bim & järnväg i belgien

Post on 05-Jul-2015

106 Views

Category:

Engineering

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Presentationer från Novapoint Användarträff 2014

TRANSCRIPT

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

BIM & Railway in BelgiumCustomer case

Benjamin Van Daele, Managing Director Vianova Systems Benelux BVBA

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

About BelgiumSome figures and background information

• Area : 30,528 km2

• Population : 11 Million

• Density : 363.6/km2

(17x more than Sweden 21.5/km2 )

• Languages (3) : NL, FR, DEMap of Belgium

By Provinces

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Chocolates

Football

EU Head QuartersMagritte

Historical Monuments

Diamants

Beers

FriesManneke Pis The Atomium

Eddy Merckx

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

About the Belgian RailwaysSome figures and background information

Map of the Belgian

Railway Network

• Infrabel (Infrastructure owner)

• 3595 km lines

• 12609 bridges, tunnels, etc.

• 1 Billion € investments (2013)

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Customer Case - TUCRAIL

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Project management, design and

execution of rail infrastructure projects.

• Subsidiary of the Belgian national railway company (Infrabel)

• Employs over 1000 people

• Turnover ~100 Million € (2013)

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Design Department

7 different

dicsiplines(~250 engineers)

10 different

Software

3D Design

since 2007

BIM since

2012

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Disciplines were collaborating

but sequentially

Building combined 3D model =

very time consuming and

already out-of-date once

produced

Project’s info still in multiple

files and formats

Why BIM?

Data loss & risk of

exchanging wrong

information

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

BIM Solution ArchitectureQuadriDCM & Novapoint 19DCM Base

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Gather all data into one LIVE engineering model

Easy to use (downsize implementation impact)

Strong visualization & data analyses

Handle a process with many disciplines

Real multi-user environment on objects level

Objectives

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Design Modulesfor Designing Infrastructure

BIM CLIENTfor Modelling and Analyzing Infrastructure

BIM SERVERfor Model-based Collaboration in a Private Cloud

Desktop (local)

Server (private or public cloud)

Solution Architecture

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

BIM SERVER

QuadriDCM

BIM CLIENT

NovapointDCM

Base 19

OTHER DBASES & APPS...

Connection to 3rd party

apps & dbases trough

API

Dataflow controlled by user management (roles),

processes & tasks...

Native data is upgraded to

“intelligent features”

Internet/Intranet

(private) cloud

DESIGN MODULES

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Workflow – Integrated BIM

Other...

Survey & Terrain

Buildings

Used Design Software:

• Novapoint Railway

• Novapoint Road Design

• Novapoint Survey

• AutoCAD

• AutoCAD Civil 3D

• Autodesk Revit

• Autodesk Inventor

• Solidworks

• InfoWorks

• ...

QuadriDCM

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

• Centralized multidisciplinary data, singel point of truth

• Accessible for everyone at any time (user roles)

• Userfriendly interface

• Object level (geometry + information)

• One live engineering model

Benefits of integrated BIM with QuadriDCM

Save timeReduce errors

Improve collaboration

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Example ProjectMobility Masterplan 2020, Cit of Antwerp

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Promote “environmental friendly”

transportation of commercial goods

Improvement of the residential liveability

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

• Widen channel to 63 meters

• Heigten vertical clearance to 9,1 meters

Project Description

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

• Replace (3) railbridges - modified clearance zone

• Heighten longitudinal profile of the lines

• Adjustments to railtracks, overhead lines & signalisation

• Repare and rebuild nearby road infrastructures

• Build new embankment

• Budget of 20 Million €

• Duration 2,5 years

Work overview – Project 048

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

City of AntwerpRailbridge 1

Railbridge 2

Railbridge 3

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Getting the job done on time and on

budget

Handling a project’s complexity while

meeting the safety requirements

Managing multiple design changes &

phases

Coordinating & collaboration between

many dicsiplines

Some challanges...

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

How did QuadriDCM help?Some examples...

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Detect design

errors, ajust and

communicate

instantly

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Detect design

errors, ajust and

communicate

instantly

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Integrated process & task

model = full project phase

control

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Handling large &

compelex datasets

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

All accurate data is

available for anyone at any

time

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Real-time, multi-

disciplinary cross section

views & analyses

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Visualization & analyses

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Building 3D combined

model while designing it

= “live model”

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Customer Quote

Vincent De BreuckICT Development Project Manager at Tuc Rail

"TUC Rail has with QuadriDCM found

the perfect match for optimizing

the level of collaboration between

our services."

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Thank you

top related