baylands boardwalk replacement project …
Post on 25-Jan-2022
4 Views
Preview:
TRANSCRIPT
BAYLANDS BOARDWALK REPLACEMENT PROJECT ARCHITECTURAL REVIEW BOARD (ARB) MAJOR PACKAGE
1 | VICINITY MAP/PROJECT DATA 4 | STRUCTURE ELEVATIONS AND SECTIONS
2 | NEIGHBORHOOD CONTEXT 5 | CONCEPTUAL CONSTRUCTION SEQUENCE
3 | SITE PLAN 6 | TREE PROTECTION PLAN
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 VICINITY MAP/PROJECT DATA 1.1
PROJECT DATA Project Address Situated in the Baylands public marshland, to the northwest of the existing Lucy Evans Baylands Interpretive Center (Nature Center) located at 2775 Embarcadero Way, Palo Alto, CA 94303 Project Owner City of Palo Alto Engineer: Anthony Notaro -Biggs Cardosa Associates Representative: Elizabeth Ames, Public Works Dept., Sr. Project Manager Zone: Land Use Designation: PF (D) P; CL; MISP Existing Improvement(s): The existing timber boardwalk structure extends roughly 850 feet north across the Harriet Mundy Marsh towards the San Francisco Bay from the Lucy Evans Baylands Nature Interpretive Center and the San Francisquito Creek Trail. The existing boardwalk structure was constructed in 1969 and rehabilitated and widened by the City in 1980. The existing boardwalk was closed in 2014 due to structural deficiencies and safety concerns. The driven timber posts and supports have gradually decayed and broken over the years due to the elements and impacts from the corrosive tidal saltwater. The once level boardwalk is now undulating along its surface and listing noticeably to the east in several locations due to failed substructure elements. Total Site Area: 25,007 SF
Existing Deck Area: 3,655 SF Proposed Deck Area: 4,815 SF Area Added: 1,160 SF
Existing Deck Elev.: 9.9 feet (NAVD88) Proposed Deck Elev.: 13.5 feet (NAVD88) Green Design Elements Potential Green Elements being considered:
The Boardwalk replacement project will avoid the use of pressure treated Douglas fir (PTDF) timber due to concerns with potential chemical treatment effects (most notably arsenic and copper) on the marsh environment.
Assessor Parcel Map
Location Map
Comprehensive Plan
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 NEIGHBORHOOD CONTEXT 2.1
PHOTOGRAPHIC DISPLAY / NEIGHBORHOOD CONTEXT
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 NEIGHBORHOOD CONTEXT 2.2
PHOTOGRAPHIC DISPLAY / NEIGHBORHOOD CONTEXT (Cont)
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 NEIGHBORHOOD CONTEXT 2.3
PHOTOGRAPHIC DISPLAY / NEIGHBORHOOD CONTEXT (Cont)
Location of Existing Palo Alto Baylands Boardwalk
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 SITE PLAN 3.1
T2
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 SITE PLAN 3.2
S1
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 SITE PLAN 3.3
S2
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 SITE PLAN 3.4
S3
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 SITE PLAN 3.5
S4
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 SITE PLAN 3.6
S10
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 SITE PLAN 3.7
S11
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 ELEVATIONS AND SECTIONS 4.1
S5
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 ELEVATIONS AND SECTIONS 4.2
S6
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 ELEVATIONS AND SECTIONS 4.3
S7
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 ELEVATIONS AND SECTIONS 4.4
S8
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 ELEVATIONS AND SECTIONS 4.5
S9
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 ELEVATIONS AND SECTIONS 4.6
COLORS AND MATERIALS
The following materials and colors are proposed for the replacement Boardwalk: MATERIALS In accordance with City and public input, the replacement Boardwalk will be constructed of timber elements to match the style and character of the existing Boardwalk structure. ALASKAN YELLOW CEDAR The timber structural elements (piles/posts, joists, bracing) are proposed to be constructed of Alaskan Yellow Cedar (AYC). AYC is highly durable and is in relatively common use for timber structures in marine environments: AYC is notable for its durability and longevity. AYC is naturally resistant to rot, decay, insect damage
and, in saltwater applications, to marine borers. AYC is considerably harder than most commercially
available softwoods. AYC resists splitting and slivering, and it is highly
resistant to wear.
REDWOOD Heart Redwood timbers will be utilized for all timber deck and railing elements. Production of redwood lumber is limited to California, but the market is nationwide. The wood is easy to work, generally straight grained, and shrinks and swells comparatively little. It is also exceptionally stable, with very little shrinkage or seasonal movement. Redwood’s durability is entirely natural. The same tannins and unique cell structure that gives redwood its warm tones and exemplary strength make it naturally resistant to insects, decay, water and even fire. Redwood has proven durability in outdoor projects such as decking, fencing and outdoor furniture. The use of Redwood Decking would match the decking of the adjacent, recently renovated, Nature Center.
METAL COMPONENTS
TIMBER CONNECTORS: All metal connectors for mounting and connecting timber elements will be stainless steel and painted prior to installation.
TIMBER FASTENERS: Coated deck screws and/ or stainless steel screws will be used for all timber to timber connections and to mount metal connectors.
RAPTOR DETERRENT ROLLERS: Raptor deterrent rollers will be made of extruded aluminum with aluminum mounting brackets with stainless steel fasteners. COLORS In accordance with the “Site Assessment and Design Guidelines for Palo Alto Baylands Nature Preserve,” all wood finishes will consist of Olympic 911 Natural Gray Stain and all metal components will be painted with Benjamin Moore Sandy Hook Gray (HC-108).
Benjamin Moore Sandy Hook Gray
Olympic 911 Natural Gray Stain
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 ELEVATIONS AND SECTIONS 4.7
INTERMEDIATE OVERLOOKS AND OBSERVATION PLATFORM The replacement Boardwalk will include an Observation Platform at the San Francisco Bay end of the Boardwalk to provide a panoramic view of the bay. The replacement Boardwalk will include four Intermediate Overlooks along its length. The existing Boardwalk has 2 overlooks. The overlooks will be spaced along the Boardwalk, and will serve to further improve access, allowing clearance for multi-mode users in wheelchairs to turn around and pedestrians to pass by. Both the Observation Platform and the Intermediate Overlooks will accommodate a 30 inch by 48 inch clear area for wheelchair users and a bench with arm rests.
Bench Concept #1 Bench Concept #2 The intermediate overlooks and observation platform will be designed to support exterior interactive exhibits to engage visitors in salt marsh phenomena. Interactive exhibits and signage will be provided under a separate contract. The Boardwalk Replacement Project will include sloped timber sign rails at the Intermediate Overlooks and Observation Platform to serve as a platform for attaching the interpretive signage in the future.
Interpretive Signage Samples
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 ELEVATIONS AND SECTIONS 4.8
RAILINGS AND DECKING A redwood timber railing, 3.5 feet minimum in height, will be erected on each side of the boardwalk. The railing will take their style and character from the timber railings of the Nature Center. The railings will be customized to meet the structural requirements of the long straight Boardwalk. The railing will be designed to be constructed in panels to minimize on site construction and to speed erection of the railing within the limited work windows provided by the project (See “Project Constraints”). Intermittent viewing panels will be provided at the intermediate overlooks and observation platform to enhance visibility for wheelchair users and small children. In consultation with the US Fish and Wildlife Service (USFWS), in order to minimize the potential for birds to strike the panels, each panel will be no more than 18 inches in width and will contain either glass with bird-safe design patterns or wire mesh.
The boardwalk’s railings will be topped by raptor deterrent rollers such as those shown in the adjacent photo, which will function to minimize the potential for predation of endangered species that are present at this location (e.g., salt marsh harvest mouse and the Ridgway’s rail) by preventing raptors from perching on the railings to scan for prey. Such rollers are in place at other locations in the area, including the boardwalk at Alviso County Park.
Existing Bird Perch Deterrent Rollers on the Boardwalk at Alviso County Park.
Redwood is also proposed to be used for the deck of the boardwalk, which is the material used for the railings and deck of the recently renovated Nature Center. Interpretive signage on the railings will be installed as part of a future project.
Existing Glass Viewing Panel at Nature Center Wire Mesh Viewing Panel Option
Existing Railing at Nature Center
Proposed Railing at Boardwalk
Glass Frit Pattern Option Glass Etching Pattern Option
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 CONCEPTUAL CONSTRUCTION SEQUENCE 5.1
CONCEPTUAL CONSTRUCTION SEQUENCE
Task 1: Site Preparation:
1.1 Install temporary marsh mats to provide equipment and material access to the near end of the Boardwalk.
1.2 Remove existing railing, reinforce the existing Boardwalk and modify the deck width as required to accommodate construction operations
Task 2: Post/ Pile Installation: 2.1 Vibrate/push lower
segment of timber post/ pile to ground line
2.2 Splice upper segment of timber post/ pile to partially installed lower segment of timber post/ pile
2.3 Vibrate/push spliced timber post/ pile to specified tip elevation and cutoff top of post/ pile to cutoff elevation
Task 3: Sub/Superstructure Installation 3.1 Install timber bent cap 3.2 Install timber cross bracing 3.3 Install timber rim joists and
blocking 3.4 Install timber decking 3.5 Remove existing
Boardwalk to mudline when no longer required for construction operations
Task 4: Timber Railing Installation
4.1 Install timber railing on completed superstructure
4.2 Remove marsh mats 4.3 Complete site clean-up
BAYLANDS BOARDWALK | ARB SUBMITTAL – AUGUST 16, 2017 TREE PROTECTION PLAN 6.1
See Attached
otlA olaP fo ytiC!nalP eht fo traP s’tI - noitcetorP eerT
!thgir boj eht od sbus dna swerc ruoy erus ekaMc morf raelc erutcurts gnihcnarb dna yponac egailof eht gnipeek yb meht tcetorp ot laitnesse era seert dnuora serusolcne decneF ,seitivitca dna slairetam ,tnempiuqe yb tcatno
hw ni )ZPT( enoZ noitcetorP eerT eht gniyfitnedi dna ,etats detcapmoc-non dna tcatni na ni snoitidnoc lios dna stoor gnivreserp ,detcirtser era seitivitca dna dettimrep si ecnabrutsid lios on hci.devorppa esiwrehto sselnu .eert detaluger a fo ZPT eht nihtiw srucco ytivitca tcejorp nehw teehs siht ot dedda eb tsum troper noitcetorp eert devorppa nA
eht weiver ,tnempoleved gnirud noitcetorp dna seert detaluger s'otlA olaP no noitamrofni deliated roF launaM lacinhceT eerT ytiC ./seert/gro.otlaolapfoytic.www ta dnuof )MTT(
1-TteehS noitcurtsnI noitcetorP eerT laicepSotlA olaP fo ytiC
)dedeen sa gnidda( teehs siht no dedivorp ecaps eht ot dedda eb llahs stroper detaler-eert rehto llA.egaP dnegeL ro xednI teehS tcejorP no )s(teehs siht edulcnI
ta dedaolnwod eb nac 1-T fo ypoc A
Apply Tree Protection Report on sheet(s) T-2
Use addtional “T” sheets as needed
TNEMETATS ERUSOLCSID EERT OTLAOLAP FO YTICeunevA notlimaH 052 ,noisiviD gninnalP10349AC,otlAolaP1442-923 )056( gro.otlaolapfoytic.www//:ptth
cilbup dna etavirp no detacol seert niatrec fo noitcetorp dna erusolcsid seriuqer ,040.01.8 retpahC ,edoC lapicinuM otlA olaP timrep gnidliub llaynapmocca tsum tnemetats erusolcsid detelpmoc A.snalp etis devorppa no nwohs ebyeht taht dna ,ytreporp
.ytivitca tnempoleved rehto ro ,snoitacilppa timrep gnidarg ro noitilomed lla ,krowroiretxe edulcni taht snoitacilppa
:SSERDDA YTREPORP ______________________________________________________________________
detalugeR ereht erA1
ONSEY?ytreporp eht ot tnecajda ro no seert )4noitceS ot deecorp ,on fI(
].elbacilppa erehw kcehc ro/dna elcric esaelP .tnacilppaeht yb detelpmoc eb TSUM 4 -1 snoitceS[
.ylppa taht esoht kcehC ?seert eht era erehW .1 )seert retemaid ”4 revo gniwohs dettimbus eb tsum snalP(ytreporp eht nO
etis tcejorp eht gnignahrevo ytreporp tnecajda nO)seerT teertS( enil ytreporp fo ’03 nihtiwtnemesae yaw-fo-thgir ro pirts retnalp ytiC eht nI *
* seert teertS1
erusolcne decnef a yb noitcetorp laiceps eriuqer edivorp tsumuoy ,timrep yna gniviecer ot roirP .snoitcurtsnidehcattaeht rep,t deriuqer fo noitcepsni rof 3595-394 ta snoitarepO skroW cilbuPgnillacyb mrofnoitacifireV noitcetorP eerT teertS dezirohtua na III ro II ,I epy
.)506# liateD dehcatta ees( gnicnef
detcetorP yna ereht erA .21
detangiseD ro1
?seerT SEY )elbacilppa erehwkcehC( ON
)s( eerT detcetorP)s( eerTdetangiseD
ytreporp eht gnignahrevo ro nO
?seert eseht fo )retemaid knurt eht semit 01 suidar(?enilpird eht nihtiwgnidarg ro ytivitca ereht sI .3 ONSEYa ,seY fI tropeRnoitavreserP eerT MTTees( weiver ffats rof dettimbus dna tsirobra deifitrec ASI na yb deraperp eb tsum
2.)52.6 noitceS ,
.stnemeriuqeR nalP etiS rep ,”!nalP eht fo traPsti ,noitcetorP eerT:,1-T teehS ot troper siht hcattA
stnemeriuqeR nalP etiS eht erA .4 ** ?detelpmoc ON SEY
yponacdnaretemaid knurt derusaem eht wohs tsum snalP )1(:gniwollof eht eriuqer tnempoleved gnirudseertdetalugeRfo noitcetorP**- 506# liateD dna1-TteehS rep ,enilpird eht ottuo aeraerusolcnedecnef a ,enil dehsad dlob a sa ,etoned tsum snalP )2( ;enilpird
mth.smrof/seert/gro.otlaolapfoytic.www//:ptth MTT osla eeS(2
)decnef eb otaera rof 51.2 noitceS ,
.erusolcsid siht fo snoitidnoc eht ot eerga ,dengisrednueht ,I ro eslaf gnidivorp yltnegilgen roylgniwonk taht dnatsrednu InoitceSedoC lapicinuM otlA olaP eht fo noitaloiv a setutitsnoctnemeriuqer erusolcsid siht ot esnopser ni noitamrofni gnidaelsim
.noitca lagel livic ro/dna lanimirc ot dael nac hcihw,040.01.8
____________ :etaD______________________________ :tnirP __________________________ :erutangiS)tnegA ro renwO .porP(
:ESU FFATS ROFgnicneF evitcetorP
eb tsum 6-5 snoitceS ffats yb detelpmoc .)timrep gnidliub ro gnidarg ,noitilomed( timrep tnempoleved yna fo ecnaussi eht rof
seerT detcetorP.5 taht gniyfirev dehcatta si tnemetats nettirw A .ecalp ni si gnicnef eert deificeps ehT .ecalp ni yltcerroc si gnicnef evitcetorp .seert detangised ro/dna detcetorp dnuora ONSEY
ereh kcehc ,seertdetcetorp on era ereht fi A/N( )
seerT teertS.6 .dehcatta si mrof noitacifireV noitcetorP eerT teertS skroW cilbuP dengis A . ONSEY ereh kcehc ,seert teerts on era ereht fi A/N( .)
_____________________________1
5.11 era hcihw skaO yellaV ro skaO eviL tsaoC – seert detcetorP )b ;ytreporp cilbup no seert – seert teertS )a –seerT detalugeR tsaoC ,regral ro retemaid ni ”Cyb detangised seert era seert egatireH dna ;edarg larutan evoba ”45 derusaem nehw ,regral roretemaid ni ”81 era hcihw sdoowdeR )c dna ;licnuoC yti
.nalp epacsdnal devorppa na fo trap era hcihw ,seert ytreporp laitnediser-non ro laicremmoc –seerT detangiseD2
ta elbaliava ,mrof siht no stnemeriuqer lla rof snoitcurtsni sniatnoc )MTT( launaM lacinhceTeerT otlA olaPlmth.launam-lacinhcet_eert/ytinummoc-gninnalp/gro.otlaolapfoytic.www//:ptth
tnemetatSerusolcsiDeerT/ofnI noitcetorPeerT/tsirobrA/vidalP/nalP:S 60/80desiveR
J XIDNEPPA
snoitacificepS dna sgniwarD dradnatS 4002 otlA olaP fo ytiC60/80desiveR 13 noitceS ,EWP ,noitcetorP fo noitacifireV eerT teertS
PS
-
OTLA OLA SNOITCURTSNI NOITCETORP EERT TEERT
--13 NOITCES-lareneG1-13
snoitcnufyramirpeerhtsah noitcetorp eerT.a raelc erutcurts gnihcnarbdna yponac egailof eht peekot )1,dna tcatni na ni snoitidnoc lios dna stoor evreserp ot )2 ;seitivitcadna slairetam ,tnempiuqe yb tcatnoc morfsi ecnabrutsidlios onhcihwni )ZPT( enoZ noitcetorP eerT eht yfitnedi ot )3dna etats detcapmoc-non
.devorppa esiwrehto sselnu,detcirtser era seitivitcadna dettimrep)ZPT(enoZ noitcetorP eerT ehT.b semit-net fo suidar a htiw eert ehtfoesab eht dnuora aera detcirtser a si
.gnicnef ybdesolcne ,retaerg si revehcihw ;teefnet roknurt s'eert eht fo retemaid eht
stnemucoD ecnerefeR 2-13506 liateD.a .woleb debircsed snoitautis fo noitartsullI –
smroF )MTT( launaM lacinhceTeerT.b ( /seert/gro.otlaolapfoytic.www//:ptth ).1 ( senoZ noitcirtseR gnihcnerT )C(02.2noitceS ,MTT ).2 ( locotorP gnitropeR tsirobrA 03.6noitceS ,MTT ).3 (stnemeriuqeR nalP etiS 53.6 noitceS ,MTT ).4 ( tnemetatS erusolcsiD eerT JxidneppA ,MTT )
mroF )VTS( noitacifireV eerT teertS.c ( smrof/seert/gro.otlaolapfoytic.www//:ptth )
noitucexE 3-13:noitcetorP eerT I epyT.a eht tuohguorht detcetorpebot )s(eert eht fo ZPT eritne eht esolcne llahs ecnef ehT
,saera gnikrap emos nI .tcejorpnoitcurtsnoceht fo efil ton lliwtaht etercnoc rognivap nodetacol si gnicnef fiybdevorppa fi ,esab etercnoc level edarg etairporppa na yb detroppus eb yamstsopeht neht ,dehsilomedeb
.snoitarepO skroW cilbuP:noitcetorP eerT II epyT.b fo edis dray dna pirts gnitnalpeht ylno ,pirts gnitnalp a nihtiwdetautis seert roF
dnaklawedis eht peekot redro nignicnef evitcetorpknil niahcderiuqer eht htiw desolcne eb llahs ZPT eht.esu cilbup rof nepo teerts:noitcetorP eerT III epyT.c ylnodesu eb oT a nidetautis seerT .snoitarepOskroWcilbuP folavorppa htiw
ni-2htiw depparw ebllahs,tip retnalp klawedis ro lleweert ot dnuorg eht morfgnicnef citsalp egnarofosehcgidot dewolla eb ton llahs stals( yleruces dnuob stals nedoowkciht hcni-2htiwdialrevodna hcnarb tsrif eht
yna gnigamad diova ot desu eb llahs noituac ,gnicnef citsalpeht fonoitallatsni gniruD.)krab eht otni.tsirobrA ytiCeht ybdetcerid sa gnicnef citsalperiuqer osla yam sbmil rojaM .sehcnarb
.decnef eb otaera dna epyt ,eziS.d niahc hgihtoof )'6( xis htiwdetcetorp eb llahsdevreserpebot seert llAot dnuorg eht otni nevird ,stsop nori dezinavlagretemaid hcni-owt nodetnuomeb ot era secneF.secnefknilsselnu,gnihcnarbretuoeht ot dnetxe llahs gnicneF.gnicaps toof-01 naht erom on ta teef-2 tsael ta fohtped a
.mroFVTSeht no devorppa yllacificepssngis ’gninraW‘.e toof-02taecnef hcae no deyalpsid yltnenimorp dna foorp rehtaew ebllahsngisgninraw A .
:srettel llat hcni flah ni etats ylraelc dna sehcni-11xsehcni-5.8 muminim ebllahs ngisehT .slavretni ot gnidrocca enif aot tcejbus si dna devomerebton llahs ecnef sihT - enoZ noitcetorP eerT - GNINRAW“
”.011.01.8 noitceS CMAPnoitaruD.f itilomederofebdetcere ebllahs gnicnef eerT . niniamer dnasnigeb noitcurtsnocro gnidarg ;no
lios rokroW.ZPT eht ni dewolla yllacificeps krow rof tpecxe ,tcejorp ehtfo noitcepsni lanif litnu ecalpdnuora krowfo esac eht ni( tsirobrA ytiC rotsirobra tcejorp ehtyb lavorppa seriuqer ZPT ehtni ecnabrutsid.skroW cilbuP morf timreP kroWteertS a eriuqer yaw fo thgircilbup eht nihtiw snoitavacxE.)seerT teertS
noitcurtsnoc gniruD.g
.1 .dnikyna fo tcapmi morfdetcetorpeb llahs etis tcejorpeht gnahrevotaht seert 'srobhgien llA
.2 seert denwo ylcilbup yna fo ytlanepsulp tnemecalper ro riapereht rof elbisnopser eb llahs tnacilppa ehTotlAolaP ehtfo 070.40.8 noitceS ottnausrup ,noitcurtsnocfo esruocehtgnirud degamad erataht
.edoC lapicinuM.3 :deniaterebot seert lla ot ylppa serusaem noitavreserp eertgniwollofehT
.a .ZPT eht nihtiw dettimrepeb llahs tnempiuqe ro selcihev ,liospot ,lairetam fo egarots oN
.b .deretla eb ton llahs aera yponac eert eht dnuora dna rednudnuorgehT
.c .lavivrus erusne ot yrassecen sa deniatniam dnadetarea ,detagirri ebllahsdeniater ebot seerT
NOITCES FO DNE
otlA olaP fo ytiC tnemtrapeD eerT
snoitarepO skroW cilbuP30349 AC ,otlA olaP 05201 xoB OP
3595-694/056 9829-258/056 :XAF gro.otlAolaPfoytiC@noitcetorpeert
fo noitacifireVnoitcetorP eerT teertS
eerT dengis htiw gnola mrof siht XAF ro liaM .mrof siht fo noitrop reppu etelpmoC :snoitcurtsnI tnacilppA.tnacilppa yfiton dna tcepsni lliw ffatS eerT skroWcilbuP .tpeD skroW cilbuP ot tnemetatS erusolcsiD
:ETAD NOITACILPPA
TEERTS FO NOITACOL/SSERDDA:DETCETORP EB OT SEERT
:EMAN S’TNACILPPA
:SSERDDA S’TNACILPPA
ENOHPELET S’TNACILPPA:SREBMUN XAF &
ffatSeerT ytiC yb tuo dellif eb ot noitcessihT
evoba eht ta seerT teertS ehT .1yletauqeda era )se(sserdda
noitcetorp fo epyt ehT .detcetorp:si desu woleb 2# ot og ,ON fI *
:yb detcepsnI
:noitcepsnI fo etaD
SEY *ON
evoba eht ta seerT teertS ehT .2era sserdda TON
tcetorPeerT.tS/SD/eerT/SPO/DWP:S 6071/5
yletauqeda gniwollof ehT .detcetorp
:deriuqer era snoitacifidom
deriuqer ehtwoh etacidnIdetacinummoc erewsnoitacifidom
.tnacilppa eht ot
noitcepsnI tneuqesbuS
dnuof erewsserdda evoba ta seert teertS:detcetorp yletauqeda eb ot .esac fo noitisopsid eht woleb ”setoN“ ni etacidni ,ON fI *
:yb detcespnI :noitcepsnI fo etaD
SEY *ON
:setoN ,seiceps yb seert teerts ytiC tsiL noitcetorp eert fo epyt dna noitidnoc ,etis
erewserutcip fi eton oslA .dellatsni.yrassecen fi teehs fo kcab esU .nekat
.ecnaussi timrep gnidliub ro noitilomed rof tnacilppA ot teehs devorppa nruteR
itcetorPeerTotlAolaPfoyti tC adetacolerasnoitcurtsnIno su.ac.otla-olap.ytic.www//:ptt lh mth.launam-lacinhcet/seert/
---GNINRAW---enoZnoitcetorPeerT
tuohtiwdevomerebtonllahsgnicnefsihT)3595-694-056(lavorppatsirobrAytiC
sinoissimreptuohtiwlavomeR*yadrepenif005$aottcejbus011.01.8noitceSedoClapicinuMotlAolaP*
:hcraeS decnavdA cipoTyBesworB
emoH tnemnorivnEytinummoC&gninnalP
emoH
ytiC - seerTdenwo
yletavirP - seerTdenwo
eerTehttuobAecnanidrO
01.8eltiT
seerTegatireH
smroF
launaMlacinhceTeerT
sQAF
sUtcatnoC
secruoseR
launaMlacinhceTeerT
oT esahcrup launaMlacinhceTeerTeht
noitidEtsriF1002,enuJ
:noitcesybweiV
stnetnoCfoelbaT )BK78,FDP(esopruPdnatnetnI )BM50.1,FDP(
noitcudortnI - launaMfoesU )BM50.1,FDP(0.1noitceS - snoitinifeD )BK69,FDP(0.2noitceS - noitcurtsnoCgniruDseerTfonoitcetorP )BK952,FDP(0.3noitceS - seerTfognitnalP&tnemecalpeR,lavomeR )BK711,FDP(0.4noitceS - seerTsuodrazaH )BK501,FDP(0.5noitceS - senilediuGecnanetniaMeerT )BK011,FDP(0.6noitceS - stropeReerT )BK48,FDP(
:snoitcesLLAweiV
launaMlacinhceTeerT - lluF )BM48.1,FDP(
SECIDNEPPAtnemeganaM&noitavreserPeerT,01.8retpahCedoClapicinuMotlAolaP.A
snoitalugeRytiCeerT:B - ASU
mroFnoitaulavEdrazaHASI:C)ecruosecnerefeR(seicepSdetceleSrofsnrettaPeruliaFtnerehnIfotsiL:D
senilediuGgninurPeerTASI:E )BM58.1,FDP(1.331ZISNA,sdradnatSytefaSeraCeerT:F - )ecruosecnerefeR(4991
003AISNA,sdradnatSecnamrofrePgninurP:G - )ecruosecnerefeR(5991 :H505&405margaiD,sliateDgnitnalPeerT
tnemetatSerusolcsiDeerT:IsnoitcurtsnInoitcetorPeerTdradnatSotlAolaP:J
1-T
Proj
ect
Dat
a
Type II Tree Protection
Type I Tree Protection
Type III Tree Protection
Tree Protection Zone (TPZ) shown in gray (radius of TPZ equals 10-times the diameter of the tree or 10-feet, whichever is greater). Restricted activity area -- see Tree Technical Manual Sec 2.15(E). Restricted trenching area -- see Tree Technical Manual Sec 2.20(C-D), any proposed trench or form work within TPZ of a protected tree requires approval from Public Works Operations. Call 650-496-5953.
TPZeither 10 x Tree Diameter or 10-feet,
whichever is greater
Any proposed trenchin TPZ requires approval
See TTM 2.20 C-Dfor instructions
6-foot highchain link fence,
typical
(to be used only with approval of Public Works Operations)
Tree fencing is required and shall be erected before demolition, grading or construction begins.
Any inadvertant sidewalk or curb replacement or trenching requires approval
Rev By Date
City of Palo Alto Standard DwgNo.
Approved by:
Dave Dockter
Date
PE No.
2006
Scale: NTS 605
Tree ProtectionDuring Construction
2-inches of Orange Plastic Fencingoverlaid with
2-inch Thick Wooden Slats
Detailed specifications are found in the Palo Alto Tree Technical Manual (TTM) (www.cityofpaloalto.org/trees/)
Warning
Warning
Warning
8.5x11-inch Warning Signs one each side
Fencing must provide public passage while protecting all other land in TPZ.
For written specifications associated with illustrations below, see Public Works Specifications Section 31
Fence distance
to outer branches or TPZ
12/14/92
Restricted use fortrees in sidewalk cutout
tree wells only
For all Ordinance Protected and Designated trees, as detailed in the site specific
tree preservation report (TPR) prepared by the applicant’s project arborist as diagramed on the plans.
Yard
Sidewalk
Parkway Strip
Street
D.D.01 08/04/04
02 D.D. 08/10/06
0 DWH
Warning
SPECIAL INSPECTIONS PLANNING DEPARTMENT
TREE PROTECTION INSPECTIONS MANDATORY PAMC 8.10 PROTECTED TREES. CONTRACTOR SHALL ENSURE PROJECT SITE ARBORIST IS PERFORMING REQUIRED TREE INSPECTION AND SITE MONITORING. PROVIDE WRITTEN MONTHLY TREE ACTIVITY REPORTS TO THE PLANNING DEPARTMENT LANDSCAPE REVIEW STAFF BEGINNING 14 DAYS AFTER BUILDING PERMIT ISSUANCE.
BUILDING PERMIT DATE: ______________________ _______ DATE OF 1ST TREE ACTIVITY REPORT: ___ _____________ CITY STAFF: ___________________________ ___________
REPORTING DETAILS OF THE MONTHLY TREE ACTIVITY REPORT SHALL CONFORM TO SHEET T-1 FORMAT, VERIFY THAT ALL TREE PROTECTION MEASURES ARE IMPLIMENTED AND WILL INCLUDE ALL CONTRACTOR ACTIVITY, SCHEDULED OR UNSCHEDULED, WITHIN A TREE PROTECTION ROOT ZONE. NON-COMPLIANCE IS SUBJECT TO VIOLATION OF PAMC 8.10.080. REFERENCE: PALO ALTO TREE TECHNICAL MANUAL, SECTION 2.00 AND ADDENDUM 11.
http://www.cityofpaloalto.org/civica/filebank/blobdload.asp?BlobID=6460
2775 EMBARCADERO WAY
THERE ARE NO TREES WITHIN THE PROJECT LIMITS
otlA olaP fo ytiC!nalP eht fo traP s’tI - noitcetorP eerT
!thgir boj eht od sbus dna swerc ruoy erus ekaMc morf raelc erutcurts gnihcnarb dna yponac egailof eht gnipeek yb meht tcetorp ot laitnesse era seert dnuora serusolcne decneF ,seitivitca dna slairetam ,tnempiuqe yb tcatno
hw ni )ZPT( enoZ noitcetorP eerT eht gniyfitnedi dna ,etats detcapmoc-non dna tcatni na ni snoitidnoc lios dna stoor gnivreserp ,detcirtser era seitivitca dna dettimrep si ecnabrutsid lios on hci.devorppa esiwrehto sselnu .eert detaluger a fo ZPT eht nihtiw srucco ytivitca tcejorp nehw teehs siht ot dedda eb tsum troper noitcetorp eert devoppa nA
eht weiver ,tnempoleved gnirud noitcetorp dna seert detaluger s'otlA olaP no noitamrofni deliated roF launaM lacinhceT eerT ytiC ./seert/gro.otlaolapfoytic.www ta dnuof )MTT(
2-TteehS noitcurtsnI noitcetorP eerT laicepSotlA olaP fo ytiC
2-T )dedeen sa gnidda( teehs siht no dedivorp ecaps eht ot dedda eb llahs stroper detaler-eert rehto llA.egaP dnegeL ro xednI teehS tcejorP no )s(teehs siht edulcnI
nloaded atwod eb nac 1-T fo ypoc A
Proj
ect
Dat
a
http://www.cityofpaloalto.org/civica/filebank/blobdload.asp?BlobID=6460
Apply Tree Protection Report on sheet(s) T-2Use addtional “T” sheets as needed