bamah nissi multilinks limited. a dream come true our plan is to make home acquisition a possibility...

Post on 16-Jan-2016

214 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Bamah Nissi Multilinks Limited

A Dream Come True

Our plan is to make home acquisition

a possibility for every determined Nigerian

Move from your village hutTo the home of your dreams

When shall I become the owner of a decent & modern home on my low income?...If

only I could acquire a home via installmental payments.

How else could we

have acquired

this property?

Introduction

A Real Estate company incorporated on September 15, 2006: RC Number: 666924

The company also provides Civil Engineering

Construction and Project Management Services

Our Vision

“We shall be a Leading Real Estate Developer

With Unmatched Engineering and Construction

Capabilities. We shall strive to eclipse and exceed the highest Global building and

Engineering Standards in our quest to providing

World class Construction and Engineering Solutions to our Valued Customers”

Our Mission

“To be the Best Indigenous Civil Engineering and Construction Firm in the Construction and Real

Estate Sector of the Nigerian economy by expertly harnessing the rich pool of talent at our disposal for the provision of top-notch products

and services”

Our 3 Estates

Bamah Nissi

Falling Rain Estate

Located at Ogonbooff the Lekki-EpeExpressway on a total of 20 Hectares

Rainbow Rain Estate

Located at Ibeju-Lekkioff the Lekki-EpeExpressway on a total of 67 Hectares

Crystal Rain EstateLocated at Olugborogan off the Lekki-EpeExpressway on a total of 20 Hectares of

Prime Land; opposite the Chevron Quarters

Location Advantages

The Location of the 3

Estates on the Lekki-Epe

Expressway is a plus to

residents as the

Incessant traffic shall soon

give way to free flowing

Traffic upon completion

of the 6 lane expressway

currently under

construction

Our Offer

We are offering serviced plots to customers, especially corporate customers and co-operatives

We commence allocation immediately the plots are completely paid for

Our secondary offer is to construct or handle the actual construction of the buildings on the acquired plots

Payment Plan

Estate Location Price per sq.m

(Naira)

Duration Initial

Deposit

Crystal Rain Olugborogan 30,000/sq.m 24 Months

10-20%

Rainbow Rain Ibeju Lekki 3,000/sq.m 24 Months

10-20%

Falling Rain Ogombo - 24 Months

10-20%

Title and Documentation

Security & Performance Guarantee

Our Bankers shall issue an APG to your co-operative or Group

to secure your investment and payments

We can also insure your group or co-operative’s installmental

payments.

A prime insurance company shall provide an insurance

cover for all monies paid to our company towards the

property acquisition.

Estate Layout

Our estate shall be replete with all the conceivable trappings, infrastructure and amenities that estates of such calibre should possess. The estate layout shall be unmatched in every parameter

Estate Standards and Specifications

Our estates shall have set standard specifications

There shall be standards for the types of houses that can be constructed within our estates. There shall be standards for the following:

Building Type Design and Other Specifications (Plumbing, Drainage etc) Build and Quality of Finishing Number of Gates Distance from Street/Road Wall height etc

Lagos State Government

The commitment of the Lagos State

Government to transform the Lekki

axis into the ‘New Lagos’, coupled

with the speed of execution shall

The EPZ and speed of execution

is also giving impetus to the rate

of property appreciation

The planned International Airport,

International Sea Port etc are all

Expansion of the Lekki-EpeExpressway into a 6 Lane HighwayThe expanded highway shall reduce commuting time from the Lekki Axis to Victoria Island/Ikoyi from a 2 Hour average to less than 20 minutes

Project Status

Below is the BJ Hotel and I004 intersection on Ozumba Mbadiwe. This high quality construction shall extend to our estate and to your doorstep:

Planned Estate Facilities

The Crystal Rain, Rainbow Rain and Falling Rain Estates shall all be replete with the following:Quality Road network Tarred Main roadPaved Access RoadsCentral Water Treatment PlantSolar-Powered Street LightsCentral Waste Disposal and Treatment PlantCentral LPG Distribution FacilityCommunity Park with Swimming PoolsEstate Shopping Mall and Theater2 Privately-run Primary Schools with crechesSecurity Post

Street Lights

The estate shall be well lit with street lights on every street.

Street lights shall not be on only major streets; the entire estate shall be well lit and lights shall be efficiently maintained and services to ensure adequate illumination estate-wide.

Solar Powered Street Lights

Street lights shall be powered by solar panels to facilitate and enhance reliability of power for illuminating the estate.

Estate Road Network

All major roads shall be tarred

Within the estates.

All access roads shall be constructed

With paving stones

The estate shall be devoid of

Earth roads and dusty or muddy

lanes

Solar Energy for Domestic Use

The schematic illustrates

The process of generating and

Distributing solar generated

Power for utilization of our

Residents.

The schematic has been

Simplified for easy

comprehension

Central Gas Distribution Plant

Our estates shall have a

Central Gas Distribution Plant

Channeled to each house.

This shall facilitate convenience

Since residents shall no longer

have to convey bottles to and fro

Gas meters shall be installed in

Every house to calibrate usage

and accurate billing.

Alternate Central Gas Distribution Technology

Water Treatment

The estate shall be equipped

with a centralized water-

Treatment plant

The schematic illustrates the

technology and processed for

the treatment and distribution

of Safe, clean potable water

Estate-wide

Alternative Water Treatment Systems

Street Drainage and Gutters

The estates shall have a covered and modern efficient drainage

System that shall eliminate the hazard of flooding within the estate.

Project Status

All Three Estates are under construction

Present Stage of W.I.P.

We are at the land-allocation/allotment and clearing stage

At this stage. we expect prospective Landlords to purchase land to any of our estates by subscribing to our smart and structured acquisition programme.

Bespoke Interiors

Bespoke Design Options

Prototypes to be customized

with elaborate Floor Plans

Sensible and ConvenientLayouts

Floor Plan Alternatives

Floor Plan of Ground Floor of 2 Storey & 3 Bed Detached House

Floor Plan of 3 BedDetached House

Foundation & Form Work

Construction Procedures in Tandem with International Best Practice

Quality Materials andSymmetry throughout

Solid and Durable Blocks

Discussion Session

top related