bonding manual (22.6.05)0 - asut · pdf filethis method statement explained machine made...
Post on 02-Feb-2018
222 Views
Preview:
TRANSCRIPT
www.asutfiberglass.com
ASUT FIBERGLASS LTD.
EPI-DUR® (GRE) Epoxy Base
VIN-DUR® (GRV) Vinylester Base
ISO-DUR® (GRP) Isophthalic Base
Assembly InstructionFOR EPOXY ADHESIVE HOT CURING BONDED JOINTS
A ASUTF I B E R G L A S S
L
(Assembly Dimension)
FLAT COLLAR
TAILED COLLAR
COUPLING
TAILED FIX FLANGE
FIBERGLASS
ASUTAsut Fiberglass Ltd.
Tarsus - Mersin Industrial Zone
Cumhuriyet Bulv. No:23
Voice = (+ 90 - 324 ) 6764262
Fax = (+ 90 - 324 ) 6764261
E mail = info @ asutfiberglass
www.asutfiberglass.com
fd - 0 / 06 - 05 - S1
BONDING SPOOL
Ep Bonding 06.05-R0
T.UPM 10.05.00
Page 1
www.asutfiberglass.com
EPI-DUR , VIN-DUR & ISO-DUR Bonding System
PURPOSE
This Method Statement Explained Machine Made GRE-GRP Plain End & Male-Female
Pipe and Double socket End Fittings Joint Installation.
SCOPE
This Method Statement cover Requirements for ASUT Fiberglass™ EPI-DUR® , VIN-DUR® & ISO-DUR®
Pipe and Fittings Workshop and Field ,Coupling 5565 Adhesive™ (with R6500™ or F5500™
Hardener) Bonding.They show you how to cut the pipe,prepare the ends,use the
adhesive,stab the joint and cure the adhesive to produce a strong and reliable bond
joint.
NECESSARY TOOLS & EQUIPMENTS FOR BONDING
· Tape Measure
· Level
· Infinitive
· Marking Pen
· Marking Band
· ½ - 2 - 3” Putty Spatula
· Rubber Piece (2-3 mm thick)
· Card Board (30x30 cm)
· Rubber - Clote Gloves
· Safety Glasses
· Small Disk Grinder Power Tools
· Big Disk Grinder Power Tools
· Hand Drilling Medium Power Tools
· Cutting (wheels) Blade 115x3
· Cutting (wheels) Blade 180x3
· Plastic Disc Pad 115
· Plastic Disc Pad 180
· Disk Sand Paper 115
· Disk Sand Paper 180
· Abrasive Flapper Roller and Sandpaper
· 2 - 3” Brushes
· Cleaner (Methylene Chlorite)
· Shaver-Taper Tools
· Curing Heating Box or Blanket
· Puller (winch) and Pipe Clip
NECESSARY RAW MATERIAL FOR BONDING
· 5565 Adhesive™ Standard (for R6500 or F5500 Hardener)
· R6500™ Hardener (for 2 hrs. handling)
· F5500™ Hardener (for 3 hrs. handling)
Ep Bonding 06.05-R0
T.UPM 10.05.00
Page 2
www.asutfiberglass.com
PREPARING THE EPI-DUR® , VIN-DUR® & ISO-DUR® PIPE AND FITTINGS
Pipes delivery to site already shaved end
Fittings delivery to site Coupling end
Collar and Fix Flange delivery to site Taper end
Ep Bonding 06.05-R0
T.UPM 10.05.00
Page 3
www.asutfiberglass.com
Check first Fitting Dimension catalogue for assemble length.
Measure required length and scribe the pipe using a pipefitter’s wrap-around.Cut the
pipe with cutting blade.Do not crush pipe if clamping to hold.Use pipe vise and protect
surface from point loading.
Prepare the outside surface of the pipe with Shaver-Taper Tool or Disk Grinder power sand
paper,approximately 5 mm longer than required by the socket depth.This is primarily to
remove the surface glaze and insure proper sizing of the pipe outside if available.Dust off
sanded area a clean with Brushes.
Do not touch tapered surface with hands or greasy gloves.Do not use solvent.Do not use
air to blow sanding dust of the prepared ends as it may contain contaminates
detrimental to bond strength.Never sand the joint surface more than two (2) hours
before making the joint.
Remove the outside surface glaze
ØB2
ØB
ØB1
ØDN
A
LC
167.5168.0150
350
500
400
250
300
200
363.0
515.0
413.0
324.0
273.0219.0
362.5
514.5
412.5
323.5
272.5218.5
40
80100
50
DN
2548.0
114.089.0
60.0
33.4
(mm)
B
47.5
113.588.5
59.5
32.9
B2(mm)
32691235168.5
363.5
515.5
413.5
324.5
273.5219.5
500
600
586
355
450
307
104
132
106
110
10994
604
732
692
560
464401
48.5
114.589.5
60.5
33.9
B1(mm)
55
100140
67
(mm)
38
L
36
7359
42
36
(mm)
C
91
213159
109
74
(mm)
A
3.900
17.200
30.000
22.000
9.000
13.000
6.200
1.100
0.455
0.320
Weight
1.800
(kg)
0.175
Design:
PN 16 DN 25-40-50-80-100-150-200-250-300
PN 10 DN 350-400-500
90° ELBOW
EPI-DUR / VIN-DUR / ISO-DUR Adhesive Bonded Type
Asut Fiberglass Ltd.
Tarsus - Mersin Industrial Zone
Cumhuriyet Bulv. No:23
Voice = (+ 90 - 324 ) 6764262
Fax = (+ 90 - 324 ) 6764261
E mail = info @ asutfiberglass
www.asutfiberglass.com
FIBERGLASS
ASUT
fd - 0 / 06 - 05 - 9
363.5362.5363.0350
500
400 413.0
515.0
412.5
514.5
413.5
515.5
150
250
300
200
80
100
50
40
168.0
219.0
273.0
324.0
60.0
89.0
114.0
48.0
DN
25
B
(mm)
33.4
168.5167.5
272.5
323.5
218.5
273.5
324.5
219.5
88.5
113.5
59.5
47.5
89.5
114.5
60.5
48.5
(mm)(mm)
32.9
B2
33.9
B1
1108104
132
106 1207
1319 90.000
54.000
97 464
109
110
97
768
820
624
58
74
43
37
316
368
266
234
4.400
16.450
11.600
32.000
7.800
0.650
1.100
1.800
2.500
(mm)(mm)
37
C
224
A
0.470
(kg)
Weight
A/2
C
A
ØDN
ØB2
ØB
ØB1
180
200
270
220
550
600
900
995
430
1055
L
(mm)
150
160
Design:
PN 16 DN 25-40-50-80-100-150-200-250-300
PN 10 DN 350-400-500
ASUTFI BERGLASS
Asut Fiberglass Ltd.
Tarsus - Mers in Industria l Zone
Cumhuriyet Bulv. No:23
Voice = (+ 90 - 324 ) 6764262
Fax = (+ 90 - 324 ) 6764261
E mail = info @ asutfiberglasswww.asutfiberglass.com
EQL. TEEEPI-DUR / VIN-DUR / ISO-DUR Adhesive Bonded Type
CC L
Ep Bonding 06.05-R0
T.UPM 10.05.00
Page 4
www.asutfiberglass.com
Flapper sander and/or hand sanding at field for factory taper end pipes
Sanding cut end
Make 45 deg. Triming to cut end corner
First check bonding space pipe and fittings before shaving
Prepare the inside surface of the socket (coupling) with power drilling tools with abrasive
flapper grinding roller and,or circular sandpaper (if necessary).Dust off sanded area with
a clean brush.Do not touch surface with hands or greasy gloves.Do not use solvent.Do
not use compressor air to blow sanding dust off the prepared ends as it may contain
contaiminated detrimental to bond strength.Never sand the joint surfaces more than
two (2) hours before making the joint.
Prepare the inside surface of fittings coupling and finished end with flapper sander
Ep Bonding 06.05-R0
T.UPM 10.05.00
Page 5
www.asutfiberglass.com
Please read first Adhesive & Hardener MSDS and Application Manual
Use a flat and clean piece of card board.Flat surface to mix the two component 5565
Adhesive™ and R6500™ Hardener or F5500™ Hardener. Using a putty spatula,mix the
two components together using turning and spreading motions,making sure all unmixed
components are folded into the bulk and mixed. The two components are different
colors,to easy to see streaks indicating unmixed adhesive.Continue scraping,turning and
folding and spreading until a consistent color is reached.Spread the mixed adhesive
over the surface of the mixing cardboard to remove any thick area.
5565 Adhesive™ (white color) and R6500™ Hardener (Black Color) and F5500™
Hardener (Black Color).Good mixed bonding material becoming grey.
Check first hardener useable life
and determining bonding quantities
Ep Bonding 06.05-R0
T.UPM 10.05.00
Page 6
www.asutfiberglass.com
The first application of the adhesive to coupling must be as thin layer worked in
scrubbed into the pores and to get wet of the coupling surface with the stick,steel spatula or
rubber piece.Seal the surface of the coupling.
Apply an even layer of adhesive the coupling not to exceed 1 mm
Do not overload the coupling as this will cause "push in" of excess material and could
cause flow restrictions.
Seal the cut end of pipe with a positive coating of adhesive.This is vital with the open cut
section of any fiberglass laminated structure.Use a pressuring and scrubbing action to
properly seal the surface.Apply a thin coating of adhesive to the exterior of the pipe rub
or scrub the material into the surface of the pipe to wet the surface.Now apply a
generous coat of the adhesive making sure by visual inspection that the thickness of the
adhesive exceeds the tolerance between the pipe and fittings so that all the air will be
displaced.Lack of adhesive could cause trapped air in the coupling,which would cause
channeling and leaking.
Ep Bonding 06.05-R0
T.UPM 10.05.00
Page 7
www.asutfiberglass.com
Plain taper end pipe & Coupling ready for Life bonding.
Move the pipe into the coupling until it firmly bottom,which should push a uniform
squeeze out of adhesive to the outside of coupling opening.Do not withdraw pipe after
insertion.Do not twist.Any back movement or withdrawal could draw air into the glue line
and cause leakage.Make any slight adjustments for plub and level,then use a ¾ or 1”
putty spatula or rubber piece to pull a fillet around the joint.
Make sure adhesive cleaned around the joint ends with Methylene Chlorite
Ep Bonding 06.05-R0
T.UPM 10.05.00
Page 8
www.asutfiberglass.com
Please check after bond insertion and pull with the winch for overal length and level
for next bonding step overal length and level
Ep Bonding 06.05-R0
T.UPM 10.05.00
Page 9
www.asutfiberglass.com
If necessary ,use puller winch with pipe clamp
Ep Bonding 06.05-R0
T.UPM 10.05.00
Page 10
www.asutfiberglass.com
If necessary, use curing heating box or blanket with winch or without winch
for fast handling to spool
Must be ; Curing for Epoxy adhesive
work life.
Ep Bonding 06.05-R0
T.UPM 10.05.00
Page 11
www.asutfiberglass.com
INSTALLATION CONSIDERATIONS
Experience has shown us that highly rellable piping system joints can be made even
under extreme weather conditions whenever the necessary precautions are taken.The
actual works will often be more quickly completed in high temperature condition.Low
temperatures can increase the work time 20% - 35% over normal shop conditions.A similar
increase is common for wet condition.
Hot Weather Installation Tips ;
Hot weather conditions,with temperature above 32 deg. C, will greatly the working time
of the bonding.The following steps are recommended when fabricating in hot weather
conditions.
· Avoid direct sunlight on the joining surfaces.
· Cool adhesive avoid direct sunlight
· Plan and organize job to reduce working time
Cold Weather Installation Tips ;
The curing time for bond is direckly related to the temperature.Colder temperature result
in longer curing times.The following steps should be used when appliying a field adhesive
bonding in colder temperature.
· Field adhesive kits should be placed in warm room before application in order to
reach temperatures of 21 to 26 deg. C. This will make mixing much easier and
speed cure times.The adhesive should not be applied at temperatures in
excess of 14 deg. C.
· When possible,piping should be field bonded indoors into subassemblies.The
warmer conditions of these areas will allow faster curing times and,in most
cases,save installation time and labor.
· It is helpful to warm the pipe ends and fittings before joint makeup.Warm parts will
contribute to faster curing times.
· A heating box or blanket may be used to obtain a faster cure time.
·
EXTREME MOISTURE
· If fittings or pipe have moisture on the bonding surface wipe them dry prior to
sanding.
· Sand pipe and fittings immediately before appliying the adhesive to bond the
joint.Sand surface until a fresh,dry surface is present then remove dust and apply
adhesive.
· Cure per the previous recommendations for normal extreme heat or extreme cold
temperature.
Ep Bonding 06.05-R0
T.UPM 10.05.00
Page 12
www.asutfiberglass.com
ADHESIVE MATERIAL (CURING TYPE)
5565 Adhesive™ (White & Green pot)
Bisphenol-A (BPA) Epoxy resin Adhesive
R6500™ Hardener (Yellow & Red pot)
Aromatic polyamine , Diamino Diphenyl Methane (DDM) Hardener.
Excellent Chemical Resistance and 140 deg C. Operating temperature.
Useable life 20 mins.
Gel time 30 mins.
Handling 60 mins at 23 deg. C applications.
Application good for Internall,Night and low temperature
R5500™ Hardener (Grey & Purple Pot)
Aromatic polyamine , Diamino Diphenyl Methane (DDM) Hardener.
Good Chemical Resistance and 100 deg C. Operating temperature.
Useable life 30 mins.
Gel time 45 mins.
Handling 90 mins at 23 deg. C applications.
Application good for Outside,day and above 35 C° temperature
Mixing Volume
* 5565 Adhesive (150 g) mixing with R6500 Hardener (150 g) = total volume 300 g
* 5565 Adhesive (150 g) mixing with F5500 Hardener (150 g) = total volume 300 g
* We have 2 type bonding material,each mixture total 300 g
* Adhesive mixing shal be one and one (all timing datum for 23 deg. C application)
Dia. 25 40 50 65 80 100 150 200 250 300 350 400 500
Qnty. 12 10 8 7 5 3 2 1.5 1.2 1 0.8 0.7 0.6
Man # 4 4 4 4 4 4 4 5 5 5 5 5 5
Appr. Number of Pipe Coupling Bonds per 300 g Kit and Installation Crew Man #
Ep Bonding 06.05-R0
T.UPM 10.05.00
Page 13
top related