QUALITY CONTROL CHECKLISTS
FOR
CONSTRUCTIONWORK
PREPARED BY: BIRLA AIRCON INFRASTRUCTURE PRIVATE
LIMITED
SHRIRAM SIGNIAA PROJECT
-
8/12/2019 Birla Check
2/31
TABLE OF CONTENTS
CHECKLIST FOR SURVEYING................................................................................................................1
CHECKLIST FOR EARTHWORKS - EXCAVATION............................................................................2
CHECKLIST FOR EARTHWORKS - BACKFILLING...........................................................................3
CHECKLIST FOR ANTI-TERMITE TREATMENT ..............................................................................4
CHECKLIST FOR PLAIN CEMENT CONCRETE.................................................................................5
CHECKLIST PRIOR TO CONCRETING.................................................................................................
.........................................................................................................................................................................
CHECKLIST AFTER CONCRETING.......................................................................................................!
CHECKLIST FOR CONCRETE BLOCK MASONRY............................................................................"
CHECKLIST FOR CUTTING# BEN$ING % FIXING OF HYS$ REINFORCEMENT.....................&
CHECKLIST FOR FORMWORK 'SHUTTERING( $ESIGN .............................................................1)
CHECKLIST FOR SHUTTERING ASSEMBLY....................................................................................11
CHECKLIST FOR SHUTTERING AFTER REMOVAL OF SHUTTERS..........................................12
CHECKLIST FOR PLASTERING............................................................................................................13
CHECKLIST AFTER PLASTERING.......................................................................................................14
CHECKLIST FOR TILING........................................................................................................................15
CHECKLIST FOR TILING $A$O % SKIRTING..................................................................................1
CHECKLIST FOR PLASTIC EMULSION PAINT.................................................................................1!
CHECKLIST FOR WATERPROOF CEMENT PAINT.........................................................................1"
CHECKLIST FOR FIXING ALUMINIUM $OORS...............................................................................1&
CHECKLIST FOR WATER PROOFING ...............................................................................................2)
INCOMING MATERIAL INSPECTION REPORT FOR CEMENT....................................................21
INCOMING MATERIAL INSPECTION REPORT FOR CERAMIC*MOSAIC TILES....................22
INCOMING MATERIAL INSPECTION REPORT FOR COARSE AGGREGATES........................23
INCOMING MATERIAL INSPECTION REPORT FOR FINE AGGREGATES...............................24
INCOMING MATERIAL INSPECTION REPORT FOR $OORS % WIN$OWS.............................25
-
8/12/2019 Birla Check
3/31
INCOMING MATERIAL INSPECTION REPORT FOR SOLI$ CEMENT CONCRETE BLOCKS
........................................................................................................................................................................2
INCOMING MATERIAL INSPECTION REPORT FOR STRUCTURAL STEEL............................2!
INCOMING MATERIAL INSPECTION REPORT FOR REINFORCEMENT STEEL....................2"
-
8/12/2019 Birla Check
4/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR SURVEYING
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. Identification of REFERENCE BASE LINES & PERMANENT
BENCMAR!S
". E#ta$%i#'ent of S(B)BASE LINES and BENCMAR!S. I# it a#
*er dra+ing#,
-. Cec for MAR!IN/ OF BM#0 CL# & /RIDLINES on #r2e3
*i%%ar#. I# it a# *er #*ecification#,
4. Cec for PROTECTION of S(R5E6 PILLAR. I# it O!,
7. E#ta$%i#'ent of $%oc %e2e%# 819' 19' grid;. I# it O!,
Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
CORRECTIVE ACTION PROPOSE$
>Signatre of Engineer In)carge after re)cecing?
Checklist for Surveying
Shriram Signiaa Project
-
8/12/2019 Birla Check
5/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR EARTHWORKS - EXCAVATION
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. I# te AREA to $e eca2ated c%ean and c%eared of a%% o$#trction#,
". I# te LA6O(T0 ALI/NMENT AND SIE of Eca2ation 'ared
on te grond a# *er eca2ation *%an,
-. Are adeate OR!IN/ SPACES *ro2ided a%% rond,
4. Cec +eter FO(NDIN/ STRATA i# #ita$%e for %a3ing PCCi.e.0 free fro' an3 #oft *ocet#. 8if NO0 re'o2e #oft *ocet# and fi%%
+it Lean ConcreteSand;
7. Cec for DRESSIN/ of te eca2ated area. I# it O!,
=. Cec for DEATERIN/ of +ater%ogged area. I# it O!,
. Cec for DISPOSAL of eca2ated eart to #*ecified area.
. Cec +eter BARRICADIN/ & CA(TION SI/NS are *ro2ided
for dee* eca2ation#.
19. Are GOINT INSPECTION RECORDS co'*%ete
ORI/INAL /RO(ND LE5EL: FO(NDIN/ LE5EL: DEPT OF EHCA5ATION:
SPL BAIL
>Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@CORRECTIVE ACTION PROPOSE$
>Signatre of Engineer In)carge after re)cecing?
Checklist for Excavation
Shriram Signiaa Project
-
8/12/2019 Birla Check
6/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR EARTHWORKS - BACKFILLING
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. Cec +eter APPRO5ED (ALIT6 SOIL i# $eing #ed for
$acfi%%ing, I# it O!,
". I# $acfi%%ing $eing done in LA6ERS0 a# #*ecified,
-. Cec +eter te $acfi%% i# ATERED #fficient%3,
4. Cec +eter COMPACTION i# $eing done0 a# #*ecified,
7. I# $acfi%%ing done *to SPECIFIED LE5EL,
Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
CORRECTIVE ACTION PROPOSE$
>Signatre of Engineer In)carge after re)cecing?
Checklist for Backfilling
Shriram Signiaa Project
-
8/12/2019 Birla Check
7/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR ANTI-TERMITE TREATMENT
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.N, $/0, YES NO NA
1. Cec +eter eart+or# for te area to $e treated are COMPLETE,
". I# te area to $e treated i# in DR6 condition,
-. I# te %oo#e eart re'o2ed fro' te area and 'ade CLEAN,
4. I# te CEMICAL $eing #ed 'atcing +it te #*ecification#,
7. Cec for CONCENTRATION of ce'ica% e'%#ion. I# it O!,
Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
CORRECTIVE ACTION PROPOSE$
>Signatre of Engineer In)carge after re)cecing?
Checklist for Anti-Termite Treatment
Shriram Signiaa Project
-
8/12/2019 Birla Check
8/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR PLAIN CEMENT CONCRETE
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
BEFORE CONCRETING
1. Cec for co'*%etion of *receding acti2itie# for te area to $e
co'*%eted
". Cec for for'+or and di'en#ion#, I# it O!,
$URING CONCRETING1. Cec for 'i *ro*ortion. I# it a# #*ecified,
". Cec for *%ace'ent & co'*action. I# it O!,
-. Cec for fini#ed %e2e%. I# it a# #*ecified,
4. Cec for #rface fini#. I# it acce*ta$%e,
AFTER CONCRETING
1. Cec for cring. I# it O!,
SPL BAIL
>Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
CORRECTIVE ACTION PROPOSE$
>Signatre of Engineer In)carge after re)cecing?
Checklist for Plain Cement Concrete
Shriram Signiaa Project
-
8/12/2019 Birla Check
9/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST PRIOR TO CONCRETING
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. Cec for c%ean%ine## of te area to $e concreted. I# it O!,
". Cec for for'+or and reinforce'ent a# *er re%e2ant cec%i#t#.
-. Cec for co'*%etion of oter *receding acti2itie# #c a# fiing ofin#ert# & e'$ed'ent# and #er2ice condit# etc.
4. Cec for #**ort# to for'# and rigidit3 of te a##e'$%3. I# it O!,
7. Cec for *ro2i#ion of acce## *%atfor'# & +a%+a3#.
-
8/12/2019 Birla Check
10/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST AFTER CONCRETING
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. Cec for #ita$%e cring arrange'ent#.
". I# adeate cring $eing en#red for #*ecified *eriod,
-. Cec for e*o#ing of in#ert# and e'$ed'ent# tat are f%# +it
te concrete #rface.
4. Cec for 'aring of %ocation of #er2ice condit# & fitting# +ere
a**%ica$%e.
7. Cec for correcti2e action on #rface defect# on e*o#ed concrete.
Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
CORRECTIVE ACTION PROPOSE$
>Signatre of Engineer In)carge after re)cecing?
Checklist for Concreting
Shriram Signiaa Project
-
8/12/2019 Birla Check
11/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR CONCRETE BLOCK MASONRY
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. A2ai%a$i%it3 of $%oc# a# *er dai%3 reire'ent#. I# it O!,
". C%eaning of +or# area off %oo#e 'ortar0 concrete de$ri# etc.
-. Cec for a%ign'ent & %ocation of concrete $%oc 'a#onr3. I# it a#
#*ecified in te con#trction dra+ing#
4. Cec for #ita$i%it3 & #afet3 of #caffo%ding. I# it acce*ta$%e,
7. Cec for 'oi#tring of concrete $%oc# $efore *%acing.
-
8/12/2019 Birla Check
12/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR CUTTING# BEN$ING % FIXING OF HYS$
REINFORCEMENT
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. I# te BAR BENDIN/ SCED(LE *re*ared
". I# te Bar Bending Sced%e a2ai%a$%e for reference,
-. Cec for correct C(TTIN/ & BENDIN/ OF BARS a# *er BBS.
-.1 BAR DIAMETERS
-." SAPES OF BARS
-.- DIMENSIONS OF BARS
-.4 N(MBER OF BARS
4. Cec for CLEANLINESS of Bar#.
7. Cec for correct FIHIN/ OF BARS a# *er Con#trction Dra+ing#.
7.1 Re%ati2e *o#ition# of $ar#0 #*acing of $ar#
7." Co2er# for reinforce'ent
7.- Pro2i#ion of cair#0 co2er $%oc# & #*acer#
7.4 La* %engt# & %ocation of %a*#
-
8/12/2019 Birla Check
13/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR FORMWORK 'SHUTTERING( $ESIGN
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. I# a STR(CT(RE)SPECIFIC S(TTERIN/ SCEME de#igned,
". I# te #ttering #ce'e 2erified for S(ITABILIT6 & SAFET6,
-. Are S!ETCES #o+ing te a**ro2ed #ttering #ce'e a2ai%a$%e
for reference,4. Cec for P6SICAL CONDITION of #caffo%d# and #tter#. Are
da'aged and defecti2e e%e'ent# re'o2ed,
7. Cec for CLEANLINESS of for'#. I# it acce*ta$%e,
Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
CORRECTIVE ACTION PROPOSE$
>Signatre of Engineer In)carge after re)cecing?
Checklist for Shuttering !esign
Shriram Signiaa Project
-
8/12/2019 Birla Check
14/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR SHUTTERING ASSEMBLY
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. Cec for A##e'$%3 of Scaffo%d# and Stter#
". Cec for Pro2i#ion and Arrange'ent of te fo%%o+ing:
".1 PROPS
"." ADG(STABLE SPANS
".- CLAMPS & CO(PLERS
".4 CANNELS
".7 PIPES
-. Cec for *ro2i#ion and arrange'ent of:
-.1 PL6OOD OR TIMBER FORMS
4. Cec for RI/IDIT6 of A##e'$%ed For'#
7. Cec for CONFORMANCE of te A##e'$%ed For'# to
DIMENSIONS0 SAPES0 LINES & /RADES
-
8/12/2019 Birla Check
15/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR SHUTTERING AFTER REMOVAL OF
SHUTTERS
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. Cec for re'o2a% of Stter For'# & Scaffo%d# after SPECIFIEDD(RATION.
". Cec E*o#ed Srface# of Concrete for te *o##i$%e occrrence of
te fo%%o+ing #rface defect#:
".1 ONE6 COMBIN/
"." LOSS OF /RO(T
".- B(L/IN/
".4 RO(/ CORNERS OR ED/ES
".7 BI/ SIED AIR B(BBLES
IF YES6# THEN ENGINEER IN-CHARGE SHALL TAKE
SUITABLE CORRECTIVE ACTION AN$ RECHECK
-. Cec for REPAIR & FINISIN/ of E*o#ed Concrete Srface. I#
it #ati#factor3,
4. Cec for CLEANIN/ of #caffo%d# & #tter# after re'o2a%.
SPL BAIL
>Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
CORRECTIVE ACTION PROPOSE$
>Signatre of Engineer In)carge after re)cecing?
Checklist for Shuttering After "emoval
Shriram Signiaa Project
-
8/12/2019 Birla Check
16/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR PLASTERING
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. Cec for co'*%etion of *receding acti2itie# %ie fiing of #er2ice
condit#0 +ater #**%3 & #anitation %ine#0 etc.
". Cec for raing of 'a#onr3 Joint# and acing on RCC #rface#.
-. Cec for #ita$i%it3 & #afet3 of #caffo%ding.
4. Cec for 'ortar 'i *ro*ortion.
7. Cec for te addition of +ater*roofing co'*ond0 if #*ecified.
Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
CORRECTIVE ACTION PROPOSE$
>Signatre of Engineer In)carge after re)cecing?
Checklist for Plastering
Shriram Signiaa Project
-
8/12/2019 Birla Check
17/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST AFTER PLASTERING
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. Cec for tre %e2e% #rface and #'ootne## of *%a#ter.
". Cec for #traigt edge#.
-. Cec for rigt ang%e# and *%'$.
4. Cec for re'o2a% of dead 'ortar and de$ri#.
7. Cec for #ea%ing of o*ening# in 'a#onr3 for #caffo%d#.
Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
CORRECTIVE ACTION PROPOSE$
>Signatre of Engineer In)carge after re)cecing?
Checklist for Plastering
Shriram Signiaa Project
-
8/12/2019 Birla Check
18/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR TILING
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. Cec for c%ean%ine## of $a#e #rface. I# %oo#e 'ortar & de$ri#
re'o2ed fro' te +or area,
". Cec for co'*%etion of *receding acti2itie# %ie fiing of door#0
*artition#0 fa%#e cei%ing etc.
-. Cec for %e2e%%ing of irreg%aritie# on $a#e #rface.
4. Cec for *ro2i#ion of #er2ice condit#0 Jnction $oe#0 etc.
7. I# te a**ro2ed *attern of %a3ing a2ai%a$%e for reference.
-
8/12/2019 Birla Check
19/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR TILING $A$O % SKIRTING
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. Cec for raing of 'a#onr3 Joint# & acing on RCC #rface#.
". Cec for c%eaning & +a#ing of +a%%#.
-. Cec for co'*%etion of *receding acti2itie# %ie fiing of door# &+indo+#0 #er2ice condit#0 #anitar3 fitting# etc.
4. I# te a**ro2ed *attern of fiing of ti%e# a2ai%a$%e,
7. Cec for 'ortar 'i *ro*ortion. I# it a# #*ecified,
Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
CORRECTIVE ACTION PROPOSE$
>Signatre of Engineer In)carge after re)cecing?
Checklist for Tiling
Shriram Signiaa Project
-
8/12/2019 Birla Check
20/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR PLASTIC EMULSION PAINT
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
PRIOR TO PAINTING
1. Are 'anfactrer# #*ecification# for *ainting a2ai%a$%e forreference.
". A2ai%a$i%it3 of a**ro2ed #ade detai%#.
-. Cec for c%eaning of +a%% & cei%ing #rface. I# it free fro' dead
'ortar0 dirt0 d#t0 a%gae0 grea#e etc.
4. Cec for fi%%ing of *it# or nd%ation# in te *%a#ter
7. Cec for #ita$i%it3 & #afet3 of #caffo%ding.
-
8/12/2019 Birla Check
21/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR WATERPROOF CEMENT PAINT
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
PRIOR TO PAINTING
1. Are 'anfactrer# #*ecification# for *ainting a2ai%a$%e for
reference.
". A2ai%a$i%it3 of a**ro2ed #ade detai%#.
-. Cec for c%eaning of +a%% & cei%ing #rface. I# it free fro' dead'ortar0 dirt0 d#t0 a%gae0 grea#e etc.
4. Cec for fi%%ing of *it# or nd%ation# in te *%a#ter
7. Cec for #ita$i%it3 & #afet3 of #caffo%ding.
-
8/12/2019 Birla Check
22/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR FIXING ALUMINIUM $OORS
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. I# te in#*ection 'ateria% for te t3*e of te door a2ai%a$%e,
". Cec for *%'$ for te doorfra'e +.r.t. 'a#onr3 o*ening.
-. Cec for fa#tening of door fra'e# to +a%%# $3 #cre+#
4. Cec for te *ro2i#ion and *ro*er fnctioning of te fo%%o+ing:
a; Gointing c%eat#
$; Door c%o#er#
c; Bo%t#
d; Loc#
e; eater #tri**ing
f; /%aKing $ead#
g; EPDM r$$er ga#et#
; Oter#
Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
Checklist for fixing aluminium $oors
Shriram Signiaa Project
-
8/12/2019 Birla Check
23/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
CHECKLIST FOR WATER PROOFING
SITE: LOCATION: DATE:
Ref. Drg. No:
S+.
N,
$/0, YES NO NA
1. Cec for #rface c%eaning.
". Cec for 'i *ro*ortion.
-. Cec for te addition of +ater*roofing co'*ond0 if #*ecified.
4. Cec for te %e2e%# *rior to %a3ing.
SPL BAIL
>Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
CORRECTIVE ACTION PROPOSE$
>Signatre of Engineer In)carge after re)cecing?
Checklist for %ater Proofing
-
8/12/2019 Birla Check
24/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
INCOMING MATERIAL INSPECTION REPORT FOR CEMENT
DATE OF RECEIPT:
CALLAN NO:
S+.N
,
$/0, YES NO NA
1. Mae & grade of ce'ent ". Batc n'$er a# 'ared on te $ag#. Crrent +ee
I# it acce*ta$%e,
-. Cec for finene##. I# it acce*ta$%e,4. Cec for %'*#. I# it acce*ta$%e,
7. I# te 'anfactrer# te#t certification for ce'ent
a2ai%a$%e,
'NOTE7 REFER WORK INSTRUCTIONS FOR ACCEPTANCE CRITERIA(
ACCEPTANCE OF THE MATERIAL BASE$ ON
THE ABOVE INSPECTION REPORT
SPL BAIL
>Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
Checklist for %ater Proofing
-
8/12/2019 Birla Check
25/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
INCOMING MATERIAL INSPECTION REPORT FOR
CERAMIC*MOSAIC TILES
DATE OF RECEIPT:
CALLAN NO:
NAME OF TE S(PPLIER:
S+.N
,
$/0, YES NO NA
1. Mae of te ti%e# ". T3*e -. Sade code 4. Cec for #a*e# and #iKe# of ti%e#. I# it acce*ta$%e,
7. Cec for 2ariation in #ade in ti%e#. I# it acce*ta$%e,
-
8/12/2019 Birla Check
26/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
INCOMING MATERIAL INSPECTION REPORT FOR COARSE
AGGREGATES
DATE OF RECEIPT:
CALLAN NO:
NAME OF TE S(PPLIER:
S+.N, $/0, YES NO NA
1. No'ina% #iKe of te aggregate# ". I# te #a*e of te aggregate# acce*ta$%e,-. Cec for *re#ence of de%eterio# 'ateria%. I# it
acce*ta$%e,
4. Cec for c%ean%ine## of aggregate#. I# it acce*ta$%e,
'NOTE7 REFER WORK INSTRUCTIONS FOR ACCEPTANCE CRITERIA(
ACCEPTANCE OF THE MATERIAL BASE$ ON
THE ABOVE INSPECTION REPORT
SPL BAIL
>Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
Checklist for &ncoming Material &ns'ection
Shriram Signiaa Project
-
8/12/2019 Birla Check
27/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
INCOMING MATERIAL INSPECTION REPORT FOR FINE
AGGREGATES
DATE OF RECEIPT:
CALLAN NO:
NAME OF TE S(PPLIER:
S+.N
,
$/0, YES NO NA
1. Si%t content a# o$#er2ed
". I# te fine aggregate acce*ta$%e,
-. Cec for *re#ence of c%a3 %'*#. I# it acce*ta$%e,
4. Cec for *re#ence of de%eterio# 'ateria%. I# itacce*ta$%e,
7. Cec for c%ean%ine## of aggregate#. I# it acce*ta$%e,
'NOTE7 REFER WORK INSTRUCTIONS FOR ACCEPTANCE CRITERIA(
ACCEPTANCE OF THE MATERIAL BASE$ ONTHE ABOVE INSPECTION REPORT
SPL BAIL
>Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
Checklist for &ncoming Material &ns'ection
Shriram Signiaa Project
-
8/12/2019 Birla Check
28/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
INCOMING MATERIAL INSPECTION REPORT FOR $OORS %
WIN$OWS
DATE OF RECEIPT:
CALLAN NO:
NAME OF TE S(PPLIER:
S+.
N,
$/0, YES NO NA
1. T3*e ". Are te #ection# 'atcing +it to#e of tecnica%
#*ecification# or #o* dra+ing#,
-. Cec for #rface defect#. I# it acce*ta$%e,
4. Cec for di'en#ion#0 de#ign#0 etc.0 I# it acce*ta$%e,
7. Rigidit3 & fini# of te a##e'$%3. I# it acce*ta$%e,
-
8/12/2019 Birla Check
29/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
INCOMING MATERIAL INSPECTION REPORT FOR SOLI$
CEMENT CONCRETE BLOCKS
DATE OF RECEIPT:
CALLAN NO:
NAME OF TE S(PPLIER:
S+.N
,
$/0, YES NO NA
1. SiKe of te $%oc# ". Cec for di'en#ion#. I# it acce*ta$%e,
-. Cec for edge# & corner#. I# it acce*ta$%e,
4. Cec for *re#ence of crac# or f%a+#. I# it acce*ta$%e,
7. I# te 'anfactrer# te#t certificate for $%oc# a2ai%a$%e,
'NOTE7 REFER WORK INSTRUCTIONS FOR ACCEPTANCE CRITERIA(
ACCEPTANCE OF THE MATERIAL BASE$ ON
THE ABOVE INSPECTION REPORT
SPL BAIL
>Signatre of Engineer In)carge? >Signatre of Engineer In)carge?
Na'e:@@@@@@@@@@@@@@@@@@@@@ Na'e:@@@@@@@@@@@@@@@@@@@@@
Checklist for &ncoming Material &ns'ection
Shriram Signiaa Project
-
8/12/2019 Birla Check
30/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
INCOMING MATERIAL INSPECTION REPORT FOR
STRUCTURAL STEEL
DATE OF RECEIPT:
CALLAN NO:
NAME OF TE S(PPLIER:
S+.
N,
$/0, YES NO NA
1. Section of #trctra% #tee% ". Cec for c%ean%ine## of #tee%. I# it free fro' r#t0 grea#e0
*aint0 %oo#e #ca%e#0 etc,
-. Cec for craced end#. I# it acce*ta$%e,
4. Cec for #traigtne## of #ection#. I# it acce*ta$%e,
7. Cec for #ectiona% di'en#ion#. I# it acce*ta$%e,
-
8/12/2019 Birla Check
31/31
BIRLA AIRCON INFRASTRUCTURE PRIVATE LIMITE$
INCOMING MATERIAL INSPECTION REPORT FOR
REINFORCEMENT STEEL
DATE OF RECEIPT:
CALLAN NO:
NAME OF TE S(PPLIER:
S+.N
,
$/0, YES NO NA
1. /rade of #tee%
". Dia'eter of reinforce'ent #tee% -. Cec for c%ean%ine## of reinforce'ent #tee%. I# it free fro'
r#t0 grea#e0 *aint0 %oo#e #ca%e#0 etc
4. Cec for craced end#. I# it acce*ta$%e,
7. I# te 'anfactrer# te#t certificate for reinforce'ent #tee%
a2ai%a$%e,
ACCEPTANCE OF THE MATERIAL BASE$ ON THE
ABOVE INSPECTION REPORT
SPL BAIL
>Signatre of Engineer In)carge? >Signatre of Engineer In)carge?