Beijing Airport / Norman Foster
• Construction start: 2004Completion: 2008
• Area: 1 300 000 m²Capacity: 43000000, 50 million passengers per year (2020)
• Client: Beijing Capital International Airport Company Ltd.
STRUKTUR & KONSTRUKSI
• Appointment: 2003Construction start: 2004Completion: 2008
• Area: 1 300 000 m²Capacity: 43000000, 50 million passengers per year (2020)
• Client: Beijing Capital International Airport Company Ltd.Structural Engineer: ArupQuantity Surveyor: Davis Langdon & SeahM+E Engineer: ArupAdditional Consultants: Michel Desvigne, Speirs and Major Associates
GTC
GTC ROOF STEEL STRUCTURE
TERMINAL 3A
Terminal 3A
• Atap T3A ditopang oleh 136 steel pipe columns
• Kolom beton bertulang
• Pondasi menggunakan pressure system pile
• Eartquake• Structure is essential• Joint must be unbreakable
Steel structural system
Terdapat 136 steel columns pada area T3A dan BSemakin ke tengah ruang, semakin besar diameternya
• Untuk mengurangi tekanan temperatur internal, maka bentuk atap terbagi menjadi body, west stem dan east stem
• The roof is a single span • The roof can go and shrink without changing
construction.
DETAIL
PondasiKondisi tanah: Cadangan air bawah tanah banyakRawan gempa
Solusi: pressure resistant and uplift pile
Terdapat kurang lebih 14000joint flelksibel
Berfungsi untuk meminimalisirtorsi yang timbul akibat gempa
AtapMemiliki bentangan yang sangat lebar, hampir 1 km
Suhu panas dapat menyebabkan pemuaian pada rangka atap maupun plat atap mencapai 80 cm
Terdapat kurang lebih 288,000 joint khusus yang dapat bergerak, menyesuaikan pemuaian
Rangka curtain wall
• 1000 special joint to reduce the damage of the earthquake.
Detail sambungan ( joint )
ROOF AND SKYLIGHT
635 skylight