8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
1/175
BTS3900(Ver.D)
V100R009C00
Installation Guide
Issue 03
Date 2014-08-30
HUAWEI TECHNOLOGIES CO., LTD.
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
2/175
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
3/175
About This Document
Overview
This document describes the installation process for the BTS3900 (Ver.D) (shortened to
BTS3900 in this document) cabinet, boards, modules, and cables. It also provides checklists for
hardware installation.
Product Version
The following table lists the product versions related to this document.
Product Name Solution Version Product Version
BTS3900 l SRAN9.0
l GBSS16.0
l RAN16.0
l eRAN7.0
V100R009C00
Intended Audience
This document is intended for:
l Base station installation personnel
Organization
1 Changes in BTS3900 (Ver.D) Installation Guide
This chapter describes the changes inBTS3900 (Ver.D) Installation Guide.
2 Overview
Familiarize yourself with this information as well as the cabinet interior, application scenarios
of the cabinets, and relevant clearance requirements before installing the cabinets.
3 Installation Preparations
BTS3900(Ver.D)
Installation Guide About This Document
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
ii
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
4/175
This chapter lists the tools and instruments that must be obtained before the installation. It also
specifies the skills that the onsite personnel must have.
4 Unpacking Check
Unpack and check the delivered equipment to ensure that all the materials are included and intact.
5 Obtaining the ESN
The electronic serial number (ESN) is a unique identifier of a NE. Record the ESN of the base
station beforethe installation for future commissioning.
6 Installation Process
Before the BTS3900 cabinets are delivered, boards inside the cabinets have been installed. You
only need to install the cabinet and cables onsite. Some optional components may also need to
be installed based on onsite requirements.
7 Checking Installed Modules and Cables
Modules and cables in the cabinet have been installed before delivery. You need to check whether
the modules and cables are installed securely.
8 Installing a Base
A BTS3900 cabinet can be installed on a base. The base can be installed either on a concrete
floor or ESD floor according to the equipment room conditions and customer's requirements.
9 Installing the Cabinet
A BTS3900 cabinet can be installed alone, side by side with another BTS3900 cabinet, or stacked
on another BTS3900 cabinet. This section describes the procedure for installing the BTS3900(Ver.D) cabinets in the preceding modes. The procedures for installing the BTS3900(Ver.B),
BTS3900(Ver.C), and BTS3900(Ver.D) cabinets are the same.
10 Installing a PGND Cable and an Equipotential Cable
A PGND cable connects a PGND screwin a cabinet and a PGND bar to ensure proper grounding
of the cabinet. An equipotential cable connects PGND screws on different cabinets to ensure the
equipotential bonding between the cabinets.
11 Installing Optional Modules and Their Cables
This chapter describes procedures for installing the optional modules and their cables onsite.
12 Installing Cables
Before cabinets are delivered, the boards and cables inside the cabinets have been installed. You
must install the external cables and cables for optional components onsite.
13 Installation Checklist
After the cabinets and devices are installed, you need to check the installation items, installation
environment,and cable-related items.
14 Powering On a Base Station
This section describes how to power on a base station and handle a failure in the power supply
to the components in a cabinet.
BTS3900(Ver.D)
Installation Guide About This Document
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
iii
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
5/175
Conventions
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol Description
Indicates an imminently hazardous situation which, if not
avoided, will result in death or serious injury.
Indicates a potentially hazardous situation which, if not
avoided, could result in death or serious injury.
Indicates a potentially hazardous situation which, if not
avoided, may result in minor or moderate injury.
Indicates a potentially hazardous situation which, if not
avoided, could result in equipment damage, data loss,
performance deterioration, or unanticipated results.
NOTICE is used to address practices not related to personal
injury.
Calls attention to important information, best practices and
tips.
NOTE is used to address information not related to personal
injury, equipment damage, and environment deterioration.
General Conventions
The general conventions that may be found in this document are defined as follows.
Convention Description
Times New Roman Normal paragraphs are in Times New Roman.
Boldface Names of files, directories, folders, and users are inboldface. For example, log in as user root.
Italic Book titles are in italics.
Courier New Examples of information displayed on the screen are in
Courier New.
Command Conventions
The command conventions that may be found in this document are defined as follows.
BTS3900(Ver.D)
Installation Guide About This Document
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
iv
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
6/175
Convention Description
Boldface The keywords of a command line are in boldface.
Italic Command arguments are in italics.
[ ] Items (keywords or arguments) in brackets [ ] are optional.
{ x | y | ... } Optional items are grouped in braces and separated by
vertical bars. One item is selected.
[ x | y | ... ] Optional items are grouped in brackets and separated by
vertical bars. One item is selected or no item is selected.
{ x | y | ... }* Optional items are grouped in braces and separated by
vertical bars. A minimum of one item or a maximum of all
items can be selected.
[ x | y | ... ]* Optional items are grouped in brackets and separated by
vertical bars. Several items or no item can be selected.
GUI Conventions
The GUI conventions that may be found in this document are defined as follows.
Convention Description
Boldface Buttons, menus, parameters, tabs, window, and dialog titles
are in boldface. For example, click OK.
> Multi-level menus are in boldfaceand separated by the ">"
signs. For example, choose File> Create> Folder.
Keyboard Operations
The keyboard operations that may be found in this document are defined as follows.
Format Description
Key Press the key. For example, press Enterand press Tab.
Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt
+Ameans the three keys should be pressed concurrently.
Key 1, Key 2 Press the keys in turn. For example, pressing Alt, Ameans
the two keys should be pressed in turn.
Mouse Operations
The mouse operations that may be found in this document are defined as follows.
BTS3900(Ver.D)
Installation Guide About This Document
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
v
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
7/175
Action Description
Click Select and release the primary mouse button without moving
the pointer.
Double-click Press the primary mouse button twice continuously and
quickly without moving the pointer.
Drag Press and hold the primary mouse button and move the
pointer to a certain position.
BTS3900(Ver.D)
Installation Guide About This Document
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
vi
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
8/175
Contents
About This Document.....................................................................................................................ii
1 Changesin BTS3900 (Ver.D) Installation Guide....................................................................1
2 Overview.........................................................................................................................................3
2.1 Components of BTS3900 Cabinets................................................................................................................................4
2.2 BTS3900 (Ver.D) Configured with RFUs but Without RRUs.....................................................................................10
2.3 BTS3900 (Ver.D) Configured with RFUs and RRUs..................................................................................................15
2.4 Installation Clearance and Layout Requirements.........................................................................................................21
3 Installation Preparations............................................................................................................25
3.1 Documents....................................................................................................................................................................26
3.2 Tools and Instruments..................................................................................................................................................26
3.3 Requirements for Onsite Personnel..............................................................................................................................27
4 Unpacking Check........................................................................................................................28
5 Obtaining the ESN......................................................................................................................30
6 Installation Process.....................................................................................................................32
7 Checking Installed Modules and Cables................................................................................34
7.1 Checking a BTS3900 DC Cabinet................................................................................................................................35
7.2 Checking a BTS3900 AC Cabinet................................................................................................................................37
8 Installing a Base...........................................................................................................................42
8.1 Installing a Base on the Concrete Floor........................................................................................................................43
8.2 Installing the Base on the ESD Floor...........................................................................................................................47
9 Installing the Cabinet.................................................................................................................56
9.1 Installing a Cabinet Without a Base.............................................................................................................................57
9.2 Installing a Cabinet on a Base......................................................................................................................................62
9.3 Installing Cabinets Side by Side...................................................................................................................................64
9.4 Stacking Two Cabinets.................................................................................................................................................66
10 Installing a PGND Cable and an Equipotential Cable......................................................68
11 Installing Optional Modules and Their Cables..................................................................73
11.1 Installing the GPS Surge Protector.............................................................................................................................75
BTS3900(Ver.D)
Installation Guide Contents
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
vii
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
9/175
11.2 Installing the GATM and Bias-Tee............................................................................................................................78
11.3 Installing a DCDU-12B..............................................................................................................................................84
11.4 Installing the BBU......................................................................................................................................................89
11.5 Installing Boards in the BBU and surge protection boards........................................................................................97
11.6 Installing the RFU....................................................................................................................................................100
11.7 Installing the EMU...................................................................................................................................................106
11.8 Installing the RRU....................................................................................................................................................108
12 Installing Cables......................................................................................................................109
12.1 Cabling Requirements..............................................................................................................................................110
12.2 Cable Holes...............................................................................................................................................................116
12.3 Installing Power Cables............................................................................................................................................120
12.3.1 Installing Power Cables for AC Cabinets..............................................................................................................120
12.3.2 Installing Power Cables for DC Cabinets..............................................................................................................13112.4 Installing Transmission Cables.................................................................................................................................137
12.4.1 Installing the E1/T1 Cables...................................................................................................................................137
12.4.2 Installing the FE/GE Ethernet Cables....................................................................................................................139
12.4.3 Installing FE/GE Fiber Optic Cables.....................................................................................................................140
12.5 Installing Signal Cables............................................................................................................................................142
12.5.1 (Optional) Installing a Monitoring Signal Cable Between Cascaded FAN 03C Assemblies................................142
12.5.2 (Optional) Installing Inter-BBU Signal Cables.....................................................................................................144
12.5.3 Installing a BBU Alarm Cable...............................................................................................................................148
12.6 InstallingRF Jumpers...............................................................................................................................................14912.7 (Optional) Installing CPRI Electrical Cables...........................................................................................................151
12.8 (Optional) Installing CPRI Fiber Optic Cables........................................................................................................154
13 Installation Checklist..............................................................................................................158
14 Powering On a Base Station..................................................................................................161
BTS3900(Ver.D)
Installation Guide Contents
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
viii
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
10/175
1Changes in BTS3900 (Ver.D) InstallationGuide
This chapter describes the changes inBTS3900 (Ver.D) Installation Guide.
03 (2014-08-30)
This is the third commercial release.
Compared with Issue 02 (2014-07-30), this issue includes the following changes.
Topic Change Description
The whole document Changed information about the appearance of
the BTS3900 cabinet.
02 (2014-07-30)
This is the second commercial release.
Compared with Issue 01 (2014-04-30), this issue includes the following changes.
Topic Change Description
8.2 Installing the Base on the ESD Floor Changed installation information of the
support for an ESD floor.
01 (2014-04-30)
This is the first commercial release.
Compared with issue draft B (2014-02-28), no information is changed.
Draft B (2014-02-28)
This is a draft.
BTS3900(Ver.D)
Installation Guide 1 Changes in BTS3900 (Ver.D) Installation Guide
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
1
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
11/175
Compared with issue draft A (2014-01-20), no information is added or deleted.
Compared with issue draft A (2014-01-20), this issue incorporates the following changes:
Topic Change Description
14 Powering On a Base Station Added descriptions of the status of the
indicators for CPRI ports.
Draft A (2014-01-20)
This is a draft.
Compared with the issues for the multimode base station version V100R008C00 and the single-
mode base station versions WCDMA-NodeB V200R015C00, GSM-BTS V100R015C00, and
eNodeB V100R006C00, this issue includes the following new information:l 7.2 Checking a BTS3900 AC Cabinet
l (Optional) Installing RRU Power Cables
l Installing EPU05A-02 Power Cables
Compared with the issues for the multimode base station version V100R008C00 and the single-
mode base station versions WCDMA-NodeB V200R015C00, GSM-BTS V100R015C00, and
eNodeB V100R006C00, this issue includes the following changes.
Topic Change Description
The whole document l Added the information about installation
of BTS3900 AC cabinets.
l Renamed all EPC6 connectors in this
document EPC4 connectors.
l Added the interconnection mode about
UMPT + UMPT for the inter-BBU signal
cable.
l Added the description of UBBP.
Compared with the issues for the multimode base station version V100R008C00 and the single-mode base station versions WCDMA-NodeB V200R015C00, GSM-BTS V100R015C00, and
eNodeB V100R006C00, no topic is deleted from this issue.
BTS3900(Ver.D)
Installation Guide 1 Changes in BTS3900 (Ver.D) Installation Guide
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
2
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
12/175
2OverviewAbout This Chapter
Familiarize yourself with this information as well as the cabinet interior, application scenarios
of the cabinets, and relevant clearance requirements before installing the cabinets.
2.1 Components of BTS3900 Cabinets
This section describes module and board configurations in BTS3900 cabinets.
2.2 BTS3900(Ver.D) Configured with RFUs but Without RRUs
When a BTS3900 is configured with RFUs but without RRUs, the BTS3900 can have different
scenarios, including a single cabinet, cabinets installed side by side, stacked cabinets, or usingthe IMS06.
2.3 BTS3900(Ver.D) Configured with RFUs and RRUs
When a BTS3900 base station is configured with RFUs and RRUs, the BTS3900 can have
different scenarios, including a single cabinet, cabinets installed side by side, stacked cabinets,
or using an IMS06.
2.4 Installation Clearance and Layout Requirements
During the installation, you need to plan the space for future maintenance and cabling.
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
3
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
13/175
2.1 Components of BTS3900 Cabinets
This section describes module and board configurations in BTS3900 cabinets.
Components of a BTS3900 (Ver.B) Cabinet
The following figure shows the components of a BTS3900 (Ver.B) cabinet.
Figure 2-1Components of a BTS3900 (Ver.B) cabinet
The following table lists the components in a BTS3900 (Ver.B) cabinet.
Table 2-1Components in a BTS3900 (Ver.B) cabinet
No. Component
Optional/Mandatory
MaximumQuantityin a SingleCabinet
Remarks
1 RFU
filler
panel
Optional - To ensure proper ventilation of the
cabinet, install a filler panel in each
vacant slot in the RFU subrack.
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
4
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
14/175
No. Component
Optional/Mandatory
MaximumQuantityin a SingleCabinet
Remarks
2 RFU Mandatory 6 A radio frequency unit (RFU) modulates
and demodulates baseband signals and
RF signals, processes data, and
combines and divides signals. For
details, seeRFU Hardware
Description.
The BTS3900 (Ver.B) supports the
following RFUs: MRFU, DRFU,
GRFU, WRFU, WRFUa, and LRFU..
3 FAN Mandatory 1 A FAN dissipates heat from the cabinet.
The FAN is configured with the fanmonitoring unit type C (FMUC), which
monitors the fans and reports alarms.
4 Filler
panel for
the air
intake
vent
Mandatory 1 A filler panel is installed in the air intake
vent.
5 BBU Mandatory 1 A BBU processes baseband signals and
enables the base station to interact with
the base station controller. For details,seeBBU Hardware Description.
6 DCDU-
01
Mandatory 1 The direct current distribution unit-01
(DCDU-01) distributes DC power to
components in a cabinet.
7 Transmi
ssion
equipme
nt
Optional - 2 U user space is reserved here to house
the customer's transmission equipment.
8 EPS24S48100D
C
Mandatory 1 The EPS24S48100DC converts +24 VDC power into -48 V DC and supplies
the power to the DCDU-01.
9 EPS489
0
Mandatory 1 The EPS4890 converts 220 V AC single-
phase, 220 V AC three-phase, or 110 V
AC dual-live-wire power into -48 V DC
power and supplies the power to the
DCDU-01.
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
5
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
15/175
NOTE
A BTS3900 -48 V DC cabinet can feed power into the customer's transmission equipment. The customer
equipment is able to work with an ambient temperature of 55oC or higher.
Components of a BTS3900 (Ver.C) Cabinet
The following figure shows the components of a BTS3900 (Ver.C) cabinet.
Figure 2-2Components of a BTS3900 (Ver.C) cabinet
The following table lists the components in a BTS3900 (Ver.C) cabinet.
Table 2-2Components in a BTS3900 (Ver.C) cabinet
No. Component
Optional/Mandatory
MaximumQuantityin a Single
Cabinet
Remarks
1 RFU
filler
panel
Optional - To ensure proper ventilation of the
cabinet, a filler panel needs to be
installed in each vacant slot of the RFU
subrack.
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
6
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
16/175
No. Component
Optional/Mandatory
MaximumQuantityin a SingleCabinet
Remarks
2 RFU Mandatory 6 An RFU modulates and demodulates
baseband signals and RF signals,
processes data, and combines and
divides signals. For details, seeRFU
Hardware Description.
The BTS3900 (Ver.C) supports the
following RFUs: MRFU, MRFUd,
MRFUe, DRFU, GRFU, WRFU,
WRFUa, WRFUd, WRFUe, LRFU,
LRFUe, CRFUd, and CRFUe..
3 FAN03B
Mandatory 1 A FAN 03B dissipates heat from thecabinet. The FAN 03B is configured
with the fan monitoring unit type E
(FMUE), which monitors the fans and
reports alarms.
4 Filler
panel for
the air
intake
vent
Mandatory 1 A filler panel is installed in the air intake
vent.
5 BBU Mandatory 1 A BBU processes baseband signals andenables the base station to interact with
the base station controller. For details,
seeBBU Hardware Description.
6 DCDU-
11A
Mandatory 1 The DCDU-11A distributes DC power
to components in a cabinet.
7 Transmi
ssion
equipme
nt
Optional - 3 U user space is reserved here to house
the customer's transmission equipment.
8 ETP481
50-A3
Mandatory 1 The EPS4890 converts 220 V AC single-
phase, 220 V AC three-phase, or 110 V
AC dual-live-wire power into -48 V DC
power and supplies the power to the
DCDU-11A.
NOTE
A BTS3900 -48 V DC cabinet can feed power into the customer's transmission equipment. The customer
equipment is able to work with an ambient temperature of 55oC or higher.
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
7
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
17/175
Components of a BTS3900 (Ver.D) Cabinet
The following figure shows the components of a BTS3900 (Ver.D) cabinet.
Figure 2-3Components of a BTS3900 (Ver.D) cabinet
The following table lists the components in a BTS3900 (Ver.D) cabinet.
Table 2-3Components in a BTS3900 (Ver.D) cabinet
No. Component
Optional/Mandatory
MaximumQuantityin a Single
Cabinet
Remarks
1 RFU
filler
panel
Optional - To ensure proper ventilation of the
cabinet, a filler panel needs to be
installed in each vacant slot of the RFU
subrack.
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
8
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
18/175
No. Component
Optional/Mandatory
MaximumQuantityin a SingleCabinet
Remarks
2 RFU Mandatory 6 An RFU modulates and demodulates
baseband signals and RF signals,
processes data, and combines and
divides signals. For details, seeRFU
Hardware Description.
The BTS3900 (Ver.D) supports the
following RFUs: MRFU, MRFUd,
MRFUe, DRFU, GRFU, WRFU,
WRFUa, WRFUd, WRFUe, LRFU,
LRFUe, CRFUd, and CRFUe..
3 FAN03C
Mandatory 1 A FAN 03C dissipates heat from thecabinet. The FAN 03C is configured
with the fan monitoring unit type EA
(FMUEA), which monitors the fans and
reports alarms.
4 Filler
panel for
the air
intake
vent
Mandatory 1 A filler panel is installed in the air intake
vent.
5 BBU Mandatory 2 A BBU processes baseband signals andenables the base station to interact with
the base station controller. For details,
seeBBU Hardware Description.
If two BBUs are required, the second
BBU is configured in the 2 U user space
below the DCDU-12A.
6 DCDU-
12A
Mandatory 1 The DCDU-12A distributes DC power
to components in a cabinet.
7 BBU Optional - 2 U user space is reserved for installing
a BBU.
8 DCDU-
12B
Optional 1 For a BTS3900 configured with RFUs
and RRUs, a DCDU-12B is installed in
the 1 U space here to provide DC power
for RRUs.
9 Transmi
ssion
equipme
nt
Optional - 1 U user space is reserved here to house
the customer's transmission equipment.
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
9
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
19/175
No. Component
Optional/Mandatory
MaximumQuantityin a SingleCabinet
Remarks
10 Filler
panel
Optional - A filler panel is installed in each slot in
which no PSU(R4850G2) is installed.
11 PSU
(R4850
G2)
Mandatory 5 A PSU(R4850G2) converts 110 V AC
or 220 V AC power into -48 V DC
power.
12 PMU
11A
Mandatory 1 A PMU 11A manages the power system
and storage batteries, monitors power
distribution, and reports alarms.
13 EPU05A
-02
Subrack
Mandatory 1 An EPU05A-02/04 converts 220 V AC
single- or three-phase power into -48 V
DC power and feeds the power into the
DCDU-12A and DCDU-12B.
NOTE
A BTS3900 -48 V DC cabinet can feed power into the customer's transmission equipment. The customer
equipment is able to work with an ambient temperature of 55oC or higher.
2.2 BTS3900 (Ver.D) Configured with RFUs but WithoutRRUs
When a BTS3900 is configured with RFUs but without RRUs, the BTS3900 can have different
scenarios, including a single cabinet, cabinets installed side by side, stacked cabinets, or using
the IMS06.
BTS3900 Configured with Only BTS3900 Cabinets
The following table lists the application scenarios for a BTS3900 that uses various BTS3900
cabinets and is configured with RFUs but without RRUs.
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
10
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
20/175
Scenario
Numberof
BBUs
ApplicationMode
MaximumNumber of RF
Modules
Illustration Applicable Cabinet
Sin
gle
cabi
net
1 Single-, dual-,
quadruple-, and
triple-mode
base stations
6 RFUs The application
scenarios are
shown by
illustrations 1 and
2 in Figure 2-4.
l One BTS3900 DC
cabinet
l One BTS3900 AC
cabinet
2 Triple- and
quadruple-
mode base
station
6 RFUs The application
scenarios are
shown by
illustrations 3 and4 in Figure 2-4.
Cab
inet
s
inst
alle
d
side
by
side
1 Single-, dual-,
quadruple-, and
triple-mode
base stations
12 RFUs The application
scenarios are
shown by
illustrations 1 and
2 in Figure 2-5.
l Two BTS3900 DC
cabinets
l 1 BTS3900 AC cabinet
+1 BTS3900 DC cabinet
2 Triple- and
quadruple-
mode base
station
12 RFUs The application
scenarios are
shown by
illustrations 3 and4 in Figure 2-5.
Stac
ked
cabi
nets
1 Single-, dual-,
quadruple-, and
triple-mode
base stations
12 RFUs The application
scenario is shown
by illustration 1
in Figure 2-6.
Two BTS3900 DC cabinets
2 Triple- and
quadruple-
mode base
station
12 RFUs The application
scenario is shown
by illustration 2
in Figure 2-6.
NOTE
l A BTS3900 cabinet is configured with one BBU by default and can be configured with a maximum of
two BBUs whose power consumption cannot exceed 1000 W. This principle applies to new site
deployment or capacity expansion.
l When cabinets are installed side by side or stacked, it is recommended that BBU 1 and BBU 0 be
installed in the same cabinet.
l One BTS3900 AC cabinet consists of one BTS3900 DC cabinet and one IMS06.
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
11
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
21/175
Figure 2-4Single cabinet
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
12
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
22/175
Figure 2-5Cabinets installed side by side
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
13
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
23/175
Figure 2-6Stacked cabinets
BTS3900 Configured with BTS3900 Cabinets and an IMS06
The following table lists the application scenarios for a BTS3900 that uses various BTS3900
cabinets and an IMS06 and is configured with RFUs but without RRUs.
Scenario Number ofBBUs
ApplicationMode
MaximumNumber ofRFModules
Illustration Description
1 BTS3900
AC cabinet+1
BTS3900 DC
cabinet+1
IMS06
2 Triple-
mode
base
station
12 RFUs The application
scenario is
shown by
illustration 1 in
Figure 2-7.
The IMS06 is used to
house 100 Ah
storage batteries,
which provides low-
capacity backup
power.
1 BTS3900
AC cabinet+1
IMS06
2 Triple-
mode
base
station
6 RFUs The application
scenario is
shown by
illustration 2 in
Figure 2-7.
The IMS06 is used to
house transmission
equipment.
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
14
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
24/175
NOTICEThe IMS06 cannot be stacked on the BTS3900 cabinet. Otherwise, the heat dissipation holes on
the top of the BTS3900 cabinet will be blocked.
NOTE
When an IMS06 is configured with storage batteries, the power consumption of a BTS3900 cannot exceed
10,000 W. If the power consumption exceeds 10,000 W, large-capacity battery packs need to be added.
Figure 2-7BTS3900 configured with BTS3900 cabinets and an IMS06
2.3 BTS3900 (Ver.D) Configured with RFUs and RRUs
When a BTS3900 base station is configured with RFUs and RRUs, the BTS3900 can have
different scenarios, including a single cabinet, cabinets installed side by side, stacked cabinets,
or using an IMS06.
BTS3900 Not Configured with an IMS06
The following table describes the application scenarios for a BTS3900 base station that uses
various BTS3900 cabinets and is configured with RFUs and RRUs.
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
15
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
25/175
Scenario
Numberof
BBUs
ApplicationMode
MaximumNumber ofRF Modules
Illustration ApplicableCabinet
Sin
gle
cabi
net
1 Single-,
dual-, triple-,
and
quadruple-
mode base
stations
6 RFUs+6
RRUs
Figure 2-8shows the
application scenario.
l One BTS3900
DC cabinet
l One BTS3900
AC cabinet
2 Triple- and
quadruple-
mode basestations
6 RFUs+9
RRUs
The application scenario
is shown in Figure 2-9
and Figure 2-10.
Cab
inet
s
inst
alle
d
side
by
side
1 Single-,
dual-, triple-,
and
quadruple-
mode base
stations
12 RFUs+6
RRUs
Figure 2-11shows the
application scenario.
Two BTS3900
DC cabinets
2 Triple- and
quadruple-
mode basestations
12 RFUs+9
RRUs
Figure 2-12shows the
application scenario.
Stac
ked
cabi
nets
1 Single-,
dual-, triple-,
and
quadruple-
mode base
stations
12 RFUs+6
RRUs
Figure 2-13shows the
application scenario.
2 Triple- and
quadruple-
mode basestations
12 RFUs+9
RRUs
Figure 2-14shows the
application scenario.
When a BTS3900 (Ver.D) is configured with RFUs and RRUs, a DCDU-12B is installed in the
BTS3900 cabinet to distribute power to RRUs.
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
16
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
26/175
Figure 2-8One BTS3900 DC cabinet (one BBU)
Figure 2-9One BTS3900 DC cabinet (two BBUs)
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
17
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
27/175
Figure 2-10One BTS3900 AC cabinet (two BBUs)
Figure 2-11Two BTS3900 DC cabinets installed side by side (one BBU)
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
18
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
28/175
Figure 2-12Two BTS3900 DC cabinets installed side by side (two BBUs)
Figure 2-13Two BTS3900 DC cabinets stacked together (one BBU)
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
19
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
29/175
Figure 2-14Two BTS3900 DC cabinets stacked together (two BBUs)
BTS3900 Configured with an IMS06
The following table lists the application scenarios where a BTS3900 base station uses an
BTS3900 cabinet and an IMS06 and is configured with RFUs and RRUs.
Scenario Number ofBBUs
ApplicationMode
MaximumNumber ofRFModules
Illustration Description
1 BTS3900
AC+1 IMS06
2 Triple-
andquadrupl
e-mode
base
stations
6 RFUs+9
RRUs
Figure 2-13
shows theapplication
scenario.
An IMS06 houses
100 Ah storagebatteries, which
provide low-
capacity backup
power.
NOTICEThe IMS06 cannot be stacked on the BTS3900 cabinet. Otherwise, the heat dissipation holes on
the top of the BTS3900 cabinet will be blocked.
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
20
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
30/175
NOTE
When an IMS06 is configured with storage batteries, the power consumption of a BTS3900 cannot exceed
10,000 W. If the power consumption exceeds 10,000 W, large-capacity battery packs need to be added.
Figure 2-15BTS3900 configured with an IMS06 (1 BTS3900 AC+1 IMS06)
2.4 Installation Clearance and Layout Requirements
During the installation, you need to plan the space for future maintenance and cabling.
Installation Clearance Requirements
Clearance requirements of a BTS3900 cabinet are as follows:
l A BTS3900 DC cabinet can be installed with its rear flush against a wall, whereas a
minimum of 100 mm (3.94 in.) space must be reserved behind the rear of a BTS3900 AC
cabinet.
l The left side of the cabinet can be against a wall. Reserve a minimum of 300 mm (11.81
in.) clearance on the right side for installing noise reduction modules later.
l Retain a minimum of 800 mm (31.50 in.) in front of the cabinet for maintenance.
l Retain a minimum of 200 mm (7.87 in.) between the top of the cabinet and the ceiling for
cabling.
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
21
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
31/175
The following figure shows the clearance requirements of cabinets in the following installation
scenarios: a single cabinet is installed alone, two cabinets are installed side by side, or two
cabinets are stacked.
Figure 2-16Clearance requirements for a BTS3900 DC cabinet
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
22
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
32/175
Figure 2-17Clearance requirements for a BTS3900 AC cabinet
Layout Requirements
Layout requirements of BTS3900 cabinets are as follows:
l Install the cabinets at a position nearest to the feeder window to minimize the feeder length.
l Install the cabinets in one row in one equipment room to facilitate cabling.
l No space is required between cabinets and user equipment in the same row.
The following figure shows the layout requirements of BTS3900 cabinets.
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
23
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
33/175
Figure 2-18Layout requirements
BTS3900(Ver.D)
Installation Guide 2 Overview
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
24
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
34/175
3Installation PreparationsAbout This Chapter
This chapter lists the tools and instruments that must be obtained before the installation. It also
specifies the skills that the onsite personnel must have.
3.1 Documents
Before the installation, obtain the following documents:
3.2 Tools and Instruments
This section lists the tools and instruments that must be obtained before installation.
3.3 Requirements for Onsite Personnel
Onsite personnel must be qualified and trained. Before performing any operation, onsite
personnel must be familiar with correct operation methods and safety precautions.
BTS3900(Ver.D)
Installation Guide 3 Installation Preparations
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
25
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
35/175
3.1 Documents
Before the installation, obtain the following documents:
Before the installation, obtain the following documents:
l Safety Precautions
l Installation Reference
l 3900 Series Base Station Hardware Description
l 3900 Series Base Station Cables
l BBU Hardware Description
l RFU Hardware Description
A BTS3900 (Ver.D) cabinet can be stacked on an IMS06, thereby meeting power distribution
and transmission requirements. For details, see the following document:
l IMS06 Installation Guide
3.2 Tools and Instruments
This section lists the tools and instruments that must be obtained before installation.
Marker Phillips screwdriver (M3 to
M6)
Flat-head screwdriver (M3 to
M6)
Diagonal pliers
32 mm (1.26 in.)
combination wrench
Socket wrench Torque wrench
Power cable crimping tool RJ45 crimping tool Cable cutter
Rubber mallet Soldering iron Wire stripper
BTS3900(Ver.D)
Installation Guide 3 Installation Preparations
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
26
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
36/175
Hammer drill (16) Heat gun Level
Multimeter Measuring tape Vacuum cleaner
ESD wrist strap ESD gloves Torque screwdriver
Gloves Utility knife Hydraulic pliers
Torx screwdriver - -
3.3 Requirements for Onsite Personnel
Onsite personnel must be qualified and trained. Before performing any operation, onsitepersonnel must be familiar with correct operation methods and safety precautions.
Before the installation, pay attention to the following:
l The customer's technical engineers must be trained by Huawei and be familiar with the
proper installation and operation methods.
l The number of onsite personnel depends on the engineering schedule and installation
environment. Generally, three to five onsite personnel are necessary.
BTS3900(Ver.D)
Installation Guide 3 Installation Preparations
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
27
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
37/175
4Unpacking CheckUnpack and check the delivered equipment to ensure that all the materials are included and intact.
Context
CAUTION
The gravity center of some cabinets is in the front, for example, the BTS3900AL, IBBS700T
and IBBS300T . Therefore, avoid toppling of the cabinet when the door of the cabinet is opened,
especially when you unpack the cabinet or before it has been secured onto a base.
NOTICE
l Power on a cabinet or BBU within seven days after unpacking it.
l Power on an RRU within 24 hours after unpacking it.
NOTE
When transporting, moving, or installing the equipment, components, or parts, you must:
lPrevent them from colliding with doors, walls, shelves, or other objects.
l Wear clean gloves, and avoid touching the equipment, components, or parts with bare hands, sweat-
soaked gloves, or dirty gloves.
Procedure
Step 1 Check the total number of articles in each case according to the packing list.
BTS3900(Ver.D)
Installation Guide 4 Unpacking Check
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
28
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
38/175
If... Then...
The total number tallies with the packing
list
Go to Step 2.
The total number does not tally with the
packing list
Find out the cause and report any missing
articles to the local Huawei office.
Step 2 Check the exterior of the packing case.
If... Then...
The outer packing case is intact Go to Step 3.
The outer packing is severely damaged or
soaked
Find out the cause and report the situation to
the local Huawei office.
Step 3 Check the type and quantity of the equipment in the cases according to the packing list.
If... Then...
Types and quantity of the articles tally with
those on the packing list
Sign thePacking Listwith the customer.
There are any goods missing, incorrectly
delivered, or damaged
Report the situation to the local Huawei office.
CAUTION
To protect the equipment and prevent damage to the equipment, you are advised to keep the
unpacked equipment and packing materials indoors, take photos of the stocking environment,
packing case or carton, packing materials, and any rusted or eroded equipment, and then file the
photos.
----End
BTS3900(Ver.D)
Installation Guide 4 Unpacking Check
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
29
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
39/175
5Obtaining the ESNThe electronic serial number (ESN) is a unique identifier of a NE. Record the ESN of the base
station before the installation for future commissioning.
Procedure
Step 1 Record the ESN on the BBU.
l If there is no label on the FAN unit of the BBU, the ESN is printed on a mounting ear of the
BBU, as shown in Figure 5-1. Record the ESN and base station information.
l If there is a label on the FAN unit of the BBU, the ESN is printed on the label and a mounting
ear of the BBU, as shown in Figure 5-2. Remove the label and record the base station
information on the label printed with Site.
NOTE
The base station information includes the name, ID, and location of the base station.
Figure 5-1ESN position (1)
BTS3900(Ver.D)
Installation Guide 5 Obtaining the ESN
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
30
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
40/175
Figure 5-2ESN position (2)
Step 2 Report the ESN and base station information to the base station commissioning personnel orremove the label and give it to the base station commissioning personnel.
NOTE
For base stations configured with multiple BBUs, record the ESNs on all BBUs and submit them to the
personnel responsible for the base station commissioning.
----End
BTS3900(Ver.D)
Installation Guide 5 Obtaining the ESN
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
31
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
41/175
6Installation ProcessBefore the BTS3900 cabinets are delivered, boards inside the cabinets have been installed. You
only need to install the cabinet and cables onsite. Some optional components may also need to
be installed based on onsite requirements.
The following figure shows the installation process.
BTS3900(Ver.D)
Installation Guide 6 Installation Process
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
32
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
42/175
Figure 6-1Installation process
BTS3900(Ver.D)
Installation Guide 6 Installation Process
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
33
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
43/175
7Checking Installed Modules and CablesAbout This Chapter
Modules and cables in the cabinet have been installed before delivery. You need to check whether
the modules and cables are installed securely.
7.1 Checking a BTS3900 DC Cabinet
Modules and cables have been installed in a BTS3900 DC cabinet before delivery. You need to
check whether the modules and cables are installed securely.
7.2 Checking a BTS3900 AC Cabinet
Modules and cables in the BTS3900 AC cabinet have been installed. You need to check whetherthe modules and cables are installed securely.
BTS3900(Ver.D)
Installation Guide 7 Checking Installed Modules and Cables
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
34
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
44/175
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
45/175
No. Cable One End The Other End
Connector InstallationPosition
Connector InstallationPosition
P6 FAN 03C
power cable
3V3 connector -48V port on
the FAN 03C
EPC4
connector
LOAD6 port
on the
DCDU-12A
P7 and
P8
BBU power
cables
3V3 connector -48V port on
the UPEU
EPC4
connector
LOAD7 and
LOAD8 ports
on the
DCDU-12A
Step 3 Check whether the signal cables in the cabinet are routed correctly and connected securely
according to the following figure and table.
Figure 7-2Signal cables installed in the cabinet
BTS3900(Ver.D)
Installation Guide 7 Checking Installed Modules and Cables
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
36
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
46/175
Table 7-2List of the signal cables installed in the cabinet
No. Cable One End The Other End
Connector Installation
Position
Connector Installation
Position
S1 ELU signal
cable
RJ45
connector
SENSOR port
on the FAN
03C
RJ45
connector
ELU
S2 FMUEA-
BBU
monitoring
signal cable
RJ45
connector
COM_IN port
on the FAN
03C
RJ45
connector
MON0 port on
the UPEU
NOTE
If no BBU is
installed in the
cabinet, this
cable should
be bound to
the right side
of the cabinet.
Step 4 Check that the CPRI cables in the cabinet are routed correctly and connected securely. For detailsabout how to connect and disconnect CPRI cables, see Inserting and Removing CPRI Cables.
----End
7.2 Checking a BTS3900 AC CabinetModules and cables in the BTS3900 AC cabinet have been installed. You need to check whether
the modules and cables are installed securely.
Procedure
Step 1 Check whether the modules are installed securely in the cabinet, and tighten any loose screw.
Step 2 Check that the equipotential cables are installed securely, the power cables are correctlyconnected, and the screws are tightened according to the following table and figure.
BTS3900(Ver.D)
Installation Guide 7 Checking Installed Modules and Cables
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
37
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
47/175
Figure 7-3Equipotential cables and power cables installed inside the cabinet
Table 7-3Equipotential cables and power cables installed inside the cabinet
No. Cable One End The Other End
Connector InstallationPosition
Connector InstallationPosition
P0 to
P5
RFU power
cable
3V3 connector PWR port on
an RFU
EPC4
connector
One of the
LOAD0 to
LOAD5 ports
on the
DCDU-12A
P6 FAN 03C
power cable
3V3 connector -48V port on
the FAN 03C
EPC4
connector
LOAD6 port
on the
DCDU-12A
BTS3900(Ver.D)
Installation Guide 7 Checking Installed Modules and Cables
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
38
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
48/175
No. Cable One End The Other End
Connector InstallationPosition
Connector InstallationPosition
P7 and
P8
BBU power
cable
3V3 connector -48V port on
the UPEU
EPC4
connector
LOAD7 and
LOAD8 ports
on the
DCDU-12A
P9 and
P10
DCDU-12A
power cable
OT terminal
(M6)
RTN(+) and
NEG(-)
terminals on
the
DCDU-12A
OT terminal
(M6)
RTN(+) and
NEG(-)
terminals near
RFC_1 and
RFC_2 on the
EPU05A-02
G0 Equipotentia
l cable
between the
BTS3900
and IMS06
OT terminal
(M6)
Ground bar in
the BTS3900
cabinet
OT terminal
(M6)
Ground bar in
the IMS06
G1 Equipotentia
l cable
between the
EPU and
IMS06
OT terminal
(M6)
Ground bar in
the EPU
OT terminal
(M6)
Ground bar in
the IMS06
Step 3 Check that the signal cables are installed securely and the screws are tightened according to thefollowing table and figure.
BTS3900(Ver.D)
Installation Guide 7 Checking Installed Modules and Cables
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
39
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
49/175
Figure 7-4Signal cables installed in the cabinet
Table 7-4Signal cables installed in the cabinet
No. Cable One End The Other End
Connector InstallationPosition
Connector InstallationPosition
S1 ELU signal
cable
RJ45
connector
SENSOR port
on the FAN
03C
RJ45
connector
ELU
BTS3900(Ver.D)
Installation Guide 7 Checking Installed Modules and Cables
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
40
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
50/175
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
51/175
8Installing a BaseAbout This Chapter
A BTS3900 cabinet can be installed on a base. The base can be installed either on a concrete
floor or ESD floor according to the equipment room conditions and customer's requirements.
8.1 Installing a Base on the Concrete Floor
This section describes the procedure and precautions for installing a base on the concrete floor.
8.2 Installing the Base on the ESD Floor
This section describes the procedure and precautions for installing a base on the ESD floor.
BTS3900(Ver.D)
Installation Guide 8 Installing a Base
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
42
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
52/175
8.1 Installing a Base on the Concrete Floor
This section describes the procedure and precautions for installing a base on the concrete floor.
Procedure
Step 1 Determine the holes for installing the cabinet according to the positioning holes on the marking-off template, as shown in the following figure.
Figure 8-1Positioning the base
(1) Anchor point (2) Marking-off template (3) Concrete floor
Step 2 Drill holes at the anchor points and insert expansion bolt assemblies in the holes, as shown inthe following figure.
BTS3900(Ver.D)
Installation Guide 8 Installing a Base
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
43
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
53/175
Figure 8-2Drilling a hole and inserting an expansion bolt assembly
(1) M12x60 bolt (2) Spring washer (3) Flat washer (4) Expansion tube
1. Use a hammer drill with a 16 drill bit to drill holes with a depth ranging from 55 mm
(2.17 in.) to 60 mm (2.36 in.).
CAUTION
Take proper safety measures to protect your eyes and respiratory tract against the dust
before drilling holes.
NOTE
Generally, the concrete floor is solid and smooth. Therefore, you can use the center punch to help
locate the drill bit. If the conditions of the floor allow direct drilling, skip this step.
2. Use a vacuum cleaner to clear the dust out from inside and around the holes, and measure
the distances between holes. If any of the hole is beyond the acceptable range, mark a new
anchor point and drill a new hole.
3. Tighten an expansion bolt slightly and place it vertically into each hole.
4. Hit the expansion bolt with a rubber mallet until the expansion tube completely enters the
hole.
5. Remove the M12x60 bolt, spring washer, and flat washer in sequence.
BTS3900(Ver.D)
Installation Guide 8 Installing a Base
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
44
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
54/175
CAUTION
After dismantling the expansion bolt assembly, ensure that the top of the expansion tube
is level with the concrete floor. Otherwise, the cabinet cannot be installed on the concretefloor evenly and securely.
Step 3 Install the base and level it.
1. Place the insulation plate and the base on the floor in sequence. Align holes on the base
with those on the insulation plate and those for inserting expansion bolt assemblies on the
floor. Insert four M12x60 expansion bolts into the holes, and partially tighten them, as
shown in the following figure.
Figure 8-3Preinstalling the base on the floor
(1) M12x60 bolt (2) Spring washer (3) Flat washer
(4) Insulation washer (5) Insulation plate -
2. Measure and level the base.
Place a level on the base and observe the position of the mercury, as shown in the following
figure. If the base is not level, use leveling bolts to level it.
BTS3900(Ver.D)
Installation Guide 8 Installing a Base
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
45
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
55/175
Figure 8-4Checking the base levelness
(1) Leveling bolts (2) Level
3. Use a socket wrench to fasten the M12x60 bolts in a diagonal sequence to secure the base
on the floor, and tighten the bolts to 45 Nm (398.25 lbfin.), as shown in the following
figure.
Figure 8-5Securing the base on the floor
Step 4 Measure the insulation between the base and expansion bolts.1. Set the multimeter to the megohm scale (M).
2. Measure the resistance between the leveling bolt and the expansion bolt, as shown in the
following figure.
Figure 8-6Measuring the resistance between the leveling bolt and the expansion bolt
BTS3900(Ver.D)
Installation Guide 8 Installing a Base
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
46
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
56/175
l If the resistance is lower than 5 megohms, the base is not insulated from the ground.
Go to Step 4.3.
l If the resistance is higher than 5 megohms, the base is insulated from the ground.
3. Remove the expansion bolt assemblies and check whether the insulation washers are
missing or damaged.
l If yes, reinstall the expansion bolt assemblies and re-level the base.
l If no, check whether the multimeter works properly and whether the setting is correct.
----End
8.2 Installing the Base on the ESD Floor
This section describes the procedure and precautions for installing a base on the ESD floor.
Context
The following figure shows the support for installing the ESD floor.
Figure 8-7Support for installing the ESD floor
(1) Mounting holes for the ESD floor (2) Support (3) Mounting holes for the concretefloor
There are three models of ESD floor supports, all of which are adjustable. The heights of ESD
floors supported by the three models are listed in the following table.
BTS3900(Ver.D)
Installation Guide 8 Installing a Base
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
47
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
57/175
Table 8-1Heights of the two types of supports
Component Applicable Height Remark
Model I 200 (7.87 in.)H270 (10.63 in.) l The height can be adjusted
within the adjustable range.l When the height of the ESD floor
is the same as the maximum or
minimum value of the adjustable
ranges, the model with a smaller
adjustable range is preferred. For
example, when the height of the
ESD floor is 410 mm (16.14 in.),
model II is preferentially
selected.
Model II 270 (10.63 in.)H410 (16.14
in.)
Model III 410 (16.14 in.)H700 (27.56
in.)
NOTE
The height of an ESD floor is the spacing between the concrete floor and the upper surface of the ESD
floor.
Procedure
Step 1 Determine the installation position for the base on the ESD floor. For details, seeInstalling aBase on the Concrete FloorstepStep 1.
Step 2 Drill holes on the ESD floor.
1. Use a hammer drill with bit 16 to drill holes at the anchor points. The holes should penetrate
the ESD floor, as shown in the following figure.
Figure 8-8Drilling a hole on the ESD floor
(1) ESD floor
BTS3900(Ver.D)
Installation Guide 8 Installing a Base
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
48
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
58/175
CAUTION
Take proper safety measures to protect your eyes and respiratory tract against the dust
before drilling holes.
2. Use a vacuum cleaner to clear the dust inside and around the holes. If the inter-hole spacing
is too wide or too narrow, locate and drill holes again.
Step 3 Position the support.
1. Place the support under the ESD floor. Use bolts to fix the support to the ESD floor
temporarily, as shown in the following figure.
Figure 8-9Fixing the support to the ESD floor
(1) Mounting holes on the ESD floor (2) ESD floor (3) Mounting holes for the concrete floor
2. Use a ruler to measure the distance between the concrete floor and the lower surface of the
ESD floor. Adjust the support to a specified height based on the measurement result, ensure
that the top of the support is leveled with the lower surface of the ESD floor, and use a
socket wrench to tighten the nuts on the support to 45 Nm (33.19 lbfft), as shown in the
following figure.
BTS3900(Ver.D)
Installation Guide 8 Installing a Base
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
49
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
59/175
Figure 8-10Adjust the support's height
3. According to the mounting holes in the concrete floor, mark the positions for installing
expansion bolt assemblies, as shown in the following figure.
BTS3900(Ver.D)
Installation Guide 8 Installing a Base
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
50
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
60/175
Figure 8-11Marking the positions for installing expansion bolt assemblies
(1) Mounting hole in the
concrete floor
(2) Concrete floor
4. Use a measuring tape to measure the inter-hole spacing, and ensure that the center-to-center
distances between the holes are consistent.
Step 4 Drill holes at the anchor points on the concrete floor. Then install the expansion bolt assembly.as shown in the following figure.
BTS3900(Ver.D)
Installation Guide 8 Installing a Base
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
51
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
61/175
Figure 8-12Drilling a hole and inserting an expansion bolt assembly
(1) M12x60 bolt (2) Spring washer (3) Flat washer (4) Expansion tube
Step 5 Secure the support for installing the ESD floor.
Use M12x60 bolts, spring washers, and flat washers to secure the support for installing the ESD
floor on the concrete floor, and tighten the bolts to 45 Nm (398.25 lbfin.), as shown in the
following figure.
BTS3900(Ver.D)
Installation Guide 8 Installing a Base
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
52
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
62/175
Figure 8-13Securing the ESD floor
(1) M12x60 bolts (2) Spring washer (3) Flat washer
Step 6 Remove the bolts that are used to temporarily fix the support instep 3.a.
Step 7 Install the base and level it.
1. Place the insulation plate and the base on the ESD floor in sequence. Align holes on the
base with those on the insulation plate and those for inserting expansion bolt assemblies
on the ESD floor. Use a socket wrench to fasten the M12x80 bolts in a diagonal sequence
to secure the base on the ESD floor, and tighten the bolts to 45 Nm (398.25 lbfin.), as
shown in the following figure.
BTS3900(Ver.D)
Installation Guide 8 Installing a Base
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
53
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
63/175
Figure 8-14Securing the base on the ESD floor
(1) M12x80 bolt (2) Spring washer (3) Flat washer
(4) Insulation washer (5) Insulation plate -
2. Place a level on the base and observe the position of the mercury, as shown in the following
figure. If the base is not level, use the leveling bolts to level it.
NOTE
Screwing the bolts clockwise will raise the base, and screwing the bolts counterclockwise will lower
the base.
Figure 8-15Checking the base levelness
(1) Leveling bolts (2) Level
Step 8 Measure the insulation between the base and expansion bolts.
BTS3900(Ver.D)
Installation Guide 8 Installing a Base
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
54
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
64/175
1. Set the multimeter to the megohm scale (M).
2. Measure the resistance between the leveling bolt and the expansion bolt, as shown in the
following figure.
Figure 8-16Measuring the resistance between the leveling bolt and the expansion bolt
l If the resistance is lower than 5 megohms, the base is not insulated from the ground.
Go to Step 8.3.l If the resistance is higher than 5 megohms, the base is insulated from the ground.
3. Remove the expansion bolt assemblies and check whether the insulation washers are
missing or damaged.
l If yes, reinstall the expansion bolt assemblies and re-level the base.
l If no, check whether the multimeter works properly and whether the setting is correct.
----End
BTS3900(Ver.D)
Installation Guide 8 Installing a Base
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
55
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
65/175
9Installing the CabinetAbout This Chapter
A BTS3900 cabinet can be installed alone, side by side with another BTS3900 cabinet, or stacked
on another BTS3900 cabinet. This section describes the procedure for installing the BTS3900
(Ver.D) cabinets in the preceding modes. The procedures for installing the BTS3900(Ver.B),
BTS3900(Ver.C), and BTS3900(Ver.D) cabinets are the same.
9.1 Installinga Cabinet Without a Base
This section describes the procedure and precautions for installing a BTS3900 DC cabinet
without a base on the concrete floor. BTS3900 AC cabinet should not be installed without a base
on the concrete floor.
9.2 Installing a Cabinet on a Base
This section describes the procedure and precautions for installing a BTS3900 AC or DC cabinet
on a base.
9.3 InstallingCabinets Side by Side
This section describes the procedure and precautions for installing two BTS3900 cabinets side
by side. The combination of One BTS3900 (Ver.D) AC cabinet and one BTS3900 (Ver.D) DC
cabinet doesn't support this installation.
9.4 Stacking Two Cabinets
This section describes the procedure and precautions for stacking two BTS3900 cabinets.
BTS3900 (Ver.D) AC cabinet should not be stacked.
BTS3900(Ver.D)
Installation Guide 9 Installing the Cabinet
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
56
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
66/175
9.1 Installing a Cabinet Without a Base
This section describes the procedure and precautions for installing a BTS3900 DC cabinetwithout a base on the concrete floor. BTS3900 AC cabinet should not be installed without a base
on the concrete floor.
Context
To facilitate operations, you can remove the cabinet door and then install the cabinet.
Procedure
Step 1 Take the marking-off template out from the position 3 U above the bottom of the cabinet, and
determine the holes for installing the cabinet according to the anchor points on the marking-offtemplate, as shown in the following figure.
Figure 9-1Positioning the cabinet
(1) Anchor point (2) Marking-off template (3) Concrete floor
Step 2 Drill holes at the anchor points and insert expansion bolt assemblies in the holes, as shown in
the following figure.
BTS3900(Ver.D)
Installation Guide 9 Installing the Cabinet
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
57
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
67/175
Figure 9-2Drilling a hole and inserting an expansion bolt assembly
(1) M12x80 bolt (2) Spring washer (3) Flat washer (4) Cushion collar (5) Expansion tube
1. Use a hammer drill with a 16 drill bit to drill holes with a depth ranging from 55 mm
(2.17 in.) to 60 mm (2.36 in.).
CAUTION
Take proper safety measures to protect your eyes and respiratory tract against the dust
before drilling holes.
NOTE
Generally, the concrete floor is solid and smooth. Therefore, you can use the center punch to help
locate the drill bit. If the conditions of the floor allow direct drilling, skip this step.
2. Use a vacuum cleaner to clear the dust out from inside and around the holes, and measure
the distances between holes. If any of the hole is beyond the acceptable range, mark a new
anchor point and drill a new hole.
3. Tighten an expansion bolt slightly and place it vertically into each hole.
4. Hit the expansion bolt with a rubber mallet until the expansion tube completely enters the
hole.
5. Remove the M12x80 bolt, spring washer and flat washer in sequence.
BTS3900(Ver.D)
Installation Guide 9 Installing the Cabinet
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
58
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
68/175
CAUTION
After dismantling the expansion bolt assembly, ensure that the top of the expansion tube
is level with the concrete floor. Otherwise, the cabinet cannot be installed on the concretefloor evenly and securely.
6. Remove and dispose of the cushion collar. Then take out the insulation washer from the
accessory bag and put it on the expansion bolt with the flat side upwards, as shown in the
following figure.
Figure 9-3Putting the insulation washer on the expansion bolt
Step 3 Move the cabinet onto the installation holes, place the expansion bolt assemblies into the holes,and partially tighten them, as shown in the following figure.
CAUTION
The cabinet is heavy so that two persons are required to move it.
Figure 9-4Installing the cabinet
BTS3900(Ver.D)
Installation Guide 9 Installing the Cabinet
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
59
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
69/175
Step 4 Use a level to check the levelness of the cabinet, as shown in the following figure. If the cabinetis not level, adjust the leveling bolts.
NOTE
Screwing the bolts clockwise will raise the cabinet, and screwing the bolts counterclockwise will lower the
cabinet.
Figure 9-5Checking the levelness of the cabinet
Step 5 Use a socket wrench to fasten the cabinet in a diagonal sequence onto the concrete floor with atorque of 45 Nm (398.28 lbfin.), as shown in the following figure.
BTS3900(Ver.D)
Installation Guide 9 Installing the Cabinet
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
60
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
70/175
Figure 9-6Securing the cabinet
Step 6 Check the insulation between the cabinet and expansion bolt assemblies.
1. Set the multimeter to the megohm scale (M).
2. Measure the resistance between the cabinet and the expansion bolt assemblies, as shown
in the following figure.
Figure 9-7Measuring the resistance
(1) Expansion bolt assembly (2) Ground bar on the cabinet
NOTE
Measure the resistance between the ground bar on the cabinet and the expansion bolt assemblies.
BTS3900(Ver.D)
Installation Guide 9 Installing the Cabinet
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
61
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
71/175
l If the resistance is lower than 5 M, the cabinet is not insulated from the ground. Go
to 7.c.
l If the resistance is higher than 5 M, the cabinet is insulated from the ground.
3. Remove the expansion bolt assemblies and check whether the insulation washers are
missing or damaged.
l If yes, reinstall the expansion bolt assemblies and re-level the cabinet.
l If no, check whether the multimeter works properly and whether the setting is correct.
----End
9.2 Installing a Cabinet on a Base
This section describes the procedure and precautions for installing a BTS3900 AC or DC cabinet
on a base.
Context
To facilitate operations, you can remove the cabinet door and then install the cabinet.
Procedure
l Install a BTS3900 DC cabinet on a base.
1. Stand the cabinet, place the cabinet on the base, and push the cabinet until its rear
aligns with the rear of the base.
CAUTION
The cabinet is heavy so that two persons are required to move it.
2. Use a torque wrench to secure the two M12x50 bolts in the front of the cabinet to 45
Nm (398.28 lbfin.), as shown in the following figure.
BTS3900(Ver.D)
Installation Guide 9 Installing the Cabinet
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
62
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
72/175
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
73/175
CAUTION
The cabinet is heavy so that two persons are required to move it.
3. Install the fixture block with the M12x60 expansion bolt onto the front of the cabinet,
and use a socket wrench to tighten the bolt to 45 Nm (398.2 lbfin), as shown in the
following figure.
Figure 9-10Installing a BTS3900 AC cabinet
----End
9.3 Installing Cabinets Side by Side
This section describes the procedure and precautions for installing two BTS3900 cabinets side
by side. The combination of One BTS3900 (Ver.D) AC cabinet and one BTS3900 (Ver.D) DC
cabinet doesn't support this installation.
Procedure
Step 1 Remove the connection plates on the top of the cabinets, as shown in the following figure.
BTS3900(Ver.D)
Installation Guide 9 Installing the Cabinet
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
64
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
74/175
Figure 9-11Removing the connection plates
Step 2 Install the connection plates in the way shown in the following figure, and then use a torquescrewdriver to tighten the M5 screw to 2 Nm (17.7 lbfin.), as shown in the following figure.
Figure 9-12Installing the connection plates
----End
BTS3900(Ver.D)
Installation Guide 9 Installing the Cabinet
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
65
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
75/175
9.4 Stacking Two Cabinets
This section describes the procedure and precautions for stacking two BTS3900 cabinets.
BTS3900 (Ver.D) AC cabinet should not be stacked.
Procedure
Step 1 Remove the screws and connection plates from the top of the lower cabinet, and install themounting blocks on the top rear of the cabinet. Then use a socket wrench to secure the bolts to
45 Nm (398.28 lbfin.). as shown in the following figure. The mounting block is delivered with
the cabinet.
Figure 9-13Removing the screws and connection plates
(1) M12 screw (2) Connection plate (3) Mounting block
Step 2 Remove the cover plate from the top of the upper cabinet, as shown in the following figure.
BTS3900(Ver.D)
Installation Guide 9 Installing the Cabinet
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
66
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
76/175
Figure 9-14Removing the cover plate
Step 3 Place one cabinet on the top of the other cabinet, and push the upper cabinet until the two cabinetsare aligned in the rear. Use a socket wrench to secure the front two M12x55 bolts to 45 Nm
(398.28 lbfin.). The following figure shows the BTS3900 cabinets installed in stacking mode.
Figure 9-15Securing the cabinet
----End
BTS3900(Ver.D)
Installation Guide 9 Installing the Cabinet
Issue 03 (2014-08-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
67
-
8/9/2019 BTS3900 (Ver.D) Installation Guide(V100R009C00_03)(PDF)-En
77/175
10Installing a PGND Cable and anEquipotential Cable
A PGND cable connects a PGND screw in a cabinet and a PGND bar to ensure proper grounding
of the cabinet. An equipotential cable connects PGND screws on different cabinets to ensure the
equipotential bonding between the cabinets.
Context
The following table lists the specifications of a PGND cable and an equipotential cable.
Table 10-1Specifications of a PGND cable and an equipotential cable
Cable One End The Other End Remarks
PGND cable OT terminal (M8) OT terminal (M8) Green and yellow
cable
l 1x160 A: 25
mm2(0.039 in.2)
l 2x80 A: 16 mm2
(0.025 in.2)
Equipotential cable OT terminal (M6) OT terminal (M6) Green and yellow
cable with a cross-
sectional area of 16mm2(0.025 in.2)
Procedure
l Install a PGND cable.
1. Cut the cable to a length suitable for the actual cable route.
2. Add OT terminals at each end of the cable according to the instructions in Assembling
the OT Terminal and the Power Cabl