ABN 80 006 412 862
CONSULTANTS IN THE EARTH SCIENCES
P. O. Box 277, Sunbury, Victoria, 3429
2 Argyle Place, Sunbury, Victoria, 3429
Telephone: 03 9744 6426
Mobile: 0418 171 796
Email: paul@rockdr.com.au
LAND CAPABILITY ASSESSMENT LAND USE MAPPING TERRAIN MODELLING HYDROGEOLOGY HYDROLOGY GEOLOGY SOIL SCIENCE LAND-SOIL RISK ASSESSMENT
A200505-JUNE 2020
MANAGEMENT PLAN
FOR
ON-SITE EFFLUENT DISPOSAL VIA SUBSURFACE IRRIGATION
AT
3-9 BACK EILDON ROAD, THORNTON
1. INTRODUCTION
This document identifies the significant land-soil unit constraints (as identified in A200505) and their management and
day-to-day operation and management of the on-site effluent system.
2. SIGNIFICANT LAND-SOIL UNIT CONSTRAINTS
2.1 Allotment Size. The day-to-day operation and management of on-site effluent systems, as described below, is not
constrained by lot size or geometry.
Although all requirements of SEPPs have been met or exceeded through conservative design, prudence dictates that
individual lot owners assiduously follow the management programme given in Section 4, below.
2.2 Nitrogen Attenuation. To reduce nitrates to insignificant levels, the effluent should not contain more than
30mg/litre total nitrogen.
Provided the irrigation areas are at least as large as those required to satisfy the nitrogen loading, as described in
A200505 Sections 1.3.1.13, 1.3.2.13 and 2.2.3.2, and that the (specified) grass is cut and (periodically) harvested,
nitrogen will be attenuated on-site.
2.3 Hydraulic Conductivity. The soils of this site are dispersive and low swelling clays with a moderate hydraulic
conductivity. The hydraulic conductivity is significantly influenced by soil structure, soil colloid stability and swell
characteristics. Breakdown or reduction of these soil parameters over time may manifest as reduced performance of
the irrigation system. The monitoring and inspection regime detailed in Section 4.7.2, below, should be adhered to.
2.4 Site Drainage. Our recommendations for on-site effluent disposal have allowed for incident rainfall (not surface
flow or lateral subsurface flow) and are conditional on regrading the land application area to be free-draining in all
directions.
The owner should also ensure that any upslope works do not divert and/or concentrate surface water flows onto the
disposal area.
2.5 Vegetation. The effluent disposal areas have been sized via water balance analyses utilising crop factors for
pasture (rye/clover mix).
3. THE ONSITE EFFLUENT SYSTEM
The onsite effluent system consists of the influent (toilets, kitchen, bathrooms), a load balancing tank/facility, the
treatment plant/sand filter (a device to treat the effluent to at least the 20/30 standard), the irrigation area including
effluent distribution system (delivery pipes and drippers), prescribed irrigation area vegetation, associated
Page 48 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 48
Paul Williams & Associates Pty Ltd
7
infrastructure (cut-off drains, outfall areas, fencing), a service and maintenance programme and on-going
management.
4. MANAGEMENT
The owner is required to understand (and ensure that users understand) that sustainable operation of the onsite
effluent system is not automatic. Sustainable operation requires on-going management, as outlined below.
4.1 Effluent. Effluent will be generated from a residence and will include black and grey water (all wastes).
4.1.2 Effluent Quality. Effluent should be treated to a standard that meets or exceeds the water quality requirements
of the 20/30 standard.
4.1.3 Effluent Quantity. The daily effluent volume of 1,320 litres has been calculated from Code of Practice - Onsite
Wastewater Management, E.P.A. Publication 891.4, July 2016, Table 4 and assumes mains water supply (equivalent)
and WELS-rated water-reduction fixtures and fittings – minimum 4 Stars for dual-flush toilets, aerator taps,
flow/pressure control valves and minimum 3 Stars for all appliances.
4.2 Treatment. It is assumed that the design, construction, operation and maintenance of all treatment elements are
carried out in accordance with AS/NZS1547:2012 and a current JAS-ANZ accreditation.
Assuming installation of a triple interceptor grease trap and load-balancing tank, the AWTS or sand filter are to be
sized to successfully treat a daily hydraulic load of 1,320 litres and a nutrient load of up to 450grams BOD.
The sand filter shall have a minimum plan area of 27m2 with the sand media complying to the Code Appendix G. The
sand media must have less than 5% fines, effective size (D10) between 0.25 and 0.60mm and uniformity coefficient
(D60/D10) less than 4mm.
4.3 Irrigation Area. The irrigation area has been determined from the results of the water and nutrient balance
analyses and AS/NZS 1547:2012, Appendix M.
4.3.1 Effluent Area Requirement. For a daily effluent flow of 1,320 litres and to satisfy the requirement for no surface
rainwater flow in the mean wet year and on-site attenuation of nutrients, the effluent should be applied to an
irrigation area of 720m2.
Effluent distribution is as detailed in Section 4.3.2, below.
In case of an increase in effluent production through the chain of ownership, there is sufficient area available for
duplicating the irrigation areas.
Any landscaping and/or planting proposals require endorsement from the Murrindindi Shire.
4.3.2 Distribution System. The distribution system must achieve controlled and uniform dosing over the irrigation
area. A small volume of treated effluent should be dosed at predetermined time intervals throughout the day via a
pressurised piping network that achieves uniform distribution over the entire irrigation area.
Uniform delivery pressure of the effluent throughout the distribution system is essential. Drip rates should not vary by
more than 10% from the design rate over the whole of the system.
To minimise uneven post-dripper seepage, the distribution pipes must be placed parallel with slope contours.
Line spacing shall be not closer than 1000mm under any circumstances.
To facilitate the creation of transient aerobic and anaerobic soil conditions we recommend that as part of the daily
irrigation process, the effluent area be irrigated sequentially by zones or time.
4.3.3 Soil Renovation. To improve the subsoil permeability and to maintain stable soil peds, the exchangeable Calcium
needs to be increased.
To achieve a suitable cation balance, gypsum needs to be added to the soil.
Page 49 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 49
Paul Williams & Associates Pty Ltd
8
Application rates are related to water (irrigation and mean rainfall) available to dissolve or distribute to depth the
required ameliorants.
In this instance, where irrigation water is expected to be constant, available water is sourced from mean rainfall plus
irrigation.
A suitable amelioration technique is to initially broadcast gypsum over the regraded irrigation area at a rate of
0.25kg/m2. After smoothing of the surface, the irrigation network can be constructed.
After two months, broadcast gypsum over the irrigation area at a rate of 0.25kg/m2.
Gypsum must be fine-ground, agricultural quality.
Gypsum should be broadcast over the land application area at a rate of 0.25kg/m2 every 3 years.
4.3.4 Buffer Distances. The water balance analysis has shown that potential surface rainwater flows from the effluent
area would be restricted to episodic events.
The estimated hydraulic properties of the upper soil materials and hydraulic gradient (equivalent to the ground slope
and regional gradients) have been used to evaluate (via Darcy’s Law) the buffer distances with respect to subsurface
flows.
Our analysis and evaluation have shown that the default setback distances given in Code of Practice - Onsite
Wastewater Management, E.P.A. Publication 891.4, July 2016, Table 5 are conservative and can be applied without
amendment.
For a building located downslope of an effluent field, your engineer should evaluate the integrity of building
foundations with respect to the assigned buffer distance.
Buffer distances are to be applied exclusive of the irrigation area.
4.3.5 Buffer Planting. All downslope (Title inclusive) buffers may be required to filter and renovate abnormal surface
discharges. Hence, they are to be maintained with existing or equivalent groundcover vegetation.
4.3.6 Buffer Trafficking. On all allotments, buffer trafficking should be minimised to avoid damage to vegetation
and/or rutting of the surface soils.
Traffic should be restricted to ‘turf’ wheeled mowing equipment and to maintenance, monitoring and inspections by
pedestrians, where possible.
4.4 Vegetation. The system design for on-site disposal includes the planting and maintenance of suitable vegetation,
as specified in A200505 and/or similar documents.
Specifically, this irrigation area has been sized (in part) utilising crop factors and annual nitrogen uptake for a
rye/clover eq mix.
The grass needs to be harvested (mown and periodically removed from the irrigation area).
Where a variation to recommended grass species is proposed, it must be demonstrated that the nitrogen uptake and
crop factors (as specified in A200505 Appendix B – water balance) are met or exceeded.
4.5 Verification. The Council is to be satisfied that the effluent system has been constructed as designed.
4.6 Associated Infrastructure. The following items are an integral part of the onsite effluent system.
4.6.1 Cut-off drains. Cut-off drains are designed to prevent surface and near-surface water flows from entering the
effluent area. They should be constructed and placed around the effluent area, as detailed in Drawings 2 and 3.
4.6.2 Outfall areas. All pipe outfalls should be at grade and designed to eliminate scour and erosion.
Page 50 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 50
Paul Williams & Associates Pty Ltd
9
A grassed outfall would normally be adequate. However, should monitoring and inspections reveal rill or scour
formation, the outfall will need to be constructed so that energy is satisfactorily dissipated.
Should this situation occur, professional advice is to be sought.
4.6.3 Fencing. The disposal area is to be a dedicated area. Adequate fencing must be provided to prevent stock,
excessive pedestrian and vehicular movements over the area.
4.7 Service and Maintenance Programme. The minimum requirements for servicing and maintenance are set out in
the relevant Certificate of Approval and the manufacturer’s recommendations.
4.7.1 Treatment Plant. Aerated treatment plants and sand filters should be serviced at least one time per year (or as
recommended in the JAS-ANZ accreditation and the effluent should be sampled and analysed as required by the JAS-
ANZ accreditation. The local authority is to ensure compliance.
The manufacturer’s recommendations are to be followed. Generally, low phosphorous and low sodium (liquid)
detergents should be used. Plastics and other non-degradable items should not be placed into the tanks. Paints,
hydrocarbons, poisons etc should not be disposed of in sinks or toilets. Advice from a plumber should be obtained
prior to using drain cleaners, chemicals and conditioners. It is important to ensure that grease does not accumulate in
the tanks or pipes. Grease and similar products should be disposed of by methods other than via the on-site effluent
system.
4.7.2 Monitoring and Inspections. We recommend that the mandatory testing and reporting as described in the Code
of Practice - Onsite Wastewater Management, E.P.A. Publication 891.4, July 2016, include an annual (post spring) and
post periods of heavy and/or prolonged rainfall report on the functioning and integrity of the distribution system and
on the functioning and integrity of the cut-off drains, outfall areas and soil media.
The effluent areas should be regularly inspected for excessively wet areas and vegetation integrity.
We recommend that the daily waste flow is metered and recorded against patronage.
The inspection regime described in A200505, Section 2.2.7, should be strictly adhered to.
4.7.3 Grease and Oil Reduction. Restaurant/cafe kitchen wastewater usually contains high levels of food waste,
grease and oils. If grease and oils or food solids reach your treatment plant they will permanently damage the plant so
that it no longer functions to dispose of wastewater. This leads to costly repairs and/or replacement. You can help
protect your treatment plant by following simple kitchen procedures.
4.7.3.1 Plate and Cookware Pre-clean. Plates and cookware need to be thoroughly scraped to remove all food waste,
especially cooking oils and creamy sauces and gravies which are high in grease, before rinsing dishes. Thorough
scraping of dishes will prevent the majority of grease in your waste stream from entering your septic system. Absorb
room temperature liquid oils with bread waste and dispose as solid waste off site.
4.7.3.2 Water Conservation. Restaurant kitchens produce surge water flows during mealtime dishwashing periods.
Surge water loads push wastewater through the grease trap too rapidly for grease to separate. Water conservation
helps prevent surge loading.
4.7.3.3 Detergents. Select detergents that are formulated to release oil quickly so that it can rise to the water surface
instead of remaining emulsified.
4.7.3.4 Solvents, Cleaners and Disinfectants. Solvents and cleaners can cause grease to become emulsified and be
carried past the grease trap to the treatment plant. Excess use of disinfectants reduces bacterial action in the
treatment system which in turn reduces treatment of wastewater.
4.7.4 Grease Trap. The recommended triple interceptor grease trap must be regularly inspected and cleaned. Only
solids and surface oils should be removed. The water should be retained in the chambers.
Paul R. WILLIAMS B.App.Sc.
PRINCIPAL HYDROGEOLOGIST
Registered Building Practitioner EC1486
Page 51 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 51
DATE: DRAWING NO:
SCALE:
NORTH: REVISION:
TP-04ABN 40 193 714 048ARBV registration No. 16171
Dion KeechArchitect
REV DESCRIPTION DATEa: 14 Kendall St, Prestonp: 0419 449 309
e: dionkeech@gmail.com
ABN 40 193 714 048ARBV registration No. 16171
THORNTON PS CAFEPROJECT:
CAFE PREP/ OFFICE & TOILET PLANDRAWING TITLE:
FOR:
HEDGER CONSTRUCTIONS
1:100 @ A3
A First issue 19/5/20
A19/05/20
total floor area52m2
Cafe Prep/ office PlanScale: 1:100
Cafe prep.
3850
1900
6050
2600 1700 4400
9100
Office
Existing metal shed refitted with new internal lining and walls
Toilet PlanScale: 1:100
MaleAccessible
FemaleCleaner
Basin
Basin wc
wc urinal
wc
Basin
Basin
Basin
wc
shower
9200
3570
Existing weatherboard building with pitched metal roof
Page 52 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 52
Copyright State of Victoria. This publication is copyright. No partmay be reproduced by any process except in accordance with theprovisions of the Copyright Act 1968 (Cth) and for the purposes ofSection 32 of the Sale of Land Act 1962 (Vic) or pursuant to a writtenagreement. The information is only valid at the time and in the formobtained from the LANDATA REGD TM System. None of the State ofVictoria, LANDATA REGD TM System, Victorian Land Registry ServicesPty. Ltd. ABN 86 627 986 396 as trustee for the Victorian LandRegistry Services Trust ABN 83 206 746 897 accept responsibility forany subsequent release, publication or reproduction of theinformation.
REGISTER SEARCH STATEMENT (Title Search) Transfer of Land Act 1958--------------------------------------------------------------------------------VOLUME 04749 FOLIO 755 Security no : 124083425280C Produced 29/05/2020 03:37 PM
LAND DESCRIPTION----------------Lot 1 on Title Plan 431776S.PARENT TITLE Volume 02750 Folio 861Created by instrument 1124420 28/08/1923
REGISTERED PROPRIETOR---------------------Estate Fee SimpleSole Proprietor UTUPUA PTY LTD of "MAYFAIR BUILDING" LEVEL 6 171 COLLINS STREET MELBOURNE VIC 3000 AT257570K 19/05/2020
ENCUMBRANCES, CAVEATS AND NOTICES---------------------------------
Any encumbrances created by Section 98 Transfer of Land Act 1958 or Section 24 Subdivision Act 1988 and any other encumbrances shown or entered on the plan set out under DIAGRAM LOCATION below.
DIAGRAM LOCATION----------------SEE TP431776S FOR FURTHER DETAILS AND BOUNDARIES
ACTIVITY IN THE LAST 125 DAYS -----------------------------
NUMBER STATUS DATEAT171349L (E) CAVEAT Registered 20/04/2020AT237329D TRANSFER CONTROL OF ECT Completed 13/05/2020AT254569K (E) WITHDRAWAL OF CAVEAT Registered 19/05/2020AT257085S TRANSFER CONTROL OF ECT Completed 19/05/2020AT257570K (E) TRANSFER Registered 19/05/2020
------------------------END OF REGISTER SEARCH STATEMENT------------------------
Additional information: (not part of the Register Search Statement)
Street Address: 3 BACK EILDON ROAD THORNTON VIC 3712
ADMINISTRATIVE NOTICES----------------------NIL
eCT Control 22342U GRINDAL LEGAL PTY LTDEffective from 19/05/2020
DOCUMENT END
Delivered from the LANDATA® System by InfoTrack Pty Ltd.
The information supplied by InfoTrack (PE) has been obtained from InfoTrack Pty Limitedby agreement between them. The information supplied has been obtained by InfoTrack Pty Limitedwho is licensed by the State of Victoria to provide this information via LANDATA® System.
Page 53 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 53
Imaged Document Cover Sheet
The document following this cover sheet is an imaged document supplied by LANDATA®, Victorian Land Registry Services.
Document Type Plan
Document Identification TP431776S
Number of Pages
(excluding this cover sheet)
1
Document Assembled 30/06/2020 14:29
Copyright and disclaimer notice:© State of Victoria. This publication is copyright. No part may be reproduced by any process exceptin accordance with the provisions of the Copyright Act 1968 (Cth) and for the purposes of Section 32of the Sale of Land Act 1962 or pursuant to a written agreement. The information is only valid at thetime and in the form obtained from the LANDATA® System. None of the State of Victoria,LANDATA®, Victorian Land Registry Services Pty. Ltd. ABN 86 627 986 396 as trustee for theVictorian Land Registry Services Trust ABN 83 206 746 897 accept responsibility for anysubsequent release, publication or reproduction of the information.
The document is invalid if this cover sheet is removed or altered.
Page 54 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 54
Page 55 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 55
Copyright State of Victoria. This publication is copyright. No partmay be reproduced by any process except in accordance with theprovisions of the Copyright Act 1968 (Cth) and for the purposes ofSection 32 of the Sale of Land Act 1962 (Vic) or pursuant to a writtenagreement. The information is only valid at the time and in the formobtained from the LANDATA REGD TM System. None of the State ofVictoria, LANDATA REGD TM System, Victorian Land Registry ServicesPty. Ltd. ABN 86 627 986 396 as trustee for the Victorian LandRegistry Services Trust ABN 83 206 746 897 accept responsibility forany subsequent release, publication or reproduction of theinformation.
REGISTER SEARCH STATEMENT (Title Search) Transfer of Land Act 1958--------------------------------------------------------------------------------VOLUME 12168 FOLIO 427 Security no : 124083425292N Produced 29/05/2020 03:37 PM
LAND DESCRIPTION----------------Lot 1 on Title Plan 962705E.PARENT TITLE Volume 11876 Folio 998Created by Application No. 143693N 26/11/2019
REGISTERED PROPRIETOR---------------------Estate Fee SimpleSole Proprietor UTUPUA PTY LTD of "MAYFAIR BUILDING" LEVEL 6 171 COLLINS STREET MELBOURNE VIC 3000 AT257570K 19/05/2020
ENCUMBRANCES, CAVEATS AND NOTICES---------------------------------
Any encumbrances created by Section 98 Transfer of Land Act 1958 or Section 24 Subdivision Act 1988 and any other encumbrances shown or entered on the plan set out under DIAGRAM LOCATION below.
Warning as to Dimensions Any dimension and connecting distance shown is based on the description of the land as contained in the General Law Title and is not based on survey information which has been investigated by the Registrar of Titles.
DIAGRAM LOCATION----------------SEE TP962705E FOR FURTHER DETAILS AND BOUNDARIES
ACTIVITY IN THE LAST 125 DAYS -----------------------------
NUMBER STATUS DATEAT171349L (E) CAVEAT Registered 20/04/2020AT254569K (E) WITHDRAWAL OF CAVEAT Registered 19/05/2020AT257570K (E) TRANSFER Registered 19/05/2020
------------------------END OF REGISTER SEARCH STATEMENT------------------------
Additional information: (not part of the Register Search Statement)
Street Address: 9 BACK EILDON ROAD THORNTON VIC 3712
ADMINISTRATIVE NOTICES----------------------NIL
eCT Control 22342U GRINDAL LEGAL PTY LTDEffective from 19/05/2020
DOCUMENT END
Delivered from the LANDATA® System by InfoTrack Pty Ltd.
The information supplied by InfoTrack (PE) has been obtained from InfoTrack Pty Limitedby agreement between them. The information supplied has been obtained by InfoTrack Pty Limitedwho is licensed by the State of Victoria to provide this information via LANDATA® System.
Page 56 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 56
Imaged Document Cover Sheet
The document following this cover sheet is an imaged document supplied by LANDATA®, Victorian Land Registry Services.
Document Type Plan
Document Identification TP962705E
Number of Pages
(excluding this cover sheet)
2
Document Assembled 30/06/2020 14:30
Copyright and disclaimer notice:© State of Victoria. This publication is copyright. No part may be reproduced by any process exceptin accordance with the provisions of the Copyright Act 1968 (Cth) and for the purposes of Section 32of the Sale of Land Act 1962 or pursuant to a written agreement. The information is only valid at thetime and in the form obtained from the LANDATA® System. None of the State of Victoria,LANDATA®, Victorian Land Registry Services Pty. Ltd. ABN 86 627 986 396 as trustee for theVictorian Land Registry Services Trust ABN 83 206 746 897 accept responsibility for anysubsequent release, publication or reproduction of the information.
The document is invalid if this cover sheet is removed or altered.
Page 57 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 57
Page 58 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 58
Page 59 of 59
Attachment 5.1Scheduled Meeting of Council9 September 2020Page 59
Office Use Only
VicSmart? YES NO
Specify class of VicSmart application:
Application No.: Date Lodged: / /
Application for a Planning PermitIf you need help to complete this form, read MORE INFORMATION at the back of this form.
Any material submitted with this application, including plans and personal information, will be madeavailable for public viewing, including electronically, and copies may be made for interested parties forthe purpose of enabling consideration and review as part of a planning process under the Planningand Environment Act 1987. If you have any concerns, please contact Council’s planning department.
Questions marked with an asterisk (*) must be completed.
If the space provided on the form is insufficient, attach a separate sheet.
Click for further information.i
Formal Land Description *Complete either A or B.
This information can be found on the certificate of title.
If this application relates to more than one address, attach a separate sheet setting out any additional property details.
The Land i
Address of the land. Complete the Street Address and one of the Formal Land Descriptions.
Postcode:Suburb/Locality:
Street Address *St. No.:Unit No.: St. Name:
Lot No.: No.:A
OR
B Crown Allotment No.: Section No.:
Parish/Township Name:
Lodged Plan Title Plan Plan of Subdivision
Application for a Planning Permit | Combined Page 1
Application TypeIs this a VicSmart application?*
No YesIf yes, please specify which VicSmart class or classes: ...................................................................................................................................
If the application falls into one of the classes listed under Clause 92 or the schedule to Clause 94, it is a VicSmart application.
Has there been a pre-application meeting with a Council planning officer?
No Yes If ‘Yes’, with whom?:
Date: day / month / year
Pre-application Meeting
Planning EnquiriesPhone: (03) 5772 0317Email: planning@murrindindi.vic.gov.auWeb: www.murrindindi.vic.gov.au
Page 1 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 60
For what use, development or other matter do you require a permit? *
i
The ProposalYou must give full details of your proposal and attach the information required to assess the application. Insufficient or unclear information will delay your application.
Provide additional information about the proposal, including: plans and elevations; any information required by the planning scheme, requested by Council or outlined in a Council planning permit checklist; and if required, a description of the likely effect of the proposal.
Estimated cost of any development for which the permit is required *
i
Cost $ You may be required to verify this estimate. Insert ‘0’ if no development is proposed.
If the application is for land within metropolitan Melbourne (as defined in section 3 of the Planning and Environment Act 1987) and the estimated cost of the development exceeds $1 million (adjusted annually by CPI) the Metropolitan Planning Levy must be paid to the State Revenue Office and a current levy certificate must be submitted with the application. Visit www.sro.vic.gov.au for information.
Describe how the land is used and developed now *For example, vacant, three dwellings, medical centre with two practitioners, licensed restaurant with 80 seats, grazing.
Existing Conditions i
Provide a plan of the existing conditions. Photos are also helpful.
Title Information i
Encumbrances on title *
Provide a full, current copy of the title for each individual parcel of land forming the subject site. The title includes: the covering ‘register search statement’, the title diagram and the associated title documents, known as ‘instruments’, for example, restrictive covenants.
Does the proposal breach, in any way, an encumbrance on title such as a restrictrive covenant, section 173 agreement or other obligation such as an easement or building envelope?
Yes (If ‘yes’ contact Council for advice on how to proceed before continuing with this application.)
No
Not applicable (no such encumbrance applies).
Application for a Planning Permit | Combined Page 2Page 2 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 61
Information requirements
Contact Council’s planning department to discuss the specific requirements for this application and obtain a planning permit checklist.
Is the required information provided? Yes No
Remember it is against the law to provide false or misleading information, which could result in a heavy fine and cancellation of the permit.
I declare that I am the applicant; and that all the information in this application is true and correct; and the owner (if not myself) has been notified of the permit application.
Signature: Date: day / month / year
Declaration i
This form must be signed by the applicant *
Application for a Planning Permit | Combined Page 3
Applicant and Owner DetailsProvide details of the applicant and the owner of the land.
Applicant *
The person who wants the permit.
Organisation (if applicable):Postal Address: If it is a P.O. Box, enter the details here:
Title: First Name: Surname:
Suburb/Locality:
Unit No.:
Name:
Contact person’s details* Same as applicant
Organisation (if applicable):
Where the preferred contact person for the application is different from the applicant, provide the details of that person.
Postcode:State:Suburb/Locality:
St. No.:Unit No.: St. Name:
Name:
Title: First Name: Surname:
Contact information for applicant OR contact person below
Business phone:
Mobile phone:
Email:
Fax:
Please provide at least one contact phone number *
Owner *
The person or organisation who owns the land
Where the owner is different from the applicant, provide the details of that person or organisation.
Organisation (if applicable):
Owner’s Signature (Optional): Date: day / month / year
Suburb/Locality
Unit No.:
Same as applicantName:
Title: First Name: Surname:
Postal Address: If it is a P.O. Box, enter the details here:
Postal Address:
i
Page 3 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 62
Checklist i
Have you:
Filled in the form completely?
Paid or included the application fee?
Provided all necessary supporting information and documents?
A full, current copy of title information for each individual parcel of land forming the subject site.
A plan of existing conditions.
Plans showing the layout and details of the proposal.
Any information required by the planning scheme, requested by council or outlined in a council planning permit checklist.
If required, a description of the likely effect of the proposal (for example, traffic, noise, environmental impacts).
If applicable, a current Metropolitan Planning Levy certificate (a levy certificate expires 90 days after the day on which it is issued by the State Revenue Office and then cannot be used). Failure to comply means the application is void.
Completed the relevant council planning permit checklist?
Signed the declaration above?
Most applications require a fee to be paid. Contact Council to determine the appropriate fee.
LodgementLodge the completed and signed form, the fee and all documents with:
i
Need help with the Application? If you need help to complete this form, read More Information at the end of this form.
For help with a VicSmart application see Applicant’s Guide to Lodging a VicSmart Application at www.planning.vic.gov.au
General information about the planning process is available at www.planning.vic.gov.au
Assistance can also be obtained from Council’s planning department.
i
Application for a Planning Permit | Combined Page 4
Deliver application in person, by post or by electronic lodgement.
Murrindindi Shire Council PO Box 138 Alexandra VIC 3714 Shire Offices Perkins Street Alexandra VIC 3714
Contact information: Phone: (03) 5772 0317Fax: (03) 5772 2291Email: planning@murrindindi.vic.gov.au
Page 4 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 63
i MORE INFORMATIONThe LandPlanning permits relate to the use and development of the land. It is important that accurate, clear and concise details of the land are provided with the application.
How is land identified?Land is commonly identified by a street address, but sometimes this alone does not provide an accurate identification of the relevant parcel of land relating to an application. Make sure you also provide the formal land description - the lot and plan number or the crown, section and parish/township details (as applicable) for the subject site. This information is shown on the title.
See Example 1.
The ProposalWhy is it important to describe the proposal correctly?The application requires a description of what you want to do with the land. You must describe how the land will be used or developed as a result of the proposal. It is important that you understand the reasons why you need a permit in order to suitably describe the proposal. By providing an accurate description of the proposal, you will avoid unnecessary delays associated with amending the description at a later date.
Planning schemes use specific definitions for different types of use and development. Contact the Council planning office at an early stage in preparing your application to ensure that you use the appropriate terminology and provide the required details.
How do planning schemes affect proposals?A planning scheme sets out policies and requirements for the use, development and protection of land. There is a planning scheme for every municipality in Victoria. Development of land includes the construction of a building, carrying out works, subdividing land or buildings and displaying signs.
Proposals must comply with the planning scheme provisions in accordance with Clause 61.05 of the planning scheme. Provisions may relate to the State Planning Policy Framework, the Local Planning Policy Framework, zones, overlays, particular and general provisions. You can access the planning scheme by either contacting Council’s planning department or by visiting the Planning Schemes Online section of the department’s website http://planning-schemes.delwp.vic.gov.au
You can obtain a planning certificate to establish planning scheme details about your property. A planning certificate identifies the zones and overlays that apply to the land, but it does not identify all of the provisions of the planning scheme that may be relevant to your application. Planning certificates for land in metropolitan areas and most rural areas can be obtained by visiting www.landata.vic.gov.au. Contact your local Council to obtain a planning certificate in Central Goldfields, Corangamite, Macedon Ranges and Greater Geelong. You can also use the free Planning Property Report to obtain the same information.
See Example 2.
Estimated cost of developmentIn most instances an application fee will be required. This fee must be paid when you lodge the application. The fee is set down by government regulations.
To help Council calculate the application fee, you must provide an accurate cost estimate of the proposed development. This cost does not include the costs of development that you could undertake without a permit or that are separate from the permit process. Development costs should be calculated at a normal industry rate for the type of construction you propose.
Council may ask you to justify your cost estimates. Costs are required solely to allow Council to calculate the permit application fee. Fees are exempt from GST.
Costs for different types of development can be obtained from specialist publications such as Cordell Housing: Building Cost Guide or Rawlinsons: Australian Construction Handbook.
Contact the Council to determine the appropriate fee. Go to www.planning.vic.gov.au to view a summary of fees in the Planning and Environment (Fees) Regulations.
Metropolitan Planning Levy refer Division 5A of Part 4 of the Planning and Environment Act 1987 (the Act). A planning permit application under section 47 or 96A of the Act for a development of land in metropolitan Melbourne as defined in section 3 of the Act may be a leviable application. If the cost of the development exceeds the threshold of $1 million (adjusted annually by consumer price index) a levy certificate must be obtained from the State Revenue Office after payment of the levy. A valid levy certificate must be submitted to the responsible planning authority (usually council) with a leviable planning permit application. Refer to the State Revenue Office website at www.sro.vic.gov.au for more information. A leviable application submitted without a levy certificate is void.
Existing ConditionsHow should land be described?You need to describe, in general terms, the way the land is used now, including the activities, buildings, structures and works that exist (e.g. single dwelling, 24 dwellings in a three-storey building, medical centre with three practitioners and 8 car parking spaces, vacant building, vacant land, grazing land, bush block).
Please attach to your application a plan of the existing conditions of the land. Check with the local Council for the quantity, scale and level of detail required. It is also helpful to include photographs of the existing conditions.
See Example 3.
Title InformationWhat is an encumbrance?An ‘encumbrance’ is a formal obligation on the land, with the most common type being a ‘mortgage’. Other common examples of encumbrances include:
• Restrictive Covenants: A ‘restrictive covenant’ is a written agreementbetween owners of land restricting the use or development of the landfor the benefit of others, (eg. a limit of one dwelling or limits on typesof building materials to be used).
• Section 173 Agreements: A ‘section 173 agreement’ is a contractbetween an owner of the land and the Council which sets outlimitations on the use or development of the land.
• Easements: An ‘easement’ gives rights to other parties to use theland or provide for services or access on, under or above the surfaceof the land.
• Building Envelopes: A ‘building envelope’ defines the developmentboundaries for the land.
Aside from mortgages, the above encumbrances can potentially limit or even prevent certain types of proposals.
What documents should I check to find encumbrances?Encumbrances are identified on the title (register search statement) under the header ‘encumbrances, caveats and notices’. The actual details of an encumbrance are usually provided in a separate document (instrument) associated with the title. Sometimes encumbrances are also marked on the title diagram or plan, such as easements or building envelopes.
What about caveats and notices?A ‘caveat’ is a record of a claim from a party to an interest in the land. Caveats are not normally relevant to planning applications as they typically relate to a purchaser, mortgagee or chargee claim, but can sometimes include claims to a covenant or easement on the land. These types of caveats may affect your proposal.
Other less common types of obligations may also be specified on title in the form of ‘notices’. These may have an effect on your proposal, such as a notice that the building on the land is listed on the Heritage Register.
Application for a Planning Permit | Combined AddendumPage 5 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 64
What happens if the proposal contravenes an encumbrance on title?Encumbrances may affect or limit your proposal or prevent it from proceeding. Section 61(4) of the Planning and Environment Act 1987 for example, prevents a Council from granting a permit if it would result in a breach of a registered restrictive covenant. If the proposal contravenes any encumbrance, contact the Council for advice on how to proceed.
You may be able to modify your proposal to respond to the issue. If not, separate procedures exist to change or remove the various types of encumbrances from the title. The procedures are generally quite involved and if the encumbrance relates to more than the subject property, the process will include notice to the affected party.
You should seek advice from an appropriately qualified person, such as a solicitor, if you need to interpret the effect of an encumbrance or if you seek to amend or remove an encumbrance.
Why is title information required?Title information confirms the location and dimensions of the land specified in the planning application and any obligations affecting what can be done on or with the land.
As well as describing the land, a full copy of the title will include a diagram or plan of the land and will identify any encumbrances, caveats and notices.
What is a ‘full’ copy of the title?The title information accompanying your application must include a ‘register search statement’ and the title diagram, which together make up the title.
In addition, any relevant associated title documents, known as ‘instruments’, must also be provided to make up a full copy of the title.
Check the title to see if any of the types of encumbrances, such as a restrictive covenant, section 173 agreement, easement or building envelope, are listed. If so, you must submit a copy of the document (instrument) describing that encumbrance. Mortgages do not need to be provided with planning applications.
Some titles have not yet been converted by Land Registry into an electronic register search statement format. In these earlier types of titles, the diagram and encumbrances are often detailed on the actual title, rather than in separate plans or instruments.
Why is ‘current’ title information required?It is important that you attach a current copy of the title for each individual parcel of land forming the subject site. ‘Current’ title information accurately provides all relevant and up-to-date information.
Some Councils require that title information must have been searched within a specified time frame. Contact the Council for advice on their requirements.
Copies of title documents can be obtained from Land Registry: Level 10, 570 Bourke Street, Melbourne; 03 8636 2010; www.landata.vic.gov.au – go direct to “titles & property certificates”.
Applicant and Owner DetailsThis section provides information about the permit applicant, the owner of the land and the person who should be contacted about any matters concerning the permit application.
The applicant is the person or organisation that wants the permit. The applicant can, but need not, be the contact person.
In order to avoid any confusion, the Council will communicate only with the person who is also responsible for providing further details. The contact may be a professional adviser (e.g. architect or planner) engaged to prepare or manage the application. To ensure prompt communications, contact details should be given.
Check with council how they prefer to communicate with you about the application. If an email address is provided this may be the preferred method of communication between Council and the applicant/contact.
The owner of the land is the person or organisation who owns the land at the time the application is made. Where a parcel of land has been sold and an application made prior to settlement, the owner’s details should be identified as those of the vendor. The owner can, but need not, be the contact or the applicant.
See Example 4.
DeclarationThe declaration should be signed by the person who takes responsibility for the accuracy of all the information that is provided. This declaration is a signed statement that the information included with the application is true and correct at the time of lodgement.
The declaration can be signed by the applicant or owner. If the owner is not the applicant, the owner must either sign the application form or must be notified of the application which is acknowledged in the declaration.
Obtaining or attempting to obtain a permit by wilfully making or causing any false representation or declaration, either orally or in writing, is an offence under the Planning and Environment Act 1987 and could result in a fine and/or cancellation of the permit.
ChecklistWhat additional information should you provide to support the proposal?
You should provide sufficient supporting material with the application to describe the proposal in enough detail for the Council to make a decision. It is important that copies of all plans and information submitted with the application are legible.
There may be specific application requirements set out in the planning scheme for the use or development you propose. The application should demonstrate how these have been addressed or met.
The checklist is to help ensure that you have:
• provided all the required information on the form
• included payment of the application fee
• attached all necessary supporting information and documents
• completed the relevant Council planning permit checklist
• signed the declaration on the last page of the application form
The more complete the information you provide with your permit application, the sooner Council will be able to make a decision.
Need help with the Application?If you have attended a pre-application meeting with a Council planner, fill in the name of the planner and the date, so that the person can be consulted about the application once it has been lodged.
LodgementThe application must be lodged with the Council responsible for the planning scheme in which the land affected by the application is located. In some cases the Minister for Planning or another body is the responsible authority instead of Council. Ask the Council if in doubt.
Check with Council how they prefer to have the application lodged. For example, they may have an online lodgement system, prefer email or want an electronic and hard copy. Check also how many copies of plans and the size of plans that may be required.
Contact details are listed in the lodgement section on the last page of the form.
Approval from other authorities: In addition to obtaining a planning permit, approvals or exemptions may be required from other authorities or Council departments. Depending on the nature of your proposal, these may include food or health registrations, building permits or approvals from water and other service authorities.
Application for a Planning Permit | Combined AddendumPage 6 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 65
The Land i
Address of the land. Complete the Street Address and one of the Formal Land Descriptions.
Postcode:Suburb/Locality:
Street Address *St. No.:Unit No.: St. Name:
Formal Land Description *Complete either A or B.
This information can be found on the certificate of title.
If this application relates to more than one address, attach a separate sheet setting out any additional property details.
Lot No.: No.:A
OR
B Crown Allotment No.: Section No.:
Parish/Township Name:
Lodged Plan Title Plan Plan of Subdivision
4 26 Planmore Avenue HAWTHORN 3122
2 LP93562P
Describe how the land is used and developed now *For example, vacant, three dwellings, medical centre with two practitioners, licensed restaurant with 80 seats, grazing.
Existing Conditions i
Provide a plan of the existing conditions. Photos are also helpful.
Single dwelling.
Applicant and Owner DetailsProvide details of the applicant and the owner of the land.
Applicant *
The person who wants the permit.
Organisation (if applicable):Postal Address: If it is a P.O. Box, enter the details here:
Title: First Name: Surname:
Postcode:State:Suburb/Locality:
St. No.:Unit No.: St. Name:
Name:
Contact person’s details* Same as applicant
Organisation (if applicable):
Where the preferred contact person for the application is different from the applicant, provide the details of that person.
Postcode:State:Suburb/Locality:
St. No.:Unit No.: St. Name:
Name:
Title: First Name: Surname:
Contact information for applicant OR contact person below
Business phone:
Mobile phone:
Email:
Fax:
Please provide at least one contact phone number *
Owner *
The person or organisation who owns the land
Where the owner is different from the applicant, provide the details of that person or organisation.
Organisation (if applicable):
Owner’s Signature (Optional): Date: day / month / year
Postcode:State:Suburb/Locality:
St. No.:Unit No.: St. Name:
Same as applicantName:
Title: First Name: Surname:
Postal Address: If it is a P.O. Box, enter the details here:
Postal Address: If it is a P.O. Box, enter the details here:
i
Mr Len Browning Responsible Developers P/L 4 12 Ardour Lane Wycheproof Vic 3527
9123 4567 tcpl@bigpond.net.au 0412 345 678 9123 4567
Mr Andrew Hodge Town Planning Consultants PO Box 111 Parkdale Vic 3194
P
For what use, development or other matter do you require a permit? *
i
Provide additional information about the proposal, including: plans and elevations; any information required by the planning scheme, requested by Council or outlined in a Council planning permit checklist; and if required, a description of the likely effect of the proposal.
Construction of two, double-storey dwellings and construction of two new crossovers.
Example 1
Example 2
Example 3
Example 4
EXAMPLES
Application for a Planning Permit | Combined AddendumPage 7 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 66
Planning Permit to
Murrindindi Shire Council
for proposed
Group Accommodation compromising six (6) cabins and community
building
Address: 86 Moores Road, Flowerdale
Lot 3 PS306336
27 February 2020
Page 8 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 67
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 1
Contents 1. Introduction ..................................................................................................................................... 3
1.1 What is in this report .................................................................................................. 3
1.2 Summary of proposal ................................................................................................ 4
1.3 Purpose of the proposal ........................................................................................... 4
2. The Site and Locality ........................................................................................................................... 4
2.1 The Region ................................................................................................................. 4
2.2 The Locality ................................................................................................................ 5
2.3 The Site ....................................................................................................................... 6
3. Existing uses ........................................................................................................................................ 8
3.1 Existing uses ................................................................................................................ 8
4. The Proposed Development ............................................................................................................... 8
4.1 Objectives of the Proposed Development ............................................................. 8
4.2 The Proposed Development .................................................................................... 8
4.2.1 Cabins ................................................................................................................ 9
4.2.2 Community Building .......................................................................................... 9
4.2.3 On-site Wastewater Management .................................................................. 9
4.2.4 Vehicular Access and Parking ......................................................................... 9
5. Planning Assessment......................................................................................................................... 10
5.1 Municipal Planning Strategy – Murrindindi ............................................................ 10
5.1.2 Vision .................................................................................................................................. 10
5.1.3 Strategic Direction ......................................................................................................... 11
5.1.5 Strategic Framework Plans .......................................................................................... 12
5.1.5 Planning Policy Framework ......................................................................................... 12
5.2 Farming Zone ........................................................................................................... 15
5.2.1 Clause 35.07-1 Farming Zone .............................................................................. 15
5.2.3 Decision Guidelines ....................................................................................................... 15
5.2.2 Schedule 1 to the Farming Zone (FZ1) ................................................................ 18
5.4 Overlays ............................................................................................................... 18
5.4.1 Bushfire Management Overlay (BMO) ......................................................................... 18
5.6 Particular Provisions ................................................................................................. 19
5.6.1 52.06 Carparking ........................................................................................................... 19
6. Other Strategic Planning Plans .......................................................................................................... 19
6.1 Goulburn Broken Regional Catchment Strategy ............................................................... 19
6.2 Rural Living Development Guidelines March 2004 ........................................................... 19
Page 9 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 68
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 2
6.3 The Kinglake Ranges, Flowerdale and Toolangi Plan and Design Framework 2015 ......... 20
7. Conclusion ......................................................................................................................................... 21
APPENDICIES
A. Planset of proposed buildings
B. Farm Plan November 2019
C. LAND CAPABILITY ASSESSMENT FOR ON‐SITE WASTEWATER MANAGEMENT AT 86 MOORES
ROAD, FLOWERDALE REPORT No. A190803 OCTOBER 2019 Paul Williams & Associates Pty
Ltd
D. Copy of Title
Page 10 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 69
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 3
1. Introduction
1.1 What is in this report
This report is a Planning Permit to Murrindindi Shire Council seeking a planning permit for the
propose the use of Group Accommodation and Community Building and associated
buildings and works including six (6) cabins and community building and associated internal
access roads and carparking.
A planning permit is required under Clause 35.07-1 Farm Zone for the use of Group
Accommodation and the Community Building which is a non-specified use under the
zoning. The buildings and works require a permit under clause as they are associated with a
section 2 use under Clause 35.07-1 Farm Zone.
The report is a result of Vivian Haung and owner of the property engaging Planning
Sustainable Solutions to prepare a planning permit for the above buildings and works and
use. Shane Sylvanspring was sought due to Vivians links to the Global Ecovillage Network
(GEN) in Asia and knew Shane would understand the vision Vivian and her family have for
the property.
The subject site is Lot 3 PS306336 known as 86 Moores Road. Flowerdale.
This report demonstrates that no significant adverse impacts will be generated by the
proposal. This application is consistent with:
• The objectives of the zoning of the site
• Strategic Directions of Murrundindi Shire
• Relevant Planning Policy Framework
• Relevant provisions
• Other strategic plans
The proposal is in the public and Shires interest as it provides additional accommodation
options, increase agricultural productivity and positive environmental and social outcomes
for the area. The following sections of the report describe the various aspects of the proposal
and assess the consistency of the application with applicable planning provisions.
Section 1 - Introduction - introduces the report and explains the
circumstances of the case and a summary of the proposal.
Section 2 - The site and locality - introduces the site and describes the
context of the site within its immediate and broader locality.
Section 3 – Existing uses – describes the current uses of the site
Section 4 - The proposed development - describes the proposal for
which this application is seeking planning consent and also describes
the objectives of the proposed development.
Section 5 - Statutory planning assessment - examines the consistency of
the proposed development with the provisions of relevant planning
policies, objectives, statutory instruments and legislation.
Appendices – attached reports and assessments
Page 11 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 70
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 4
1.2 Summary of proposal
This planning permit is for group accommodation that will provide guests with an experience
of rural Victoria, community living and organic farming and earth building practices. The
accommodation is low key with a communal dining and lounge area to increase the
organic farming and low impact community lifestyle the property wants to promote.
1.3 Purpose of the proposal
The proposed group accommodation is to provide temporary accommodation for visitors to
the area wishing to experience alternative farming practices and natural building.
The owner’s vision is for Chinese visitors to Melbourne to come and experience the rural
Victorian countryside as well as engage in farm activities that promote regeneration and
organic lifestyles. To support this vision the owner is planning to build from environmental
materials such as Strawbale, engage in water saving technologies and operate an organic
farm producing a wide variety of crops and fruits. Visitors will be able to experience
regenerative farming practices such as permaculture and organic farming in practice while
hosted by a local Chinese family. No such venue or experience is currently available for
Chinese tourists within the greater Melbourne area.
The current farm is not financially viable to sustain itself from the current orchard, so this use
will ensure long-term sustainability both financially and environmentally for the site. The
accommodation will allow confidence in exploring more diverse cropping and mixed crops
in the organic permaculture and regenerative agricultural practices. The existing cherry
orchard is to be retained and converted into organic cherry production. See appendix B for
proposed farm plan.
2. The Site and Locality
2.1 The Region
The proposal site is within the Hume region of Victoria is an economic rural region located in
the north-eastern part of Victoria, Australia. Comprising an area in excess of 40,000 square
kilometres with a population that ranges from 263,000 (in 2011) to 300,000 (in 2012),
King Parrot Creek the major waterway in Flowerdale is part of the large Goulbourn River
Catchment that covers large areas of Victoria and the region is known for its agricultural
areas of orchards, livestock and wineries.
The area is on the border of the greater Melbourne area as it is also in the northern foothills of
the Great Dividing Range that separates Melbourne from the drier and larger inland areas.
Page 12 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 71
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 5
Wider locality (Source: MapshareVic)
2.2 The Locality
Flowerdale is a town in Victoria, Australia. The town is 95 kilometres from Melbourne and in
the foothills of the Great Dividing Range, in the upper catchment of the Goulburn
River system. At the 2016 Census, Flowerdale had a population of 689.
The area was devastated by the Black Saturday bushfires in February 2009 with the loss of
many houses, however the school, hotel and community hall were spared.
Flowerdale absorbed the entire adjacent town of Hazeldene on 9 April 2014, when the state
government formally merged the two towns. The council, which had supported the move,
cited a community desire for a "unified sense of community identity" following the Black
Saturday bushfires, which had caused significant damage in both towns.
The town and area is known for its scenic rural landscapes of bushland and hills with dry
sclerophyll forests, pastures and creeks meandering through rugged hillside country.
Moores Road and immediate environs
Page 13 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 72
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 6
The subject site and its immediate locality are depicted below.
Nearby locality (Source: MapshareVic)
2.3 The Site
The subject site is a 21.4ha lot (53-acre allotment) rural allotment located at 86 Moores Road
known as Lot 3 PS306336. The property is a mixed grazing and orchard property with a 3ha
cherry orchard and pastures. Very little native vegetation is found on site with windbreaks the
only tree coverage on the property
The aerial image below depicts the site and the existing access from Moores Road. The site is
only 400m from the turn off of Moores Road and Boradford- Flowerdale Road which is major
road for the area.
The site is also only 2km from the small township of Flowerdale which has basic services.
Appendix A contains plans and site plan for the proposed cabins and buildings.
Page 14 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 73
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 7
Site (Source: MapshareVic)
Subject Site looking north down the King Parrot Creek valley showing orchard, house, sheds and grazing areas
Page 15 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 74
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 8
3. Existing uses
3.1 Existing uses
‘Carric Hill’ has a history as a cherry farm for over 10 years. The farm is a small-scale crop that
was a self-pick sales venue. The remaining land has been used for livestock. Due to the soil
and management of past owners the farm cannot handle a financial sustainable amount of
livestock. The property was struggling financially.
The property has one residence and several rural sheds expected for a property of its type.
The property has no native forested areas and is cleared grassland with steep sections and a
3ha netted cherry orchard currently not maintained well which is proposed to remain and
be managed appropriately.
The current orchard is in transition to organic spray free methods.
Farm Sheds associated with the agricultural use also exist as well as a large irrigation dam.
4. The Proposed Development This section of the report describes the proposed development and the environmental
planning objectives adopted for the proposal.
4.1 Objectives of the Proposed Development
The objectives of the proposed development are as follows:
• Attain planning approval for the proposed uses and buildings and works
described
• Provide a suitable design solution that will satisfy the needs of the farm
• Design the new buildings required to minimise conflict with views, privacy or
amenity of adjoining properties;
• Provide adequate services to the proposed buildings;
• Manage on-site wastewater generated by the new developments;
• Provide an increase in production and uses for the agricultural property;
• Provide additional accommodation for visitors wanting to experience and
learn farm management
• Be consistent with relevant planning controls.
4.2 The Proposed Development
The proposal includes the use of the land for Group Accommodation and associated
buildings and works which include internal road, administration and community building and
6 cabins. The buildings will be in vicinity to the existing buildings on-site and utilise existing
internal road access.
Page 16 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 75
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 9
Strawbale building technique
4.2.1 Cabins
The proposed cabins are situated to the rear of the property. They are proposed to be
constructed of strawbale, and environmentally friendly and sustainable natural building
technique. Each cabin will contain an ensuite and bedroom. The Cabins are 34m2 in size
and will be built into the landscape with landscaped food producing gardens surrounding.
Details of the cabins can be found in Appendix A.
Proposed Cabins
4.2.2 Community Building
It is proposed to have a community building
on-site where visitors can gather, have meals,
lounge and meet. The facility will be able to
offer meals to accommodation guests only
and farm workers and will not be open to the
public. The building will be built of strawbale
to educate visitors on the benefits of natural
buildings. Incorporated in the building is a
small administration area underneath the
main building.
The community building is designed as a solar
passive building and provides outlook onto
landscape gardens where demonstrations
can be given. Details of the building can be
found in appendix A.
4.2.3 On-site Wastewater Management
Appendix C contains the On-Site Wastewater Management report by Paul Williams and
Associated Pty Ltd.
The report demonstrates that the site is unconstrained and that the proposed treatment
systems are suitable and proposed wastewater treatment areas are adequate for all
developments within the proposal. See appendix B for proposed site of area of treatment.
4.2.4 Vehicular Access and Parking
The proposed access is using the current access and extend to service the cabins and
community facility. This will be a gravel road and developed in accordance with regulations.
The major Broadford-Flowerdale Road is only 400m from the site and therefore little road
upgrades are required.
Page 17 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 76
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 10
Carparking will be provided at the community facility for 12 car spaces as well as single car
spaces at the cabin sites.
Approximate location of proposed buildings on-site
5. Planning Assessment The proposal is subject to the Murrindindi Planning Scheme which is the planning instrument
for the site. Below are relevant areas of the scheme applicable to the development.
5.1 Municipal Planning Strategy – Murrindindi
The proposal supports many aspects of the Municipal Planning Strategy. All relevant areas
are included below:
5.1.2 Vision
VISION
• Council seeks to enhance the liveability, amenity and quality of life in the municipality.
• Council will facilitate sustainable population and economic growth.
• The municipal rate base will be actively grown through sound planning, support for
continued economic development and protection of the natural and built environment.
• A strong economy will attract people to the municipality, creating further opportunities for
lifestyle choice, business investment and prosperity.
The proposal supports the vision by increasing the economic development of the area in a
sustainable way without compromising the liveability, amenity and quality of life in the
municipality.
Page 18 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 77
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 11
5.1.3 Strategic Direction
The proposal supports the following strategic directions of the Planning Policy Framework:
Settlement
• Concentrating development in locations free from environmental constraints, where
environmental values are protected, and the level of community safety is improved
The site is free from development constraints.
Environmental and landscape values
• Protecting environmental values, including native vegetation, roadside vegetation, and
scattered paddock trees.
• Encouraging environmentally sustainable design and energy and water efficiency
• Protecting and enhancing waterways, catchments, flood plains and wetlands.
The development is located to protect existing environmental values of the site.
Environmental risks and amenity
• Reducing the impacts of climate change, by supporting alternative energy sources, carbon
farming, reducing greenhouse gas emissions, and adopting environmentally sustainable
development principles.
• Encouraging development only when the risk to life and property from bushfire can be
reduced to an acceptable level and that bushfire protection measures can be implemented.
• Minimising risk to life and property from bushfire and flooding through the appropriate
siting, design and management of uses and developments
The development is located so there is little risk of fire or flood to property or life.
Natural resource management
• Protecting rural land for productive agricultural uses and compatible rural uses.
• Ensuring that the use and development of rural land protects and enhances agricultural
potential and the productive capacity of the land and surrounding land.
• Supporting existing agricultural production activities, including beef and sheep grazing,
horticulture, cropping, vegetable growing, aquaculture, timber production and niche
products.
• Supporting emerging agricultural industries that are compatible with existing agricultural
practices, including horticulture, intensive animal production, agroforestry, farm gate
agricultural sales, boutique, niche agriculture, agricultural processing, value adding
industries and carbon farming.
• Supporting the evolution of agriculture in response to improved practices and climate
change. Ensuring that agricultural land is not developed for primarily residential purposes.
• Discouraging the fragmentation of rural land into lots incapable of productive agricultural
and rural use.
The proposal supports the improved practices of agriculture and protects the existing
agricultural production on-site. The development will increase the agricultural production
and capacity on site as well as protect the rural use of the area.
Economic development
Page 19 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 78
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 12
• Encouraging business expansion, investment and employment. Facilitating the growth of
home-based business, small businesses, niche industries and rural based industries
• Encouraging sustainable growth in tourism, leveraging Murrindindi Shire’s natural assets,
proximity to Melbourne and links with neighbouring regions.
• Facilitating development of new tourism accommodation options and conference centres.
• Facilitating the rebuilding of tourism accommodation, attractions and facilities in areas
affected by natural disasters, including the 2009 bushfires.
• Encouraging small enterprises in tourism, creative arts, home-based businesses, overnight
visitor accommodation and farm enterprises and markets that showcase local produce.
The proposal encourages small enterprise in tourism and overnight visitor accommodation
and provides a new tourism accommodation option. The town of Flowerdale was impacted
by the 2009 fires however this site was not impacted and is of low fire risk.
5.1.5 Strategic Framework Plans
The proposal is outside any specific framework plan however is located near a tourism route
being the Flowerdale Road as shown below. Therefore, the strategic framework supports
tourist related activities such as the proposal along these routes.
5.1.5 Planning Policy Framework
In addition to the proposal supporting many of the objectives of the Strategic Direction of
Murrindindi, the proposal is also supported by the following objectives and policies within the
State Planning Policy Framework.
11.01 Settlement - Hume
Page 20 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 79
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 13
• Support growth and development in other existing urban settlements and foster the
sustainability of small rural settlements
Settlement - Murrindindi
Strategies
• Support the recovery and rebuilding of communities affected by the 2009 bushfires.
• Support the rebuilding of destroyed homes and damaged infrastructure from the 2009
bushfires.
• Support the re-establishment of commercial centres and opportunities for local employment
arising from the 2009 bushfires.
Flowerdale was heavily impacted by the fires in 2009. This development will possibly increase
local employment opportunities.
14.01-2S Sustainable agricultural land use
Objective: To encourage sustainable agricultural land use.
• Ensure agricultural and productive rural land use activities are managed to maintain the
long-term sustainable use and management of existing natural resources.
• Support the development of innovative and sustainable approaches to agricultural and
associated rural land use practices.
• Support adaptation of the agricultural sector to respond to the potential risks arising from
climate change.
• Encourage diversification and value-adding of agriculture through effective agricultural
production and processing, rural industry and farm-related retailing.
• Assist genuine farming enterprises to embrace opportunities and adjust flexibly to market
changes.
The proposal will help the farm diversify and encourage sustainable agricultural practices.
15.01-2S Building design
• Minimise the detrimental impact of development on neighbouring properties, the public
realm and the natural environment.
• Ensure development is designed to protect and enhance valued landmarks, views and vistas
• Encourage development to retain existing vegetation.
No vegetation removal is required and the buildings and works respond and protect the
environmental and landscape values of the area.
15.03-2s Aboriginal Cultural Heritage
The proposal is not in an area of Cultural Sensitivity (see map below) or is known cultural
heritage place in reference to the Aboriginal Heritage Act 2006.
Page 21 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 80
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 14
Map showing property and areas of cultural sensitivity (in green)
17 Economic development
17.01-1 Diversified economy - Hume Strategy
• Encourage appropriate new and developing forms of industry, agriculture, tourism and
alternative energy production.
The proposal is a new form of tourism for the area where international guests enjoy
sustainable farming and rural stays specific to Chinese visitors.
17.04-1S Facilitating tourism
Objective: To encourage tourism development to maximise the economic, social and cultural benefits
of developing the state as a competitive domestic and international tourist destination.
Strategies
• Encourage the development of a range of well-designed and sited tourist facilities, including
integrated resorts, accommodation, host farm, bed and breakfast and retail opportunities.
• Seek to ensure that tourism facilities have access to suitable transport.
• Promote tourism facilities that preserve, are compatible with and build on the assets and
qualities of surrounding activities and attractions.
• Create innovative tourism experiences.
• Encourage investment that meets demand and supports growth in tourism.
The proposal is for a tourist facility that preserves the rural nature of the area and creates an
innovative tourism experience. There is a known demand for the type of visitor the proposal
will cater for.
17.04-1R Tourism - Hume Strategies
• Support large commercial tourism uses in urban locations or rural areas of lower agricultural
value and away from areas identified as strategic agricultural land.
• Facilitate rural tourism activities that support agricultural enterprises such as cellar door and
farm gate sales and accommodation in appropriate locations.
Page 22 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 81
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 15
• Support the region’s network of tracks and trails and activities that complement and extend
their use.
The site is of low agricultural value and not identified as strategic agricultural land. The tourist
accommodation will support the agricultural activities on-site.
5.2 Farming Zone
5.2.1 Clause 35.07-1 Farming Zone
86 Moores Road, Flowerdale is within the Farming Zone (FZ) within the Murrindindi Planning
Scheme.
Purpose of the zone
• To implement the Municipal Planning Strategy and the Planning Policy Framework.
• To provide for the use of land for agriculture. To encourage the retention of productive
agricultural land.
• To ensure that non-agricultural uses, including dwellings, do not adversely affect the use of
land for agriculture.
• To encourage the retention of employment and population to support rural communities.
• To encourage use and development of land based on comprehensive and sustainable land
management practices and infrastructure provision.
• To provide for the use and development of land for the specific purposes identified in a
schedule to this zone.
A planning permit is required under Clause 35.07 of the Farming Zone for the use of Group
Accommodation and Community Building which is an unspecified use under section 2 of the
zoning.
The proposal supports the purposes of the zone by retaining the prime purpose of the land
for agricultural production, allow employment opportunities and supports sustainable land
management practices.
5.2.2 35.07-4 Buildings and works
A permit is required for the proposed buildings and works the buildings and works associated
with a use in Section 2 of Clause 35.07-1 and are not exempt under the clause.
All setback requirements however are achieved for the zoning.
5.2.3 Decision Guidelines
Before deciding on an application to use or subdivide land, construct a building or construct
or carry out works, in addition to the decision guidelines in Clause 65, the responsible
authority must consider, as appropriate:
General issues
• The Municipal Planning Strategy and the Planning Policy Framework.
See for response to the Municipal Planning Strategy.
• Any Regional Catchment Strategy and associated plan applying to the land.
See response to Regional Catchment Strategy.
• The capability of the land to accommodate the proposed use or development,
including the disposal of effluent.
Page 23 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 82
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 16
The report has demonstrated that the land can accommodate the proposed use and
development. See Appendix C for more details.
• How the use or development relates to sustainable land management.
The organic cherry orchard on-site will remain and there will be an increase in diverse
cropping and farming production as a result of the application. The accommodation will
showcase the proposed regenerative farming proposed on-site.
• Whether the site is suitable for the use or development and whether the proposal is
compatible with adjoining and nearby land uses.
The proposed use and development will not impact adjoining land uses and is compatible
with the area.
• How the use and development makes use of existing infrastructure and services.
The proposal will enhance existing agricultural uses of the site, utilises existing access roads
and areas already developed.
• Agricultural issues and the impacts from non-agricultural uses
The non-agricultural uses proposed make up only a small percentage of the site and will not
impact the current productivity or proposed agricultural uses. The proposed development
will occur on degraded pasture with poor soil quality and no longer used for livestock within
vicinity of existing non-agricultural uses on site (existing dwelling and rural sheds).
• Whether the use or development will support and enhance agricultural production.
The proposal supports the existing agricultural uses of the property as well as allowing the
enhancement of production.
• Whether the use or development will adversely affect soil quality or permanently
remove land from agricultural production.
The proposal will only remove a small percentage of land from agricultural production. As
the cabins are relocatable the land removed permanently from production is further
reduced.
• The potential for the use or development to limit the operation and expansion of
adjoining and nearby agricultural uses.
Nearby farming uses are grazing which will not be impacted by the proposed use or
buildings.
• The capacity of the site to sustain the agricultural use.
The property is of a size that is difficult to sustain through grazing alone. The orchard on site is
also of a size that is difficult to financially sustain the use. The proposal introduces a third
financial input which can support more diverse cropping and production.
• The agricultural qualities of the land, such as soil quality, access to water and access
to rural infrastructure.
The site has poor agricultural qualities with poor soils and access to water. Dams currently
provide irrigation to crops. It is hoped through organic farming methods such as mulching
and diverse cropping water reduction and soil health can be improved.
• Any integrated land management plan prepared for the site.
No integrated land management plan has been prepared however a farm plan has been
prepared -see appendix B
Page 24 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 83
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 17
Dwelling issues
The proposal is not for an additional dwelling rather group accommodation.
Environmental issues
• The impact of the proposal on the natural physical features and resources of the
area, on soil and water quality.
The proposal will only use a portion of the current available land. The development will
increase soil fertility as it will support more regenerative organic farming techniques on the
land such as mulching, composting and increasing soil health. The development will have no
impact on the existing water quality.
• The impact of the use or development on the flora and fauna on the site and its
surrounds.
The proposal requires no removal of vegetation and has no impact on surrounding flora and
fauna. The proposed farm plan will enhance flora and fauna on the site.
• The need to protect and enhance the biodiversity of the area, including the
retention of vegetation
The proposal requires no removal of vegetation and has no impact on surrounding flora and
fauna. The proposed farm plan will enhance flora and fauna on the site.
• and faunal habitat and the need to revegetate land including riparian buffers along
waterways, gullies, ridgelines, property boundaries and saline discharge and
recharge area.
The plan is to repair current riparian areas on the farm which are located away from the
proposed development.
• The location of on-site effluent disposal areas to minimise the impact of nutrient loads
on waterways and native vegetation.
The proposed area for treatment of wastewater will have no impact on native vegetation or
waterways located over 950m from the nearest waterway.
Design and siting issues
• The need to locate buildings in one area to avoid any adverse impacts on
surrounding agricultural uses and to minimise the loss of productive agricultural land.
The proposal will have no impact on the surrounding land uses which is livestock grazing. The
amount of land used for the proposal will not result in a loss of productive farmland with only
around 2 acres out of 50 being used for the development.
• The impact of the siting, design, height, bulk, colours and materials to be used, on the
natural environment, major roads, vistas and water features and the measures to be
undertaken to minimise any adverse impacts.
The proposed community building and cabins are to be built of natural materials and are of
a scale and bulk that they will not be visible from roadways or surrounding properties. The
cabins are small in nature and located in the least visible area of the property.
• The impact on the character and appearance of the area or features of
architectural, historic or scientific significance or of natural scenic beauty or
importance.
There is no known significant features on the site and the proposal will not impact the scenic
beauty of the area as it is not located on a ridgeline or visible from any public area.
Page 25 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 84
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 18
• The location and design of existing and proposed infrastructure including roads, gas,
water, drainage, telecommunications and sewerage facilities.
The proposal is sited to utilise existing access roads and will be self sufficient in all areas
• Whether the use and development will require traffic management measures
The proposal is only proposed to generate 24 car movements a day (4 x6) at maximum and
therefore is unlikely to require any traffic management measures.
5.2.2 Schedule 1 to the Farming Zone (FZ1)
The proposal meets the schedule to the Farm Zone in the following:
The proposal is not for a dwelling and therefore minimum lot size does not apply
All development meets the minimum setbacks of:
• 5 metres from all boundaries
• 100m from dwellings not in the same ownership
• 20m from Moore’s Road which is not a Category 1 or 2 road
Earthworks associated with the development are minor in nature (under 1m) and will not
change the flow of water over the site.
Distance of proposal to adjoining dwellings
5.4 Overlays
The proposal is within the following Overlays which are addressed below:
5.4.1 Bushfire Management Overlay (BMO)
The property is partially covered by the Bushfire Management Overlay as shown.
Page 26 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 85
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 19
All proposed buildings and works are outside the overlay and are over 100m from where the
overlay starts. The proposal is not required to consider requirements stipulated under this
Overlay. Appropriate access to the buildings is proposed for emergency vehicles and all
buildings will be built in accordance with building and fire regulations.
No other overlays exist on the site.
5.6 Particular Provisions
5.6.1 52.06 Carparking
Under Clause 52.06 there is no specified carapaces required for accommodation. There will
be however 2 car spaces provided per cabin which would be equivalent to the
requirements of a dwelling under this clause.
6. Other Strategic Planning Plans
6.1 Goulburn Broken Regional Catchment Strategy
The Goulburn Broken Regional Catchment Strategy applies to the area as the King Parrot
Creek within 2km is part of the upper Goulbourn Catchment. The area is within the
Commuting Hills section of the plan.
The proposal supports the following Strategic priorities:
• Establish sustainable agricultural practices
• Increase biodiversity in agricultural land-use
6.2 Rural Living Development Guidelines March 2004
The proposal is not within a Rural Living Zone within the Shire (RLZ). However, the proposal
does achieve the development guidelines and objectives in most cases.
Page 27 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 86
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 20
6.3 The Kinglake Ranges, Flowerdale and Toolangi Plan and Design Framework
2015
The proposed site is outside the Flowerdale Masterplan and Study area (see below). The
proposal however supports the framework as it provides a tourist accommodation option
within proximity to the township and a tourist route with future options to walk or ride into the
township or recreation reserve along the proposed shared pathway.
Flowerdale Design Framework
Page 28 of 84
Attachment 5.2Scheduled Meeting of Council9 September 2020Page 87
DEVELOPMNT APPLICATION FOR: PLANNING SUSTAINABLE SOLUTIONS
Planning Permit for Group Accommodation 86 Moores Rd, Flowerdale | 21
7. Conclusion
The proposal meets the requirements of the State and Local Planning Policies as well as the
Zone objectives and relevant overlays of the Murrindindi Planning Scheme. All setbacks and
works are within the prescribed requirements according to the planning provisions. The
proposal will result in a diverse agricultural production as well as tourist destination within a
small village on a marked tourist route. No impact will occur to the amenity or use of the
surrounding land and the proposal will protect the environmental and landscape values of the
area.
The proposal will enhance the township of Flowerdale and provide a niche tourist venture for