bim cost model - hc bim qs
DESCRIPTION
Cost models from HCTRANSCRIPT
-
COST MODELS
-
HCBiM QS 2016 AndBeyond
HC BiM QS is an unique Construction and Property Consultancy. We offer a versatile and comprehensive portfolio of services to both Clients and Contractors.
Our service is of the highest quality and our values determine the relationship with our clients is always long term.
Introduction
-
HC BiM QS2016 And Beyond
Quantity SurveyingHC BiM QSprovides QSprocurement and commercial support servicesfor the constructionindustry . Specialist capabilities include Building and Civil Engineering, Rail, M&E services
Cost ModellingHC BiM QSprovide an innovative processgiving savings in time and costAccurate measurement of quantities from 5D modelsIntegrated bill of quantities' and estimatesVisual 3D outputs
Our Expertise
-
Introducing 5D A New Solution
Cost Modelling
DynamicinteractiveBiMcostmodelsfrom 2Ddrawings
BiMmodelsproducedfor all sectorsof constructionandengineering
BiMprocesscanbe usedat anystageof the projectdevelopment
CostPlans,EstimatesandBillsof Quantitiesareautomaticallypopulated
Simpleandquickchangequantification
-
Process Explained
1. We construct a model from CAD
drawings, specifications and other
information available
2. We digitally measure geometric
information to produce accurate
quantities
3. We link the quantity information
with project specific Bills of
Quantities and Cost Plans
4. We create client specific reports.
-
Introducing Vico
Vico Cost Planner
-
Process Overview Map
Templates
SMM7
CESMM
Breakdown
Structures
Libraries
Historic Costs
BCIS
Hutchins,
SPONS, Etc.
Cost Plan
2D CAD DrawingsProject Specifications Stage Reports
BiMModel
Bills of QuantsBills of QuantsBills of Quants
Estimate
Cost Plans and Cost Estimates are dynamically linked to the 5D model to
calculate quantities.
NRM1
NRM2
CESMM
-
CASE STUDY Example:
Station Shafts and Tunnels
-
Estimate for Shafts and Tunnels
HC BiM QS were appointed to undertake the production of estimates for the
new Crossrail station at Whitechapel along with the associated shafts and
tunnels.
Subsequently we were requested to value various engineering options. As the
BiM model is dynamically linked to the requisite quantities we were able to
quantify each option quickly.
Case Study
-
Shaft
-
Shaft
-
Shaft Section
-
Station Tunnels Whitechapel Station
-
Station Tunnels Whitechapel Station
-
Rendered image of train station
-
CASE STUDY Example:
Building (School)
-
Case Study
Bill of Quantities for New Build School
HC BiM QS were appointed to produce the of bills of
quantities for all sections of the building works including the
external works for a client who was tendering for the works.
Using the BiM cost modelling process we produced the full
bill of quantities for the school within the 4 week timeframe
-
Case Study
-
Case Study
-
Case Study
-
Case Study
-
Case Study
-
CASE STUDY Example:
Superstore and Retail Units
-
Case Study
Bill of Quantities for New Superstore
Using the BiM cost modelling process HC BiM QS were
appointed to produce the of bills of quantities for a new
superstore and associated retail units for a client who was
tendering for the works.
-
Retail Block
-
Loading Bay
-
Superstore
-
CASE STUDY
C178
Westbourne Bus Park
-
Option 60 Capacity
-
Option 116 Capacity
-
Earthworks Cut & Fill calculation
-
Earthworks Cut & Fill calculation
-
Outputs 1 Traditional Bill
-
Outputs 2 Client Customised Bill
-
Outputs 3 - Estimate Customised
-
Outputs 4 Cost Plan
-
HC BiMQS Modelling provides:
1. Speedand Efficiency
The system is being used on live projectsproviding time and cost savings
2. Flexibility
The system can incorporate changes in designand specifications quickly
3. Clarity
The quantities and changes can be checkedlive in BiM Model, providing traceability
4. Accuracy
Digital BiM models are created and linked todesign drawings
Benefit Overview
-
Cost Saving
Design Stages
Cost Saving
Through Efficiency and
Flexibility