blm diagnostic thursday june 19, 2008 jeff dooling jcdooling@anl.gov 1 slac redwood room a/b, slac...

Post on 21-Dec-2015

220 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

BLM Diagnostic Thursday June 19, 2008

1 Jeff Dooling

jcdooling@anl.gov

SLAC SLAC Redwood Room A/B, SLACRedwood Room A/B, SLAC

Thursday, June 19, 2008Thursday, June 19, 2008

BLM Testing at APSBLM Testing at APS

Jeff DoolingArgonne National Laboratory

BLM Diagnostic Thursday June 19, 2008

2 Jeff Dooling

jcdooling@anl.gov

Measurements at APS

What do they tell us?

BLM Diagnostic Thursday June 19, 2008

3 Jeff Dooling

jcdooling@anl.gov

Cerenkov Detector (CD) loss monitors in the APS SR

Distributed around the SR, ~1 per sector

Generally on the outboard side ~10 cm from the beam centerline

Small fused-silica, cylindrical radiators (8-mm OD, 8-mm length), V=0.4 cc

Close-coupled to small PMT

BLM Diagnostic Thursday June 19, 2008

4 Jeff Dooling

jcdooling@anl.gov

APS CD

BLM Diagnostic Thursday June 19, 2008

5 Jeff Dooling

jcdooling@anl.gov

CD Loss Signals during Top-UP

BLM Diagnostic Thursday June 19, 2008

6 Jeff Dooling

jcdooling@anl.gov

CD Loss Signals during Top-Up--with large signals the amplitude saturates

but the width keeps growing

BLM Diagnostic Thursday June 19, 2008

7 Jeff Dooling

jcdooling@anl.gov

FO Beam Loss Position Monitor (BLPM)

BLM Diagnostic Thursday June 19, 2008

8 Jeff Dooling

jcdooling@anl.gov

BLPM Loss Signals during Top Up injection

BLM Diagnostic Thursday June 19, 2008

9 Jeff Dooling

jcdooling@anl.gov

Zooming in on the first injection loss case

BLM Diagnostic Thursday June 19, 2008

10 Jeff Dooling

jcdooling@anl.gov

Zooming in further on the first injection loss case

BLM Diagnostic Thursday June 19, 2008

11 Jeff Dooling

jcdooling@anl.gov

LCLS BLM

BLM Diagnostic Thursday June 19, 2008

12 Jeff Dooling

jcdooling@anl.gov

Prototype testing at APS

BLM Diagnostic Thursday June 19, 2008

13 Jeff Dooling

jcdooling@anl.gov

Prototype testing at APS—to go on in S35 and S9

BLM Diagnostic Thursday June 19, 2008

14 Jeff Dooling

jcdooling@anl.gov

Acknowledgments

Bingxin Yang and Bill Berg have contributed many hours to this project

Also need to thank Adam Brill, Matt Kasa, Lester Erwin, Tony Pietryla, Mike Merritt, Liz Moog, and C.Y. Yao

top related