cajon tunnel

Post on 23-Feb-2016

59 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Cajon Tunnel. Cajon Railroad and Aqua Duct Tunnel. The intent of the construction of the Cajon Tunnel for the Electrified Railroad . - PowerPoint PPT Presentation

TRANSCRIPT

Cajon TunnelCajon Railroad and Aqua Duct

Tunnel

9 mile 12.44 mile

Elev.1651'

Elev.2882'

Elev. RR Cajon Pass3843'

Elev. adit base2168'

Summit Valley Adit ShaftElev. 3182'Access Shaft Depth = 1014'

RR climb reduction= 961'

Cajon Railroad and Aqua Duct

Tunnel

Grade = 1.08%

34.5 Km21.44 mile

The intent of the construction of the Cajon Tunnel for the

Electrified Railroad This tunnel construction will reduce the incline grade to 1.03% and reduce the elevation climb by 961 feet. The electrification will encompass the territory from Barstow

to Long Beach. Regenerative braking will be incorporated. In addition we will be able to transport water at the base of the tunnel. In addition we also will incorporate the high voltage electrical (shielded) transmission power through the tunnel segments (500K>), this will reduce the visual

impact of the above ground transmission lines. Also note: We, the railroads may be able to provide the right off way

for the electrical power transmission network. Moneys earned from such deriving will be used to further the

infrastructure improvements of the rail network.

top related